Moving configuration data from ECC to MDG

Hi,
We are also in process of moving the configuration data from ECC (Ehp 5.0) to MDG Hub (Ehp 6.0), looking for the option copying tables in transport request and moving the transport request to MDG-C.
Appreciate your suggestion or best practices on the movement configuration data, is there is any best option to move the configuration data from ECC (Ehp 5.0) to MDG-C Hub (Ehp 6.0) as both the system on different Enhancement pack.
thank you,
Parvez

Hello Parvez
Go through the below thread.
http://scn.sap.com/thread/3492091
Kiran

Similar Messages

  • Data import from ECC to MDG via MDMGX tool for CC group and CC hierarchy

    Hello,
    We currently in process of importing data from ECC to MDG (co-deployed).
    The MDMGX guide we follow mention about Accout (ACCA), Cost Center(CCTR) and Profit Center (PCTR).
    While doing DIF, it shows above 3 domains but didnt mention about how cost center group(CCTRG), Cost center hierarchy (CCTRH) and same with profit center group (PCTRG) and profit center hierarchy (PCTRH) will be imported to MDG?
    is there seperate process to bring hierarchy data from ECC to MDG?
    Thnx in advance
    Sahil

    Hello Sahil
    With MDMGX you can load individual master data but for group and hierarchies, you have to use the old procedure. If you ask me, then the MDMGX takes longer time rather that downloading the data in file from tables directly and upload it in MDG.
    Go through this document and load the hierarchy and group data.
    How to upload Finance data in MDG - Hub
    Kiran

  • Reverse Sync from ECC to MDG

    Hi Experts,
    we have a co-deploy scenario with MDG as an add-on in our ECC system. We have a portal interface(MDG-F) for users to change master data.
    usually changes are very few so never had a problem but we recently had a major reorg and had to immediately reflect it into our ECC system for reporting. since the number of changes were high, the business users forced us to update the master data directly into ECC.
    assuming a co-deploy option refers to the same master data tables, we assumed the same data will be visible via MDG as well but this does not seem to be the case. We do not see the changes via MDG.
    need help here to sync the master data back to MDG and to avoid having to manually enter the data via MDG again. Or if there is any option to make mass changes via MDG.
    regards
    Yogesh

    Hi Yogesh,
    basically you have broken the most important role of MDG: any data that is governed by MDG should never be changed in the ERP backend. Please consider the same for any future scenarios! MDG can support "emergency changes", e.g. by a simplified workflow template that is assigned to a corresponding change request type (and of cause a very strict authorization who is allowed to use the related CR type).
    Additionally your understanding of a "co-deployment" is unfortunately not correct. "Co-deployment" means that from a technical perspective your MDG system runs on the productive ECC instance. The "Hub deployment" would mean, that there are dedicated and separated systems for MDG and the ECC instance. This does not affect the actual storage of active master data!
    The storage of master data is defined by the related MDG data model (respectively its entity types). MDG generally supports "Flexible" data models and "Re-Use" data models. "Flexible" means that both inactive and active data are stored within the generated database tables of MDG. "Re-Use" means that only inactive data is stored within the generated tables, but active data is stored in the corresponding ECC tables.
    The pre-defined data model of SAP are defined as follows:
    MDG-M: re-use
    MDG-BP/C/S: re-use
    MDG-F: flexible
    That explains why your ECC changes are not seen in MDG-F. The solve this issue, you have to either perform the same changes in MDG-F, or you could load the data from ECC to MDG-F.
    Best regards
    Michael

  • When transferring HR data from ECC to CRM via change pointers

    When transferring HR data from ECC to CRM via change pointers ,certain data is getting earsed in CRM
    paricularly the last name and first name of BUT000
    Do you have any idea why this could be happening
    Thanks in advance

