MIRO after Quality inspection..?

Hi guru
Can anybody explain me , how to make the MIRO process after Quality inspection done.
1. MIGO done,
2. Materials moved to quality
3. If materials ok then MIRO or If not ok the system should not allow to do MIRO. is it possible in SAP
If yes what are all the configuration settings..
Thanks
sap-mm

HI,
I was telling you the case if QM is not active.
if its active
General Procedure for a Goods Receipt Posting
When goods are delivered to a warehouse, they are frequently held for inspection before being posted to unrestricted-use stock for consumption or issue. If the control indicator for posting the goods to inspection stock is active for the inspection type, the stock is assigned a stock category that is retained until the goods have been inspected and released. Goods that are posted into inspection stock are not available for consumption or issue.
When an inspection lot is created automatically, all stock postings are carried out by the QM component. As a result, you can make stock postings using the functions within the scope of the usage decision.
The QM component creates an inspection lot and maintains the stocks for the material if:
QM is active for the inspection type
The control for posting the goods to inspection stock or goods-receipt blocked stock is active for the inspection type
The inspection lot is created automatically
The goods receipt process can be summarized as follows:
The goods receipt is recorded in the inventory management system.
- The quality level is checked
- The inspection lot is created (automatically)
- The quantity is posted to inspection stock or goods-receipt blocked stock (automatically)
- The sample size determined (automatically)
- The sample is taken (manually)
The goods are inspected by the inspector.
The inspection results are recorded in the QM component.
A usage decision is made for the inspection lot in the QM component.
- The quantity is posted to unrestricted-use stock
- The quality level record is updated (automatically)
regards

Similar Messages

  • Batch creation after quality inspection

    Hello friends,
    I am using a raw material with batch management. I dont want to create batch  when goods receipt takes place in MIGO . I want to create batch when i post quality stock to unrestricted use  after quality inspection.
    How can i do this?
    Please help me.
    Thanks!

    hi kiran
    When you are creating a Gr for raw material (for which you have activated Batch MGt) ,If you do not enter Batch number then Batch number is  not be attched to raw material....but when you process the lot /take UD then By batch Magt you can create/asign batch to raw material.
    this is possible in Batch MGt.
    .I hope you have now created char (MIC with Class type 23) now You must have used it in QP01.
    2.Now create a lot using MSC1N
    3.create a inpecion lot(migo)
    4.While result recoding system will ask for batch,Enter bach you have created in MSC1N..
    5.Take UD .save
    All the char will be get copied to batch as per spro setting .these result can be seen in batch MSC3N.
    settings:
    Go to QCC0->Quality inspection->Inspection lot completion-->transfer inspection decision to batch
    Regards
    Sujit Gujar

  • After quality inspection

    Hello,
    After quality inspection what happen to the material??

    Please note the example
    While you are in QA11 for stock posting scree will as like below where 500 is total quantity to be posted which is presently in Quality stock
    Quantity Posted                                 To be Posted
    Total                          0.000                                500
    To unrestricted use  0.000
    To scrap                   0.000
    To sample usage       0.000
    To blocked stock       0.000
    To new material         0.000
    To reserves               0.000
    Return Delivery           0.000
    You can split the quanty 500 to be posted as you  wish like
    Quantity Posted                                 To be Posted
    Total                          0.000                                500
    To unrestricted use  0.000                                 400
    To scrap                   0.000
    To sample usage       0.000          
    To blocked stock       0.000
    To new material         0.000
    To reserves               0.000
    Return Delivery           0.000                               100
    and press enter
    Thanks & Regards
    Rajendran
    Edited by: Poovancheeri Rajendra on Feb 21, 2011 4:32 PM
    Edited by: Poovancheeri Rajendra on Feb 21, 2011 4:33 PM

  • Control invoice verification after quality inspection

    Dear all,
    I want to restrict vendor invoice verification to be done after quality notification, I set QM control key 0007: Del. release, invoice block in the QM view of material master, then I post GR for a PO with inspection lot created, then I did invoice verification through MIRO it was successful without even a warning message.
    Does anybody know how to control this?
    Thx
    Danny

    Hi Danny,
    MIRO will be processed, but you will get message as "Blocked for Payment". You can see the reason for block and clear the block in MRBR. Ensure that in PO indicator GR-Based Invoice Verification is flagged.
    For more details Block the payment if inspection lot is not cleared by quality
    Thanks & Regards,
    Ramagiri

  • How to move the stock after quality inspection in wm

    hi ,
       if i am posting GR with PO  for the material XXXX quantity of 10  it should not be posted in Warehouse. after completion of stock inspection in QM then only it moved to warehouse . But the problem is when i post gr in migo the transfer requirement created automatically...if i make this  TR manual, two posting occurs one for gr posting  and another one for manual tr...how to control this....
    ex: matxxx-10 quantity
    migo posted(no stock should be posted in wm)
    after qc--8 quantity o.k
    then we need to move this 8 quantity to storage bin.
    how to achive this process in WM. (i already working manual TR it will create two posting)
    Thanks
    Muthuraman.D

    Hi,
    Use movement type 103 for GR. so, the goods will posted in to blocked stock.  you deselect the auto TR creation for 103 movement type.
    once the Quality inspection over the do the 105 to release blocked stock to unresticted stock. in 105 you activate the auto TR creation.
    Now you may avoid double tr creation.
    this you have to discuss MM consultant also. because of 103 & 105 movement type using.
    SAM

  • Reverse Goods receipt after Quality Inspection...

