New to Photoshop (CS4Ext) and need help with basic loading of images to new folder.

Just purchased CS4Ext and installed it. It's not showing up on my desktop as a quick entry icon. I want to simply load images from a portable hard drive (USB) to a new folder in photoshop so I can review them and begin to select  and separate out some of interest to manipulate  and share or get ready to print. It 's the most basic help one can need butI'm jut not clear on the workflow steps . Would appreciate someone walking me through the steps .
Thanks much

drmjp2 wrote:
Just purchased CS4Ext and installed it. It's not showing up on my desktop as a quick entry icon.
Let's see…   First of all, this is the Photoshop Macintosh forum.  Installed applications never, ever show up on your desktop as a "quick entry" icon on a Mac.  Are you on a Windows PC maybe?
drmjp2 wrote:
I want to simply load images from a portable hard drive (USB) to a new folder in photoshop so I can review them and begin to select  and separate out some of interest to manipulate  and share or get ready to print.
Just select them with your mouse in the Finder and drag-copy them into the new folder.  Done.

Similar Messages

  • New to time capsule and need help with installing it?

    I just bought a new 3tb time capsule and  also new to apple routers I want to use this as my new wireless router how do I go about switching this out with my router now. Im using a linskys router now nothing special I think its only a 300Mbps the only problem is that we just  had our new house complete and prewired with ethernet connection in every room and a security system that runs off of the router how do I go about switching that set up to the new time capsule? I know if I had to have the company come out to do it they charge a hefty fee which I know its that hard to do the only thing that's stopping me is that set up to the security system I don't want to screw that up???

    Three different aspects
    1. Set the form up to submit the data (XML or FDF), not the full PDF. You can import the data to the PDF on your end.
    2. You can turn on Extended Reader Rights, but then limit the use/users to 500 by the EULA. The applicability of this option depends on your intended application. In a small office, it would be fine. For general web use you would likely exceed the limit and be in violation of the EULA.
    3. There may be an e-mail problem, one reason that e-mail is not recommended for form submission (even if the manual discusses it). Again, in a controlled environment like an office it will probably work fine, but in a web setup it is best to use a web script. There are 2 problems with e-mail that both depend on the client system (YOU have no control, but will be blamed in any case). First, the client machine has to be set up as an active MAPI client. Many folks do not have this on. Second, some e-mail clients treat PDFs like text and the result is a corrupt e-mail submission, even if it makes to you.
    If you have the possibility of web submission, do it. I suggest only having the form data submitted and not the form.

  • New to Adobe Forms and need help with Submit Email button

    I am new to Adobe Forms in Windows.  I created a form with a submit email button.  When users try to click the button, the message is operation cannot be completed.  My test user has Adobe Reader 9 installed.  I'm at a loss as to how to resolve the issue.  Please assist.  TIA!

    Three different aspects
    1. Set the form up to submit the data (XML or FDF), not the full PDF. You can import the data to the PDF on your end.
    2. You can turn on Extended Reader Rights, but then limit the use/users to 500 by the EULA. The applicability of this option depends on your intended application. In a small office, it would be fine. For general web use you would likely exceed the limit and be in violation of the EULA.
    3. There may be an e-mail problem, one reason that e-mail is not recommended for form submission (even if the manual discusses it). Again, in a controlled environment like an office it will probably work fine, but in a web setup it is best to use a web script. There are 2 problems with e-mail that both depend on the client system (YOU have no control, but will be blamed in any case). First, the client machine has to be set up as an active MAPI client. Many folks do not have this on. Second, some e-mail clients treat PDFs like text and the result is a corrupt e-mail submission, even if it makes to you.
    If you have the possibility of web submission, do it. I suggest only having the form data submitted and not the form.

  • New to Crystal reports and need help with formula

    Post Author: dausa
    CA Forum: Formula
    I will try to keep this short and sweet.
    Data comes from excel sheet and I am doing a outter left join.
    The need: IF the status is S or N, then i want it to sum the qty required for each part number.
    my formula looks like this;  If ({WIP_ORDER.STATUS}) = 'C OR N' Then SUM ({WIP_ORDER.QUANTITY_REQUIRED}, {ORIGINAL_.PART NUMBER})
    thanks for any help
    dausa

    Post Author: Manuel de Kleine
    CA Forum: Formula
    Dausa,You could use a formula like below:IF  ({WIP_ORDER.STATUS}) IN ['C','N']THEN 1ELSE 0Now, you can do a SUM on this formula.

