Dear PS gurus!
Want to know that can we create one project having multiple plant, if yes ? how we will do costing?How to customize?
plz let me know the concept.
Ansar

you can have multiple plants in one project
there is no customising for this - the plant would be set up as part of enterpise customising
the costing will be based on the WBS object assigned
for eg you can have a project where some work is carried out in plant A and some work in plant B - projects can be cross plant the cost will be assigned to the WBS based on the actual postings but the WBS can have different plant assignments

Similar Messages

  • Multiple Developers on one Project

    Hi,
    I would like to know if there is a way that multiple developers on one project can work separately and later merge work into the main project?  I am thinking about the concept concurrent development.

    Hi Oumar,
    Use the NWDI to acheive this.
    Thanks.
    Sushil

  • Multiple exams in one project and variable

    Hello captivators,
    How do I make a captivate project with multiple exams. And with variables (widgets) that I need in the whole project.
    In the intro of the project you can select a character. That selected person is the visual coach (different branding) for the course.
    The student needs to through an intro module, next he can choose 6 parts of the course.
    One part = intro,n * show me, n * practice me, 1 * exam.
    The student needs to follow 1 part to the end. And then return to the intro.
    1st option: one project
    I can’t seem to make multiple examns with multiple results
    2nd option: multiple CP’s
    Then I have problems with the variables that are only known in one CP (SWF)
    3th option: Aggregator
    Then I can’t make condition. And I can’t hide the captivate menu when exported. I need conditions.
    HEEEELP Please,
    Koen

    I've not tried something like this to advise on whether it's possible in Captivate natively...but you've seem to have looked at all options and not found it possible. If that's the case, then perhaps the best option is to make the 'aggregator' in Flash, where you load each related CP file as the condititions are met. It's definitely possible to do, as one of my colleagues always uses his own 'Flash Shell' for this sort of thing. Possible for you, and ok in the project constraints?
    Erik

  • Best way to have multiple arrangements in one project file?

    Hello everybody,
    I am trying to figure out a smart way of having multiple arrangements associated with one project. More importantly, this would allow me to have multiple arrangements associated with the same pool of audio files in one audio window -- without needing to import/export audio.
    In DP this is achieved with multiple "sequences". I am aware this feature is not in Logic. However, perhaps there is a way to achieve a similar process?
    I guess a not-so-elegant approach would be to simply save a new song; however, if I want to use new song audio files in the old song, i'd have to import the new song audio files to the old song. Not a big deal, I guess.
    Thanks,
    D
      Mac OS X (10.4.5)  

    Thanks for responding Justin & David,
    Let me to try to better explain what I am trying to achieve.
    (Currently my problem is that I am thinking in the "workflow language" of DP, trying to figure out an analogous "translation" in Logic. For those familiar with DP, I am simply wanting to create a new sequence, within the same "song" file.
    Let's say I create a bunch of audio tracks, and compile them into arrangement A. I would like to work on a new idea that may be part of the final piece; So, I would like to have a clean, new arrangement page where I can put some of the previous audio files generated & used in arrangement A, as well as make some new ones. I'll call this arrangement B. So, in other words, arrangement B is a fresh new arrangement page that uses audio files from arrangement A as well as new ones.
    If any previous/current DP users know the best way of approximating DP's use of multiple sequences, I'd love to know what you do.
    I will explain what I am able to do if I were in DP (for the sake of communicating my problem, but not intended to begin a DP vs. LP thread).
    I will use Logic terminology, but DP concept:
    In DP, one can have multiple Arrangement windows that share a pool of audio files from one Audio Window. This allows one to try different arrangements, without keeping track of new/old audio files; and without needing importing and exporting them between songs.
    I have been reading the Project Manager section in the Logic manual. (By the way, I am not seeking a DP functionality in Logic; I am seeing how one achieves a similar workflow approach in Logic.)
    I realize I cannot even explain myself well. Perhaps I should consider the concept of sub-arrangements, and master arrangement. I guess, sub-songs, and work-in-progress master song. The master songs should have all audio files, and sub-songs have whatever audio files were created while working on that particular sub-song. So, with this, whenever I want to go back to master song, I've got to import the audio files from the sub-song.
    This may make sense - & may work smoothly. I've got to try it out.
    (Btw, David, I captured a screen shot, but I don't know where/how to post it.)
    A major thanks to all who have the patience to read so many words for a one word sentence.
    Thanks,
    Danny