    Hi Expets,
    I'm able to do the GR reverse  after the Quality inspection Lot also using mb01 and mov type 102.The stcok is also updating as soon as i do the reverse. Here my questions are.......
    1)Why  I need to do the cancel of Inspection Lot since there is no effect on stock postings by cancellation and stock postings are effected by GR only.
    2) GR = 10 qty
        Inspection  Lot  = 5 Unrestricted, and for remaining UD for 5 has not been made.
    here I'm able to do the reversal of GR  for 10 Qty and I did also. and same time I,M  not able to do the cancellation of Lot because the qty 5 is still pending, for this If i post the qty 5 to un restricted in the Lot  and do the cancellation  lot , the stock will be duplicated in mmbe. kindly guide me how to handle this type of issue....
    where reversal of GR for full qty before partial Inspection qty for the lot and completing the inspection lot after GR reversal and cancellation of full Lot
    Regards,
    Sri.........

    Hi Manu,
    For wht Z-Tcode and programme has to be developed ?
    Regards,
    Sri......

  • EWM Scrapping after quality inspection

    Hi guys,
    I'm trying to work out a scenario in EWM but I'm not sure how the standard process should work, hopefully you can help.
    I'm receiving a returns shipment in my warehouse. After Goods Receipt, I transfer the goods to my quality inspection area using POSC. Here, I enter the inspection result via /SCWM/QINSP. Depending on the inspection result, the follow-up task is determined.
    The current behaviour is as described below:
    1. If the product is OK, it can be putawayed via the already exising warehouse task.
    2. If the result is not OK, the product needs to be scrapped. Currently, EWM creates a Warehouse Task to my putaway storage type, and assigns stock type S5 (Scrapping from Putaway) to the product. When I confirm this Warehouse Task, the stock is moved to the putaway area and the stock type is changed to S6 (Scrapping from Warehouse).
    Is this correct behaviour? I would actually expect that the scrapped stock would be moved to the scrapping area (storage type 8040), and not to the putaway area...
    Thanks & regards,
    Oliver

    Hi Juergen,
    The Warehouse Process Type for decision "not ok" (Follow-up action D - Scrapping) is 4020 (Scrap).
    The Destination storage type / bin for this whse process type are 8040 / SCRAP-ZONE.
    As far as I can see, this is correct, right?
    Appreciate your help.
    Regards,
    Oliver

  • How to Cancel MIGO Document after Quality Inspection

    Hi,
    I have done
    1). Purchase Order
    2). MIGO
    3). Quality Inspection
    4). After that for some reason, i need to cancel the MIGO document. When i tried to cancel the MIGO in MBST, i am getting the below error. Kindly help me
    Deficit of BA Stck.in qual.insp 10,000 EA : 101921 1100 1001 REGULAR
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 10,000 EA.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    Note:
    The abbreviations in the short text of this message can have the following values:
    BA = batch
    OR = order
    PL = plant
    PR = previous period
    PU = purchasing document
    RE = reservation
    SL = storage location
    VC = consignment stock from vendor in storage location
    Thanks
    Dharmendra

    Hi,
    Check out this:-
    Re: reverse migo..when UD -inspection is done...
    Quality Inspection in MIGO
    Cancel raw material goods receipt document in MIGO
    pherasath

  • Material not getting reversed after quality inspection

    Hi Friends,
    I want to reverse a material document for material which has been cleared in the quality inspection step. But I am unable to do so. Can you please let me know if there is any way we can reverse material which has been cleared from quality inspection.
    Regards,
    Wasim.

    Hi,
    Please apply the note 175842 by this you can reverse the Quality inspection & cancell the Material Doc.
    Regards,
    Manish Jain

  • Confirmation to do MIRO after GRN

    Hi Friends,
    I want to have a check for making vendor invoice (MIRO) after GRN. The scenario is like this:
    I do GRN of 100 qty the stock goes into quality. After quality inspection I accept only 70 qty and reject 30 qty. I want to raise vendor invice for 70 qty only and not total 100 qty as received initially.
    Can someone please guide how can I do this.
    Regards,
    Wasim.

