No Availabilty Check can be carried out

Dear All,
While do the availablity check for material, I face an error :- "No Availability Check can be carried out for Material XYZ".
As per my opinion,if this material is blocked with some sales transactions like Sales orders & Delivery,it will show the same.
How to rectify this problem and why it is coming ? Kindly Elaborate.
Best Regards,
Ankur

Hi
First of all No Availability Check can be carried out for Material XYZ
This is not a error message and it is a information message
This comes while sales order creation because
Say Material X plant 1000 and user A is entering a sales order and hes has not finished sales order creation still in VA01 transaction only
Say the available qty for thar material is 25 units and user A has put 20 units and has not pressed enter
Now user B creates another sales order for  same Material X and same plant 1000  say for 15 units
Now for user B the system will throw this message No Availability Check can be carried out for Material for material X
Because the system doesnot know at the time of user B craeting sales, what is going to the order of user A and it cannot do Availabilty Check for two sales orders simultaneously for the same material in same plant
To control this only , define material block for users in we have  Availability Check in sd--basic fns in img
Once the user A comes out VA01 t code and pressed enter for that material the system then can do Availability Check  for user B or otherwise settings are reqd define material block for users in we have  Availability Check in sd--basic fns in img
Regards
Raja

Similar Messages

  • "No Availability Check Can Be Carried Out"

    Q.- In which all business situations we can get an error message - "No Availability Check Can Be Carried Out" except Material is blocked by another user?
    Please replay as early as possible.
    Thanks and Best Regards,
    Amol
    Edited by: amwsapsd on Aug 25, 2010 8:06 AM

    It will Pop -up the same Message in case if the Order , Delivery note & Reservation of Material is Processing.
    You can then block the relevant Transaction as per the requirements.
    Best Regards,
    Ankur

  • Tax can't carry out for some material and Cusomter

    Hi,
         We found the following two material at Customer(2811165) can't carry out the VAT for create sales order. But the Tax can carry out for the other customer. The customer(2811165) can carry out the VAT for other material sales order. I checked the customer and material the Contry code(KR) and Tax classification(1) is correct and normal. It is only the two material for the special customer can't get the VAT. I check the pricing analysis. The follwoing is the log. Pls help check it.Thanks.
    The mateials:
          KTPJC001-02
          KF-8005-0XXXXXXXXX
    The following is the log:
    Access Message Description
    08 010 Access not executed (Requirement 008 not fulfilled)
    10 010 Access not executed (Requirement 007 not fulfilled)
    20 010 Access not executed (Requirement 008 not fulfilled)
    Best Regards
    Park

    Dear Park
    It seems you have assigned Routine 008 for the table which has the combination of some description and applicable to domestic.  For the same combination, in VK13 / UTXJ, you have maintained a tax code for a domestic customer and you are trying to create a domestic sale order.  Actually routine 008 is meant for Exports and hence the problem.
    If my understanding is correct, Go to V/07, select the condition type JIND and click on "Accesses".  There check whether any routine is maintained under the tab "Requirement".   If so,  just remove  those routines and retry your process.
    thanks
    G. Lakshmipathi

  • Order can not carry out revenues

    Hi Experts ,
                      I was trying to release production order and got message no valuation variant is assigned . Even after assigning it in opn2 and reading PP master data it is showing same error .
    Also while doing goods receipt ( MB1A ) I am getting error : Order 600003045 can not carry out revenues .
    Please guide
    Thanks
    Neal

    Hi neal
    As per controlling config. Planed cost has to be calculated during release are create of prod order. For that you have to assign costing carriant in OPL8. both for Plan and actual . in standard SAP PPP! is costing variant for plan and PPP2 is costing variant for actual.
    For this costing cariant you have to assign costing type and valuation variant.
    Please do it SPRO-Production-SFC-Integration-Order costing
    Do these setting.
    Standard valuation variant for PPP1 is 006 and for PPP2 is 007.
    Regards
    J. Saravan

  • Whether MRP can be carried out for work scheduling GR. 20 i.e. work to orde

    Dear Experts,
    Whether MRP can be carried out for work scheduling GR. 20 i.e. work to order.
    mahendra

    Hi MShirodkar,
    Yes, s and it specifies the time needed to process the material in the operations at the different work centers.
    The GR processing time depends on the order quantity.
    The GR processing time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine the planned dates for planned orders in materials planning.
    You can define work scheduling times in the material master record in one of two ways.
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    I hope it clears you doubt any queries please revert me back.
    Regards,
    Madhu.G

  • Can I carry out the persistence and ORM tasks using EclipseLink?