  • Multiple Delivery from one project

    Experts we need inputs on this process,
    Presently we are trying to map the production/Assemble through Network with out PP module,
    but if we have multiple products (sections) delivery needed through one project.
    Thanks

    Hi PSR,
    Thanks for your response,
    Yes we will assign required material through BOM transfer with header (-ve) as final product,
    But requirement is to complete one product we may have 10 or more sections, so if we assemble only it will become final product in project site , now each section we need to show in SAP as deliver from project .

  • Handling Multiple DVD as one project?

    Hi all,
    I am new to Encore. I got a chance to play with Production Studio CS3 (retail) before buying, and here is what I'd like to do to test my usual workflow:
    I have approx., 6 hours of video in PP CS3 (both DV and HDV) in one project.
    I'd like to create 3 DVD-Video disks from this. Is it possible to handle more than 1 DVD in Encore Project at once?
    If not, what is the best workflow for this?
    Should I split PP project to 3 separate ones, one per DVD, before export?
    Or is it possible to export only part of PP project to Encore (say, 1 sequence)?
    How do you usually handle multi-DVD workflow?
    Thanks,
    Vlad

    Welcome to the forum.
    The answer would be the same, even with CS5.
    Now, there is a recent thread on a user with multiple Projects, that have a common structure and many common Assets. I offered a workflow, that I have used for building a "template" Project, where one just Imports the unique Assets, edits the Menus, and then Burns that segment of a series of discs. In my case, I had 17 discs, in a set, and used that for all common items.
    If I can find that thread, I will post a link to it, however, if you do not have all those common assets, it will likely not be a useful workflow for you.
    Hunt

  • Do I make multiple videos in one project or make multiple projects??

    I am going to make at least three music videos for a local band for their web site. Do I make all three in one project and can i encode them for YouTube separately or do i do all three in totally separate projects??? It seems like once i have all the footage and audio loaded in a project and do one video to upload to YouTube then to do another video i have to load all that raw footage and audio all over again for the next video and then for the third video.... seems like once all that is loaded into a project i could just separate the videos for a few seconds and do another and then another, but how then to send them to YouTube separately???
    Or if i do all three in separate projects how can i combine them into one project to export in DVD quality for the band to use for promo???

    Personally, I would break the Project into three, discrete Projects, but you do have a point about the Importing of the Assets.
    You can certainly do this with one Project, and then Export/Share segments of it with the WAB (Work Area Bar). Here is a look at the WAB from an earlier version of PrE:
    As I do not upload to YouTube, I cannot tell you if you can use the WAB, when you do the direct Export/Upload. You may have to do an Export/Share for the individual segments, and then manually Upload each. Others can shed more light on this aspect.
    Good luck,
    Hunt

  • Multiple titles within one project for sharing to iDVD

    Hello,
    I have about 90 minutes of video from Christmas.
    I want to create one iMovie project from this footage, but separate it into 5 different titles (within the project) each of which will have 2 or 3 chapters, so I can just share the one project with iDVD when burning to a DVD, rather than having to do 5 different projects.
    Is this possible?
    I've trying for most of the day to figure it out, but I can't.
    Can anybody help?
    Regards

