Multilevel Controlling in cProjects

Hi,
I am using multilevel controlling, in cprojects -4.0.A project structure is getting replicated in PS for corresponding elements in cProjects.
My doubt is how do we capture the other costs i.e of Material, labour etc.Do i need to create a network and activities in PS, to assign n captur this cost?
Secondly after the costing is done in PS, does it gets replicated or updated in cProjects Project Structure?
If anyone is having any document or mtrl on it pls send me to [email protected]
Thanks in advance.
Regards,
Sarang

Hi Thorsten,
One more issue in cprojects;
I am still stuck up problemof Error of 'Cost/Revenue rates not defined for Resources'.
Just go thru the steps, which i have followed n let me know if i hav done it correctly:
1.Intially i hav defined an orgn in PPOCE, where in i have mentioned the Account Assignment details of CO area,Cost Centre etc.
2.I hav assigned a Position to it i.e. Proj Manager, for which i have defined the rates in backend in R/3.
3.After that i have created a BP in employee role.
4.By again going to PPOME i have assigned this BP to the position and hence the orgn which i have created earlier in PPOCE.
5.Finally when i have created a proj in cProjects, i have assigned that orgn in additional data tab page.
6.Going to the Resource tab page, i have selected the role and staffed the employee(created earlier) for that role i.e Proj Manager.The cost for that role can be seen in costing tab page.But when i calculate the cost i am getting an error that Cost/Revenue rates not defined for Resource (along with the Resource name, which i hav created in employee role)
As per my knowledge i have followed all the steps, but still i am unable to solve the error.If u can give me ur personal id, i can even send u the screen shots which will give u a more clearer idea.
Waiting for ur reply.
Regards,
Sarang

Similar Messages

  • Accounting integration - Multilevel Controlling - cProjects 4.0

    Hi,
    I am using cProjects 4.0.
    a) However in Multilevel controlling i am unable to convert the cProject project to SAP PS project. I am able to do the manual assignment but automatic conversion to PS is not taking place.
    I have checked all the IMG settings related to Accntg Integration. .
    b) Also while costing it gives an error - Internal error - Costing leads to exception.
    Please suggest
    Regards,
    Amit
    [email protected]
    9820502246.

    Hi Amit,
    I am facing the problem too, could you show me how you solved your problem and some recommend about this?
    Thanks
    Long
    [email protected]

  • Message no. DPR_FIN_GECCO024 Error occurred in accounting - see link controlling cockpit (cProjects)

    Hi, everyone
    I'm integrating PS( which is on IDES system ECC6 PH6) with cProjects( which is on DEV system ECC6 PH6 PPM 5.0). I've done customizing in DEV and IDES. The Controlling Method is Multilevel Controlling (Structure Element, Automatic).
    When I'm saving a project with status 'to be transferd', the warning message appeared and I'm failing to assign PS Project automaticlly. But manual assignment works fine.
    Error occurred in accounting - see link controlling cockpit (cProjects)
    Message no. DPR_FIN_GECCO024
    Diagnosis
    Errors occurred when transferring to accounting.
    System Response
    DPR_FIN_GECCO 024
    Procedure
    Choose the Controlling Cockpit (Project Management) link on the Accounting tab page. In the cockpit, you can create a variant with your Project Management project under Selection Variant Orders Project Management. The errors that occurred are then displayed. If no messages are displayed in the controlling cockpit, they have already been processed or deleted. If this is the case, trigger the transfer again.
    No more messages are displayed once the transfer has been carried out successfully (that is, no errors occurred).
    Here is the problem:
    In this Message, I was told to Choose the Controlling Cockpit (Project Management) link on the Accounting tab page. But actually, I can not find the Controlling Cockpit (Project Management) link on the Accounting tab page. It was missing.
    I don't konw what‘s the problem with the missing Controlling Cockpit and how to deal with this warning message getting automatic PS assignment done.
    By the way, I've done IDES test, cProjects and ERP system were integrated on the same system with RFC destination NONE. And that works fine on IDES, so I guess I've done the right customizing in the ERP system( IDES).
    Best Regards,Yemi

