Multiresource Scheduling message number /MRSS/SGE032

Hi guys,
I'm trying to integrate the MRS add-on to the PM / CS. If I try to call the Planning Board for the resource planner I get a message that my user is not assigned as a planning node. Even if I try in HCM to establish a new organizational unit, it still doesn't work. I have attached the exact message as jpg.
I would be very glad if someone could help me.
Thanks in advance.
With best regards
Christian

Hi,
This is SAP Business one forum for SAP add-on. Please find correct forum and repost above discussion to get quick response.
Please close this thread here with helpful answer.
Thanks & Regards,
Nagarajan

Similar Messages

  • Error Message: Number is not in external Interval (Testing Schedule)

    Hii ,
    Iam working on Stability study process. I have maintained stabity test with materiial (QS) & performed my test upto Initial test of Inspection lot. But when i click create Testing Scheudle in the Notification (QM02) , system asks for testing schedule data for
    Maintenane strategy, scheduling period.
    On clciking create testing schedule , system throws error message "Number is not in external interval". I have maintained all the prerequite setting on number range in following spro path stability study>testing schedule for stability study> Category--> no range.
    For Group ST   600000000- 6999999999 for Intenal & 70000000-7999999999 for external. But still iam facing with error message ""Number is not in external interval".  It throws message no "IP324" . Even I had cross checked with maintenance setting, but error message remains . How to resolve this issue?
    with regards,
    K.Lokesh.
    Edited by: Lokesh K on Mar 11, 2010 1:13 PM
    Edited by: Lokesh K on Mar 12, 2010 5:55 AM

    Hi Lokesh,
    did you actually enter a number ( i.e. 70000001)?
    Usually Stability studies are created using the external number range so that ringing names can be used for the studies:
    Example:
    Material: 000000000000000001  acetylsalicylic acid
    Stability study: ASA1
    I hope that this information proves usefull.
    Regards
    Isabelle

  • Multiresource Scheduling within Unconstrained Plan

    Hello,
    We are 12.0.6 hybrid manufacturing (Discrete and OSFM) using Unconstrained Plan.
    When scheduling planned order for Make items the system calculates the Order Date according to the following formula:
    Due Date-Fixed Lead Time-(Variable Lead Time*Planned Order Qty)-PreProcessing Lead Time.
    Assuming Planned Order:
    - for 10 units
    - lead time 30 days (5 fixed+25 variable)
    - order date calculation = 5+25*10
    This is under an assumption that there is one resource performing that job.
    We have multiple resource!
    According to ASCP Documentation, chapter 6-105, "Multiresource Scheduling" the system has to schedule the planned orders simultaneously. This feature is contolled by 'Round Order Quantities" attribute at item level.
    In our tests, I'm using item with this attribute as Checked.
    Unfortunately, the system still schedule the planned orders in sequence, one by one. By that, Planned Order Date is moved beyond the items lead time.
    What is the way to set the multiple resource working within Unconstrained Plan.
    Taking into account multiple resource should shorten Order Date calculation.
    I will appreciate any help.
    Regards,
    Max.

    Dear Max
    Have you defined the resources , attached routing to the item etc?. Not sure without that definition how will system know that you have x number of multiple resources..
    Thnx
    Partha

  • SAP Multiresource Scheduling MRS 700 - Help

    Dear all,
    I am looking for additional information regarding SAP Multiresource Scheduling.
    The main is to control the detailed planning and capacity of a group of 150 resources, splitted in different sub teams, attached to different roles, with different skills and working potentially on 1 to n projects. We would like to control the detailed capacity and planning at the resources level. Currently all our projects are stored in the NPDI system.
    I would like to know :
    -if it is possible?
    -if it is manageable with a solution not "too heavy" and complex to manage
    -if somebody has a similar experience
    Thanks a lot for your quick help.
    Regards,
    Patrick

    Hi
    With respect to the question I can tell you that the dump is generated because in configuration was not adding mrss positions on the screen Planner inside SPRO options:
    Set up scheduler workplace -> Workplace Profile -> Define User Interface Profiles
    Within this option exists Maintain Container positions in the layout
    Regards
    Damy

  • Delivery schedule line number in make to order

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated and delivery date is not picking correctly in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    regards
    piyush

