Messages in Test Plan Management
Hi,
In STWB_2, am viewing a Test Plan. It contains 10 Test Packages. Each Test package has some Messages assigned to Test cases.
When i click on the MESSAGE INDICATOR against a particular Test Package, none of the messages are getting displayed in the Message Overview Report.
But When i click on the Message Overview Icon on TestPlan, i could see all the Messages associated with the TESTPLAN, but the same is not fetching the message report for Test Package.
Can anyone help me out.
Thx,
Waseem
any updates?
Similar Messages
-
How to use Abap Editor(SE38) Test Plan Management Option
Hi,
I am trying to use the Test Plan Management option in Abap Editor.
I could not find any articles/forum postings about it.
Please guide me on the same.hi,,
go through the below link for help.
http://help.sap.com/saphelp_erp2005vp/helpdata/EN/06/27185efc5211d1bcfd080009b4534c/frameset.htm
regards,
bhavana -
Reg: Test Sequences in Test Plan Management
Hi Guru's
I do created the Test plan and Created Test Packages and also assigned Testers to that package
I do also created a Sequences for the testers
But it allows the tester to change the status whose in Sequence 2 before the tester whose in sequence 1 is not yet ended the test.
It give just an information
Previous test case not yet finished
Message no. AGSTWB000
I wanna make it as an error- It should not allow the tester in sequence 2 to change the status until tester of sequence is completed / ended the test.
Help me to guide this issue
Thanks in advance
Regards
AnandhHi,
is there any solution?
Is it possible within a test sequence that Tester No.2 can NOT edit his test case before Tester No.1 has finished the previous test case?
Any idea?
Thanks and best regards,
Marco -
Error While Genrating Test Report in Test Plan Management
Hi Guru's
I am getting an authorization error while generating test report via STWB_info.
Just i selected the test package and while click the test report i am getting this error.
Error during authorization check
Message no. TWBHS540
Guide Me to solve this issue
thanks in advance
regards
AnandhHi,
Please try the following:
Start transaction SMGENDOC03
Do not change anything but just hit the save button.
Afterwards restart transaction STWB_2 and try again to generate again.
Hope this helps.
Cheers
SH -
Hi All,
I have to do testing on Test work bench in Solution manager 3.2 for a demo project.
Anybody can provide me good links or documents for the same ASAP.
I definately reward points.Hi Prakhar,
go there:
http://help.sap.com/saphelp_sm32/helpdata/en/index.htm
and click on Test Organization, there you are
Regards,
Pascal -
Job help to regenerate the test plan after test case addition in solar02
Hi,
Any job help to regenerate the test plan after the test case addition in the solar02?
It is very hard to regenerate in the test plan in test plan management, need to select the test case manually every time.
Rg,
KarthikHello,
You can send mail with the status of the test catalog-
specify a mail system to which Test Workbench test objects send messages to the people responsible
Please refer the below link for more information:
http://help.sap.com/saphelp_smehp1/helpdata/en/6a/88370a002911d2bd02080009b4534c/frameset.htm
Regards, -
Projects Test Plan - Test Case - Tester export of list
Dear SAP Gurus
I am trying to make an extract/ an spreadsheet of
a Test Plan
with assigned Test Packages
with then again assigend Testers
The reports I have been able to run does not have this option, is that something someone has tried.
Best Regards
Jeppe KristensenHi Fabricius
Thank you very much, looks very good that does get me some part of the way, but not the whole way, unfortunatly.
The most important thing for me at time is also to get the testers assigned to these test cases, I would like to be able to export a what I see in the screen test organizer.
STWB_2
Select a test plan
Go intio test-plan management
This I would love to be able to export or print.
Best regards Jeppe
Edited by: Jeppe Lærke Kristensen on Jul 14, 2011 5:56 PM -
Archiving/Deleting Test Messages in SAP Solution manager
Hi,
We have configured Service Desk in our solution manager 7.0 with EHP1 system.
