MRP in MD51

Hi ,
How to idnetify on which WBS the MRP was run previously.In our scenario we want to run MRP on wbs only once.we want if user goes to run MD51 on the same WBS twice system should give error How can this achieved ?
Rgds

Hello,
You can also use T.code MD04 and then individual or collective access
Thanks
Anish

Similar Messages

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • MRP problem in case of MD51

    Hi,
    I have not activated MRP in OMDU tcode. So at the time of MRP run I should get error that "Requirements planning is not active in plant XXXX" but in case of tcode MD51 this is not the case.
    When I am running MRP for WBS element using MD51, I am getting planned order for a header material assigned but at the same time let me tell you, system is not exploding BOM for the same.
    My concern is in case of deactivated MRP for that plant why system is not giving error and allowing me to run MRP using MD51..??

    Hi,
    Go to se16 enter the table  J_1IRGSUM and Check the material quantity available.
    Regards,
    Chetan

  • Additional Material Showing in CN52N report after MRP MD51

    Dear All,
         I am attaching a FG material component to the internal activity and exploding bill of material for same. When I am seeing component overview report in CN52N I am getting material list which is attached to activity in Project.
         I am doing MRP run MD51 and generating PR. We donu2019t have PP here so only PRu2019s are generated. I using u201CCreate purchase req. u2013 1 Purchase requisitionsu201D in while running MD51.
         After running MD51 when I checked CN52N again * am getting an additional material attached to project which doesnu2019t exist in Project Structure. These Items will have same Project WBS (for which activity is attached and BOM exploded earlier) but No network and activity reference.
         This case happening inconsistently. Let me know if possible what could be the possible resone for it.
    Thanks and Regards,
    Atul R. Rajmane

    Hi,
    in CN52N
    You are getiing all the materials after MRP Run
    you just look at the  Resevation - your FG having reservation against project/ network/ activity
    remaining all materials having dependent requirement reservation no. for FG.
    Venkatesh

  • MRP for Project MD51

    Hi all,
    I have a problem that is showed below:
    Our general stock is 100 for material ABC (procurement type is F: external procurement).
    We have 3 project stock for 3 WBS element. They are
            - Project stock 1: 0
              OrdRes: 50
            - Project stock 2: 0
              OrdRes: 30
            - Project stock 3: 0
              OrdRes: 60
    Total requiment for 3 WBS element is 140.
    When I run MRP for PS by tcode MD51, the system generate 3 PR for material ABC particular for each of OrdRes.
    1. I think that the system will generate 3 transfer posting for each of OrdRes, doesn't is? That is the first system.
    2. The system will generate one PR (quantity 40) to cover 3 OrdRes based on current stock (quantity 100), doesn't is? That is the second question.
    3. Are there any distribution key to distribute auto from general stock to project stock? And when I run MRP by MD51, the system will generate PR with quantity exactly for each OrdRes, doesn't is?
    Thanks all
    Regards,
    Hoai Vu

    Hi Mario
    I have checked by assign "2" in field individual/collect on tab MRP4. When I have assigned this material to activity in project and release. in MD04, I can't see Order Reservation be assigned in project stock. So, when I run MD51 for project, the system does not generate planned order for this material while I want run MRP for WBS element
    Besides, if field individual/collect on tab MRP4 not be assigned "2", the order reservation will be appear follow project stock in MD04. And when I run MD51, the system will not check stock in general stock.
    I wonder why SAP does not support for me to run MRP for each WBS element and generate planned order base on check general stock and project stock at the same time?
    Can you aupport me to solve this case
    Thanks and regards
    Hoai Vu

  • Planning File Entry in case of MD51

    Hi,
    While we run MRP through MD51, Planning file entries are not getting updated.
    Means, In the planning file entries "X" indicator remains there. Actually it should be removed after MRP run.
    Is it a problem or standard behaviour?
    If it's SAP standard behaviour then what is the logic behind it?

