MySAP PLM
In all the presentations that are present in service.sap.com related to mySAP PLM it talks about Quality Management using mySAP PLM, Life cycle data management and life cycle process management. Under Life cycle data management we have Document management system, change management system, variant configuration etc. I am a certified PP consultant. As per my knowledge the above mentioned components under Life-cycle data management already exist in SAP R/3 Logistics. Also Quality Management exists in SAP R/3. I would like to understand how mySAP PLM DMS system or mySAP Quality management differ from SAP R/3 DMS and SAP R/3 Quality Management.
Also there is a mention of engineering work bench and IPPE (Integrated product and process engineering) under Life-Cycle data management. As I mentioned earlier EWB and IPPE are very much part of R/3 Logistics. Now I would like to understand if these components of SAP R/3 come under the purview of mySAP PLM even though they exist under R/3 or there are differences.I would also like to understand the components that exist in mySAP PLM apart from cFolders & cProjects.
Hi,
You are quite right about the fact that almost all PLM components already existed in SAP R/3.
When SAP divided its solution in different blocks (SCM, CRM, SRM and PLM), some of these blocks included other software than SAP R/3 (APO, CRM...), and MySAP PLM is the only one based mainly on SAP R/3.
I see it as a functionnal presentation of existing components.
Now when I give the PLM100 training, I explain that the material, document, BOM... are part of the PLM funcionnalities, but technically parts of SAP R/3.
now : what is in PLM and not in R/3? as you said, mainly cProject, cFolder. EH&S used to be in PLM only, as well as the CAD interface.
Hope it helps
Regards
Similar Messages
-
Installation of mysap PLM integration for Autodesk from Cideon Software
Where to download
Installation of mysap PLM integration - For AutoDesk / Auto CAD from Cideon Software
(SAP AutoCAD integration using CAD Desktop)
Is it comes along with SAP Inst or
do we need to get licence to use from Cideon Software.Hi,
for clarification:
The AutoCAD-SAP Integration is a SAP product, developed by CIDEON Software together with SAP.
So it is an SAP pricelist product, it has to be purchased from SAP. Consulting services are typically done by CIDEON. -
MySAP-PLM (MRO) presentation.
Dear All,
I am looking for mySAP-PLM presentation in MRO space.
Please help me.
Regards
Chanduhi sir,
please give me your mail id so i can send you the presentation.
thanx
sunil jawalkar -
MySAP PLM + java 7 rev67 + OSX 10.9.5 : problem upload/Download
Hello,
I'm user from MySAP PLM on Safari or Firefox on Mac with OS 10.9.5 (Mavericks). Last Java version.
I have to upload/download files but the window to choose direction doesn't appears.
When I click on upload or download button, the window opens. But after, when I click on the button "Select files" nothing appears (see file attached).
My first question is : is it possible to upload/download somethings from a Mac ? (from a PC, it works).
Second : if yes, what settings should I set up ?
Thank you for your help.
A.SigoillotThis discussion thread belongs to the Product Lifecycle Management (SAP PLM) space. Generically speaking Safari support is somewhat restricted. In order to analyze the situation any further, please share the version of your SAP system, especially SAP_BASIS including the SP level.
-
I would like to understand how to configure Web DMS. Do we need to download any software like we do for Easy DMS? Basically I would like to understand how to access the doucments created in R/3 using Web DMS.
thanksWebDocuments is a BSP application provided by SAP from 4.7 onwards. To configure WebDocuments, go to SPRO
Cross-Application Components -> Document Management -> Set Up WebDocuments(BSP)
Here you make additional settings for the document types that you want to access through WebDocuments.
The BSP application is 'CVAW_ENTIRE'. -
Hi, I am new to PLM and was asked today to spec out what it would take to install a PLM instance. I have spent a bunch of time in OSS looking for the components and am not finding much outside of the PLM/PPM component. From what I can tell, this is a component of ECC but I am not sure if it is an addon component or part of the base install.
Can anyone give me a highlevel oveview of what is involved in the PLM landscape since it is not clearly called out by SAP?
thanks
RichHi ,
1. The installation of mySAP PLM like as mySAP ERP.
2. After installation done, just you will have to some Add-Ons and some componets, whcih are available in http://service.sao.com/downloads.