  • New to pl/sql and need help with procedure

    Hello there, I got two tables STAFF and BONUS which are not related by any constraints
    STAFF
    ID_NUMBER HIREDATE SALARY BONUS
    100020 12-MAY-03 13600
    100021 04-NOV-01 30000
    100022 08-APR-02 28000
    100023 08-APR-02 24000
    BONUS
    PERCENTAGE MORE_THAN_YEARS
    0.1 3
    0.15 5
    0.3 7
    0.45 9
    0.5 12
    I am trying to create a procedure that would calculate bonus based on years of employment according to bonus table.
    If employees sysdate -hiredate is greater than 5, he would get salary*0.15%....
    I created this procedure, but I got stuck here.
    I calculated the length of employment for every soldier using cursor in a loop, but I don't know how to get values from bonus table and connect them together.
    Please help me!
    create or replace
    procedure bonus_staff
    as
    cursor c1 is select *from staff;
    bon real;
    begin
    FOR ITEM IN C1
    LOOP
    bon := FLOOR(months_BETWEEN(SYSDATE,ITEM.hiredate)/12)*
    update staff
    set bonus = bon
    where id_number = ITEM.id_number;
    exit when c1%notfound;
    end loop;
    end;
    Thanks in advance..

    update staff
    set bonus = (select percentage
    from bonus
    where more_than_years = (select max(more_than_years)
    from bonus
    where more_than_years <= FLOOR(months_BETWEEN(SYSDATE,staff.hiredate)/12)
    You can do this in pure SQL, which operates on a set, so no PL/SQL is required.
    Sybrand Bakker
    Senior Oracle DBA

  • Need help with Elements loading RAW images since I switched cameras.

    I recently switched from a Canon Rebel XT to a Canon Rebel T1i. I have Elements 6.0 and was able to see RAW images with my old camera. For some reason the RAW images aren't loading in Elements now. I get a message saying the files are corrupt. I've tried different cards but still no difference. Any suggestions?

    Please read this TechNote:-
    http://kb2.adobe.com/cps/407/kb407110.html
    It shows at:-
    http://kb2.adobe.com/cps/407/kb407111.html
    you need at least ACR 5.4 for your T1i/500D
    ACR 5.6 and therefore earlier versions work on PSE 6.
    You should upgrade your PSE 6 to ACR 5.6; it does work on PSE 6 at least in WIndows. I know because ACR 5.6 works on my PSE 6 under Windows Vista.

  • Project Server 2013: I am using Project Server Permission Mode and need help with permission assignments?

    Hi 
    Project Server 2013: I am using Project Server Permission Mode and need help with permission assignments?
    How can I change Permissions for the individual users to see specific projects or all projects in project center and to see specific quick launch items?
    For Example: if i have 4 users, A, B, C and D. what i want is:
    User A can see everything and act as a project manager or Admin.
    User B can view all projects in project centre but can change the schedule or resource assignment etc.
    User C can only act as approver of projects and can view all projects in project centre.
    User D can only view specific projects for which permissions are given.
    can i have some expert help in sorting and understanding permission modes... as i was playing with project server mode permissions and can't figure out how to apply the above scenario to set of my user.
    Thanks in Advance
    Cheers
    AJ
    Ajay Kumar

    Hi Ajay,
    Please refer to this link for detailed explanations about PS2013 security model. 
    http://technet.microsoft.com/en-us/library/cc197638(v=office.15).aspx
    Actually, it will take a couple of days to explain in detail the security model that is a fundamental and tricky aspect of every PS implementation. But basically, you NEVER set permissions for a single user. You have groups in which your insert users. Groups
    define "what users can do". Then you associate groups to a corresponding category. Categories define "what user can see". Thus the association of a group with a category will set "what the user can do on the objects he can see". Then, for more advanced security
    level, you can use the RBS that will consist in "branches" in which you'll insert users. Based on those branches, you'll customize categories to fine-tune what user can see (for projects and resources) depending on the RBS branch and level.
    I'd advice you to start "playing" in a test environment with the default categories/groups that might probably cover your need.
    Concerning your 4 users:
    user A : add him to the "administrator" group. Be careful that you're mentionning either project manager or administrator, which are 2 groups/categories with totally different permissions level.
    user B : basically can see everything and change everything? it could be in the project manager group, assuming that there are no project visibility restrictions on the category via the RBS.
    user C : waht do you mean by "approver"? Workflow approvals? Then it will be the portfolio manager group. Task update or timesheet approval? Then it is another long topic: please refer in the documentation to the "status manager" and "timesheet manager"
    concepts. There are not related to the security model. In a few words, the status manager is the owner of the project plan, is defined for each task and approves tasks updates. The timesheet manager is an attribute defined for each resource in its parameters
    and approves resource timesheet.
    user D : you have to define which permission level must be given to this user. Basically it could be a team member that will see only projects he's in the project team. Note that team member cannot interact with the project plan in another way than submitting
    timesheets and/or tasks updates which must be approved.
    Once more, those are large and complex subjects that require a deep dive into your business model and tons of tests in a test environment.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Urgent: im new and need help with this task!