    Hi
    When you do the MRP Run at MD02, maintain the Delivery Schedules as 3 (schedule lines), so when ever you do the MRP Run, it will run along with the delievry date.
    reward if it helps
    Regards
    Prasanna R

  • Delivery schedule line number in sales order is not populated in production

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Will reward points.
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

  • Delivery schedule line number in sales order is not populated  in productio

    Hi all,
    i am doing make to order scenario with 20 strategy group. In sales order we r defining the different delivery schedule lines.when i run the MRP and getting the plan orders for all the FG material and semifinished material, the sale order number and sale order item number is getting updated in production order . Beside these two , delivery schedule line number is not populated in production order.
    please give your valuable suggestion .
    i would be highly thankful to u
    Regards
    Kumaraguru

    Hi Kumar,
    Some changes done in your PRD server.If yes then contact abap consultant regarding the same.
    Because these type of problem comes when you do transport or changes done in the system.
    Regards,
    Anil

  • Link between schedule Line Number and Delivery

    Is there a link between Schedule line Number and Delivery number ?
    Eg. Line item 10 with quantity 100. 
    has 5 schedule lines..with 5 different delivery dates.
    1 .  quanity 40
    2.   quantity 30
    3.   quantity 20
    4.   quanity  6
    5    quantity  4
    For schedule line 1, 2 deliveries were created,
    one      with quantity 20
    another with quantity 15
    quantity 5 is still not delivered.
    also schedule lines 2,3,4 and 5 are fully delivered.
    Is there any table, FM etc in SAP which will give me the link between the schedule line and delivery number ?
    Total deliveries created : 6. - But which delivery corresponds to which schedule line ?
    Please dont tell me to look VGBEL and VGPOS.. that will just give line item number 10.. I need to get the schedule line number.
    Also, RV_SCHEDULE_CHECK_DELIVERIES --> will give me the delivered quantity against each schedule line.
    My purpose is to create an ontime delivery report .
    a report which list each schedule lines, and tell, how many shipments were late/ontime/early etc..
    and for Late ones, how many days late has to be found.
    this is where i need the delivery.
    No. Of days Late = Actual GI Date - Planned GI Date.
    Actual GI date is in the delivery.
    Any suggestions ?
    Thank you in advance.

    Hi,
    Check in the below link.
    relation between VBEP-ETENR and LIKP-VBELN
    Thanks,
    Sree.

  • Schedule line number determination - Schedule line category CP(MRP)

    Hello All,
    I want to know on what basis schedule line numbers getting determined.
    Schedule line category: CP-MRP
    Sales order line items getting confirmed based on the Planned order--> production order created through MRP run.
    I have created sales order line item 1 with 100 quantities. for example I created today. RDD also today.
    3 production order created.
    Those production orders confirmation date as below.
    Production order 1 - 60 quantities - 14.04.2014
    Production order 2 - 30 quantities - 16.04.2014
    Production order 3: 10 quantities - 18.02.2014.
    There are four schedule lines for the line item 1.
    All the 4 lines showed as per the confirmation date order.
    But the schedule line numbers are not as per the above order.
    For example,
    Schedule line number   ----- delivery date ----- Confirmed qty
    1.                                         09.04.2014            0
    3.                                         14.04.2014            60
    2                                          16.04.2014           30
    4                                          18.04.2014            10
    On what basis this schedule numbers getting determined? Is there any standard procedure ?
    Why schedule line numbers not inline with the confirmed date?
    Let me know if you need more information.
    Thank you.
    Regards,
    Rakkimuthu C

    Hi,
    Schedule line number is the number that uniquely identifies the schedule line .
    Use When an item has more than one schedule line, the system automatically assigns a unique number to each line. The number is displayed in the details screens for schedule lines.
    Note The schedule line number serves internal purposes and does not, for example, determine the sequence of schedule lines in the overview screen. The schedule lines on the overview screen are sorted by date.
    The schedule line number will get created automatically by the system. I hope this will clarify your doubt. Thanking you.

  • Write message to Job log with message class and message number

    hi folk,
    When running a background job I'm able to write a message to the job log using the statement - Message "some text..." type 'I'.
    In the Job log I can see the message "some text.." with a "default" message class and message number (but in my report i don't specify any message ID) so I have no idea it comes from.
    Then I try to send a message where I specify the message class/number etc...using message id 'Z1' number 000 with "some text..." In the job log I now can see the "right" message class "Z1" and the number 000, but the message is empty?
    Please advice how to write a message with the message class and message number.
    Best regards
    LinhNg

    Hi Linh,
    How did you provide the text "Some message"? Did you hard code it or used a text element?
    Regards,
    Immanuel.