We have created test messages to test the configuration.
We need to delete these test messages which are appearing in T Code CRM_DNO_MONITOR.
We run the report "CRM_ORDER_DELETE" but the output is
Deletion of CRM Documents
The following document could not be deleted: 8000000259
Not possible to delete, a reference exists to a subsequent document
Number of documents deleted: 0
Number of documents not deleted: 1
So
We have followed the "Note 1329247 - Archiving Solution Manager Service Desk messages".
1)
a)Call transaction DNOTIFWL and set the deletion flag for the Service Desk message. The deletion flag corresponds to the system status I1076 (deletion flag).
b) Execute the report Z_DELETE_BASIC_NOTIFICATIONS
The above step we have executed successfully.
2)
In CRM
You cannot delete a service process in CRM. The service process must be archived.
Call transaction SARA and select the archiving object CRM_SERORD. Archiving involves three steps:
a) Initial run Report CRM_ARC_SERORD_CHECK
b) Write run Report CRM_ARC_SERORD_SAVE
c) Delete run Report CRM_ARC_SERORD_DELETE
in SARA T Code we have typed archiving object CRM_SERORD.
After this what to do??? How to proceed further.
Can any body suggest us the step by step procedure to archive these test messages.
Regards,
Raj> In CRM
> You cannot delete a service process in CRM. The service process must be archived.
> Call transaction SARA and select the archiving object CRM_SERORD. Archiving involves three steps:
> a) Initial run Report CRM_ARC_SERORD_CHECK
> b) Write run Report CRM_ARC_SERORD_SAVE
> c) Delete run Report CRM_ARC_SERORD_DELETE
>
> in SARA T Code we have typed archiving object CRM_SERORD.
> After this what to do??? How to proceed further.
You need to schedule a BGD job to execute this. You can do this from the SARA screen itself, clicking on the 'Job' button. Please refer:
http://help.sap.com/saphelp_crm50/helpdata/en/e6/c66f3b6c980c3be10000000a11402f/content.htm
Rajeev -
Test Plan creation in Solutoin manager Production
Hi
We have the Solution and Blue print updated in the Solman production System. The test system is quite old and does not have the update Solutoin or the Blue print . As we have updated Testcases & processes in production system, we would like to create a test plan (using test organizer) directly in the production system. But the system is not allowing creation of test plan in Productoin and system is expecting us to create in test and transport to Produciton. As we do not have the updated process/solution in the test, the creation of test plan in Test has no meaning and cannot be used. What is the way out to resolve our problem. Also guide us the procedure to create test plans directly in Produciton system and highlight us if there is signifcant impact.
Regards
SriniHi Srini
You are asking why it is not possible to do directly in solman production
the answer is same if you ask for ECC PRD or BI PRD why we have 3 tier landscape simply because PRD is not a test system or training system all the configuration development happen in ECC/BI dev then we move the request to QA for testing
Samething if you create a Test Plan in Solution Manager PRD where you expect to do the testing for your configuration.
Moreover where are you planning to train your Actual Tester's who will use your Test Plan.
Last you have to open the client for changes to happen in PRD do you think is it correct it ?
Hope I have explained or clarified your doubt
Regards
Prakhar -
Solution Manager: Creating test plan - no test cases uploaded show up
Hi,
I am attempting to create test plans that include all the test case documents that I uploaded to the system. Unfortunately, when I upload the documents, check them out and then in again, and then go to stwb_2 to create a test plan, the documents do not show up in the test plan structure.
Why is this and is there someway to make the documents show up?
Thank you!
Edited by: acraver on Mar 13, 2009 6:37 PMHave u tried regenerating the Test plan by going to change mode and pressing the generate button after selecting the documents
Secondly what is the status of the doc is it change
Note whn u generate the test plan you have to chooose the Status of the Test Documents.