    There are at least two ways to do this depending on what results you want:
    One way would be to create five separate iMovies; each with its respective 2-3 chapters and then import the five iMovies into iDVD.
    When you import the first one into iDVD, you will see its title and the options 'Play Movie' and 'Scene Selection.'
    When you import the second one, iDVD creates a title link to another submenu showing the Play Movie and Scene Selection options for the second movie; and so forth for each of the five movies.
    This gives you the five titles on the main iDVD screen, and the chapter options on the submenus. With this method you would not have a "Play All" option unless you import the entire iMovie as the first movie. Then, you would have the 'Play Movie' option (which you could rename as Play All Movies) with the five separate movies as title buttons linking to each one's Play Movie and Scene Selections.
    However, if you wanted all five titles and the chapter options to be on iDVD's main screen, you can do this with some copy/paste/delete manipulation of the submenus. If you wish to do this, post back for specific instructions.
    Second method would be to leave your iMovie as one long iMovie and create chapter markers for each of the five titles; and markers for each of the chapters within those titles. If you label the chapter markers correctly, a viewer will easily be able to see the organization of your iMovie.
    The chapters will appear on submenus...usually 4-6 chapters per submenu. I have done this with iMovies of trips where I marked the first chapter 'Italy: Rome' second 'Venice' third 'Milan' and fourth 'France: Paris' fifth 'Chartres' sixth 'Bordeaux' etc.
    This option will allow the iMovie to be selected in its entirety...the Play All option...as well as begin at whatever chapter is selected. By carefully manipulating the submenus, you could easily have each of the five divisions as separate submenus.

  • Multiple TOCs for One Project

    Is it possible to split the topics in one help project into
    two toc (hhc) files? I have a master project that merges about 53
    chm files. Some of the slave projects are rather large and over the
    years have had several types of information added to them. The
    information in the projects are related to each other, but they
    need to be organized separately in the master TOC. Splitting the
    projects themselves is not a good solution. I would like to have
    multiple hhc files for the projects so that the topics can easily
    be inserted in their logical place in the master TOC.

    Hi,
    I am TW working jointly with another TW on a huge multifirm
    project for a same client. He is well versed in RH, while I am a
    beginner (with using RH) not with TW. He and I each produce large
    parts of what will be merged into a single huge context sensitive
    .chm file. Having experimented a bit with possibilities such as the
    ones you are exploring, I thought we could use it for our project.
    But the other TW felt we would have problems down the road.
    Just to confirm what John says. But then, I also am not
    adding anything positive by way of solution. Hope somebody else
    reacts to these two successive negative answers, and comes up with
    help for you.
    Daniel Garneau, CTM, CL
    Technical Writer, Canada

  • Multiple Quizzes in One Project

    I'm developing a project that teaches 4 different standards,
    then has a overall assessment quiz at the end of the course.
    The problem I'm running into is that the "pre" quiz after
    each of the four standards cannot be independently "scored" without
    adding to the total score for the project. It's as if you can only
    have one quiz total slide per project, and that total slide can't
    be duplicated for individual quizzes.
    Any suggestions? I guess I have to break up each of the
    standards into their own projects, then present the final
    assessment as another independent project.
    Thanks
    JimmyD

    Welcome to our community, JimmyD
    I think you are spot on. There is currently no way within
    Captivate to have multiple quizzes in the same project. I'm not
    even sure if that would be possible from a technical standpoint.
    But I've seen a few folks ask about it here. Because of that, I
    would strongly encourage you and anyone else that sees a need for
    this capability to alert the Captivate Development team by
    completing a Wish Form.
    Click
    here to view the WishForm/Bug Reporting Form
    Cheers... Rick

  • Multiple connections in one project

    Hi,
    Is there perhaps some kind of a document describing a 'best practice' for using multiple connections in a ADF BC application. One connects to an oracle DB another to a SQLServer.
    I suppose I need to create two different services? Anybody having experience with this?
    Regards,
    Koen Verhulst