    I need help with converting the pseudo code to java code, Any help will b greatly appreciated!
    // Declare a variable of type int, called "choice".
    // Generate a random number between 0 inclusive and 7
    // exclusive, and store that number into the variable
    // "choice". (How do you generate a random number? Use the
    // nextInt(int) method inside the random object, which takes
    // a single int parameter. You can read about this method
    // here:
    // http://java.sun.com/j2se/1.5.0/docs/api/java/util/Random.html
    // If "choice" is equal to 0, then create and return a new
    // IBlock object, passing "game" as the parameter to IBlock's
    // constructor.
    // Otherwise, if "choice" is equal to 1, then create and
    // return a new TBlock object, passing "game" as the
    // parameter.
    // Otherwise, if "choice" is equal to 2, then create and
    // return a new OBlock object, passing "game" as the
    // parameter.
    // Otherwise, .... etc ....
    // (please continue to do this for all of the 7 kinds of block
    // that can be created)

    import java.util.*;
    public class Echo{
         public static void main(String[] args)     {
              //System.out.println("enter ur choice");
    Random r=new Random();
    int choice=r.nextInt(6);
         switch(choice)
         case 0:
              IBlock object0=new IBlock("games");
              break;
         case 1:
              TBlock object1=new TBlock("games");
              break;
         case 2:
              OBlock object2=new OBlock("games");
              break;
         case 3:
              LBlock object3=new LBlock("games");
              break;
         case 4:
              JBlock object4=new JBlock("games");
              break;
         case 5:
              SBlock object5=new SBlock("games");
              break;
         case 6:
              ZBlock object6=new ZBlock("games");
              break;
    class TBlock
         TBlock(String s)
              System.out.print("TBlock called"+"\n value passed is "+s);
    class IBlock
         IBlock(String s)
              System.out.print("IBlock called"+"\n value passed is "+s);
    class JBlock
         JBlock(String s)
              System.out.print("JBlock called"+"\n value passed is "+s);
    class OBlock
         OBlock(String s)
              System.out.print("OBlock called"+"\n value passed is "+s);
    class LBlock
         LBlock(String s)
              System.out.print("LBlock called"+"\n value passed is "+s);
    class SBlock
         SBlock(String s)
              System.out.print("SBlock called"+"\n value passed is "+s);
    class ZBlock
         ZBlock(String s)
              System.out.print("ZBlock called"+"\n value passed is "+s);
    }

  • Need help with ACE Load Balancing Base on URL pattern

    This is the first time for me trying to configure something like this on the ACE load balancer.  I need help configuring a load balancing policy base on URL pattern.  URL https://ineedhelp.com base on /willuhelpme and /imlost
    Key: ineedhelp_key
    cert:  ineedhelp_cert
    serverfarmA
    serverA 10.1.1.1 443
    serverfarmB
    serverB 10.1.1.2 443
    ineedhelp.com/willuhelpme-------serverfarmA
    ineedhelp.ocm/imlost---------------serverfarmB

    This is the first time for me trying to configure something like this on the ACE load balancer.  I need help configuring a load balancing policy base on URL pattern.  URL https://ineedhelp.com base on /willuhelpme and /imlost
    Key: ineedhelp_key
    cert:  ineedhelp_cert
    serverfarmA
    serverA 10.1.1.1 443
    serverfarmB
    serverB 10.1.1.2 443
    ineedhelp.com/willuhelpme-------serverfarmA
    ineedhelp.ocm/imlost---------------serverfarmB