3. First you will have to discuus with client, what they want and also get the confirmation and install it.
http://service.sap.com/plm
Regards,
Srini Nookala -
Sorry folks. This is an offbeat question. Appreciate if you could still spare a few moments to answer it. The phrase "mySAP" is normally prefixed to SAP Business suite components like PLM, CRM, SCM, SRM and ERP. What does one make out when someone says that he/she possess skills on mySAP MM, mySAP QM or mySAP SD. What comes to my mind, is that someone who has worked on MM in an mySAP ERP environment would claim to have skills on mySAP MM & so on. Does any one know what else could be an explanation for a mySAP MM skill, for example. Thanks in advance.
Dear
You r right partially, earlier the modules are SAP QM, PP, SD etc. So earlier people don't use mySAP PP etc. But now the SAP has modified its course content and is awarding the courses under mySAP PLM, mySAP SCM, mySAP APO etc. Hence now people can use mySAP for the respective modules
I hope this may answer your querry
Regards -
Hi All,
I am BW consultant.Interested in PLM .Could you please tell about PLM and if I want learn PLM what shall i do? This module comes under functional or technical?
Thanks,
RakeshHi Rakesh,
There are different tracktion for PLM in SAP
1. <b>Product Data Management</b>
which covers Material Management, Bill of Material, Document Managment System, Classification System, Variant Configurations, CAD Interfaces. etc.
Most of the Industries will be using these cross application components for their Engineering Departments.
2. <b>Program Management</b>
Where Entire Program is capture i.e. From Customer Enquirry to the Order execution and till Dispatch.
Here again Project System, CFolder, CProjects, DMS, MM, BOM, Workflow etc can be a part of the PLM
3. <b>Asset LifeCylce Management</b>
This is used in different Scenarios where companies wants to trace there assets
or lifecycle of their assets.
Project Systems and DMS will be mostly involved.
4.<b> Quality Managment</b>
Strictly Speaking PLM Products are used in R& D Department, Engineering Department, Design & Drafting Departments of the Companies/organizations,
Where they try to modify their existing Products, try to Design as per the customer requirements, Try to launch new Product by doing R & D works.
PLM is Mostly used in these Departments of the Organizations
SAP Material Material Details:-
http://help.sap.com/saphelp_ppm400/helpdata/en/index.htm
http://help.sap.com/saphelp_cpro31/helpdata/en/home.htm
For Certification on SAP PLM follow the below link:
https://websmp203.sap-ag.de/certification
(Note you need Service ID to access this link)
Certification - Solution Consultant
Certificate Name Exam Topics Duration (h)/
No. of questions Software
Components Curriculum Booking Code
(SAP internal)
mySAP PLM Quality Management (2005) German/English 3 / 80 mySAP ERP2005 (ECC 6.0) C_TPLM40_05
PLM - Maintenance & Repair with mySAP ERP 2005 German/English 3 / 80 SAP ECC 6.0 C_TPLM30_05
PLM - Project Management with mySAP ERP 2005 German/English 3 / 80 SAP ERP Central Component 6.0 English/German C_TPLM22_05
mySAP PLM Quality Management (2003) German/English 3 / 80 SAP R/3 Enterprise English/German C_TPLM40_03
mySAP PLM - Project Management (2003) German/English 3 / 80 SAP R/3 Enterprise German/English C_TPLM22_03
mySAP PLM - Asset Life Cycle Management - Plant Maintenance (2003) German/English 3 / 80 SAP R/3 Enterprise German/English C_TPLM30_03
mySAP PLM - Asset Life Cycle Management - Customer Service (2003) German/English 3 / 80 SAP R/3 Enterprise German/English C_CS47_03
SAP Consultant Certification
Solution Consultant PLM - Project Management with mySAP ERP 2005
Software components: SAP ERP Central Component 6.0
Certification exam is included in course TPLM22 and is also offered in separate certification events at many SAP locations.
Certification ID (Booking code): C_TPLM22_05
Certification duration: 3 hours
Number of certification questions: 30
Required certificates for participation in this certification test: None
Consultant Academy courses for certification preparation: TPLM20 (Project Management I), TPLM22 (Project Management II (Case Study))
Alternative Project Team Training courses for certification preparation: PLM200 (Project Management), PLM210 (Project Management - Structuring), PLM 220 (Project Management Logistic), PLM230 (Project Management Controlling), PLM240 (Project Management Reporting)
Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system).
