MCJB MTTR/MTBR

Dear Sir's,
Our User want to know the process, How to calculation of MTTR/MTBR in MCJB Report.
And I am new for PM.
Please tell me the whole process , step by step how to put the values and what is the master data for this and how to calculate the MTTR/MTBR report.
Thanks in advance.

Hi Sharma,
Thanks for using the BPX!  However you are one the Higher Education & Research BPX. Please try one of the following sites to get the appropiate experts helping you out:
- Enterprise Asset Management (SAP EAM)
Or outside the SAP SDN bpx:
- http://www.sap-basis-abap.com/sappm.htm
- https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/86f7b690-0201-0010-c49c-eade0473022a
- http://www.itjobswatch.co.uk/contracts/uk/sap%20pm.do
- http://www.sap-img.com/sap-pm.htm
- http://www.sap-img.com/plant/questions-answers-on-pm-equipment.htm
- http://www.sap-img.com/plant/sap-pm-questions-answers-on-functional-locations.htm
- http://www.sap-img.com/sap-pm.htm
br,
Rob

Similar Messages

  • MCJB-mttr/mtbr data resides in whcih table

    I have a feild called downtime in the MTTR/MTBR reprt in T.Code MCJB i want to know in which table is this data residing .Quick response will be highly appreciated.
    Thanks & Regards
    Mzee.

    Hello,
    MTTR/MTBR & Downdown Time is calculated on the basis of realtime, this value is not upadted in any table.
    when you execute MCJB transaction the calculation done on Logic to calaculate the MTTR/MTBR & Downdown Time with help of data in tables VIQMEL,EQUI & S070 which is display as Output of MCJB on real time.
    Regards,
    Rakesh

  • BREAKDOWN ANALYSIS V/S MTTR-MTBR ANALYSIS

    Dear Friends,
    I want to know what is the difference between MTTR-MTBR analysis and Breakdown analysis?
    T-code for Breakdown Analysis is MCI7 in Standard analysis but this shows the MTTR-MTBR Analysis then if this is the MTTR-MTBR Analysis, then how can we find out the actual breakdown analysis from sap?
    Thanks in advance

    HI,
    Suppose take an equipment  K3001 -compressor
    It fails 2 times this month.
    Then Breakdown is 2.
    MTBF -  is Mean time between failure
    The running hour between these two breakdown is MTBF  For ex:  150 hr
    MTTR - is Mean time to repair.
    After Breakdown the time you take to repair and make it operable  is MTTR  for ex: 8 hr
    MCJB  &  MCJC   - MTTR  -MTBF  report

  • MTTR MTBR Report on Assembly Level

    Dear All
    Standard MCJB report give the MTTR and MTBR report on Equipment Level. we need it on Assembly level. for that we did changes on LIS. we create the new Info Structure by coping S070 and added Assembly.
    with this Assembly is now coming in the report but the Time is not getting Update. Please help me on this..
    Regards
    Ankit..

    Hello
    First You need to create the notification for assemblies then you can see the MTTR & MTBR Time in report.
    Can you explain that ,your creating any Notification for Assemblies if so please check the weather that notification in Completed status
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Jul 29, 2010 4:39 PM

  • MTTR/MTBR Breakdown and Machine Failure Time

    We create PM Notification with the IW24 where we enter the Breakdown time.
    The problem is that we need to monitor the MTTR/MTBR (MCJB, MCJC & MCI7) but only when there is a breakdown because of a malfuction of the machine (machine failure) and not for a non-machine-cause breakdown. We need to register both times (Breakdown, and Machine Failure).
    I think that an option is using these 3 scenarios:
        1. If we select the "Breakdown box" it will be a machine failure.
        2. If we not select the "Breakdown box", but there is a quantity on the "Breakdown duration" .. It will represent that there   were a Breakdown.
        3. If we not select the "Breakdown box", but there is NOT a quantity on the "Breakdown duration" .. It will represent that there were NOT a Breakdown.
    The problem is that if we use the 3rd scenario, when we save the Notification (or the PM Order) the time disappears.
    ¿There is an option to save the time even do the "Breakdown box" is not selected?
    ¿Where can I configurate the PM Notification? ¿Or where can I configurate the MTTR/MTBR (MCJB, MCJC or MCI7)?

    Hello
    Manzarek     ,
    I will suggest you following;
    1.Just create different different notification types for all your scenarios.
    2.Just select the breakdown vies in the notification type where the actual machine breakdown occurs due to machine failure.
    The path for that is
    Plant Maintenance and Customer Service->Maintenance and Service Processing->Notification Creation->Notification Types->Define Notification Types
    3. You can not directly enter the breakdown time without completion of the same.
    Regards
    Naveen

  • What are the prerequisite for getting MTTR / MTBR data.

