MTS  Scena. but after creation of SO & mrp run ,double requiremnt generated

Dear Gurus and Sir,
Good morning,
Client Has Make to order scenario. Scenario is as stated below
company  is into  making "Machines which manufactures bottles" which is a standard product for client.
Hence as per experiance, Client manufactures the Machines in adavance for the Stock.
As and when  sales requirement is observed, machine is assembled with the changes asked by customer.
For Make to Stock Scenario.
Standard Machine code (11digit) is avaialble with BOM. The same code is used for Long term planning.
After receipt of order, customer wise MAterial code is generated. The above stadard code becomes child of This new material code.
The changes are addressed to customerwise material code.
This customer wise material code is nothing but dispatchable assembly as per customer requirements.
The Stratergy used for Stad. M/c code in MRP3 view is 40 and in MRP4 collective indicatior  as 2.
The stratergy used for customer material code in MRP3 is 50 and w/o collective indicator.
Hence there is a std. bill of material for standard machine. MD61 plan will run  against the same std. code.
MD61 is having Consumption indicator stated as 3.
As soon as Sales order is received, The MRP run is taken with command MD50. 
During this MRP run, system consideres the Sales order requirement as a seperate Demand apart from Planned demand through MD61.
The system should not generate double requirement.
Needless to quote that  raw materials and semi-finish items are planned in advance due to make to stock strategy.
"I have got one solution presently
that using MD02  take MRP run for common components
after receipt of sales order take MRP run  MD50  for final assly.
system will not generate double requirement .
When MRP RUN taken through MD01,system generates double requirement. MRP run through MD01 run is required for VB marked items.
The std user Exit M61X0001 is available in standard SAP.
What should be the appropriate/correct solution for above stated problem.
Advance Thanks & regards,
Vidyasagar

Hi Vidyasagar,
In your case, MRP Creates sepearte dep requirements for customer demand.
As per ur settings, yor are doing procurement for std material before the receipt of sale order of customer material code.
u need not worry about dep requirements created against custome ordder. Bcz once u issue the std material to production order (while confirming production order created for custmer material from planned order) it will be reduced.
Please comeback
Regards
pradeep

Similar Messages

  • Using Vista operating system Firefox Version 3.05 tried to update to new version but after download it goes to run then my only option is save the file it will not run the file.

    the firefox set 7.01 up file can be downloaded but will not run do I have to update to 4 the 5 up to 7?
    download run setup
    unable too run setup everytime

    The longer this thread continues, the more ancillary comments you throw in that aren't directly pertinent to your problem with your DVR software not working with Firefox 4.0. Sorry, I don't intend to continue with this discussion.
    I do agree that ''something'' needs to be done better with regards to plugins for Firefox, but I do disagree with you as to whose responsibility that ''something'' is.

  • Serial Numbers are not downloading after creation of Delivery in ECC

    Dear all,
    As per client business process, we need to download Serial numbers after creation of Outbound delivery.
    I could see the generated Serial numbers in ECC Delivery document, but those Serial numbers are not downloading into CRM.
    I have already done initial download for SERIALNUMBER object and I could see downloaded serial numbers in COM_TA_R3_ID Table.
    But after creation of Outbound delivery in ECC, those delivered serialnumbers are not available in CRM system, even after successful data transfer of Sales Order, Delivery, PGI and Invoice documents Information.
    Kindly help me in resolving the above issue
    Best regards
    Raghu ram

    Hi
    1.Check in material master whether serial number management is active in Plant data/stor Tab and serial number profile is assigned
    2. Check while doing MIGO once if u enter the material and transfer qty you are getting the serial number tab or not
    3. If everything is ok, then after posting the document check the serial number status in IQ09, check the stock type and the storgae location in the serdata tab
    Regards
    Amuthan M

  • Purchase requisition not generate for dependent requirement after MRP run

    Hello PP expert,
      In our MTO scenario after MRP run planned order generate for header material but no PR generate for BOM components, (BOM not explode) when we run MRP component level in MD02 PR generate, system showing message "40- No coverage not provided by master plan" in MD04 order tree. this problem coming after when we DIMP applied. I checked some OSS note also.
    Can any one provide right solution.
    thanks in advance.....its urgent as client requirement.
    regards,
    Amit Awasthi.