The certification test Solution Consultant PLM Project Management with mySAP ERP 2005 verifies the knowledge in the area of the mySAP Product Lifecycle Management for the consultant profile Project Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
The certification test consists of questions from the areas specified below:
Topic Areas
1. Project Structuring (+++)
Basic data in PS: work breakdown structure, network and activities, milestones, PS texts, documents
Project Builder and project planning board
Project simulation
Standard work breakdown structure, standard network
Assembly processing
2. Dates
Time scheduling and scheduling (network scheduling, project scheduling, overall network scheduling)
Actual dates
3. Resources
Work center
Capacity planning and capacity evaluation
Workforce planning to HR resource
Confirmation and working time sheet
Internet scenarios
Workflows in PS
4. Material
Work breakdown structure BOM
BOM PS interface
Component assignment in the network
Material procurement through in-house production or external procurement
Collective stock and project stock
Requirements grouping
Progress tracking
ProMan
Delivery from the project
5. Costs and Budget (++)
Cost planning in the work breakdown structure
Network costing
Assigning orders to the project
Budgeting and availability control
Commitment and actual costs through account assignment and order assignment
6. Revenue and Payments
Revenue and payment planning in the project
Sales pricing and quotation creation
Resource-related billing
Milestone billing and down payment processing
7. Period-End Closing
Template allocation
Application of overhead
Interest calculation
Progress analysis and Progress Analysis Workbench.
Results analysis
Incoming orders
Settlement
8 Miscellaneous
Exernal service and service activities
Organizational units in SAP ERP
Info systems in project management
Field selection
OpenPS
Amount of questions by topic (as percentage of test):
+ = 1 - 10%
++ = 11 - 20%
+++ = over 20%
SAP Consultant Certification
Solution Consultant mySAP PLM Quality Management (2003)
Software components: R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10)
Certification duration: 3 hours
Number of certification questions: 80 multiple choice questions
Required certificates for participation in this certification test: None
Courses for certification preparation:
PLM400 (Quality Management) or LO170 (Quality Management)
PLM405 (Quality Inspections) or LO705 (Quality Inspections)
PLM410 (Quality Notifications) or LO710 (Quality Notifications)
PLM415 (QM in Procurement) or LO715 (QM in Procurement)
PLM420 (QM in Discrete Manufacturing) or LO720 (QM in Discrete and Repetitive Manufacturing)
PLM421 (QM in the Process Industry) or LO721 (QM in the Process Industry)
PLM425 (QM in Sales and Distribution/Quality Certificates) or LO725 (QM in Sales and Distribution/Quality Certificates)
Participants who have attended the prerequisite courses in SAP R/3 4.6C, can learn about the new developments for SAP R/3 Enterprise by attending the delta course D47QM.
TPLM40 Quality Management (Case Study)
Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system).
The certification test Solution Consultant mySAP PLM Quality Management (2003) verifies the knowledge in the area of the mySAP Product Lifecycle Management for the consultant profile Quality Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
The certification test consists of questions from the areas specified below:
Topic Areas
1. Integration of QM and MM (++)
Material master
Quality info record: Procurement
Source inspection, GR inspection
Vendor evaluation, vendor release, vendor selection
Manufacturer part number
Handling Unit Management
Warehouse Management
2. QM in Discrete Manufacturing (++)
Integrated inspection planning
Routing, reference operation set, rate routing
Inspection during production
Inspection at end of production
Inspection for external processing
Inspection during repetitive manufacturing
Statistical Process Control (SPC)
3. QM in the Process Industry
Integrated inspection planning
Master recipe
Integrated inspection processing
Inspection during production
Inspection at end of production
Batch valuation
Recurring inspections
Statistical process control (SPC)
Engineering change management
Digital signature
Batch record
4. Integration of QM in the areas Service and Sales and Distribution
Inspections for delivery
Quality info. record: Sales and Distribution
Make-to-order production
Make-to-stock production
Repairs and returns processing
5. Quality Planning (++)
Basic data
Inspection planning
Logistics master data
6. Quality Inspections (++)
Inspection lot
Defects recording
Results recording
Usage decision
7. Quality Certificates
Certificate planning
Certificate creation
Quality certificates on the Web
Quality data interchange
8. Quality Notifications
Notification systems
Customer complaint
Complaints against vendors
Internal problem notification
Simplified notification
ISR