    Among other things, the BC4J Configuration defines the name of the JDBC connection to use. To solve your problem, you can create two Configurations one for each database. The JDBC connection value will be the only different element between these two Configurations. To create a BC4J Configuration in JDeveloper, right click on the AppModule node and then click Configurations...,
    Use oracle.jbo.client.Configuration class to create AppModules connected to the database you want.,
    import oracle.jbo.*;
    import oracle.jbo.client.Configuration;
    String am = "demo.DemoModule"; // Fully-qualified application module name
    // Configuration name with JDBC connection to source database
    String cf1 = "DemoModuleSourceDb";
    ApplicationModule amSrc = Configuration.createRootApplicationModule(am,cf1);
    // Configuration name with JDBC connection to dest database
    String cf2 = "DemoModuleDestDb";
    ApplicationModule amDest = Configuration.createRootApplicationModule(am,cf2);
    Note that the AM name can also be different if you want.
    Hope this helps,
    Sathish.
    I want to access several Databases from one BC4J-Project.
    For example I want to write an application, which collects data from one database, does some computation and stores the results in a second database.
    I would prefer to use BC4J-Components for both, the source and the target database, but unfortunately I can select only one connection per BC4J-Project.
    Has anyone got an idea, how I can access more than one database-connection from one BC4J-Project without having to write all the JDBC-Stuff on my own? JDev-Team, can you please give a hint?

  • Multiple Assessments within one project

    Hi,
    Currently working on a project where I'd like to have 3
    assessments built in to the same project. The criteria I'd like to
    set is:
    On the first assessment, they need to pass to progress
    On the second they need to pass to progress
    On the third they get a total score and marked as compentent
    to complete.
    Is this possible?
    Cheers,
    Dean

    PR_098 - WELCOME to the all volunteer board. There is one
    cumulative score given at the end. There are not sub-scores.
    However, you might be able to say "you passed phase 1 and your
    score is 33.33% or 100% for that section. But that would be only
    one question giving you that ability. Then it would continue and
    score the next part the same way. At the end you would get the
    number of questions and the overall score. But I think you would be
    asking several questions per subsection and that would make this
    not work.
    If you were using an LMS, then you would just break this into
    courses that link to each other. A passes assessment would go to
    the end and a failed assessment would take users to the next
    learning module. At the end you would have individual scores., but
    you might be able to score a sub-module as a collective course with
    an LMS. I don't see this as a shortcoming of Captivate because it
    is not an LMS, yet it has a built-in Quiz module.
    Regarding the first post here by happystar73, that is
    possible, but the course would move on and score it at the end. I
    have designed several courses with:
    Slide 1
    Slide 2
    Slide 3
    Slide 4
    Quiz-Slide 5 - On fail go to slide 6 on pass go to slide 7.
    Slide 6 Failure - message, hints, etc then on Next> Back
    to Slide 1
    Slide 7
    Slide 8
    Quiz Slide 9 - On fail go to slide 10 on pass go to slide
    11.
    Slide 10 Failure - message, hints, etc then on Next> Back
    to Slide 7
    Slide 11 End / Score
    Notice the pattern. This is what is needed to loop-back in
    Captivate 2 (I don't have Captivate 3 due to ongoing bugs that must
    be fixed before I agree to upgrade). The loop-back that goes
    forward first is the only way that I can get multiple answer
    Multi-Choice questions to reset / clear for another try in
    Captivate 2. I usually set the maximum attempts at 10 or 20 when I
    do this (in the overall Quiz settings and in the Quiz slide
    settings and the user MUST take the Quizzes to continue).
    If you add to the above the Captivate 3 functionality for
    Quiz Pools and randomizing of answers, then you have something more
    dynamic. It still produces only one final set of results.
    The final method is to link several courses together where
    one calls another. But the scoring sould be presentation and not
    cumulative.
    More advanced users can use SCORM SCO editing tools and
    modify the behavior to allow multiple SCO's. There are tools that
    assist with this and one of the local (board) SCORM Guru's recently
    posted a website that has all of those tools.
    I think I just restated what is in many other posts on this
    site. However, Captivate is a fantastic screen capture tool for
    software simulations, demos and software proficiency assessments.
    When you are doing more of a PowerPoint and sound enabled
    presentation and need strict SCORM compliance, there are other
    options available (generally at a higher price).
    Best of luck to you on your projects.
    Joe C.