    Hi Yemi,
    Controlling cockpit is accessed to view the error details in the accounting integration. This can be accessed through two ways.
    1) In Project-->Accounting tab
    2) Through tcode - COCPCPR
    You can try the second method to view the error details.
    And coming back to your query on project profile config in PS, as Pramod said, by standard SAP delivers a standard profile in SAP PS for cProjects-->PS integration. You can find the same in the below SPRO path.
    Project System-->Structures-->Operative structure-->Work Breakdown structure(WBS)-->Create Project profile
    Project profile name : CPR0001
    This project profile is used when an automatic PS project is created through accounting integration.
    Hope this helps.
    Regards,
    Ravi

  • Accounts integration - Multilevel controlling

    Hello,
    I try to adjust the following variant of integration - Multilevel controlling (Structure Element, manual).
    I have the following situation:
    1. I have the PS Project whith the project structure (project definition and wbs elements)
    2. I have the  cProject Project with phases and tasks.
    3. I have executed step 1 "Assign PS Project" of Account Assignment. (in cProject Project - Accounting -> Account Assignment)
    Problem: In step 2 (Assign WBS elements) I did not see PS Structure on the right side of screen.
    Dear colleagues in what there can be problem?

    Hi Matthias,
    I have checked PS project - status is released. If you were interested by a problem please look the customizings on a following reference - http://files.mail.ru/UM1ZMV
    Thank you.

  • PLM-CPR Multilevel Controlling (Structure Elemen, Automatic) :: WBS

    We use Multilevel Controlling (Structure Elemen, Automatic) controlling
    method for automatic cProjects project transfer in PS projects. We need
    WBS element key (PRPS-POSID) would be transferted from a cProject
    field with external number (user field or standard field "Number"
    on "General data" tab for cProjects task modifired for external
    maintenence - see message 0000082945 2008). We also would like to
    transfer not all tasks and phases into WBS elemets. We need to transfer
    only some of them.
    Are there any ideas for standart functions modifacation?
    Ñould anyone please name functional modules used in automatic cProjects
    project transfer to PS projects.
    Product versions:
    SAP cProject 4.0 (SP 0011)
    SAP ECC 6.0
    Best regards
    Edited by: Aleksey Teplouhov on Feb 18, 2008 9:11 AM
    Edited by: Aleksey Teplouhov on Feb 18, 2008 9:12 AM

    Hi All,
              Even i need information on this..
    regards,
    rajesh.

  • Error during multilevel controlling

    I am trying to perform a multilevel controlling. After marking flag to transfer I am getting the following error:
    "There is no internal order for project xxxxxxxx". The WBS element is also not created. I am using auto mode for multilevel controlling.
    Waiting for your feedback.

    Hi Anantharam,
    I am working on a requirement  to get Cost/Revenue Rates from ECC6.0 to cProjects ,  I know the standard configuration can replicate data from cProjects to ECC6.0 , I need to know do we have anything from the other way round,
    can you please send me the document which you have for cProjects Accounting Integration
    to email-id [email protected]
    Thanks
    Praveen

  • Can not adjust the manual assignment function (Multilevel Controlling)

    Hello all.
    One more post throughout theme "Accounting Integration - Multilevel Controlling".
    At This time it is impossible to adjust manual assigning WBS Elements to cProjects project element.
    Current situation: We have achieved automatic creation a PS project from a project in cProjects. In this case we have assignment which was created automatically - It is healthy, it pleases us.
    But also we wish to use function of manual assigning WBS Elements to cProjects project element. By the current moment there is following:
    - "Select the cProjects project element and the WBS element you want to assign and then choose Assign"  - This step is fulfilled, and The WBS element is established as the Account Assignment Element.
    - "Save the cProjects project" - on this step there is error - "Recoil: account assignment should be dumped". Result of the given step is assignment cancellation. http://files.mail.ru/0GG4RQ
    Colleagues, prompt, in what there can be reason? Thanks.
    PS project is created by analogy to automatically created PS project.