    Hi Kittu,
    Change pointers. Change pointers are R/3 objects that mark changes to SAP master data. Change pointers are managed by mechanisms in a Shared Master Data (SMD) tool and are based on Change Document (CD) objects. CD objects record the changes occurring to master data at a field level. These changes are stored in tables CDHDR (header table) and CDPOS (detail table). ALE configuration provides a link between CD objects and change pointers. Internal mechanisms update tables BDCP and BDCPS, which host the change pointers. While CD objects are application-data-specific, the processing status of change pointers is message-type-specific. Also, the ALE change pointers are activated first at a general level and then at the message-type level.
    use this links kittu.
    http://help.sap.com/saphelp_nw04/helpdata/en/ab/27bde462848440ba70cf8eb348c86f/frameset.htm
    http://help.sap.com/saphelp_nw04s/helpdata/en/12/83e03c19758e71e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/0f/9d563cf19bcb43e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/ab/27bde462848440ba70cf8eb348c86f/frameset.htm
    http://help.sap.com/saphelp_nw04s/helpdata/en/12/83e03c19758e71e10000000a114084/frameset.htm
    Creating a change pointer and subsequently triggering an IDOC
    thanks
    karthik

  • Data from ecc to xi to mdm

    Hello
    would you please let me know how data data flow from ECC-XI-MDM
    Thanking you

    Hi
    For vendor master use IDOc of type CRemas.
    for customer master use idoc OILDEB,
    Configuration for sendinf any master data from ECC to XI
    1. create RFC destination of type 3 in ECC using SM59 and point to your XI system
    2. Create Communication Port for IDoc Processing using Transaction WE21 select the RFC destination created in above step.
    3. Create Logical System (LS) for IDoc Receiver System: Transaction BD54
    4. Create Partner Profile with Outbound Parameter.  Transaction WE20
    -Deepak.

  • Issue in transfer of data from ECC to APO

    Hi All,
    I have a requirement of transferring data from ECC to APO. I am using EXIT_SAPLCMAT_001 fro this purpose. The problem is, I need to transfer the data of a field that is not present in cif_matloc but present in /sapapo/matloc.
    How should I proceed...Please help....this is an urgent requirement
    Thanks & Regards,
    SriLalitha

    Hi,
    you may want to go to the transaction /SAPAPO/SNP_SFT_PROF
    Determine Forecast of Replenishment Lead Time
    Use
    In this field, you specify how the extended safety stock planning determines
    the forecast of the replenishment
    lead time (RLT). The following values are available:
    Supply Chain
    The system determines the RLT forecast using the supply chain structure by
    adding the corresponding production, transportation, goods receipt, and goods
    issue times. If there are alternative procurement options, the system always
    takes the
    longest
    option into account.
    Master Data
    The system determines the RLT forecast from the location product master
    data.
    Master Data/ Supply Chain
    First, the system determines the RLT forecast from the location product
    master data. If no RLT forecast can be determined, the system determines the
    forecast using the supply chain structure (as described under
    Supply
    Chain
    Dependencies
    You can retrieve the replenishment lead time forecast yourself by using the
    GET_LEADTIME
    method of the Business Add-In (BAdI) /SAPAPO/SNP_ADV_SFT.
    Replenishment Lead Time in Calendar Days
    Number of calendar days needed to obtain the product, including its
    components, through in-house
    production or external
    procurement.
    Use
    The replenishment lead time (RLT) is used in the enhanced methods of safety
    stock planning in Supply Network Planning (SNP). The goal of safety
    stock planning is to comply with the specified service level, in order
    to be prepared for unforeseen demand that may arise during the replenishment
    lead time. The longer the RLT, the higher the planned safety stock level.
    Dependencies
    The field is taken into account by the system only if you have specified
    master data or master data/supply chain in the RLT: Determine
    Forecast field of the safety stock planning profile used.
    Hope this helps.
    The RLT from ECC is in MARC-WZEIT which is transferred to APO in structure /SAPAPO/MATIO field CHKHOR.
    May be if you maintain the setting in the profile, you may get the value in RELDT.
    Thanks.

