Mic's in prod order

Hi, pls advise how to see the master insp chracteristics assigned in routing in production order?

Dear Yadav
GO into Master Data Tab PAge in Production order
double click on routing
now system will show u routing details select operation and click on MIC tab
now u will see the MIC assigned to that operation
REgards
Sachin

Similar Messages

  • Link between Prod Order and Sale Order schedule line

    Dear all,
    Ours is a MTO (81).
    In Scheduling Agreement / Sale Order , there are multiple schedule lines for a single item .
    Production Orders are generated for every schedule line of the Item.
    The client wants to know (for a custom developed report) , against which schedule line of the Sched Agreement/ Sale Order, the Production Order is generated ?
    This Information can be seen in MD04.But  I am not able to fetch from the tables .
    The schedule line field (KDEIN ) is not updated in AFPO table & the order no (AUFNR) is not updated in VBEP table .
    Say,
    Sale Doc No : 42000506
    Schedule line/Dely date            Order qty          Prod Order No
    06.10.09                                    500kg               100170
    15.10.09                                    300kg               100171
    Pls give your valuable inputs.
    Regards,
    Sheik

    Hi,
    Only Sales Order No & Sales Order Item No is updated in the table.
    Whereas , I want to know the Sales Order Schedule Line no.
    Regards,
    Sheiki

  • Converting SNP Planned Order /Purch Req to Prod.Order/Purch.Order

    Guys
    What is the standard process to Convert the SNP Planned Order /Purch Req. into a Prod.Order/Purch.Order ?
    Can the conversion indicator be set in APO for SNP Planned Order /Purch Req.and then transferred to R3 as Prod.Order/Purch.Order  or can the convesrion of Planned Order /Purch Req to Prod.Order/Purch.Order  can be done in R3 itself ?
    I am not clear on how exactly this works. Would appreicate if you could provide me with the standard process and any config involved in the same such as Number Ranges and how to set the conversion indicator automatically through SNP planning runs ?
    Thanks

    When you set this indicator for a planned order or a purchase
    requisition, the system automatically converts the order into a
    Production order or purchase order after the transfer to the
    connected SAP R/3 system.
    The converted orders are then retransferred to the SAP APO system with a
    different category; a purchase requisition with category BS-ANF becomes
    a purchase order delivery schedule line with category BS-EIN.
    Please check configuration setting in SPro for transfer setting to R/3.
    1. Configure Transfer to OLTP Systems(SNP)
    2.Maintain Global Parameters and Defaults(PPDS)
    Also on R/3 side you can see it in MD04/MD07 collectively for a product . or individually on
    MD13 : planned order
    MB51n: PR
    Manish

  • Material staging indicator not populating in prod order WM pick list item

    Hello,
    I have an issue with material staging in an prod order
    1) PP-WM interface is activated
    2) Control cycle for material is created
    3) Production storage location is created for material
    4) storage type is 100 for production
    5) There is one discontinued material and also the follow up material
    6) stock of discontinued material is zero and requirement are passed to follow up material
    When we confirm the order the stagging indicator for both follow up material as well as discontinued material automatically populates zero (Non relevence to pick list items) where as it should be one (1 - for pick list items).
    One more issue user has manually inserted discontinued material as well as follow up material in production order change mode.
    In the BOM of a main material both discontinued as well as follow up material is there with some quantity as a component.
    For the same work center, control cycle , production storage location the indicator is populating.
    These two material (discontinued as well as follow up) are appearing twice in the WM pick list screen where first two line items are OK and populating indicator "1". But in line item last and second last indicator is not there.
    My question is why the stagging indicator is not automatically populating in the production order WM pick list screen in front of components.

    Unfortunately, WM material staging via production orders is not possible
    from the pull list.  Please see the long text of message RMPU 311
    (WM material staging for production order reservation not possible):
    "You cannot carry out a WM material provision for pick parts from
    production order reservations in the pull list". The reasons for this
    are cleary explained in the SAP on-line documentation via the
    following path :
      Logistics -> Logistics Execution -> Warehouse Management Guide ->
      Goods Issue -> Goods Issue for Production Supply ->
      Material Staging for Repetitive Manufacturing
    See the following under the Selection heading :
    The choice of the selection type influences which types of WM material
    staging are supported in the pull list. However, the pick parts can be
    staged via RS headers/planned orders but not with the current BOM
    explosion. The release order parts, on the other hand, can also be
    staged if the current BOM is used for calculating the dependent
    requirements.
    WM material staging via production orders is not possible from the pull
    list.
    I think you may try in CO02 or COR2 for production order or process order.

  • Block creation of multiple prod. order against single sales order in CO08

    Hi All,
    We have a requirement of blocking the creation of multiple production order against single sales order in CO08 if the production order is already created for that item.
    How to achieve this?
    SmanS

    Hi,
    you need to check if any user exit is there which will check order haeder table for the said sales order if any Prod Order exist for the same and flag custome error whicle prod order save.
    Pls revert if you need any further information.