    Hi,
    Then what is the role of Strategy Group.
    Let's assume a scenario where by a single material is assigned a srategy group combining MTS & MTO strategies (instead of MTS & Project).
    For such material if Independent demand exist under MTS & Sales order exist under MTO then how planning file entry will behave in MRP run?
    At last if we accept that there is no role of planning file in case of Project base planning. Then can we also say that, all materials will be considered irrespective of checking planning file scope in each MRP run (MD51).
    Edited by: hr-hr-hr on Aug 2, 2011 11:15 AM

  • PR,s not getting generated after MRP run

    Dear All,
    I'm running MRP through MD51 for WBS element where RM's are attached to WBS.
    It is MTO scenario where no stocks of RM's are maintained. I have checked all relevant settings of Masters.
    After running MRP through MD51, system is not proposing PR's for RM's but when i run the MRP for independent FG (MD02 & MD03) system is proposing PR's.
    Please suggest & help.
    Thanks in Advance.
    Shaiz

    Little confused on your statement
    System is not proposing PR's for RM's but when i run the MRP for independent FG (MD02 & MD03) system is proposing PR's.
    I would like to Know, whether the FG is attached with WBS or RM?

  • Problem in MRP run with Project/WBS Element

    Dear PP Gurus,
    I want to run MRP thro Project/WBS Element.
    I have created WBS Element & WBS BOM for Material. Then created sales order for that material and assign WBS element to sales order.
    Maintain Planning Strategy 21 ( Make to Order/Project) for Main Mtl.
    Now when I run MRP with MD51 then no requriements are generated for main material and its components.
    Is there any thing missing from PS-PP & SD point of view?
    Pl guide me for the same.
    Thanks in Advance.
    Umesh

    Dear Nagrajan,
    Thanks for your reply.
    There is no safety stock & un-restricted stock of that material.
    Also I don't want to assign this mtl to that wbs Network. If I assign the Material to WBS network then network req.is generated and thro Normal MD02 MRP generates the requirements.
    & in the plan order it will not show WBS Element
    But My req. is I want to run MRP with  MD51 & want WBS element as account asignment tab in plan order & production order too.
    IS there any config. missing from PP/ PS / SD ?
    Pl guide me for the same.
    Thanks ,
    Umesh

  • EXCLUDE PROJECT STOCK MRP

    DEAR GURU
    MY QUESTION IS I WANT TO EXCLUDE PROJECT STOCK WITH INDICATOR Q FROM MRP.
    SHOULD I TRY THE STORAGE LOCATION METHOD BY EXCLUDING A PARTICULAR LOCATION FROM MRP?
    OR
    IS THERE ANY WAT TO DO SO....PLEASE SUGGEST

    Hi ,
    Just my 2 cent idea ,
    For PS MRP run MD51, system checks the available quantity of PS stock against specific WBS.
    Please note that the special stock  indicator Q for project stock will not consider existing stock.
    Goto Run MD51 and then take MRP run again in MD02 and check the result.
    I would suggest you use Master Data Level to excluded because is easier to control but depend on your business scenario.
    As if you using Storage location , you need to have specific location only for PS and you need to involve Material transfer among.
    TQ.

  • Project Based MRP run issue

    Hi Friends,
    There is one issue reg. Project Based MRP Run as below :
    We are running MRP through MD51 (Project based MRP run). For this we are assigning FG material code under respective WBS Element which generates Network reservation with movement type 281Q  which is base of MRP run in MD51. After MRP run we get planned order generation and then convert it to Production order and execute Production Order to receive Project Stock after GR.
    After receiving Project stock and then selling it through Post Goods Issue through SD cycle, project stock is consumed but network reservation is not getting closed which results in again generation of planned order if MRP is run again. 
    I need your valuable inputs if we are missing any configuration setting which can set Final issue indicator in reservation while Posting Goods Issue (PGI) in SD because FI indicator checking will only ensure reservation doesnu2019t take part in planning again.
    Your earliest reply will be highly appreaciated.
    Regards,
    Tejas

