Negativ Standard Price in Material Master Record

My customer (a cement producer) purchase a rohmaterial  (bone) and get mony for it, so that the quantity on stock is positiv  but the total-value negatic;
--> standard price negativ.
Do somebody have a solution???

Hi ,
     Try to use the  following FM's:
CONVERT_MATPR_TO_MBEW_MTPER
use the BAPI "BAPI_MATERIAL_GET_DETAIL" and take the price from the Export parameter MATERIALVALUATIONDATA. This parameter points to the structure BAPIMATDOBEW which has all the material price details like :
Price control indicator
Moving average price/periodic unit price
Standard price
Price Unit
Currency Key
ISO code currency
Hope this solves your problem.
Thanks,
Greetson

Similar Messages

  • Process will not be created with zero standard prices in material master

    Hi,
    I have two type of material;
    1.     In process material say A1
    2.     Finished Goods say B1
    Both materials price control are standard price.  I do not run costing. So , after creation of material master , standerd price has to update through MR21 in the account1 tab before start production .
    Suppose, if I forget to update standard price in material master and prepared process order, it will carry zero value of production cost.
    Hence, I want to restrict the creation of process order with zero standard prices in the material master.
    In order words, as long as standard price will not be updated after creation of the material master, user will not be allowed to create process order, if wrongly try, system will give message u201Cwith zero standard price creation of process order will not be allowedu201D.
    Please let me know either standard configuration or name of User exit or Badi.
    Regards,
    Amit

    Hi,
    You need to use BADI: workorder_update.
    Method: At release.
    check MBEW-STPRS field in the code ..and flag error and reject error if STPRS = 0.
    Regards,
    Santosh Sarda

  • Standard Price in material master  and MBEW

    Hi
    We have unique problem. The currency was setup with out decimal places due to some valid reason. Due to which STANDARD PRICE in MATERIAL MASTER  looks alright (lets say 1000) but in MBEW(field STPRS) it is 10.
    I would like use value which is in Material master for calculations  in ABAP program. How can i achieve this? Is there any function module for the same so that I can convert value in MBEW-STPRS to value in material master.
    Thanks in advance.

    Hi ,
         Try to use the  following FM's:
    CONVERT_MATPR_TO_MBEW_MTPER
    use the BAPI "BAPI_MATERIAL_GET_DETAIL" and take the price from the Export parameter MATERIALVALUATIONDATA. This parameter points to the structure BAPIMATDOBEW which has all the material price details like :
    Price control indicator
    Moving average price/periodic unit price
    Standard price
    Price Unit
    Currency Key
    ISO code currency
    Hope this solves your problem.
    Thanks,
    Greetson

  • How to view previous standard price in material master?

    Dear expert,
    in material master Costing tab 2, i can view the current and future cost estimate price. but i want to view the previous month standard cost estimate price in material master?
    For these, is there any configuration setting needed?
    Thanks for advance

    Hi
    When you re-release a Std Cost - The Future cost would become the CURRENT cost and the Existing curent cost would become the PREVIOUS cost.... You can then see the Previous cost estimate in material master
    br, Ajay M

  • Changing standard price in Material Master.

    Hi Gurus,
               Can anyone please tel me in material master Accounting1 view,is there any way to change the standard price field immediately,once its created?When I go in change mode the standard price field is disabled.
    Thank you all in advance.
    T6

    Hi,
    Use MR21 Tcode and change the moving average price if u have a stock means no problem bcaz in the OBYC T code Cost (price) differences- PRD u have to give the G/L account and that value goes to that account. System Does not allow to change the price in MM02 Transaction. U must do it in MR21 only.
    Regards,
    Venkatesh
    MM consultant

  • Want to update Moving or Standard price from material master to ***.Value ?

    Hai Experts,
    As per Subcontract Logic, 1.1 % of the standard price should be update in J1ID Asseable value..
    so I need to update Standard price value should be automatically update in Assesable value whenever it price changes..
    Kindly guide me

    Hi,
    I think its not possible to shiftf from th MAp to J1Id assessable value.
    Need to maintina in the field place of J1ID.
    Regards,
    Andra

  • Standard price in Material master

    Hello,
    in the Table MBEW und Field STPRS ther is the actual standard preis.
    We actualise (change) the preis every Friday. It means we have another price on saturday
    How can I see the Preis from wednesday on saturday. It's there any table for change history where i can get the last price.
    Thanks

    HI,
    try following
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/b3/7e6da267a4cd47bbba47d3536adeeb/content.htm]
    Regards
    Kailas Ugale

  • Update of Price in Material Master  when standard costing is released.