    Hi Amit
    You must select the green star for the correct answer, in order to close the thread.
    You may also select the yellow start for the helpful answers, in order to award points for those who helped you. See the blog below for more details:
    How to close a discussion and why
    I can see that most of your old threads are still open, therefore, I'd like to ask you to review and close them, by selecting the correct answer.
    BR
    Caetano

  • Sales order block for MRP run when the Customer payment terms is in Advance

    My client needs to block some sales order for MRP which customer payment term is advance. But it should be based on the customer payments terms (In case of Advance). After getting his advance amount, we would be release it and it also be consider for MRP.
    Option 1.Status profile  this concept is will controlled by sales document controls VOV8 not by customer's payment term Advance
    Option  2: In CMR sales area Billing Document tab  by using payment guarantee procedure and in VOV8 in billing tab Payment guaramtee procedure by using this setting , i am getting a pop up message" No Finanical document assigned" in sales order when u try to save. Now sales order is blocked for delivery but not MRP run.
    i am to ask the abaper to develop "here in the information box we will maintained required text say example u201C customeru2019s Payment term is in advance please check the reason for rejection number u201Csay ex: 13u201D: advance " after this is happen go to change mode of sales order put reason for rejecation" now MRP run will not generate the requirement for the sales order.
    for Undo these this flow :
    Va02 : remove the reason for rejection keep it in Blank
    VKM3 : release the sales order.
    Options 3: Development 
    Kindly suggest me the second options is only alternative for solving this issue but really i m not used specific feilds to solving this issue.

    Cleint is not using the field  in CMR Payment granatee , i gone for user-exit and closed this issue

  • Order reservation should not get planned in mrp run

    Hello friends,
    Actually for a finished material i have created one production order by CO01.Because of it for semi finished material system created order reservation.I dont have any stock of semi finished material.Now i want while running the mrp run system should not planned this Order reservation of semifinished material.For these in configuration of availability check (Scope of check T.C  OPJJ), I  made the settings that system should not consider reservation (i deactivated the tick for include reservation) and for include depend reservation , i selected Donot check.And all these settings i made in checking group 02 and checking rule PP.After doing all these settings than also system is considering the order reservation for semifinished material and generating the planned order for it.
    Do i need to do any other configurations?
    Thanking you guys in advance.

    Hi Jitendra,
    Checking Control (OPJJ) has no relation with MRP.It is useful in the case of Plan and Production / Process Order only to find out Missing part.
    Now come to MRP again.
    You have a choice of only 3 type of stocks to include or exclude them during MRP run while rest of the things like (PO,PR,Reservation etc are consider by default)
    Go to OPPQ and after selecting Plant go to Available Stock.You will find that options,
    - Stock in Transfer
    - Block Stock
    - Restricted Stock.
    And one more thing Reservation is not a available stock but its one kind requirement and if there is no stock then system will activate the Planning file entry and during next MRP run it will generate Planning proposal also.
    Regards,
    Dhaval

  • Cheracteristic consideration during MRP run

    Dear frnds,
    during implementation for one steel industry i have stuck up in problem which is
    they have crm plant in which finished products are endless depending upon thickness like .023,.325
    if we make material master for every thickness then it will infinite number of material master.
    so we thinking for single material master group of thickness i.e for single mmr for range of thickness and during sales order creation person will mention actual thickness in text of sales order or we can make it configurable and characteristic for actual thickness so during he will mention actual thickness in characteristic value.
    but problem is that during mrp run, characteristic value is not taking into consideration,
    so i want some customization so that characteristic value is considered during mrp run
    please help me out its very urgent
    thanks

    Hello,
    are you talking about a pure ERP implementation? A good description on modelling this with APO can be found in the Best Practice for Primary Steel (see link on BPX Mining and Metal).
    Usually we work with configurable material variants, as a starting point.
    Best regards,
    Stefan

  • MRP Run in an excluded Storage Location

    Hello all. I have this situation.
    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    I tried deactivating SL02 in Material Master MRP4 for material X, but then the MRP Run doesn't generate any proposals because my reservations are in SL02, and it's deactivated. Even if my Availability Check is set not to look at "storage location", if I the requirement is in SL02, it won't propose anything.
    Is there any other solution to my problem? How can I have the system ignore the stock in SL02, but still propose those 5 pieces I'm missing in SL01?