    Dear SAP Experts,
    I want to know what are the prerequisite for getting MTTR / MTBR data.
    Regards
    ERP Tech

    Pre-requisites are:
    Maintain Start date in Equipment / Functional location master
    Maintain the Malfunction Start date & time, Malfunction End Date & time in Notification
    Maintain the Breakdown tick mark in notification
    Maintain update group (stats) in Notification type configuration (IMG - Plant Maintenance & Customer Service - Maintenance & Service Processing - Maintenance & Service Notifications - Notification types - Define Notification types)

  • Data Source for MTTR/MTBR

    Hi all,
    Can somebody say which is the correct data source for MTTR/MTBR. I'm trying to use 2LIS_17_I0NOTIF. But it doesn't have fields for start & end date, time of malfunction. But these fields are mapped in standard infosource 2LIS_17_NOTIF.
    With regards,
    VMKumar.

    Hi Jijo,
    We are using 2LIS_17_I0NOTIF and it has both AUZTB (Malfunc end) and AUZTV (Malfunc Start)....check again.
    Regards.
    Edited by: Venu Gopal on Jul 7, 2009 3:35 PM

  • Transformation for MTTR / MTBR

    Dear all,
    The requirement is to create a report for MTTR & MTBR with total no. of breakdown and no. of breakdown during production hours.
    I'm trying to use the standard DSO's 0PM_DS01 (Downtime Notification) & 0PM_DS02 (MTTR / MTBR).
    When I'm migrating the standard update rules 0PM_DS01 2LIS_17_NOTIF & 0PM_DS02 80PM_DS01 into transformation system gives syntex error in routine (Rule (target: 0DWNTM_EFF, group: 02 Standard Group): Syntax error in routine).
    When I checked inside the routine the following error message is displayed.
    (E:Field "RESULT_TABLE[]" is unknown. It is neither in one of the
    specified tables nor defined by a "DATA" statement. "DATA" statement)
    Please suggest the logic which needs to be followed while migrating the update rule into transformation.
    With regards,
    Muthu.

    Hi Jijo
    You need to re-write the code in the end routine with the records that are available in the result_package.
    RESULT TABLE concept no longer exists in BI 7.0.
    Thanks.

  • Query on MCJC - MTTR/MTBR Functional Location report in Plant Maintenance

    We have recently upgraded our SAP 4.7 system to mySAP ERP 2005 ecc6.0.
    We are facing problem in report derived using tcode'MCJC' in Plant Maintenance.When we execute MCJC (MCJC - MTTR/MTBR Functional Location ) transaction, there is no data appearing in the report output.This report is used to get the functional locationwise data from maintenance order. The transactions are entered for creating maintenance order & notifications through IW31. This is getting updated in table s070.
    This is a standard report and was working fine in SAP 4.7.

    Hello Mr Subrahmanyam,
                                            When you are saying that the Equipment is in Breakdown, it may happen that the whols FLock could be considered in Break down, but not necessary,
    say we take an Example of a Work Shop, where Mechanical Workshop is the Functional Location and it has N no of Equipments like Lath, Grinding m/c, Welding M/c, Shaper Etc.... in this case can you please tell me if only one of the above mentioned Equipment is under Break down can the Whole Mechanical Workshop be termed as under Shut down.
    What you are saying is correct in the Line Production, where we can have the Predessing as well as the Succeding Equipments, there for the Critical Equipment you generally have a Back-up Equipment, may be possible the capacity of the Backup might not be same as the mail Equipment, but still it can serve the Purpose for the Time Being. in that condition how can you say that the whole FLock is in Breakdown.
    Hope I am able to clarify.
    Regards,
    Yawar Khan

  • PMIS : MTTR/MTBR - Equipment

    Hi Experts,
    I want to know the data in PMIS : MTTR/MTBR - Equipment, but after input equipment, there are no data record. I also do set the breakdown indicator check box in the notification and also enter malfunction start date and mallfunction end date and in SPRO setting, creation of notification type I have to give update group -26 but the result is still no data.
    How Should I do to get the data in in PMIS : MTTR/MTBR - Equipment?thx for the great answer.
    Best Regrads,
    Bernardus Jalu

    Check this thread, you may get some clue.
    Breakdown analysis report (MCI7)
    Are you getting any details in Breakdown Analysis report (MCI7)?

  • MTTR / MTBR Calculation

    Dear All,
    I just want to confirm one thing that mttr/mtbr is calculated from breakdown notification from Breakdown Duration. But now if we are also updating Malfunctioning start and end time in other notification types (Because we need to know time occured in other maintenance also) but NOT doing tick on breakdown.
    Hope it will not make any impact on mttr and mtbr reports.
    plz  share.
    thanks
    DM

    hi
    Unless you mark the Breakdown in notification ,it will not consider for MTTR/MTBF calculation
    regards
    thyagarajan

  • MTTR/MTBR report......