    Hello SAP gurus,
    When we created standard cost estimate, various cost estimate is created in various views Cost of good sold, cost of good manufactured and Inventory ( commercial ). Different view have different cost estimate.
    But we I release costing , the material master is updated by cost estimate of Inventory ( commercial). The cost estimate from Cost of good manufactured should be update?
    I am not able to solve the above issue , please help with customizing link
    Regards,
    Anand Agrawal

    Hi Anand,
    While you configure the Cost Componenet structure you define the attributes of cost Components in OKTZ.
    When defining the cost components, you must specify whether the cost component plays a role in the creation of the different prices that are transferred into the material master record. You have the following options:
    Standard price
    Costs that are flagged as relevant for stock valuation form part of the standard price if the results of the standard cost estimate are marked and released. These costs also serve as a basis for the following:
    The calculation of target costs in variance calculation
    The valuation of scrap in variance calculation
    The valuation of work in process for the confirmed yield for the operation (order-related production, process manufacturing) or at the reporting point (repetitive manufacturing)
    Commercial price
    Costs that are flagged as relevant for inventory valulation for the purposes of commercial law form part of the commercial price. This price is calculated in an inventory cost estimate and can be written to the material master record.
    Tax price
    Costs that are flagged as relevant for inventory valuation for the purposes of tax law form part of the tax price. This price is calculated in an inventory cost estimate and written to the material master record.
    The above information will prove helpful.
    Regards,
    amol

  • Price Control Indicator in Material Master Record (Accounting View1)

    Hi,
    Is there any way to make the Standard Price (S) or Moving Average Price (V) automatically SET in Material Master Record? So that everytime we create a material, there will be no need to enter which price we prefer.

    Hi,
    Go to OMS2. select material type- goto detail- Tick 'Price control Mandatory".
    Also if you maintain "ext pro allowed i,e,2" ,system will pick price control V automatically.
    For price control S, maintain Int proc allowed as 2.
    Regards,
    Piyush
    Edited by: Piyush Mishra on Jul 20, 2010 9:06 AM

  • Standard price of material to be included in pricing procedure

    Hi Gurus,
    Can I include the standard price of material from material master in my pricing procedure?  If yes, how?  Also, I want to tax 7% of this material in the pricing procedure.  Can I configure a condition type this way?
    Thanks,
    Paul

    HI John,
             1. Please maintain the condition type VPRS in your pricing procedure, the standard cost from Material master will come in to your pricing procedure.
            2. If you want to maintain tax in your pricing procedure you need to maintain Tax related condition type Ex: MWST and you create condition record for that condition type in VK11
            Define Tax procedure and assign to country (Please take help of FI people)
            Maintain Taxcode at FTXP
    I hope it will help you,
    Regards,
    Murali.

  • Material without material master record

    Dear All,
    i want material without material master record by using account assignment category k. how can i do that. item category should be standard. i will use another material group with a different valuation class.
    regards,
    qsm sap

    Hi,
    In ME21N, In case of w/o material master purchases (Text Purchases), do not enter material code in PO, Enter following details;
    Account Assignment Category (For e.g. K - Cost Center),
    Item Category - Blank
    Short Text,
    Quantity,
    UoM,
    Material Group,
    Plant,
    Gross Price, etc...
    Then Save it.
    2. MIGO - GR w.r.t. PO
    It will Debit Expense A/c and Credit GR/IR Clearing A/c.
    3. MIRO - LIV w.r.t. PO
    It will Credit Vendor A/c and Debit GR/IR Clearing A/c.
    And if you want account determination on the basis of material group then do following config.
    SPRO > MM > Purchasing > Material master > Entry Aids for Items without an material master > here assign different valuation classes to different material groups as per your Accounting requirement.
    And then do necessary account determination in OBYC for the Valuation classes, T/E Key "GBB" and Val. modifier "VBR"
    Also refer the following link;
    [Default GL account in account assigned Purchase Documents|http://www.sap123.com/showthread.php?t=10]

  • Mass update of huge list of Material master records

    Hi dudes,
    I want to update 1 field for the huge list of  material master record, i.e., statistics field in sales org 2 tab.
    please help
    regards,
    madhav

    SAP has designed its system to use the standard transaction way to update any fields, no direct table update should be made.
    I have seen so many direct table updates in my career, and what do you think why I have get knowledge about that?
    Because it was done incorrectly.
    There are that many dependcies in SAP, you never really know them all.
    People changed (or deleted entries) in one table, but forgot the update in a second dependend table.
    You should be a very experience consultant before you may consider direct table updates, and when you became an experience consultant, then you know that you will not do that.

