Need to perform an inter facility mass asset transfer

We have a custom program to perform mass asset transfers between facilities in different company codes.  However, we now need to perform mass asset transfers between facilities in the same company code.  Is there anything standard that can handle mass inter facility asset transfers?
Thanks,
Patrick

Patrick,
Please try OA02 - Maintain substitution for Mass change and create your own substitution.
Then use AR01 to generate the worklist. Enter the assets to be changed and create the work list.
Go to AR31, enter the worklist number and release it.
Check whether this works for you or not.
Regards,
Vinod

Similar Messages

  • Mass Asset Transfer

    We need to transfer 11,000 assets to a new company code.  I've created the worklist in AR01, created the substitution rules to populate the new cost centers, and processed through AR31.  Does anybody know what the following errors are referencing or why we're receiving them?
    1.  Error in sub transient work item 'Intercompany Asset Transfer' (Message # SWF_RUN817)
    2.  Asset 1010 INTERN-00001-1 is incomplete, check asset (I think this one is related to a a missing required field).
    3.  Error handling for work item 229478 (Message no. SWF_RUN630)

    Hi Darrin,
    I had a similar requirement in my project as well. Besides others one of the options that exists in such cases is creating a worklist and then a substitution rule . But we felt it was best to apply the OSS note no 851357. It then worked for us, maybe you could try it too.
    Thanks
    Sharmila

  • Mass Intracompany asset transfer

    We need to change the account assignment on multiple asset records.  Is there a way to perform a mass intracompany transfer?

    In ABUMN screen we have a push button Multiple Assets in Application Tool Bar. Pleae try with it.

  • Mass Intercompany Asset Transfer

    Hi
    1. We have 7000 assets which needs to a Mass Intercompany Asset transfer
    2. Depreciation has been booked to the above assets till Dec 2010 and business wants to transfer to another intercompany and dont want to have any depreication booked in the existing company code for the month of Jan 2011
    3. Master data for the transferrable asset needs to be created in the new company with the left over life
    4. Balance showing in the existing company books on those assets will get paid by the other company so that there is no loss/gain posting on the asset in the existing company accounts.
    5. Once transaction is done: Depreciation will be calculated in the new company.
    Suggest the steps and transaction codes that i need to follow
    Thanks
    Kum

    Hi Vish,
    We have 7000 assets which needs to a Mass Intercompany Asset transfer
    Ans) Use LSMW or BDC with T.Code (ABT1N)
    Question: i see multiple assets in Tcode ABT1N but its greyed out, how to open the field. You mean LSMW using recording one asset transfer using ABT1N? Could you please eloborate on this option
    2. Depreciation has been booked to the above assets till Dec 2010 and business wants to transfer to another intercompany and dont want to have any depreication booked in the existing company code for the month of Jan 2011
    Ans) Confirm from client Acc dep values req or not. Or they want only new values in new comp code.
    Question: They want new values in the new company code but the new asset in the new company code will have the balance useful life ( like original life was 5 years out of 3 years were used and now transferred to the new company so the new company will charge only 2 years)
    3. Master data for the transferrable asset needs to be created in the new company with the left over life
    Ans) with transfer asset values system automatically creates new asset no with values while selecting New Asset radio button
    Question: We have the same number range in both company codes and when i click new asset it is giving errors for transaction types. So is the other option is first create asset master record in the other company and then use the same asset as exisiting asset for transfer.
    4. Balance showing in the existing company books on those assets will get paid by the other company so that there is no loss/gain posting on the asset in the existing company accounts.
    Ans) you transfer assets , not sale or scrap. System will transfer assets with as on date values. No accounting entries loss or gain.
    Question: We have straight line half year rule, so is there any way we can switch off this rule while transferring the asset.
    5. Once transaction is done: Depreciation will be calculated in the new company.
    Ans) this is standard practice system automatically updated asset de-activation field in old comp asset master, dep post only new comp code.
    Question: Now Business wants to transfer AUC (asset under construction ) assets also, is there a way to do this and what will be the impact?
    Regards,
    Viswa

  • I want to use a mac mini as a server supporting storage. Can I pair my macair to it for when I need to perform updates and maintenance ?