  • I'm new to flash and need help with some controls

    I'm builidng a site that has a portfiolio of work to display.
    When the visitor arrives at the portfolio page he (or she) is
    faced with a split panel. The right panel displays a summary of a
    client and the work. The left panel displays the work examples
    attributed to that client. By clicking forward and backward arrows
    in the right panel, the visitor can call the summaries of the
    different clients. Landing on a client page 'opens' a separate swf,
    called using loader component, that contains the portfolio of that
    client's work into the left panel
    1. I want forward and backward arrows located on the main
    movie in the left panel to control the progress of the loaded swf,
    rather than using forward and backward arrows on the loaded swf.
    2. I want to prevent the forward and backward arrows in both
    panels from clicking beyond frames in the Portfolio area of the
    timeline.
    3. I want the backward arrow to be innactive on the first
    frame, and the forward arrow to be innactive on the last frame.
    I have no problems making the arrows work on the main movie
    controlling the client summaries. What I don't know how to do is
    make them control the movement of the loaded swf, or #2 and #3.
    Any help will be greatefully appreciated. Thanks in advance,
    Art

    "Art Lazaar" <[email protected]> wrote in
    message news:[email protected]...
    > Tralfaz,
    >
    > Thanks for your response. I must be missing something
    very simple here, but I
    > can't make this work no matter what I do. Let me see if
    I understand some of it:
    >
    > On my main movie I put the fwd_btn and rew_butn
    codes...do I put these on the
    > actual buttons, or in an actions time line? When I put
    them on the buttons, I
    > get an error report saying they need to be in an 'on'
    event handler. I thought
    > that's what 'onRelease' was.
    >
    > On my loaded movie, I place the 'one.swf' code. I'm not
    sure what you mean by
    > placing the code inside a loop, I don't seem to be able
    to find a reference to
    > using 'loop' anywhere. When I use an 'onEnterFrame', I
    presume I do that with
    > onEventClip(enterFrame). When I do that, if I run the
    'one.swf' by itself, i
    > get an error report saying onEeventClip is for movies
    only. But there's no
    > error report when it loads from the main movie. What
    happens tho' is it loops
    > continuously, even if there are stops() in it.
    >
    > Boy, am I confused ;)
    >
    > I am really baffled by this seemingly simple little
    task. Your help is
    > gratefully appreciated.
    >
    > Art
    >
    >
    >
    Hi Art,
    There are different coding methods, depending on where you
    put code..
    1) Frame code
    Click on a frame of the timeline to enter frame code
    2) Attached code for movieclips and buttons
    Click once on a movieclip or a button then enter attached
    code
    To make an onEnterFrame event for a movieclip, first chose
    either frame code or attached code method. I personally rarely ever
    use
    attached code because it hides code in places that can be
    hard to find. Almost all my coding is frame code, but it's a
    personal
    choice.
    Frame code method to make an onEnterFrame for the main
    timeline..
    // put this code into a frame on the main timeline
    this.onEnterFrame = function()
    // do something once per frame at the frame rate
    checkMyButtons(); // once per frame we will check on the
    button status
    OR
    Attached Code method to attach an onEnterFrame event to a
    movieclip
    // click once on the movieclip (don't dbl click it .. stay at
    the root timeline level)
    onClipEvent(enterFrame)
    // do something once per frame at the frame rate
    Those two types of code are not interchangeable. One type
    must be entered into a frame and the other style must be attached
    to a
    movieclip or you will get errors.
    Then there is the DOT syntax way to write frame code that is
    equivalent to attaching code..
    myMovieClip.onRelease = function()
    trace("release");
    myMovieClip.onPress = function()
    trace("press");
    myMovieClip.onDragOut = function()
    trace("drag out");
    tralfaz

  • Im new to this and need help with putting a password on my wireless

    I've had my linksys router for a few years now and recently have been asked to secure it so no one else in the neighborhood can connect to it but me but Ive never known how and I cannot find the installation CD for it.  I have a model number# WRT54G.  I tried searchin the forums but couldn't seem to find one I could understand.  If anyone could please offer me some help on how to simply put a password on it so just my computer and the others in the house can access the wifi thatd be great.  Thanks