  • Unable to extract the data from ECC 6.0 to PSA

    Hello,
    I'm trying to extract the data from ECC 6.0 data source name as 2LIS_11_VAHDR into BI 7.0
    When i try to load Full Load into PSA , I'm getting following error message
    Error Message: "DataSource 2LIS_11_VAHDR must be activated"
    Actually the data source already active , I look at the datasource using T-code LBWE it is active.
    In BI  on datasource(2LIS_11_VAHDR) when i right click selected "Manage"  system is giving throughing below error message
    "Invalid DataStore object name /BIC/B0000043: Reason: No valid entry in table RSTS"
    If anybody faced this error message please advise what i'm doing wrong?
    Advance thanks

    ECC 6.0 side
    Delete the setup tables
    Fill the data into setup tables
    Schedule the job
    I can see the data using RSA3 (2LIS_11_VAHDR) 1000 records
    BI7.0(Service Pack 15)
    Replicate the datasource in Production in Backgroud
    Migrate Datasource 3.5 to 7.0 in Development
    I did't migrate 3.5 to 7.0 in Production it's not allowing
    When i try to schedule the InfoPakage it's giving error message "Data Source is not active"
    I'm sure this problem relate to Data Source 3.5 to 7.0 convertion problem in production. In Development there is no problem because manually i convert the datasource 3.5 to 7.0
    Thanks

  • Error while loading data from ECC to BI

    Hi BW Experts,
    while loading data from ECC 6.0 to BI  i got error in details tab of the infopackage as datapackage 1  arrived in bw processing not yet finished.
    Could any one help me out?
    Thanks

    Amar,
       please check the source system job status. If its successfully completed then we can expect data load sucess in BW side.
    to check source system status: RSMO> select related load>in Menu Environment-->Job overview in source system.
    once this over check the TRFC or IDocs struck
    if TRFC, chk in TCode-SM58 or from environment select TRFC from source/data warhouse.
    if you are finding TRFcs are in stuck just select and run manually to complete.
    M

  • Transfer Data from ECC to SRM

    Hi ,
    I'm trying to transfer data from ECC to SRM for creating bid document ( Function : BBP_PD_BID_CREATE ). After transferring the data I want to get the data back to ECC ( I need bid document number to write on delivery document's field ). What's the best way to do this ?
    Regards.

    Hi vinit ,
    I've written code to call 'BBP_PD_BID_CREATE' in ECC. But ECC and SRM have different structures. So i am not sure how i can define data to send SRM.
    Here is my code in ECC program
    CALL FUNCTION 'BBP_PD_BID_CREATE' IN BACKGROUND TASK
       DESTINATION 'XXX'
       IMPORTING
         I_REF_GUID    =
         I_BAPIMODE    =
         I_PARK        =
         I_SAVE        =
         I_TESTRUN     =
         I_HEADER      = I_HEADER ?
         IT_ATTACH     =
         IT_DYN_ATTR   =
         IT_CONDITIONS =
        EXPORTING
          E_HEADER      = E_HEADER ?
          ET_ATTACH     =
          ET_DYN_ATTR   =
          ET_CONDITIONS =
        TABLES
           I_ITEM        =
           I_PARTNER     =
           I_LONGTEXT    =
           I_SDLN        =
           I_ORGDATA     =
           I_HCF         =
           I_ICF         =
           I_TOL         =
           I_WEIGHT      =
           IT_EXCHRATE   =
           E_ITEM        =
           E_PARTNER     =
           E_LONGTEXT    =
           E_SDLN        =
           E_ORGDATA     =
           E_HCF         =
           E_ICF         =

  • Master/Transaction data from ECC to APO-BW

    Hi All,
         Normally we come across scenarios where Master/Transaction data is pulled from ECC to BW and then pulled into APO-BW. What are the pros and cons of CIF (direct connection between ECC and APo-BW) rather than pulling data from ECC to stand-alone BW and then into APO-BW?
    Regards,
    Joy

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Fetching data from ECC to APO

    Hi,
    I have fetch to data from ECC custom table to APO and create data, can anyone let me know the procedure.
    Thanks in advance