    I want to use a mac mini as a server supporting storage. I have other devices such as an iMac and iPad that will access information from the server. I do not want to purchase a monitor and keyboard as the unit will sit in a cupboard out of sight. Can I pair my macair to it for when I need to perform updates and maintenance ?

    I have a 2010 Mac Mini running Yosemite and Server which I use
    as a headless home server.
    I have is set up to allow screen sharing and can connect to it and
    control it with my iMac, Macbook Pro, iPhone, and a 2011 Mini Server
    that I use as an HTPC.
    You can check this out for all the Yosemite Server capabilities:
    https://help.apple.com/advancedserveradmin/mac/4.0/
    I have iTunes Home Sharing set up on it and have my entire iTunes
    library on it.  I can then use any of my Macs to play Movies or Songs
    from it and only keep locally a select subset of that on my individual
    devices.
    Rather than and update server, I utilize Server's Caching Service.  The caching
    server will duplicate any update download (system or MacApp Store purchases)
    any time a device that is connected to my network down loads one.  The update will
    then be stored locally and all other devices will download the update from it which
    can be faster than from Apple directly.  This has the advantage of only having to download
    once with limited bandwidth internet connections.  There is also an Update Server service
    available, but it is some what more involved in setting up.  However, it will download
    and store all available updates.
    There is another thing as well if you do not care for syncing things like Contacts, Calendar, etc.
    to iCloud, you can set Server up to sync these items across devices locally.

  • Need to perform both Queue and stack operations in Visual C# code

    Need to perform both Queue and stack operations, is any Data Structure available for this. or how can i custom create the structure for this?

    Hi,
    In this structure contains base logics of Queue and Stack. Well stack plays major role here with operations of PUSH, POP with additional operation of Queue i.e., ENQUEUE and DEQUEUE.  Here the stack has enqueue and dequeue 
    https://code.msdn.microsoft.com/The-Stacked-Queues-An-11f3703a
    Regards,
    Selva Ganapathy K

  • Mass asset retirement Error

    Hello, all.
    i had create the worklist in AR01(asset balance) for mass asset retiremen.
    ( task is retirement without revenue)
    and then,
    i had released it in AR31.(edit worklist)
    but, it was occured the error.
    these assets' acquisition year is current year, so i had input '250' as transactio type.
    error message is.
    000 Error in sub transient work item 'retirement without revenue'
    001 Company code 1000: Asset 000000000205/0000
    001 Choose transaction type and base value appropriate for asset values
    001 Error handling for work item 000000386109
    do i config something in IMG for worklist or mass retirement??
    i have found them,,, but i couldn't find it.
    would you give the solution?
    thank you.

    Hi,
    Go to transaction SWU_OBUF and sync the buffer.
    Then try again.
    If does not work, please check with BASIS team.
    Regards,
    Gaurav

  • How to shrink this LOB and what steps need to perform.

    Problem Description: hi
    one of our production database having one table i that table having 320 gb LOB in one column
    can you please suggest how to shrink this LOB and what steps need to perform.
    during shrinkg of LOB how much undo tablespace is require,and does it create more archive log because LOB size is 320gb.
    this table having function based index also.so we will not shrink it.
    we need to release the space from database this in only big LOB out of my DATABASE its took approx. 80%.
    there is any way we can reclame this space with less time.
    please suggest how to do this and how much downtime is required.
    database version 10.2.0.4 and OS AIX 5.3

    Hi;
    Please check below which could be helpful for your issue:
    Shrink LOB Segment On Partitioned Table [ID 802059.1]
    How to determine the actual size of the LOB segments and how to free the deleted/unused space above/below the HWM [ID 386341.1]
    Why is no space released after an ALTER TABLE ... SHRINK? [ID 820043.1]
    Troubleshooting Guide (TSG) - Large Objects (LOBs) [ID 846562.1]
    Regard
    Helios