    Hi Vivek,
    Thanks for your reply. Actually my issue has got resolved the way suggested by Mario Adler.
    Hi Mario,
    Thanks for your solution. PGI through Project is working fine for me.
    Hi Krishna,
    Follow the procedure as suggested by Mario which will resolve your issue.
    Once again thank you all for spending your precious time to respond my query.
    Regards,
    Tejas

  • MRP with WBS element

    Dear Experts,
    My senario is like this:
    Strategy:21(Account assignment:D).At sales order line item I have assigned WBS as account assignmentThen I run MRP through MD51 for the WBS element.No message is coming,but the material not being planned.What should be the reason.
    Regards
    Reshmi

    Dear ,
    Planning Statgey 21 measn MTO with Projects .It generally  consider the WBS demand either as WBS Sales Order .
    Did you check whether you have  released the Sales Order Credit Check  in VKM3 or what is the Schchelule Item Categoery ??
    It should be CP -relevent for planning .Check the Sales Order overall stauts -should be realsed and Sch.line item categoery should CP to pass the requirement  for MRP.
    Regards
    JH

  • To run MRP status of WBS

    Dear All,
    To run MRP from MD51 against a WBS what is the status of WBS to be?
    WBS should be in CRTD or REL.
    Pls share your views
    Thanks

    Dear All,
    Pls share your views
    Thanks

  • Problem in MD51

    Dear All
    In My Project Structure I assigned raw material say A, B & C to activity which assign to particular WBS . I run MRP on that WBS by MD51 system generate PR for that raw material that work as per sytem but when i delete one material say A & assign one material say D & re run MRP by MD51 system generate PR for D & not delete PR of material A which i was delete from project even i run option in Planing mode as Delete and recreate planning data during MRP run in MD51.
    Pl give solution on this
    Regards

    Hi Nivrutti,
    When you delete the material in project, only the material gets deleted. But the PR still remains in the system. So, when you run the MRP after deleting the material in your project (in the planning mode 3), the MRP does not consider the deleted material. Hence, the PR is still not deleted even though you use the planning mode no.3.
    You have to do like this:
    Dont delete the material in the project. Now run MD51 with planning mode 3. This will delete the PR for that material. This will solve your problem. After this you can delete the material from your project.
    Hope I have put it clearly.
    bye
    Pratap.V

  • WBS status to run MRP

    Dear All,
    To run MRP from MD51 against a WBS what is the status of WBS to be?
    WBS should be in CRTD or REL.
    Pls share your views
    Thanks

    Dear All,
    Pls share your views
    Thanks

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

Maybe you are looking for

  • How do I copy an excel file from my PC to my iPad?

    My first anything Apple. How do I move files, ie excel, from Win 7 PC to my iPad 4?

  • Hi frnds,  need some clarification on OBIEE.

    How the details of the reports created in OBIEE gets saved? Database or FlatFile. I have created some reports in OBIEE but not able to find the structure of the report or data stored in table in the database. Kindly help in figuring out this.    Than

  • Web Based PDF forms to be sent by e-mail

    I write a simplistic web page for a labor union local. We have several forms we embedded as forrm fill PDF's. Members are having difficulty saving completed forms to file, and no one has succussfully submitted a file via the submit button. Anytime at

  • Windows 7 Machine, iPad Won't show up to Sync

    I have a Windows 7 machine and cannot get my Ipad to show up in ITunes to sync. As of now it's just a paper weight, I can't get it to do anything. Please help me, I don't have a MAC yet so I am stuck using my thinkpad

  • Sony's ICS UI style

    Is Sony planning to change the UI in the next update for the 2011 family? One major reason for me to upgrade was to get the ICS look and feel. But Sony's stock apps (settings, home, messaging, etc.) are not updated with the ICS holo theme, they rathe