    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    Sorry, but your logic is not clear to me...
    your stock:
    5 pcs (SL02) + 15 (SL01) = 20 pcs
    your requirements
    5 x 5 pcs (SL02) = 25 pcs
    Procurment proposal (w/o excluding SLoc):
    20 pcs (stock) - 25 pcs (requirements) = -5 pcs > procurement proposal 5 pcs
    You are saying:
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    So, you can see MRP will give a procurement proposal of 5 pcs without any SLoc exclusion...
    Please clarify your requirement / business process. Why don't you want to consider the stock in Sloc2? What is your process?
    You can see that you cannot exclude a SLoc with Sloc MRP and still consider the requirements relevant to that SLoc (unless you use reorder point planning in that SLoc).
    Thanks,
    Csaba

  • MRP Run can not create Planned order to Sales order

    Hi,
    I have a problem with planning run to sales order. We have a configurable material which have make to order strategy. MRP Run does not create planned order to some of our sales order. I think it has relation with schedule lines but i can not understand the problem.
    If schedule line has 1 as confirmed quantity MRP run can not plan but 0 as confirmed quantity MRP Run creates planned order.  How can i solve this problem?
    Regards,
    techmastere

    Hi,
    Order for which qty is confirming, check which schedule line is determined and which requirement type system is determining.
    then in VOV6 for schedule line tick mark availability check & Transfer of requirement
    for requirement class OVZG tick mark availability check & Transfer of requirement
    Note: if schedule line is not relevent for availability check & ToR then system always defaul confirm quantity.
    kapil

  • MDBT : MRP RUN Problem

    I have one storeage locaion  for which i want to tun MRP run in backgruond .
    Now i have cerated MRP area (STORE) as stoarge location asssigne th erespective storge location there.
    Now i created  scop of planning & i assigne tthat MRP area as "STORE"to scope of planning.
    Now cerated varaint as "CONSUMPTION"and in scope of plalning i selcetd the scope of planing as my MRP area  and saved the variant .
    Now all material under this area are cinsumption baed material means everyone has MRP type as VB, reordre point and lot siza as HB, max lot qty  and STORE as MRP area in material master.
    NOw in MDBT i selcted the variant and click on start inmmediate i m getting mesage as "Request with variant CONSUMPTION Started"
    If i see MD04 til no requirenment is genrtaed with this Run ??
    1. Please tel ..where i ned to corect
    2. Is there any mesage after background MRP executed ;like in MD02 planning result screen .

    Dear,
    Please check whether planning file entry exists in MD21 also check MDAB & MDRE ?
    or run program RMMRP000.
    Please note With MRP type VB (Manual Reorder Point Planing) system will not consider Dependent requirement or any other reservation.
    It will take care about only Reorder point.
    If You have set reorder point of 100 Nos.
    And dependent requirement is of 35 Nos , and available stock is 90 Nos. then at the time of MRP run system will generate PR of 10 Nos only just to cover that less qty than the reorder point of 100 Nos.So there is nothing wrong in your case.
    If you want to concider Dependent requirement also during Planing run then you have to change MRP type VB to PD then check.
    Regards,
    R.brahmankar

  • Not able to find the source requirement of MRP RUN-(for planned order)

    Dear All,
    Actullay In MRP run system is generating 10000 qty in planned order but in MD61 there is only 3000 qty and no sales order requirement also exists for the same. And when i rerun the MRP by choosing option 3 in planning mode, then also it is generating the planned order for 10000 qty only but Iam not able find out the base requirement for that. Kindly suggest me the solutions.
    Regards,
    Krishna

    Hi
    In MD04 at bottom, you can see a button for pegged requirement, click there you will come to know the list of requirement. It is not only because of Planned independent requirement you maintain in Md61, it could be due to lot size in Material master, or if you have fixed vendor in sourcelist then it could be because of Minimum order quantity with the vendor, or it could be safty stock or reorder point maintained in Material master
    Regards
    Antony

  • Not able to find the source requirement of MRP RUN-(planned order)

    Dear All,
    Actullay In MRP run system is generating 10000 qty in planned order but in MD61 there is only 3000 qty and no sales order requirement also exists for the same. And when i rerun the MRP by choosing option 3 in planning mode, then also it is generating the planned order for 10000 qty only but Iam not able find out the base requirement for that. Kindly suggest me the solutions.
    Regards,
    Krishna

    Dear balu
    Check assembly scrap in MRP 1 view
    and also check which lot size u r using
    is it HB - replanishment up to maximum stock level
    or FX - fixed order size
    Kindly check
    Regards
    Sachin