  • INVALID_QUEUE_NAME :  Error while scheduling message using qRFC

    Hello SDNers
    We are currently performing our PI 7.1 upgrade and one of our scenario uses a Sender SOAP of the type EOIO. We tried executing this scenario in PI 7.1 XID environment and in it worked fine without any errors but in our PI 7.1 QA environment it is giving the following errors
      <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Message Split According to Receiver List
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIServer</SAP:Category>
      <SAP:Code area="INTERNAL">SCHEDULE_ERROR</SAP:Code>
      <SAP:P1>XBQOC___*</SAP:P1>
      <SAP:P2>INVALID_QUEUE_NAME</SAP:P2>
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:Stack>Error while scheduling message using qRFC (queue name = XBQOC___*, exception = INVALID_QUEUE_NAME)</SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    Can you please exaplian what could be the issue we are facing.
    Thanks.
    Kiran
    Edited by: Kiran Sakhardande on Oct 22, 2008 4:08 PM

    HI Kiran,
    Have gone throgh the following link?
    INVALID_QUEUE_NAME
    Regards
    Sridhar Goli

  • Scheduling agreement number is not shown in the MD04

    Dear all,
    The scheduling agreement number is not shown in the MDO4 screen for the material x.
    when i check the mrp data  for availabiity check as 02 .
    if i copy line item of the material in same SA , and enter the  forecasting line, system showed in the MD04 for the SA number
    Pls help me out to find out the reason.
    thanks
    vbraj

    Dear,
    Thanks for your reply.
    i checked the assigned schdule line catogry as L2 and it have the tick mark over the Req / Assmbly.
    anyother reason?
    Thanks

  • Item Text value of scheduling agreement number (ME32L).

    Hi All,
    How I can get all changed values of item text for a scheduling agreement number in ME32L transaction. Actually when I am using function module ‘READ_TEXT’ it will give only last changed value of item text. But I want all changed values of  item text.
    Please reply ASAP. It’s very urgent.
    Thanks & Regards
    Rakesh

    Dear,
    Thanks for your reply.
    i checked the assigned schdule line catogry as L2 and it have the tick mark over the Req / Assmbly.
    anyother reason?
    Thanks

  • MRP - want to create query for Exception message number (MD04)

    Dear all MM kings
    consider  i had one purchase against xxxx material , if i go to MD04  In Exception message number  column i got massage number 20 Cancel process, now i want to know how many purchase order exist  in system having the Exception message number  20
    i want to define query for Exception message number 20
    is there any way to do the same

    Hi,
    There are links on the first thread on this MM board that describe how to produce a query.
    But if you have not done this before and have no ABAP experience, you might find it a bit tricky.
    You need someone to find the tabkle that stores the MRP lists and see if this contains the exception message, first.
    the structure I gave you is probably built dynamically by the program and so may not be available for a query.
    One simpler option is to use the "Collective access" tab in MD04. here you can enter an MRP controller etc. and get a list of materials. You can then find out which of the 8 numbered columns contains the exception message 20 and then sort the list in this sequence (the exception messages are linked to one of the columns and this can be different in every implementation and so I can't tell you which one it is)
    This will not just get the "20" messages unless they have been configured to use a separate column, but at least it is avail;able now without config and may be enough for your purposes.
    Steve B

  • Maintain default cost element in controlling area Message number FI660

    Hi All,
    We found the Down Pay Request (doc. booked by F-47)  cannot be picked up by F110. In Job log the error shown as Maintain default cost element in controlling area.
    Long text error details.
    Maintain default cost element in controlling area
    Message number FI660
    CO down payment update is active in controlling area WAPC. You  must  therefore maintain a default cost element and a revenue element  for down payments.
    Maintain the default cost element for dow payment for controlling area in the project system implementation guide.
    Kindly advice.
    Note
    In the define dafault cost elemens for down payments in Project system-OKEP  the CE for vendor and cusotmer downpayemnt  is missing

    hi srinivas
    OKEP configuration is necessary
    if while creating down payment request you have not assigned cost element
    maintain cost elements there.
    regards
    rohit

Maybe you are looking for