Hope it solve ur problem
Regards
Prakhar -
Transport of Test Plan / Test Packages
Dear all,
We intend to transport a test plan with all test packages from the development Solution Manager to the productive Solution Manager because in the productive Solution Manager no configuration is allowed.
We are using the Solution Manager functionality to execute manual testing in the following way:
On SOLAR02 the project 'FOUNDATION' is stored. The project 'FOUNDATION' has been migrated from a outstanding sandbox Solution Manager system to all three Solution Manager Systems: DEV, TEST and PROD. Test scripts have been uploaded on the 'test cases' tab of the respective business process branch.
In the development Solution Manager SMD a test plan has been generated using the uploaded test scripts mentioned above.
On the quality assurance Solution Manager the same project 'FOUNDATION' is stored and the same test scripts are uploaded on the same branches.
When the test plan is transported (using the recommended STWB_2 transport functionality) from the development SM to the quality assurance SM there are two issues.
1. The transported test plan cannot be edited / regenerated anymore. An error message "The specified structure does not exist" is displayed. Message number is SOLAR056.
2. The transported packages can be assigned to users but no notes can be added to the test cases. The error message is: "Unable to find template". Message number is SOFFICEINTEGRATION231.
It seems that the transported test plan cannot retrieve the underlying project structure, even it is identical to the project structure of the development SM.
This problem is urgent to us, as the test phase is starting next week.
Thank you very much for your support.
Best Regards,
Marc ReinhardtHello Marc,
We have experienced similar problems. A transport of the test plan and copies of the test plans have resulted in us loosing status values and test notes.
I was informed it had to do with the fact the information is stored in the GUI. How I don't know, I am not a technical person.
I was wondering if you may have encountered the similar problems I have had above and found ways around it.
You can reach me at [email protected] as well. -
How to send a mail about the test plan status
Hi
I have finished the development of ecatt automation test cases.
And I have integrated the ecatt automation test cases into the test plan of TWB.
I have scheduled a job in background to run the test plan.
After the job has finished, I need to send a email to related users to tell them the status of each test cases in the test plan.
Is there any way to implement it?
Thanks a lot in advance!Hello,
You can send mail with the status of the test catalog-
specify a mail system to which Test Workbench test objects send messages to the people responsible
Please refer the below link for more information:
http://help.sap.com/saphelp_smehp1/helpdata/en/6a/88370a002911d2bd02080009b4534c/frameset.htm
Regards, -
How to create a test plan with specific transactions (or program)
Hello,
I'm a new user in Sol Man !
How to create a test plan with specific transactions (or program).
In my Business Blueprint (SOLAR01) I've created in 'transaction tab' the name of my specific transactions and linked it.
In my test plan (STWB_2) those specific doesn't appear to be selected !
Thanks in advance.
Georges HUYNENHi
In solar01 you have defined but you have to assign the test case in solar02 for this test case in the test cases tab.
When you do so expand the business sceanario node in test plan generation of STWB_2 transaction and now that will appear.
Also visit my weblog
/people/community.user/blog/2006/12/07/organize-and-perform-testing-using-solution-manager
please reward points. -
Unable to saver images in a note within a Test Plan - STWB_2
Hi all,
While trying to edit a note in Tx STWB_2 (Test Plans), I'm not able to save an image on it. I can add and save text but no images. Other odd thing is that even when I click on "Save Active", the message "Document saved as raw version" appears. In case of text, the data is saved (as mentioned earlier). No mutter save mode I select the note is always saved as a raw.
Is this behavior the standard one or should I perform some actions? Could this message be linked to the fact that I canu2019t saved images in my notes.
Your help is highly appreciated
Solman Version: 7.1 (Windows server 2008 R2/SQL server 2008 R2)
Windows Microsoft Office 2007Hi all,
While trying to edit a note in Tx STWB_2 (Test Plans), I'm not able to save an image on it. I can add and save text but no images. Other odd thing is that even when I click on "Save Active", the message "Document saved as raw version" appears. In case of text, the data is saved (as mentioned earlier). No mutter save mode I select the note is always saved as a raw.