  • MRP Run for Multiple plants

    Hi Guys:
    IN SAP R/3
    My client has requirement to merge planning of material for multiple plants and run the MRP under one head plant.
    For example:
    Plant : 1000, 1001, 1002, where plant 1000 is a head plant who had authorization to perform MRP run.
    if I run MRP Sepeartely:Each plant has below requirement for one material number (M1)
    Plant 1000 : 3 EA
    Plant 1001 : 2 EA
    Plant 1002 : 5 EA
    Instead of running MRP per plant, my client needs to run MRP for multiple Plants  that Consolidate  total requirement for all plants.
    and generate PR--->PO , In the PO, M1 should be delivered to 3 different plant locations by vendor and Po Will be issued from Head Plant 1000?
    Is there any Report in SAP , Where MRP Controller can See Requirements from Different Plants @ Central Purchasing  level after one Multi Plant MRP run, So that he can decide on how much to allocate to each plant?
    Thanks for help
    Thanks
    Sweth

    Hi,
    If u want to perform the MRP in one plant for all the plant requirement is depends on the bussiness process.
    You can try the following scenario:
       Planning in one plant nd production in other plant - Respective master data and special procurement have to maintain.For 
    further clarity please follow the below link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm.
    We can evaluate the PR and PO by providing the authorisation object for the multiple plant to the respective users.
    Revert me back in case of clarification.
    Thanks
    P.Srinivasan

  • Automatic creation of PR after MRP run

    Hi,
    can anyone please tell me what all fields are picked up in a Purchase Requisition(PR) in the scenario of automatic creation of PR after MRP run.
    If we are using more than 1 PR type in the system how is it determined during the MRP run that the PR will be created for which type.I understand that source list will have to be created and maintained but how is the PR type determined
    Thanks in advance

    In PR the system checks for the material and vendor. See the steps below.
    Step1:Auto PO tick in material master Purchasing view (mandatory)
    Step2:Auto PO tick in vendor master Purchasing view
    Step3:Maintain Source list for vendor and material (If u r not using source list for auto PO creation, the assign the Source of supply to a PR in ME56)
    Step4:Maintain Pur. Inforecord
    Step5:ME59n : execute for PR and Vendor In ME59n, you can also select the PR document type. If you want to select different document types, go for multiple entries and enter the doc types.
    When u execute, the system will give the appropriate PRs. Select the required and convert to PO.
    But through MRP you cannot create PO directly only Planned orders can be created.
    Reward if helpful..
    Thanks,
    Srib

  • Automatic creation of Schedule line after MRP RUN

    Hi,
    Till now we are  using only PO for placing orders to vendor, now we want to use the functionality of scheduling agrement,  so that after MRP run,  we can get automatic schedule line creation,  for this ,  what are settings required, how system create the automatic schedule lines based on which criteria, second thing while creating on eschedule agrement i found that the conditon which i can add for a vednor in ME21N  that all condition are not coming while creating schedule agrement  even my vendor is same for PO and Schedule agrement,  so what are  the setting required for this.
      regards,
       zafar

    Hi
    1.In material master purchasing view data auto PO is to be flagged.If scheduling agreemet with release documentation.
    Then flag JIT indicator 1.
    2.maintain MRP views in material master
    3.In source list for fix vendor,source list usage 2 is to be maintained.
    4.Vendor master purchasing data auto PO indicator is to be flagged.
    5.Then when you run MRP automatically schedule lines are generated.
    For JIT and forecasting maintain creaton profile in OMUP transction.
    Assign the creation profile in scheduling agreement.

Maybe you are looking for

  • TransformerException -- possible bug in weblogic.apache.xalan.transformer.TransformerImpl

    Using WebLogic Server 6.1 SP2. Am using xslt to transform xml into html. After repeatedly using the same Transformer object to transform different xml documents, the Transformer eventually becomes corrupt – sometimes after 20 or so transforms, someti

  • Need help identifying a kernel panic

    Hi all, I've been struggling with my iMac now for six months or so.  At the worst of things, I couldn't boot up in anything other than safe boot.  I did end up identifying a stick of 4gb Corsair ram as the culprit, but after pulling it I am still hav

  • Problem in bluetooth saving file location

    i have blckberry z10, i have not using sdcard in my phone.. when i receive files using bluetooth. i cannot find the files in any folder from file manager not even in download folders please help me for this problem...

  • IMessage is on but not working

    I recently lost my iphone 5 so I had to switch to an old 3G in the meantime. Basically, the imessage claims its on with both my current number and email. However, when I send messages to people with iphones and ios 5 or higher it is still sending as

  • How to fine-tune KM Navgation iView

    Hi Experts, We have 6-7 KM navigation iviews on the homepage, all rendering xml news from different folders of KM. Now we have discovered that the maximum time of page loading is occupied by these navigation iviews(If we make these navigation iviews