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Loading of data from ECC to BW initially takes time

    Hi,
    I am loading data from ECC to BW System.
    But I find that this process initially takes some time to start say for 15 minutes or so.
    I have no clue as to why this is happening.
    Could anyone help me out here.
    Regards,
    Sushanth Hulkod

    No, I found that there were no BGD's available in SM50 Transaction.
    But initially, the loading of data does not start for some time.
    After that all the data is loaded at once.
    I am uanble to understand this weird behaviour.
    - Sushanth Hulkod

  • Transaction data from ECC to APO DP

    Dear All,
    Can you tell me if i can directly load transaction data directly from ECC to APO BW Infocube.
    For example i want to load say sales orders from ECC.
    Can i directly load from ECC --> APO BW Infocube --> DP Keyfigures.
    Or any staging is required inbetween ECC and APO BW
    Thanks
    Santhana.

    Hi Santhana,
    If you want to add data of ECC to APO BW & Then in to DP, then follow the following Steps.
    1. Create Generic Data Source in ECC for thet Sales Order table.
    2. Replicate that data Source in to APO BW with Source System.
    3. Create whole data flow process by using created Data Source.
        Data Flow Process: 1. Info Package
                                      2. Info Source
                                      3. Info Cube
                                      4. Transformation between DS & IS, Then IS & IC
                                      5. Data Transfer Process.
    4. Load data from ECC to APO BW
    5. Use transaction /n/sapapo/tscube, for copy Info Cube data to Planning Area.
    Hope this will help you.
    Regards
    Sujay

  • Extraction of data from ECC to 3rd Party systems

    Hi All,
    I want to know all the options available for extracting data from ECC to a 3rd party system (custom datawarehouse like Teradata, hyperion etc). Also, I want know if there is a best practice documentation available for extraction of data from ECC to any 3rd party system?
    Thanks,
    SB.

    Hi SB,
    Check the following link
    http://expertisesapbi.blogspot.com/2010/06/how-to-transfer-data-from-sap-system-to.html
    Ranganath.

  • Source System Creation in BI to load data from ECC 6.0

    Our ECC 6.0 and BI 7.0 is one server. I would like to load data from ECC 6.0 to BI. How to create source system? I have source system for flat file and Data Mart (Myself source system) but don't know how to create source system to laod data from ECC 6.0. Please provide step by step guide.
    Thanks.

    Check here:
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0751ba5-b7a8-2b10-6d97-e91e85c0fafa
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/0087780d-81b0-2a10-eb82-86e1062f1a2d
    http://www.saptechies.com/connectivity-file-system-in-sap-bi/
    http://help.sap.com/bp_biv370/html/index.htm
    Thanks...
    Shambhu

Maybe you are looking for

  • I cannot make Robohelp 9 export epubs

    I have tried with very little succes all day making Robohelp 9 export to epub. I am running techcomm 3.5 full version on win 7/64 bit. I have opend a very small FrameMaker 10 book file with a front page, a toc and a 7 pages content file with some 7 o

  • IMAP email not appearing in Mail

    Background: I have an IMAP email account that's over a decade old.  It's going away soon so I'm trying to figure out how to get a complete local copy of all that email.  There are a total of around 100 folders with anywhere from 5 to over 2000 emails

  • Upgrading Photoshop CS5 to CS5 Production premium

    I'm a happy guy now i have CS5 Production Premium - and everything installed great - but Photoshop CS5 has not upgraded to the extended version I selected it in the installation programme, but the 3D module is not there. Any ideas please?

  • How to insert APPEND hint.

    Is there a way to do /*+ APPEND */ hint in the insert statement in the OWB mapping? How do I do it?

  • Photoshop CC starts slowly

    I have a 2013 27" iMac running OSX 10.8.5 with 32GB of RAM and a 3TB fusion hard drive.  When i now start start Photoshop CC it takes 31 seconds to open and be ready to use. For comparison, on a MacBook Air running OSX 10.9.1 with 8GB of RAM Photosho