    To set up wireless security, you must use a computer that is wired to the router.
    Where to find the router settings: The router's login password is usually on one of the "Administration" pages. The other settings are all found in the "Wireless" or "Wireless Security" section of the router's setup pages, located at 192.168.1.1
    First, give your router a unique SSID. Don't use "linksys".
    Make sure "SSID Broadcast" is set to "enabled".
    Next, leave the router at its default settings (except for the unique SSID), and then use your pc to connect wirelessly to the router. Test your wireless Internet connection and make sure it is working correctly. You must have a properly working wireless connection before setting up wireless security.
    To implement wireless security, you need to do one step at a time, then verify that you can still connect your wireless computer to the router.
    Next, encrypt your wireless system using the highest level of encryption that all of your wireless devices will support. Common encryption methods are:
    WEP - poor (see note below)
    WPA (sometimes called PSK, or WPA with TKIP) - good
    WPA2 (sometimes called PSK2, or WPA with AES) - best
    WPA and WPA2 sometimes come in versions of "personal" and "enterprise". Most home users should use "personal". Also, if you have a choice between AES and TKIP, and your wireless equipment is capable of both, choose AES. With any encryption method, you will need to supply a key (sometimes called a "password" ).
    The wireless devices (computers, printers, etc.) that you have will need to be set up with the SSID, encryption method, and key that matches what you entered in the router.
    Retest your system and verify that your wireless Internet connection is still working correctly.
    And don't forget to give your router a new login password.
    Picking Passwords (keys): You should never use a dictionary word as a password. If you use a dictionary word as a password, even WPA2 can be cracked in a few minutes. When you pick your login password and encryption key (or password or passphrase) you should use a random combination of capital letters, small letters, and numbers, but no spaces. A login password, should be 12 characters or more. WPA and WPA2 passwords should be at least 24 characters. Note: Your key, password, or passphrase must not have any spaces in it.
    Most home users should have their routers set so that "remote management" of the router is disabled. If you must have this option enabled, then your login password must be increased to a minumum of 24 random characters.
    One additional issue is that Windows XP requires a patch to run WPA2.   The patch is located in SP3, so you will need SP3 to run WPA2. 
    Note:
    WEP is no longer recommended. The FBI has demonstrated that WEP can be cracked in just a few minutes using software tools that are readily available over the Internet. Even a long random character password will not protect you with WEP. You should be using WPA or preferably WPA2 encryption.

  • Day one of my new MacBook Pro & I desparately need help with calendar and email

    It's day one of my new relationship with a Mac, and I need help! I'd like to use microsoft exchange to sync my calendars to iCal &amp; my emails the way I currently do with my iPhone 4 and iPad 2. The problem is that all I get are error messages. They either say that communication with the server cannot be established or communication to ports 80 &amp; 440 cannot be established. One account I'd an ssl and the others are gmail. Please advise!

    anyone? please? i would appreciate any information.

  • New to AI and need help with individual images

    Hi,
    A client sent me her website mock up as an .eps file.  I can open that in Illustrator but I'm having a hard time "grabbing" the individual images and putting them into Fireworks and then ultimately they need to make their way to Dreamweaver (I know how to do that part!)
    Can I get some help on saving the individual images in the design so that I can use them again?
    Thanks
    Debi

    It's important to note you don't have to use any other app. But if you're unfamiliar with Ai, it may be easier.
    If you've got an item you can't seem to select in Ai you need to check if it's locked, the layer's panel should show a little lock next to any locked object. That's another one of those questions that's practically impossible to answer effectively without seeing the file.

  • New here and need help with design

    Hello all, I am working on my son's first birthday thank you cards.  I need help removing the line in between the blue and green background.  Thanks. Stacey

    You also have a narrow black line on the lower left side.
    Increase the the magnification to 500% and select the black and the white lines with the Magic Wand (Continuous checked).  Feather by one pixel.  Sample the green right under the white line, make it the Foreground Color and fill the selection with it.
    Juergen

  • New to Blackberry and need help with calendar

    Hi all,
    Just got my very first BB and could do with some help with my laptop and calendar (don't know if what I want is possible or available, so sorry it its not )
    I got my BB for my personel use and want to be able to sync it with a calendar on my laptop.  I don't have microsoft outlook, so I was wondering if anyone knew of a application or download I can get that will give me a calendar on my Laptop that I can sync with my BB.
    Many thanks
    Abi
    Solved!
    Go to Solution.

    Abi, welcome to the Forums.
    Google Calendar sync is a perfect option.
    http://www.google.com/mobile/blackberry/sync.html
    1. If any post helps you please click the below the post(s) that helped you.
    2. Please resolve your thread by marking the post "Solution?" which solved it for you!
    3. Install free BlackBerry Protect today for backups of contacts and data.
    4. Guide to Unlocking your BlackBerry & Unlock Codes
    Join our BBM Channels (Beta)
    BlackBerry Support Forums Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

Maybe you are looking for