  • Settlement rule SDI in prod order

    Hi,
    I used strategy make to order in my client, when i create prod order the settlement rule is always MAT and want the settlement rule to be SDI to my sales order.
    What should i config to achieve this ? since i tried to change order type dependent parameter and it did not allow (only PP1 and PP2 allowed).
    Please kindly help
    Best regards,
    Freddy Ha

    Hi,
    i tried to change the requirement class for makte to order so the setlement become SD1 in setting for requirement type KE. In the OPJH i still used PP01. and now it work thanx for all off your input.
    Thankx once again.
    Good day,
    Freddy Ha

  • Different batch no in prod order at the time of creation of prod order

    Hi, we need different batch numbers in production order at the time of creation of production order. tried in system, i can able to create only one batch no at the time of creation of order. we need different batch no at the time of order creation and same no should be assigned at the time of GR from prod order. pls advise how to map this.

    Dear,
    Use the Exit EXIT_SAPLCOBT_001 under enhancement PPCO0001 where-in based on your requirement you can create batch for your order. You can use CALL FUNCTION 'VB_CREATE_BATCH' to create the batches as per your requirement.
    Also make sure the automatic batch creation setting in Prodn Scheduling profile has been turned-off so that the batch is created only through the user-exit.
    Refer this thread,
    Re: Batch creation
    Please try and revert back.
    Regards,
    R.Brahmankar

  • Require settlement rule when creating a Prod order

    Hello,
    Hello,
    one of our processes is to fabricate complex tools that will be capitalized and depreciated when completed.
    while the tools is being fabricated, we would like to settle regularly the production order to a capital order (AUC) and track the budget for the fabrication.
    in this production process we want to require the user to enter a capital internal order in the settlement rule of the production order master data..  this way when Prod order is settled we dont have issues.  can you make settlement rule entry as required during production order creation?
    any input is appreaciated on the issue. Thanks
    Andy

    Hi,
    There is no standart control for this, but I know a PP user exit which excatly meet you requirement.
    PPCO0007---User Exit for Checking or Changing Header Fields During Order
    You can first control if it is a production order ( ı think it is a special type to produce auc) that you want to control. Then you can select settlement rule and control and give error message settlement rule is mandotory you can not save. The exit sends a signal that it is not possible to save. For error message you can write code into the exit for the message.

  • Status of Prod Order not updated as delta - 2LIS_04_P_COMP

    Hi all,
    We are currently using 2LIS_04_P_COMP to update the data to BI. We have enhanced the DS to include the status of the prod order from table JEST. However it seems that this is not getting updated to BI server whenever prod order change its status. There is a delta queue when I see in tcode LBWQ and then I run the collective update in LBWE and then it will disappear from the queue which is correct. But when I see in RSA7, there is nothing and also I run the infopackage in BI server, it cannot get any data. Anybody has this issue before?
    Many thanks in advance.
    Regards,
    Janet

    The delta will only be captured if the Production Order actually changes. When a change is made to the status of an object in JEST, or JCDS, it doesn't register as a change on the object. Therefore, changes in Production Order status won't invoke a change on the source tables for Production Orders and therefore not get captured on the 2LIS_04_P_COMP or 0PRODORDER_ATTR DataSiources.
    If you need to capture the changes in status for Production Orders, you will have to create a generic DataSource that is sourced by the JEST table and join it with the Production Order in BW.
    Edited by: Dennis Scoville on Sep 17, 2009 8:16 PM

  • Qty withdrawn is not updating in prod order.

    Hi gurus,
        Qty wihdrawn is not updating in prod order , when i issuing
    raw material through tcode mb1a 261 movement type.
        What could be the possible reasons.Pls suggest.
    Thanks in adv.
    Sudarshan

    Dear
    you are issuing the materials in MB1a w/o reference to the reservaton.
    You need to do as below
    In MB1a ---follow the menu path -Goos issue -->create w.referenec to order.
    Enter the order number. execute the report
    system will default matrerial no and qty/storage loc from order. Here you enter the qty requuired and post. This qty you posted in this way will refect/update the withdrawl qty in the production order.
    You are not entering the order the way I suggested, hence it is going as a unplanned issue...hence the problem.
    come back if required

  • Form for Gr against Prod order.