  • Price in material master

    Dear all
    the price in material master was 15.50 INR but due to client required 3 decimal place so fico consultant has changed it to 3 decimal place in spro SAP Natwear ->general setting--->currency  and maintained 3 decimal places. it changes to 155.0 when this problem occcured  he changed as before. it doesnt effect in material master price.
    the problem is that this is not for 1 material this is for all materials.how to make it as previous
    how to changed it .
    please help me out.
    regards
    Pravin

    Hi,
    Please let me know whether its a Standar Price Or Moving Average Price.
    Whatever it may be you can change the Moving average Price for a Particular Plant in MR21 Trxn code.
    If its a Standard Price Re enter the Price in the Future value Field and Give Valid from date. Bcoz once you enter Price in the Material Master it wont Fluctuate.
    Reg,
    Ashok
    Please ssign points if Its helpful.

  • How to reset planned price in material master

    Hi Gurus,
    Can anyone tell me how to reset planned price in material master.
    my user has run ck40n with wrong values, but i am not able to reverse costing run by using ckr1 or ck44. what could be the reason behind this.
    even after executing tcode ckr1, i can still see the standard cost in material master.
    how to reverse the costing run.
    Thanks in advance
    Suresh

    Hi,
    If you want reset you can delete the cuurent planned price in the material master for the cuurent period,
    Use t.code CKR1,  you have to enter comapny code, plant,material
    In control parameters you have to choose radio button Current Standard Cost Estimates
    Current Standard Cost Estimates
    If you set this indicator, the system will select the current standard cost estimates for deletion.
    If you also set the Additive cost estimates indicator, then additive cost estimates will be selected for deletion.
    Regards,
    Rama Mohan Bangaru

  • Search Facility from Material MAster Record

    Dear Experts,
    My client, when they upload the Material Master Data, the manufacture name, they key in Material Long text field, there are millions of materials,
    Now if i want to search for a particular manufacturer name - how to do search in SAP, since it is maintained as Long Text field?
    Please suggest me the permanent solution for this.
    Also i would like to see the consumption of materials, after the output of Manufacture name report.
    Note: Material Master record, Manufacture name maintain in Long text field, not in Manufacture field.
    Thanks in Advance
    Saravanan

    Hii,
    You Can identify a Field and capture the Manufactures name in that field.
    Based on that some Standard Reports will be available and still if you are not meeting your requirements you can develop a Zee Reports.
    Regards,
    Kumar

Maybe you are looking for

  • I can't access the "notes" on my Ipod Touch

    I can't access my "notes" on my ipod, which is a fourth generation. What happened, while deleting some notes, one came back up but as a blank note. when opening, it was still blank so I tries deleting it, but to no avail. So, I tried to delete it aga

  • How do I master a voice recording in Audition CS5?

    Hi, I want to record myself playing the guitar and singing over the top, however although I am more than capable on the guitar I can not sing for toffee. So my plan is as follows: Using Audition CS5 I will open a new multi-track session, I will then

  • Has anyone ever heard anyting like this?

    Hello I was a very happy Macbook pro 5.1 user until, for some reason my laptop would start to behave very erratically and drop its wireless signal and crash, just lock up and freeze. the only thing to do then is to restart the machine. after months o

  • Flash to Quicktime MySpace upload problem

    Here's the situation: I have an animation in Flash, that I've successfully exported to a Quicktime .mov file, for posting onto a MySpace page. Every time I attempt to upload the video, MySpace tells me the video is "processing" for a number of hours

  • Are iDVD 05 and DVD Studio Pro 4 incompatible on the same computer

    Since I have installed DVD Studio Pro 4, I have had chronic problems attempting to burn DVDs in iDVD05. Often I get an error message "error occured during burning". Are iDVD 05 and DVD Studio Pro 4 incompatible on the same computer?