    Hi Alex,
    I have a similar scenarion where we want to link WBS to cProject apart from automatic creation.
    I am getting following  error while manually linking WBS to cProject:
    "Costing data may not be up to date  Display Help
    Rollback: Account assignment must be reset "
    I have defined costing model and costing variant for ECP.
    Can you please tell me what you did for ECP which enabled to solve your problem.
    Thanks in advance,
    Manoj

  • Manual Multilevel Controlling in PPM5

    Hi Experts,
    When defining the multilevel controlling assignment in the Project Management area, we are able to select a PS project and see it in the screen, but the Assign button in it is deactivated so we cannot assign any WBS element to the structure.
    What are the criteria to enable the assignment between PS and PPM?
    Note: the WBS element has the Planning and Accounting assignment checks enabled.
    Best regards,
    Neil

    Neil,
    Check what is the Tranfer Type for the selected project type which you have selected to create project.
    Based on the transfer type, the Assign Button will be enabled for the project on below actions:
    1) Save
    2) On release of project
    3) On status change "To-Assign"
    Cheers
    Amit

  • Field Controls in cProjects

    Hi,
    I am trying to hide or display some fields in  cProjects tab of RESOURCES. We want that the  Role Type, Role function field and the STAFFING field in the RESOURCE tab to be in DISPLAY status only. Can sombody let me know that which parameter (Object) and Sub object do I need to select and set the status as Display only.
    Waiting for your reply @ earliest.
    Thanks & Regards,
    Gaurav

    Hi  Gaurav,
    0. go to filed control SPRO node in cProjects,
    1. select filed control (you can create your custom)
    2. select obj category as MTG
    3. in "Assign Fields to Field Groups"
    For DPR_TS_API_PARTICIPANT   Select Role type     Select G003
    4. Similarly check fro other fields
    Niranjan
    let me know if it helps
    Award if useful

  • Field Controls in cProjects - Question

    Hi,
    I have added a Custom field in a Custom include. This include is included in standard structure DPR_TS_API_PROJECT_O.
    I have placed the custom field in the UI of a WD Component. Now i want to control the attributes of this custom field through field controls.
    When i go to the option "Setup Field Control" in SPRO, i could not find this particular field under the standard structure DPR_TS_API_PROJECT_O.
    Is there any other customization that i am missing as the field is not appearing under field controls.
    Thanks & Regards,
    Ram.

    Hi Ram
    You have to execute the DPR_CUST_FLDS_IN_FC_MAP report.
    The Webdynpro interface uses the API structures that were newly defined for Release 4.00. The field mapping between old and new API structures is defined in the DPR_FC_MAP table. The DPR_CUST_FLDS_IN_FC_MAP report also adds the additional customer fields to this mapping table. This means that field control is then also available for the additional customer fields.
    When you execute the DPR_CUST_FLDS_IN_FC_MAP report, you only have to create the structure with the customer inclu
    de, for example, DPR_TS_PROJECT_EXTENDED_ATTR.
    Execute this report: you will see the field
    Nitin

  • Programmed control of availability cProjects project fields.

    Hello all.
    We want to have programmatically control of availability cProjects project fields in case, when execute following event: cProjects project assign/unassign to xRPM item.  
    For example:
    We have the following event: assign cProjects project to xRPM item. 
    At this moment we transfer value from field «location» xRPM item to field «location» cProjects project (abap development). Also, we want to change «read only» attribute of  field «location» cProjects project.
    What functional module used to control availability cProjects project fields? How it possible to do this?

    Hi Aleksey,
    Please see your other post, as I see, the UI configuration supported by webdynpro can not be used, because it depends on the condition. It worth to try, if it can be realized via cProject  field cotnrol, actually it is not very easy but powerful.
    Kind regards,
    Zhenbo

  • Creation of WBSE in SAP-PS from all Phase of Project from cProjects

    Hi,
    Need suggestion for the automatic creation of WBSE in SAP-PS from each phase of Projects from cProjects i.e. multi level controlling scenario
    I have done the required configuration of Define Controlling Scenario where for the project type, controlling method has given (Multilevel Controlling (Structure Element, Automatic).
    But in my case only one WBSE is getting created for all phse s & project defintion of project in cProjects.
    Request you to suggest me on this issue.
    Regards,
    Ranjan