    Hi
    I need a form for Gr against Prod order.. the form be trigerred once the Prod oder is saved...
    Can you pl let me know the smartform for the same which can be used in this ...
    Thanks in advance

    This scenario is new
    Normally during production order creation Order Printing can triggered automatically through spro setting
    I don't think the GR related smartform
    K.Prabakaran

  • Order Type: LA , when Planned Order --- Prod Order

    In STD SAP, In MD04 when we convert planned order to prod order, a new screen comes
    where we mention planned order ---> prod order,
    In the above screen, ORDER TYPE :LA is mentioned (Bottom Right end corner)
    As far to my understanding goes
    In CO40, Order type PP01 which controls/holds
    the production orders are being generated 
    (pickup from MRP parameters, under Planned order --> prod order (Tcode: OPPQ))
    Then how does, ORDER TYPE: LA is being used & from where the system is pulling the order type LA
    Please clarify

    Hi Eswer,
    Please check with SPRO t.code OMDD
    Order profile is linked with  Order type & Procurement type & SP type&  Acct assisnment cat at OMDD.
    When u run the MRP based on MRP view settings the Ordetype is selected For EX inhose porduction order type = LA.
    When u create planned order manually, u have to select the Order profile manually.
    Regards
    Pradeep

  • SG:50, Cannot convert planned orders to prod orders at BOM component level

    Test scenario for Strategy Group 50 (Planning without final Assembly)
    Product Structure
    Material-->  SG50.00 > FERT> (Strategy Group: 50)
    Material---> SG50.02 --> HALB --->(Strategy Group: 40)
    Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
    Maintained PIRs and Ran MRP at the header level, Planned orders are created
    with order type VP at levels of BOM structure. Thus cannot covert planned orders
    to production orders without having sales order.
    But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
    before sales orders are recieved ). Now planned orders with order type VP not able to convert
    planned orders to prod orders at BOM component level

    Stuti/Prasobh:
    Thanks for your inputs, it answers my question
    Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
    Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator  to "2" at component level
    Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on  Also plan on unchanged components
    Able to see planned orders at component level with order type LA
    Due points have been assigned

  • Changes in Prod.order

    Hi Experts,
    Can anybody please tell me,
    Where do I see changes done in production order.
    Suppose I realesed Prod.order with quantity 20 unit.if other user do Read PP master data & change quantity & delete one BOM component. Like that whatever  changes takes place in order which how can we find which user change which data in production order.

    Hi Brahmankar,
    Thanks for your continue reply.
    I have made setting in OS54 as you said.
    Tick marked for - Rev.level Active,Higher Rev level,Rev.level Automatic,Ext.sequence check.
    Tick marked for - Realese Active under Realese key tab.& saved it.
    again I goto CC02,enter change number & enter.
    In Change change master data:change Header maintain change no. status 1 & Realese key 1.
    when I pressed enter system shows warning message as follow:
    You cannot withdraw the "Technical release" indicator
    Message no. CC278
    Diagnosis
    You have chosen the function Release package.
    System Response
    When you do this, the system sets the Technical release indicator.
    Procedure
    You receive this warning message because you cannot make any further object changes to a change package that has been technically released.
    Only choose the Release package function if you have completed all object changes with reference to this change package.
    Even then after enter I can not realese change number. realese indicator grey out.
    What to do.

  • User Exit at the time of saving Prod Order.

    Hi All,
              I need to know whether there is any exit which gets called when I save the Production Order.
    In our project Serial No as well as Production Order gets created when we save the Production Order.
    I have to pass "Basic Start Date" to a FM which generates Serial No.I can hit some DB table if i know
    Planned Order no at the time of saving of Production Order.So i want the user exit at the time of saving Prod Order
    I have also tried one program which gives all the User exits for a certain Transaction.But the user exit mentioned in that is not getting called.
    Thanks in Advance,
    Saket.

    hi,
    check this exit for production order by placing a break point in it.it will work .
    PPCO0007                         Exit when saving production order
    exit name : EXIT_SAPLCOZV_001

Maybe you are looking for

  • Multiple screens in an MIDP client

    Hi, I've just started working with J2ME and everything involved with it. I bought a book called core j2me published by sun. It explains a lot of things, but its also left me with a few questions. I want to make an extremely efficient well coded progr

  • PSE 6 lockup in email Share

    I'm a new PSE 6 user, and this will be my first e-mail image share. In Share w/email attachments, at the select recipients step, the computer locks up when I click the "edit recipients in contact book" icon (small silhouette of person). I'm trying to

  • 24" iMac - How many colors?

    The specs. for the 24" iMac display state simply "millions of colors." At the same time the specs. for, for example, a 23" cinema display state very specifically "16.7 million colors" (which I believe would be 24 bit color). So my question is, specif

  • Increasing canvas size and re-clipping (intentionally)

    Hi, So I bolluxed up a little bit while creating my first full-bleed print piece. I used Ps to edit the image, Ai to add some stuff, and ignored Id completely for the printer. Now I have a perfect 8.5 x 11 image that I want to print all the way to th

  • Contract Management for CCM 1.0 items ? (Not in backend)

    Hi guys, I would like to enable Contract Management (Local & Global) in my SRM 4.0 sp8 environment.    However, 90% of the catalog items in CCM (4,000 articles aprox) do not exist in the backend.    My very simple question is: Should I create all thi