SAP Support Desk
Solution database
9. Quality Control (++)
Dynamic modification
Statistical Process Control (SPC)
Quality key figures, results history
Quality-related costs
Standard analyses, flexible analyses, early warning system
Business Information Warehouse
Interfaces to subsystems (QM-STI)
10. Test Equipment Management
Test equipment
Calibration planning
Calibration inspection
Test equipment tracking
11. Sample Management
Physical samples
Physical-sample categories
Confirmation requirement
Sample-drawing procedure
12. Stability Studies
Creating a stability study
Initial test
Stability planning
Stability tests
Completing a stability study
13. Configuration and Organization
Customizing
Enhancements
BAPIs
BAdIs
Field selection
Lists
Status management
User roles
Analysis tools
Interfaces
Follow-up actions
SAPScript Forms
Authorization concept
Amount of questions by topic (as percentage of test):
+ = 1 - 10%
++ = 11 - 20%
+++ = over 20%
SAP Consultant Certification
Solution Consultant PLM - Maintenance & Repair with mySAP ERP 2005
Software components: SAP ECC 6.0 ( SAP ERP Central Component 6.0)
Certification exam is included in course TPLM30 and is also offered in separate certification events at many SAP locations.
Certification ID (Booking code): C_TPLM30_05
Certification duration: 3 hours
Number of certification questions: 80 multiple choice questions
Required certificates for participation in this certification test: none
Courses for certification preparation: PLM300 (Business Processes in Plant Maintenance), PLM305 (Structuring and Managing Technical Objects), PLM310 (Preventive Maintenance and Service), PLM315 (Maintenance Processing: Operational Functions), PLM318 (Analytics in Enterprise Asset Management), TPLM30 (Asset Life-Cycle Management - Plant Maintenance (Case Study))
Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system).
The certification test Solution Consultant PLM - Maintenance & Repair with mySAP ERP 2005 verifies the knowledge in the area of solution mySAP Product Lifecycle Management for the consultant profile Maintenance & Repair. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
The certification test consists of questions from the areas specified below:
Topic Areas
1. Organizational Units and Master Data in Plant Maintenance (++)
Organizational Units
Maintenance Plant and Planning Plant
Work Centers
Functional Locations
Structure Indicator
Reference Location and Functional Location
Creation Options
Data Transfer
Equipment
Installation/Dismantling at Functional Locations
Equipment Hierarchy
Change Documentation
Equipment Category
Synchronization of material/construction type
Synchronization of equipment/serial number
Material and Serial Numbers
Serial Number Profile
Goods Movement and Warehouse Stock
Valuation Batches
Bills of Material (BOM)
Assemblies
BOM Categories
Item Categories
Change Documentation
Additional Functions
Classification
Measuring Points and Counters
Partners and Addresses
Document Link
Status Management
2. Maintenance Processing (+++)
Corrective Maintenance
Notification Types
Objects and Object Information
Catalogs and Catalog Profiles
Integration Notification/Order
List Viewer for Notifications and Orders
Order Type
Object List
Operation List
Relationships
Material List
Availability Check
Order Release and Printing
Material Withdrawal
Completion Confirmation in Time
Technical Completion Confirmation
Technical Completion
Action Log and Document Flow
Processing External Services
External Services as Individual Purchase Order
External Services with External Work Centers
External Services with Service Entry Sheets
Processing Refurbishment Tasks
Valuation Type and Valuation Category in the Material Master
Refurbishment Without Serial Numbers
Refurbishment with Serial Numbers
Inventory Management and Controlling
Processing Maintenance Projects
Planning and Executing Maintenance Projects
Completion, Settlement, and Monitoring of Maintenance Projects
Capacity Planning
Scheduling
Work Center and Available Capacity
3. Controlling Functions in Plant Maintenance (++)
Plant Maintenance in the Organizational Structures of Accounting
Cost Estimation
Planned/Actual Cost Determination
Order Settlement
Logistics Information System (LIS)
Plant Maintenance Information System (PMIS)
4. Preventive Maintenance (+++)
Task List Management
Task List Types
Profile and User Fields
Component Assignment
Task List and Order
Single Cycle Plan
Structure
Scheduling Indicator
Deadline Monitoring
Change Documentation
Strategy Plan
Maintenance Strategy
Task List and Maintenance Strategy
Change Documentation
Performance-Based Maintenance Planning
Counters and Measurement Documents
Maintenance Plan Scheduling
Deadline Monitoring
Maintenance Planning with Multi-Counter Plans
Cycle Sets
Link Type
Weighting Key in the Test:
+ = 1 - 10%
++ = 11 - 20%
+++ = over 20%
Regards
Rehman
Reward Your Points If Useful -
Relation between PLM and QM modules
What is the relation between PLM and QM modules?