  • Multiple people on one project

    Hey guys,
    Another person was assigned to help me on a project so I had them install Flash Builder 4 and told them where my workspace it. Now I get an error when I try to open the same workspace when they have it open.  How can I have multiple people working on the same project in Flash  Builder?
    Thanks,

    Hi,
       Yeah just sharing the workspace files is not going to do it for you and create problems as you have noticed. You'll probably be best to look at using some kind or source control like SVN using subclipse maybe with Flash Builder. There are many solutions out there but that is perhaps one of the most popular.
       you can find subclipse at http://subclipse.tigris.org/ that might give you some ideas on where to start moving forward on team collaboration with Flash Builder.
    Hope this helps,
    Regards,
    Peter Witham
    www.uibuzz.com

  • Multiple rollovers in one project

    Hello!
    I am working on a project that requires multiple rollovers and I cannot determine the best way to do what I want it to. I want to be able to rollover a shape and have a text box appear as well as lines connecting other dots. Then, as the lines are still showing, I want to be able to move to another shape, click it, and have it take me to a web page with a job description. I feel like this should be possible, but have spent hours and hours with no success and no ideas.
    Here's a view of what I want (kind of):
    I want the user to hover over the main dot, words and lines appear, and each dot connection is clickable and leads the user to a separate page.
    Please help!

    You need to be able to trigger an Advanced Action on mouseover of an object.  This Advanced Action can be set to SHOW any number of slide objects that start out as hidden.
    There are two ways to trigger an Advanced Action with a mouseover event this in Captivate. 
    One way is by using a rollover slidelet and using the Roll Over event of the slidelet hit area.  You can move the part of the slidelet that normally appears on rollover somewhere off stage where it doesn't get seen.  All you really need the slidelet for is to trigger the Advanced Action.
    The other method is to use the Infosemantics Event Handler widget.  It allows you to trigger Advanced Actions on rollover or rollout of any object on the slide.  (It also allows you to use many other mouse events to trigger actions.)
    You can learn more about it here:
    http://www.infosemantics.com.au/adobe-captivate-widgets
    It's the third widget from the top.

  • Using multiple harddrives for one project

    I'm about to purchase a new iMac and Final Cut Studio, and I have a question about harddrive setup. Currently, I have two external 320 GB harddrives I'm planning on using, and the iMac will come with an internal drive of 320 GB. This should be enough space to fit the estimated 468 GB of footage I'll have (36 hrs * 13 GB/hr for HDV is my calculation), but I've heard that there can be problems splitting a project across multiple harddrives. Should I upgrade the internal harddrive on the iMac to 750 GB so I can fit the project all on one drive?
    Thanks very much!

    Listen to what David said,
    don't use your internal disk as scratch disk, it will slow down your system, put it at an unnecessary risk .
    Are your drives FW connected or USB? If the case is the latter use your drives as back up drives and for more efficiency get at least FW400 drives and in the future do take into consideration bigger drives, 320 GB when editing video on a regular basis is peanuts.
    Here some suggestions:
    http://www.CalDigit.com/index.asp
    http://www.dulcesystems.com/html/products.html
    http://www.g-technology.com/Products/Products.cfm

Maybe you are looking for

  • Chromosomes and genes in portal look and feel

    Hi everybody. Has anyone experimented succesfully the use of genes and chromosomes in bea portal 9.2? I have troubles with look and feel editor, that doesn't show inlined css, and runtime also, that seems to always get the default.chromosome file ins

  • Where can I find this

    Dear all I was wondering if any of you lot know where I can download a free copy of visual age for java? Thanks J

  • Hangs every time I click on a link

    It appears that every time I clicked a link in Firefox, it would just hang. It didn't matter which website I was going to, the second I clicked on something, it would hang. I even tried to ask a question about it here using Firefox and it hung when I

  • Using iSetup for day-to-day change management

    We are an existing 11.5.10.2 e-business shop with many instances and many release flows. We've done a little bit of foundation object automation with fndload (just conc programs and request sets). We're contemplating using iSetup for day-to-day migra

  • IStore Dev Setup with JDeveloper

    All, I want to setup Jdev for iStore 12i, Can any one tell me the steps or Metalink note. I found this metalink note 419887.1 but it has steps to setup iStore 11i not 12i. Can any one tell setups for 12i iStore ?? I am using the JDevelper 10.1.3 and