Is this behavior the standard one or should I perform some actions? Could this message be linked to the fact that I canu2019t saved images in my notes.
Your help is highly appreciated
Solman Version: 7.1 (Windows server 2008 R2/SQL server 2008 R2)
Windows Microsoft Office 2007 -
SQL Plan Management (11.2.0.1)
Hi Guys,
I'm doing some testing as below.
I tried to keep the SQL plan in baseline. (when the table has no index, as such performing full scan)
However, after i create the index. It's not picking the original plan which i put it in baseline. It's using range scan.
Can advise what have i done wrong?
thanks!
SQL> show parameter OPTIMIZER_CAPTURE_SQL_PLAN_BASELINES;
NAME TYPE VALUE
optimizer_capture_sql_plan_baselines boolean FALSE
SQL> CREATE TABLE spm_test_tab (
2 id NUMBER,
3 description VARCHAR2(50)
4 );
Table created.
SQL>
SQL> DECLARE
2 TYPE t_tab IS TABLE OF spm_test_tab%ROWTYPE;
3 l_tab t_tab := t_TAB();
4 BEGIN
5 FOR i IN 1 .. 10000 LOOP
6 l_tab.extend;
7 l_tab(l_tab.last).id := i;
8 l_tab(l_tab.last).description := 'Description for ' || i;
9 END LOOP;
10
11 FORALL i IN l_tab.first .. l_tab.last
12 INSERT INTO spm_test_tab VALUES l_tab(i);
13
14 COMMIT;
15 END;
16 /
PL/SQL procedure successfully completed.
SQL>
SQL> EXEC DBMS_STATS.gather_table_stats(USER, 'SPM_TEST_TAB', cascade=>TRUE);
PL/SQL procedure successfully completed.
SQL> set linesize 2000
SQL> set pagesize 2000
SQL> SET AUTOTRACE TRACE
SQL>
SQL> SELECT description
2 FROM spm_test_tab
3 WHERE id = 99;
Execution Plan
Plan hash value: 3128910679
| Id | Operation | Name | Rows | Bytes | Cost (%CPU)| Time |
| 0 | SELECT STATEMENT | | 1 | 25 | 13 (0)| 00:00:01 |
|* 1 | TABLE ACCESS FULL| SPM_TEST_TAB | 1 | 25 | 13 (0)| 00:00:01 |
Predicate Information (identified by operation id):
1 - filter("ID"=99)
Statistics
26 recursive calls
5 db block gets
49 consistent gets
0 physical reads
944 redo size
228 bytes sent via SQL*Net to client
239 bytes received via SQL*Net from client
2 SQL*Net roundtrips to/from client
0 sorts (memory)
0 sorts (disk)
1 rows processed
SQL>
SQL> set autotrace off;
SQL>
SQL> SELECT sql_id, sql_text
2 FROM v$sql
3 WHERE sql_text LIKE '%spm_test_tab%'
4 AND sql_text NOT LIKE '%dba_sql_plan_baselines%'
5 AND sql_text NOT LIKE '%EXPLAIN%';
SQL_ID SQL_TEXT
gat6z1bc6nc2d SELECT description FROM spm_test_tab WHERE id = 99
44b32kmh8ub2g DECLARE TYPE t_tab IS TABLE OF spm_test_tab%ROWTYPE; l_tab t_tab := t_TAB(); BEGIN
SQL> SET SERVEROUTPUT ON
SQL> DECLARE
2 l_plans_loaded PLS_INTEGER;
3 BEGIN
4 l_plans_loaded := DBMS_SPM.load_plans_from_cursor_cache(
5 sql_id => 'gat6z1bc6nc2d');
6
7 DBMS_OUTPUT.put_line('Plans Loaded: ' || l_plans_loaded);
8 END;
9 /
Plans Loaded: 1
PL/SQL procedure successfully completed.