These two are different modules or QM is one of the module in PLM and there is no module as PLM and its just general term?
Why QM is many times called with PLM - QM?Hi Sandip,
mySAP PLM has many key features like:
1.Collabarative Engineering and Design.
2. Custom Product Development
3. Knowledge Management
4. Project Management
5.Colloborative Maintenance management
6. QUALITY MANAGEMENT
<u>Begin quality planning during the product design phase, and create a foundation for quality inspection processes and in-process control during production
and Allow employees to play a central role in quality management
and it also Satisfy criteria for ISO 9000 and Good Manufacturing Practice (GMP)</u>
Tracking the Product through out its life from a quality perspective is PLM-QM
The Functionality that Spans the Entire Product & Asset Life Cycle are:
1. Life Cycle Data Management (MM, BOM, DMS, CAD Interface, Classification System)
2. Program & Project Management(Project System, Collaboration Folders, Collaboration Projects, XRPM, xAPPS)
3.QUALITY MANAGEMENT
4. Asset Life-Cycle Managment
5. Environment, Health and Safety.
Regards
Rehman
Reward Your Suitable Points if Helpful -
Dear All,
I am venturing into PLM, mainly configuring its interface with SRM.
Request you guys to let me know if there is a standard documentation available whih will help me get started.
Regards,
KaustubhHello, hope this helps
https://websmp108.sap-ag.de/~sapidb/011000358700002897362004E/CG_Sourcing5.pdf
there is a small chapter about Integrating mySAP PLM cFolders with SAP
Bidding Engine (SRM).
Regards, Luciano. -
Send Email & Store in mySAP Cfolders
Hi,
I have developed a WD application through which I populate a adobe form from SAP.Now user keys in some more fields.
When user clicks submit it should send an email which is already in that form plus it should store in respective project (Hard Copies) folder of Mysap PLM Cfolders as We already have these folders bulit up for all projects.
FYi.. I don't need anything back to SAP. I have used Submit by ema.. button and it sends an XML file though.but I need to send PDF form which is filled by the user.
Also,I have hard coded my em..address but I want it be binded to my address which I will be prefilling.
Any ideas?
rgds
Vara
Edited by: Vara K on May 7, 2009 11:50 PMHi,
Thank you for the links.
My requirement made me follow the blog of Juergen.
https://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/6676. [original link is broken] [original link is broken] [original link is broken]
Right now with submit button I can attach PDF and it is linking it to my EMAEL client but my EMAEL address is not showing up in TO address.
This is what I followed from Juergen Hauser blog.
I create the EMAEL button on the form based on the standard button. I drag and drop the button onto the form and then take a look at the properties. In the "field" tab of the object palette you can find the "control type". I just set it to "submit". Doing this I get an additional tab called "submit". This tab contains a field where you can enter the "Submit to URL". If you want to submit data via EMAEL you have to use an "EMAELto:" URL.
The EMAEL address shouldn't be contained in the form template. It should be data driven so that it can be changed without touching the template. So let's assume that the EMAEL address is contained in the form data (e.g. in a node that is not bound to any field on the form).
First of all we have to find out where the URL is stored in the template. The XFA Specification helps us here (see also my blog about where to find documentation on scripting for Interactive Forms). It tells us that a submit button has a node "event". This node has another subnode called "submit" and this node has a property called "target". To dynamically set the submit-to URL we have to script against this property.
To access the "target" property of the EMAEL button in JavaScript we have to use the function resolveNode. You can use the following JavaScript line to set the URL of a submit button:
I have used following Code in Initialize & also tried in ready event.
this.resolveNode("#event.#submit").target = "EMAELto:"+$record.EMAELaddress.value;
My plan is to use the EMAEL address from node.