    Hi Wasim,
    Try to check settings of this block in
    SPRO-QM-QM in logistics--Define Control keys
    Here make sure Block Invoice is checked and Message mode is E (Defects)
    This will block the payment after MIRO.
    If you still want that MIRO is to restricted then you can go for a user exit with the help of ABAPER
    block MIRO before UD posting is done is thru an enhancement
    LMR1M001
    Here you need to post following code to block MIRO in include:ZXM08U16
    this code will cause an error message before UD and will allow MIRO for only qty posted to Unrestricted stock
    *& Include ZXM08U16
    Declaration of variables
    DATA: w_prueflos TYPE qamb-prueflos,
    w_lmenge TYPE qals-lmenge01.
    Declaration of Internal Tables
    DATA: itab LIKE qals OCCURS 0 WITH HEADER LINE.
    LOOP AT e_tdrseg WHERE selkz EQ 'X'.
    Checking whether the document require Inspection
    CLEAR: w_prueflos.
    SELECT SINGLE prueflos
    INTO w_prueflos
    FROM qamb
    WHERE mblnr = e_tdrseg-lfbnr
    AND zeile = e_tdrseg-lfpos.
    IF sy-subrc EQ 0.
    CLEAR: itab[], itab.
    SELECT SINGLE * INTO CORRESPONDING FIELDS OF itab
    FROM qals
    WHERE prueflos = w_prueflos
    AND stat35 = 'X'.
    IF sy-subrc EQ 0.
    READ TABLE itab INDEX 1.
    CLEAR: w_lmenge.
    Sum of quantity (Excludes Block stock)
    w_lmenge = itab-lmenge01.
    IF e_tdrseg-menge GT w_lmenge.
    MESSAGE ID 'ZMM' TYPE 'E' NUMBER '004' WITH w_lmenge e_tdrseg-lfbnr.
    ENDIF.
    ELSE.
    MESSAGE ID 'ZMM' TYPE 'E' NUMBER '005' WITH e_tdrseg-lfbnr.
    ENDIF.
    ENDIF.
    ENDLOOP.
    Cheers
    Kris

  • Good receipt in quality inspection

    hi gurus
    i have maintained quality inspcton set up in material master data. now when i do good receipt it is posted in quality inspecton stock. now query after quality inspection how to take stock from quality inspection stock to unrestricted stock .in between this how to do quality usage decision so that rejected material can be returned and  for accepted material invoice cen be posted.if some one have snap shots for usage decision please send it my mail id 
               [email protected]
    points will be rewarded.thnks

    HI,
    Go to QA 32 , you can see the list of inspection lots .
    You can do result recording & Usage decision.
    During usage decision , you can do the stock posting (Unrestricted , returm delivery)  from the stock posting tab in UD screen.
    Ref the link below for more details.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/QMIMUD/QMIMUD.pdf
    Hope this helps you.
    Regards
    K.M.Arun

  • Block for payment in MIRO if there is blocked stock in quality inspection

    Hi all,
    In quality inspection, if they put some quantity into blocked stock, then i should go for payment block in MIRO . Here
    the QA status may be Pass or Fail.
    my payment block will depend upon blocked stock in quality inspection but not on QA status.
    Thanks
    babu

    Hi Pabitra
    If the material is taken to QI, then no liability is created for the vendor during GR. Now if you pass it in QA, then the stock moves to Unrestricted stock. Now if you transfer from Unrestricted stock to blocked stock, this will not block MIRO, as the GR/IR has already been hit.
    if you bolck payment for these type stock, then you can take help of User Exit, in MIRO
    Regards

  • Need to send data, after Usage decision in quality inspection (QA11)

    Hi all,
    After Usage decision in quality inspection (QA11), i need to send some data like material number, qty etc to external database or to external party. is there anyway i can achive this in real time? real time means, it should send the appropriate data to external party after usage decision is made.
    Thanks
    Pabi

    Hi,
    You can change results recording in case the MIC in the inspection plan of the lot are marked as "long term characteristics", else it wont be possible to change result recording.
    you can change the UD code only after giving the Usage decision.
    you cannot change the defects recording.
    Thanks
    SUMIT

  • How to by-pass: MIRO: material is still under quality inspection

    All SAP Gurus,
    At the time of posting the MIRO, system giving an error message as 'material is still under quality inspection'.
    We want to by-pass this message and post the MIRO.
    Regards,

    Hi,
    Thanks for reply.
    We have already taken the UD, and cleared the lots.
    Still the system giving the message as 'material is still under quality inspection'.
    So, we want to by-pass this message and post the MIRO.
    What settings are required for this?
    Please help...........
    Regards,

  • Sample  still showing in quality inspection stock after usage decision completed

    After process order completed, we have received 100 units as a quality inspection stock.  After usage decision,( QA11), I have posted 98 units to unrestricted use and 2 units to the  to sample usage
    98 units successfully move to unrestricted stock.
    However 2 units for sample still showing quality inspection stock.
    I have checked MB51, mat document number for sample is 4900000160 and movement type is 331
    Do you have any idea why sample still showing in quality inspection stock. It  should consumed and zero out the quality inspection stock in MMBE

    Hi,
    Please check you MIC's control Indicators.
    Is it tick on Destructive insp. under Sample tab ?
    Please tick it and try again with whole process.
    Destructive Insp. : You specify whether the sample is to be destroyed after inspection. This means that is no longer available. This quantity is used in the usage decision as the proposed quantity for the posting to sample.

Maybe you are looking for