  • Which two operattions do you need to perform after restoring---QNo.106

    In your database, all the tablespace are locally managed. You started RMAN using recovery catalog and restoring the contol file by using the following command:
    RMAN>RESTORE CONTROLFILE;
    which two operations do you need to perform after restoring the control file from backup?(choose two)
    A. shut down and restart the instance
    B. add new tempfiles to the temporary tablespaces after recovery
    C. perform a media recovery and open the database with the RESETLOGS option
    D. perform a media recovery and bring the database to NOARCHIVELOG mode

    This question is a little ambiguous.
    C is a correct answer when restoring a control file
    http://download-east.oracle.com/docs/cd/B19306_01/backup.102/b14194/rcmsynta051.htm#BGBJJGCB
    Restrictions and Usage Notes for RESTORE CONTROLFILE
    After you restore a backup control file, you must run RECOVER DATABASE and then open the database with the RESETLOGS option.
    B. If you were restoring a database from a backup you would need to create the temp files because temp files are not backed up.

  • Every time I open iPhoto, the program freezes, showing me the spinning rainbow of death.  I always need to perform a Force Quit.  I have updated my software, but that did not help.

    Every time I open iPhoto, the program freezes, showing me the spinning rainbow of death.  I always need to perform a Force Quit.  I have updated my software, but that did not help.

    tullch24
    Try these in order - from best option on down...
    1. Do you have an up-to-date back up? If so, try copy the library6.iphoto file from the back up to the iPhoto Library (Right Click -> Show Package Contents) allowing it to overwrite the damaged file.
    2. Download <a href="http://www.fatcatsoftware.com/iplm/"><b><u>iPhoto Library Manager</b></u></a> and use its rebuild function. This will create a new library based on data in the albumdata.xml file. Not everything will be brought over - no slideshows, books or calendars, for instance - but it should get all your albums and keywords back.
    Because this process creates an entirely new library and leaves your old one untouched, it is non-destructive, and if you're not happy with the results you can simply return to your old one.
    3. If neither of these work then you'll need to create and populate a new library.
    To create and populate a new *iPhoto 08* library:
    Note this will give you a working library with the same Events and pictures as before, however, you will lose your albums, keywords, modified versions, books, calendars etc.
    In the iPhoto Preferences -> Events Uncheck the box at 'Imported Items from the Finder'
    Move the iPhoto Library to the desktop
    Launch iPhoto. It will ask if you wish to create a new Library. Say Yes.
    Go into the iPhoto Library (Right Click -> Show Package Contents) on your desktop and find the Originals folder. From the Originals folder drag the individual Event Folders to the iPhoto Window and it will recreate them in the new library.
    When you're sure all is well you can delete the iPhoto Library on your desktop.
    In the future, in addition to your usual back up routine, you might like to make a copy of the library6.iPhoto file whenever you have made changes to the library as protection against database corruption. 

  • Configuration settings Inter Company asset transfer

    Hi
    Can you please give material on Configuration settings Inter Company asset transfer. we have 2 different company codes under same client. we want to transfer some assets from one company code to another company code. please help
    Regards
    Sreenivasulu

    Go to T.code ABT1N
    1. Give transferring cocode and asset number that you want to transfer
    2. Give the cocode to which you want to transfer and select whether you want to transfer to an exisiting asset or create a new asset
    3. Maintain Acquisition from affiliated company and clear revenue sale to affiliated company accounts in AO90 for the contaicode to which u r transferring.
    4. Maintain Company for both the company codes in OBY6
    Assign points if helpful
    Sneha.

  • Mass asset retirement

    Hi gurus,
    can some explain the mass asset retirement process( scraping)
    Edited by: SAP FICO on Feb 5, 2009 8:38 PM

    - pl refer to help in link below
    [http://help.sap.com/saphelp_470/helpdata/EN/4f/71fd71448011d189f00000e81ddfac/frameset.htm]
    - use ABAVN and choose multiple assets.
    Rgds.