It may by default bring the EMAEL address from database or else user-may also key in the EMAEL address and it should take that EMAEL whle sending the PDF.
What is going wrong with me.
resolved it basically I was misisng
TABLE name in code
this.resolveNode("#event.#submit").target = "mailto:"+$record.ITEM.PEMAI.value;
Rgds
Vara
Edited by: Vara K on May 11, 2009 4:06 PM
Edited by: Vara K on May 11, 2009 4:39 PM -
Hello,
I would like to know if you could recommend any good books on SAP PLM ?
Thx,
DirkHi Dirk,
I recommend the following book:
Product Lifecycle Management with SAP
The Complete Guide to mySAP PLMStrategy, Technology, and Best Practices
G. Hartmann, U. Schmidt
SAP PRESS
620 S., 2005, geb.
69,95 Euro, ISBN 1-59229-036-1
http://www.sap-press.de/katalog/buecher/titel/gp/titelID-933?GalileoSession=60106758A2-yBwU3N80
kind Regards / mit freundlichen Gruessen,
Robert Eifert / SAP PLM Development Support -
Difference between mysapplm and PLM
I am bit confused with mysapplm and SAPPLM.I am a Plantmaintenance consultant.
My client is implementing SAP-Plantmaintenance but they call it as SAPPLM.
Request the SAP forum to clarify the above
Thanks
TeekaramanThanks Per Högberg
Any how I happen to download the following PLM stuff and when I go through, I could see all the mySAPPLM related to Core Plant maintenance activity and no mention about DMS,CAD etc.
Request you to give your comments/views on the same
SAP Consultant Certification Solution Consultant mySAP PLM - Asset Life-Cycle Management - Plant Maintenance (2003)
Software components: SAP R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10)
Certification duration: 3 hours
Number of certification questions: 80 multiple choice questions
Required certificates for participation in this certification test: none
Courses for certification preparation: PLM300 (Plant Maintenance), PLM305 (Structuring and Managing Technical Objects), PLM310 (Preventive Maintenance and Service), PLM315 (Maintenance Processing: Operational Functions), PLM316 (Maintenance Processing: Controlling and Reporting), TPLM30 (Asset Life-Cycle Management - Plant Maintenance (Case Study))
The certification test Solution Consultant mySAP PLM - Asset Life-Cycle Management - Plant Maintenance (2003) verifies the knowledge in the area of solution mySAP Product Lifecycle Management for the consultant profile Asset Life-Cycle Management - Plant Maintenance. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
The certification test consists of questions from the areas specified below:
Topic Areas
1. Organizational Units and Master Data in Plant Maintenance (++)
Organizational Units Maintenance Plant and Planning Plant
Work Centers
Storage Locations
Functional Locations
Structure Indicator
Reference Location and Functional
Location
Creation Options
Data Transfer
Equipment
Installation/Dismantling at Functional
Locations
Equipment Hierarchy
Change Documentation
Equipment Category
Synchronization of material/construction type
Synchronization of equipment/serial number
Material and Serial Numbers
Serial Number Profile
Goods Movement and Warehouse Stock
Valuation Batches
Bills of Material (BOM)
Assemblies
BOM Categories
Item Categories
Change Documentation
Additional Functions
Configuration
Classification
Measuring Points and Counters
Partners and Addresses
Document Link
Status Management
Permits and Warranties
Data Transfer
2. Maintenance Processing (+++)
Breakdown Maintenance
Corrective Maintenance
Notification Types
Objects and Object Information
Catalogs and Catalog Profiles
Integration Notification/Order
List Viewer for Notifications and Orders
Order Type
Object List
Operation List
Relationships
Material List
Availability Check
Order Release and Printing
Material Withdrawal
Completion Confirmation in Time
Technical Completion Confirmation
Technical Completion
Action Log and Document Flow
Processing External Services
External Services as Individual Purchase Order
External Services with External Work Centers
External Services with Service Entry Sheets
Processing Refurbishment Tasks
Valuation Type and Valuation Category in the Material Master
Refurbishment Without Serial Numbers
Refurbishment with Serial Numbers
Inventory Management and Controlling Processing Maintenance Projects
Planning and Executing Maintenance Projects
Completion, Settlement, and Monitoring of Maintenance Projects
Capacity Planning
Scheduling
Work Center and Available Capacity
Capacity Leveling
Employee Assignment
3. Controlling Functions in Plant Maintenance (++)
Plant Maintenance in the Organizational Structures of Accounting
Budget Planning and Monitoring
Cost Estimation
Planned/Actual Cost Determination
Order Settlement
Logistics Information System (LIS)
Plant Maintenance Information System (PMIS)
Enhancement Options
4. Preventive Maintenance (+++)
Task List Management
Task List Types
Profile and User Fields
Component Assignment
Task List and Order
Single Cycle Plan
Structure
Scheduling Indicator
Deadline Monitoring
Change Documentation
Strategy Plan
Maintenance Strategy
Task List and Maintenance Strategy
Change Documentation
Performance-Based Maintenance Planning
Counters and Measurement Documents
Maintenance Plan Scheduling
Maintenance Planning with Several Counters
Cycle Sets
Link Type
Weighting Key in the Test:
+ = 1 - 10%
++ = 11 - 20%
+++ = over 20%
Kind regards
Ramesh -
Hello Friends,
I am new to PLM , actually my requirement is 2 have 3D image rotation like for CAD Files.