SQL> SELECT sql_handle, plan_name, enabled, accepted
2 FROM dba_sql_plan_baselines
3 WHERE sql_text LIKE '%spm_test_tab%'
4 AND sql_text NOT LIKE '%dba_sql_plan_baselines%';
SQL_HANDLE PLAN_NAME ENA ACC
SYS_SQL_7b76323ad90440b9 SQL_PLAN_7qxjk7bch8h5tb65c37c8 YES YES
SQL>
SQL> ALTER SYSTEM FLUSH SHARED_POOL;
System altered.
SQL>
SQL> CREATE INDEX spm_test_tab_idx ON spm_test_tab(id);
Index created.
SQL> EXEC DBMS_STATS.gather_table_stats(USER, 'SPM_TEST_TAB', cascade=>TRUE);
PL/SQL procedure successfully completed.
SQL>
SQL> SET AUTOTRACE TRACE
SQL>
SQL> SELECT description
2 FROM spm_test_tab
3 WHERE id = 99;
Execution Plan
Plan hash value: 2792204123
| Id | Operation | Name | Rows | Bytes | Cost (%CPU)| Time |
| 0 | SELECT STATEMENT | | 1 | 25 | 2 (0)| 00:00:01 |
| 1 | TABLE ACCESS BY INDEX ROWID| SPM_TEST_TAB | 1 | 25 | 2 (0)| 00:00:01 |
|* 2 | INDEX RANGE SCAN | SPM_TEST_TAB_IDX | 1 | | 1 (0)| 00:00:01 |
Predicate Information (identified by operation id):
2 - access("ID"=99)
Statistics
1072 recursive calls
3 db block gets
192 consistent gets
0 physical reads
888 redo size
242 bytes sent via SQL*Net to client
239 bytes received via SQL*Net from client
2 SQL*Net roundtrips to/from client
18 sorts (memory)
0 sorts (disk)
1 rows processed
SQL> set autotrace off;
SQL> SELECT sql_handle, plan_name, enabled, accepted
2 FROM dba_sql_plan_baselines
3 ;
SQL_HANDLE PLAN_NAME ENA ACC
SYS_SQL_7b76323ad90440b9 SQL_PLAN_7qxjk7bch8h5tb65c37c8 YES YESCheck the value of OPTIMIZER_USE_SQL_PLAN_BASELINES.
Double check the sql id and exact matching signature of both statements .
Turn autotrace off, execute statement then use:
SELECT * FROM TABLE(DBMS_XPLAN.DISPLAY_CURSOR(NULL,NULL,'ALLSTATS LAST'));to get the actual execution plan of the last executed statement in that session
If in doubt, enable a SQL Plan Management trace:
alter session set events 'trace[RDBMS.SQL_Plan_Management.*]';
Maybe you are looking for
-
Caller ID on TV does not work.
This feature has become so unreliable that I have had to make several calls and send emails to Verizon. The last tech promised me that the problem was resolved for ever, but alas, the problem has returned. No caller ID on TV. It works OK on my pho
-
I cannot send any messages from my iPad. The send button is not lit up. My setting are on. When I put the address in it comes up in red with an exclamation mark
-
SG200 Switch not forwarding Packet
Hello, I have a problem with my SG200-08 Switch the switch not fowarding a special Packet. I try to run a simple Profinet installation for testing on the switch but it didn´t work correct. A special packet (Profinet error message) was not forwarded.
-
Can't get iCloud to push to iPad
Can't get iCloud to push calendar appointments to iPad.
-
Error 100008 - Corrupt file message when downloading iTunes
I just got my video ipod, and when i went to download music on it at iTunes, every song (4 in total) that I tried to download failed to do so, but took my money. All I got was this message, "There was a problem downloading 'I Walk the Line/ With His