  • URGENT- MASS Intercompany Asset Transfer

    HI there
    Can you please give me details of mass intercompany asset transfer.
    We have more than 100 assets and I can use the TCode ABT1N.
    PLease give me Tcodes in detail
    Many thanks
    Sharath

    Sharath
    Have you tried to use tools like LSMW or CATT ?
    It is relatively very easy using transaction SCAT to record with tcode ABT1N. Let me know if it helped.
    Karthik Coneru

  • Do I need to perform Process Index on the cube when measure groups has been processed with full individually?

    hi there, I am not sure if I need to perform process Index?  Do I have to do that after I process full on measure groups?
    thanks
    --Currently using Reporting Service 2000; Visual Studio .NET 2003; Visual Source Safe SSIS 2008 SSAS 2008, SVN --

    I did process update on all dimensions... after that, I did process full on each measure groups...
    In this case, do I need to process index on the whole cube? 
    Hi Cat_ca,
    ProcessFull - Simple to digest, applies all objects which means it discards the storage contents of the object and rebuilds them.
    ProcessIndexes - Applies to dimension, cube, measure group, and partition.
    Since you did process full on each measure groups, I don't think you need do a processindex, here are some links about process options on Analysis Services for your reference.
    Different Kinds of SSAS Processing in simple words
    Difference between SSAS ProcessUpdate and ProcessFull
    Regards,
    Charlie Liao
    If you have any feedback on our support, please click
    here.
    Charlie Liao
    TechNet Community Support

  • Once you install RAM into Mac book, do I just turn it back on?  Do I need to perform some type of action?

    I received some great replies concerning my increasing the RAM on my laptop. From the information gathered I was able to gather more information and am curious as to what and if there are more steps besides the ones I've listed below: 
    1.  Power off
    2.  Take battery cover off.
    3.  Remove battery cover.
    4.  Remove battery.
    5.  Remove 3 screws.
    6.  Remove L bracket.
    7.  Remove RAM(2 sticks of 512MB).
    8.  Install new RAM(2 sticks of 1GB).
    9.  Insure the new RAM is snug into the slot.
    10.Reverse the process.
    Now at this point do I just power it back up or do I need to perform some other type of action.
    Hardware Overview:
      Model Name:          MacBook
      Model Identifier:          MacBook2,1
      Processor Name:          Intel Core 2 Duo
      Processor Speed:          2.16 GHz
      Number Of Processors:          1
      Total Number Of Cores:          2
      L2 Cache:          4 MB
      Memory:          1 GB
      Bus Speed:          667 MHz
      Boot ROM Version:          MB21.00A5.B07
      SMC Version (system):          1.17f0
    Any input would be appreciated.
    Thank you,
    Tq1

    Just turn it back on. The MacBook will automaticly recognize the new RAM.
    If the MacBook doesn't turn on the RAM may not be the right speed for a Mac. Macs are very finicky about RAM. Much more so than PCs. The way to test that would be to put one of the old RAM sticks back in one slot and start up.

Maybe you are looking for

  • How to add field to the header for FBL5N ALV report

    Hi,    I need to add fields to the customer line item display ALV report(FBL5N) header part.Right now there are four fields in the header like customer, company code, name and city, after that I need to add first name last name and phone no. Can any

  • Bill and Routing Interface concurrent program is not processing component

    Hi All, While running Bill and Routing Interface concurrent program,not processing the component item(Line Item) from bom_inventory_comps_interface,still it show process flag as 1. where as billing item(Header Item) is successfully done..i have tried

  • SMS credit left in oracle convergence 2

    I want to show SMS credit left for user in event reminder of calendar and alert to be sent through sms only if there is sms credit available.

  • Re:System Prompting Quality inspection

    Dear All, I have a query regarding Quality inspection process. Can we configure the system (QM) in such a way that when its due for inspection system prompt some information to the user. Actually I have a process where the product stays in one stage

  • Problem installing creative cloud

    I have been trying to install CC for the last 3 days and nothing installs. Any help is appreciated.