Im using ecl viewer for that, but my seniors told me that one can use PLM
What is PLM ? Is it different from SAP R/3
is it a software which needs to install or it has its complete different hardware ???PLM stands for Product Lifecycle Management.
A PLM definition:
A strategic business approach that applies a set of
business and IT solutions in support of collaborative
creation, management and use of product definition
information across the extended enterprise from
concept to end of life integrating people, processes,
business systems, and information. Product Lifecycle
consists of three interacting lifecycles in the
organization: product definition, production definition
and operational support.
The key benefits for customers are accelerating time
to market, reducing life cycle costs and optimizing
asset utilization.
Management of product definition lifecycle is not a
new concept. Twenty years ago Product Data
Management (PDM) was a leading concept for
management of engineering information. Customs
implementation focused on precise applications.
Today, PLM is a business concept that covers the
lifecycle in the extended enterprise, addressing top
and bottom line issues. PLM solutions can support a
broad range of products in all kind of
industries/customers (civil engineering/construction,
chemicals, high tech/electronics, and public sector).
Industry specific data/process requirements like FDA,
ISO, STEP, UCC can be covered in SAP PLM solutions.
PLM does not include other major enterprise
solutions like ERP and CRM. However, PLM solutions
integrate with other business systems
on information and process level.
So: the MySAP PLM solution is one of the market
leaders in Product Definition Management. -
What are the Connectors available for KM file repository?
Hi All,
Which are different connectors available for KM?
Apart from below list
Windows File Server
Web Servers (HTTP)
WebDAV compliant servers (MS Sharepoint, MS Exchange Public Folders, LiveLink)
mySAP PLM DMS
SAP Knowledge Warehouse
Lotus Notes
3rd Party DMS (Filenet, IXOS)
EP KM repository
is any of above connector is not used now a days??
These are the list given in documentation of EP 6.
So if in EP 7, if they have included more or removed any then please let me know
Regards,
PuravHi
There is another connector for KM
DMS CONNECTOR FOR KM
Thanks
Maybe you are looking for
-
How can i use ipad to watch the movies in TC directly.
Just like the title.
-
How can I get email on my phone?
My email quit downloading to my I phone 4 on April 9, 2014, how can I get it back up?
-
Modify the login page (login.jsp) of B2B scenario of the Internet Sales app
All I wanted to modify the login page (login.jsp) of B2B scenario of the Internet Sales application By typing the URL "http://<servername>:50001/b2b/b2b/init.do." I could able to see the login page My requirement is to add an extra link in this page
-
Revision: 5604 Author: [email protected] Date: 2009-03-26 14:00:26 -0700 (Thu, 26 Mar 2009) Log Message: Ensuring qualified class names are used in type selector cache keys for Flex 4 applications. QE: Yes, this should address style issues for test c
-
Oracle Data Integrator / Informatica ?
Our current process uses the Informatica Essbase DIM to connect our teradata database tables to Essbase cubes via the Informatica workflow. Our Informatica workflow has a target that calls the DIM (Informatica Essbase Connector). In recent conference