    Dear All,
    As per my knowledge we have mttr/mtbr reports straightway available in system, but they calculate from the start date till current time..............accumulative.
    But if i want some month wise comparison, or monthly MTTR/MTBR reports,,,,,,,,and others like COST Comparison,,,do we have available in SAP??
    PLz guide
    rgrd
    DM

    Dear
    For SAP std Report u have the look at MCI1 to MCI 8. If you need any specific dates not from Period wise , Better u can create ABAP report.
    The Breakdwon, Costing (MaterialactivityServices), Planner Grps, Actions (agst Brk down) in one report.
    Make mandatoty fields for Planr Grp, Wrk center, Cause, Damage at Notification , order.
    U can go for own according to the client requiremnet. I think u got some points from all submited earlier post also.
    If any ?
    Thenna

  • MTTR/MTBR report..........Equipment

    Dear All,
    As per my knowledge MTTR/MTBR reports are calculated on the basis of START UP that we maintain in equipment master...and VALID from date have NO ROLE in this report.?? AM i rite ? One more thing there is one field 'TIME BETWN REPAIR" wat does it show, can anyone help?
    rgrds
    DM

    Hi deepak
    As you said for calculating the MTTR/MTBF the start up date will be taken up by the system,whereas if you not specified the start up date then the date of first malfunction end will be considered.
    you can also specify what is the MTTR/MTBF for the time period ie for last year by specifying the valid from date
    Time between repair is tme actauly take to get back the system in to operation, whereas Mean time is the average calculated based on time taken and breakdown entered
    regards
    thyagarajan

  • MTTR/MTBR REPORT---SAP PM

    Dear All,
    I created one Malfunction Notification on equipment for down time.But not able to see the MTTR/MTBR report for that equipment.
    Please suggest.
    Regards
    Vishal

    And pls can anyone say, what is the settings for MTTR AND MTBF in a sap pm.
    kindly share the details to [email protected]
    kindly help me to know the settings in implementation phase....
    siva

  • MTTR/MTBR Report in PM

    Dear Guru's,
       My client has a query that why SAP not Provides MTTR/MTBR report for functional location when an equipment is breakdown corresponding functional location is also breakdown but the system consider only the equipment, not consider the functional location that is linked to the equipment.
    Regards,

    Hello Mr Subrahmanyam,
                                            When you are saying that the Equipment is in Breakdown, it may happen that the whols FLock could be considered in Break down, but not necessary,
    say we take an Example of a Work Shop, where Mechanical Workshop is the Functional Location and it has N no of Equipments like Lath, Grinding m/c, Welding M/c, Shaper Etc.... in this case can you please tell me if only one of the above mentioned Equipment is under Break down can the Whole Mechanical Workshop be termed as under Shut down.
    What you are saying is correct in the Line Production, where we can have the Predessing as well as the Succeding Equipments, there for the Critical Equipment you generally have a Back-up Equipment, may be possible the capacity of the Backup might not be same as the mail Equipment, but still it can serve the Purpose for the Time Being. in that condition how can you say that the whole FLock is in Breakdown.
    Hope I am able to clarify.
    Regards,
    Yawar Khan

Maybe you are looking for

  • Report from date range

    I am creating a report from a series of inputs using a customizable date range. I need to select a start and end date (i was going to use two calendars for that) and place the data from the range into a pivot table. Any help on how to do this would b

  • How can I charge and listen at the same time?

    I'm using a windows PC and the USB connector. If I plug the cable in, iTunes automatically opens and I get the "do not disconnect" message and can't play music. If I eject my iPod from iTunes, it doesn't charge anymore.

  • Masking works in timeline, not testing or publishing

    Okay, perhaps this has been answered before, but I can't find that answer. I've been having problems with the masking effect in Flash Professional. You see, I had created some text, and then rigged a glint to go across it. When played in the main tim

  • WRT54G wired connection very slow

    I just installed my first wireless router last night (the WRT54G), and I got the wireless portion up and running, which is a success to me.  But I immediately noticed that my wired desktop connection to the internet is now much slower than before.  I

  • Error when Install Mac OSX 10.4

    when i install MacOSX 10.4 .NO WORK . Jun 29 03:33:42 localhost : Launching the Language Chooser for an OS Install Jun 29 03:33:48 localhost : Found primary language hint "en" Jun 29 03:33:49 localhost : Language Chooser ready Jun 29 03:33:53 localho