    Hi Vetrivel,
    Thanks for your prompt response. These are settings made for multi level controlling scenarios.
    1. Project Type:
    Accounting Intergation-accounting integration in my SAP ERP, as of relese of the project
    2. Define Object Links for Accounting Integration
    - 0FIN_INT_ERP_PS Single-Obj. Controlling on WBS Elements
    - Search Fields OLR3_TS_PRPS_SHLP
    - Proxy Class CL_DPR_OLR3_WBSELEMENT
    - 0FRAME9 frame has considered
    3. Controlling
    - Controlling Scenarios: PS01 Costing Variant
    - Then Costing Model has assigned to Controlling Scenarios
    - Assignment of Cost Elements to Cost / Revenue rate
    Please suggest me if i have missed some things. I am checking the planed cost in CN41 transaction of the PS module. Morever in Project in cProjects costing button is disabled & while doing calculate no planned cost os updating in Projects.
    I am following role based costing process. Project Role has defined & employee assiged to Projects.
    Thank you in advance.
    Regards,
    Ranjan

  • CProjects project not replicated in PS

    Hi,
    I have maintained all the settings for Account Assignment in Multilevel controlling.But still i am unable to replicate the cprojects project in PS.In account assignmet tab i am getting the PS Project party empty and no WBS are replicated for corresponding cProjects element.
    Can anyone guide me on this?
    Regards,
    Sarang

    Hi,
    you should check the button in accounting "controlling cockpit" and check the different variants here. The error messages are quite good.
    Did you assign a organizational unit which is assigned in ERP to a controllingobject in transaction PPOME?
    Renate

  • Problem in Accounting Integration in cProjects 4.0

    Hi,
    I am trying to customize the Accounting Integration in cProjects 4.0 with R/3. The  problem comes when I try to replicate the Cost/Revenue rates to the R/3 system. I get the following error: "<i>Cost/revenue rate PM01: organizational unit 40000582 does not exist</i>"
    The "organizational unit" is set in the cost/revenue rate as organization responsible. Why is that error poping up? Where can I create those organization responsibles? Do I have to create the data in my R/3 system?
    Thanks in advance!
    Best regards,

    Thank you very much for your info, but I am still having the same trouble.
    Apart form the former one I got two more customizing problems:
    The point "Make settings in ERP systems" returns in an error
    In the point Define Controlling Scenario in R/3 I don't have to option to choose Multilevel Controlling (can I customize those options?)
    Thanks again,
    Best regards,

  • Integration cProjects and PS. Incorrect order of the created WBS elements

    There is a ERP2005 and cProjects 4.0 and automatic multilevel controlling to WBS elements is activated.
    But sometimes I get the backward order of the created WBS elements. For instance, in cProjects I have the following structure:
    Project definition
    - Phase 1
       -- SubTask a
       -- SubTask b
    - Phase 2
       -- SubTask c
       -- SubTask d
    In PS I get the following structure:
    Project definition
    - Phase 2
       -- SubTask d
       -- SubTask c
    - Phase 1
       -- SubTask b
       -- SubTask a
    Does anybody know what is the reason of such behaviour?
    Thanks!

    Does anybody know the reason?

Maybe you are looking for

  • "Network Magic Notification: NMApp.exe - No Disk" error message

    Since downloading a trial of Network Magic I get an error message when linking to websites from email. How do I fix this.

  • RAID 50 or SAN

    I have an XServe Raid that I would like to make a single volume for all 14 drives. Before I create software RAID 0 over the 2x RAID 5 volumes I'm wondering about my upgrade path. Can I expand any of the RAID 5 volumes once they are part of the RAID 0

  • Scenarios used b/w standalone j2ee and XI system

    Hi , I am a beginner in XI and have just started practicing basic concepts. I have add-in netweaver sytem in which XI is installed and standalone j2ee system. What kind of XI scenarios can I start working with?  And also how to give mapping contents

  • How can you transfer tags from Elements 8 to 11?

    I recently installed Elements 11 on a brand new computer.  My old computer has Elements 8 and all the tags I want on the new machine.  How can I transfer the tags from one machine to the other?

  • PO qty Incorrect in MRP

    hi Gurus, i have facinga problem in MD04 screen in which against a Shipping Notification iam receving the same qty for recipt and available qty,where its subcontracting PO with mvt TYPE 543 in which these steps are taking PO Inbound delivery GR are t