    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?
    How about TopLink Essentials?
    Edited by: junez on 18-Nov-2009 05:51

    junez wrote:
    Can I carry out the persistence and ORM tasks using EclipseLink (without TopLink or Hibernate) ?
    Is the EclipseLink a free tool and no license fee?And yes, EclipseLink is an open source project so there are no license fees. However, Oracle does redistribute EclipseLink as part of the Oracle TopLink product and therefore customers are able to access support for EclipseLink through Oracle support.
    --Shaun                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

  • Critical Issue: Availabilty check & alternative BOM selction issue

    During the upgradation project I'm working facing the following critical issues:
    1)While creating the sales order, system carries out the availability check in APO.In material master checking group Z5 is defined.
        Actually I want to know hw the system carries out the search in APO & what are the settings in R/3 or APO we have to make?
    2)Suppose there are 3 alternative BOM's of a finished product.A requirement is while creating the sales order availabilty check should be carried out & system should check the availability of components on the required date.If the component is not avalable system should go & check the second alternative...third alternative until it gets the confirmation of component availability.
         How we can set this functionality & what are the prerequisites or customisation settings we needs to make?
        Would appreciate providing your inputs on this critical issue.
    Thanks,
    Nilesh<b></b>

    Before you understand how the APO Availability Checking concept works, I would suggest you understand about the regular R3 availability checking. As this is the core for the SD and APO GATP. Refer help.sap.com
    Question 1:
    <b>Settings in R3:</b> You have the ATP integration model in CFM1 transaction. You need to activate this just one time and never again. what this does is basically transfer all your availability checking customizing to APO.
    All the settings for the Availability Checking group ( Z5, etc) are already maintained in R3 and they get transferred to APO by the integration model. You donot need to anything else.
    <b>Settings in APO:</b>
    If you are using <b>Product Allocation Concept</b>, You have to maintain the Check Instructions.... Otherwise there are no other settings in APO
    <b>Availability Check in APO :</b>
    ( see the following blog for the requirements class( Name in R3) or check mode( Name in APO) determination http://solution-timezone-issue.blogspot.com/ )
    The check mode and the business event( These are hardcode internally in R3 - For SD- A) are determined from the order and based on this in APO it follows the following order
    (1) Reads the check instructions settings in APO
    For example say the following have been determined from the SD Order : Check Mode 041 and  Business Event A
    Say we have maintained in APO that the first step is Availability Check and all the other two steps we havent maintained or left blank ( Product Allocation and Forecast)
    Look for the customizing in APO
    SPRO>APO>GATP>General Settings>Maintain Check Instructions ****
    (2) Carries out availability Checking same as in R3 and no different
    From the masterial master considers the availability checking group ( Ex: Z1) and the business event( SD transactions- A)
    Very Important and the core of availability checking which is similar in R3 and APO***
    Against these 2 combinations, the settings are checked which define what stock and in/outward movements are to be considered during the availability check
    For customzing settings in APO
    SPRO>APO>GATP>Maintain Check Control>
       For Customizing in R3
    SPRO>Sales and Distribution>Basic Functions>Availability Check and transfer of requirements>Availability check with ATP logic or planning>Carry out control for availability check
    This is the answer to your first question.
    Your second question would need some time  and I will try to answer it as well.
    Hope this helps you..

  • Availabilty check & tor

    Hi sd gurus,
    can anyone plz send me screen shots for availabilty check and tor in sd point of view ,plz help me am having the theory part idea but am not geting complete picture plz send me

    Hello Srinu,
    I cant provide you any screen shots for the topics you have asked. But pls go through the following notes. Its really good and you'll have a clear Picture on the topics.
         Availability check is considered as a pre-sale activity, where as TOR and MRP are post sale activities.
    Materials Requirements Planning (MRP) and Transfer of Requirements (TOR).
    1.     A schedule line in a sales order represents the customers intended delivery date and quantity to be delivered. In a standard sales order processing, the system transfers requirements (TOR) to Material Requirement Planning (MRP).
    2.     MRP - then determines if there is enough quantity of stock available for the scheduled delivery date. The TOR aims to ensure that the materials ordered are ready for the requested delivery date.
    3.     The TOR is closely integrated to Materials Management and Production Planning modules – thus it must be configured in association with the respective teams.
    4.     The TOR can be set either for individual requirements or for collective requirements in MMR (Sales: general/plant and MRP3 views).
    5.     Individual requirements are the transference of requirement to MRP for each schedule line of the sales order. An advantage of this is that the availability overview (CO09 – logistics – material management – environment – stock – availability overview) will show the order quantity, sales document number, item number and requirements class for each schedule line for which a demand has been created.
    6.     Collective requirements are a collective grouping of requirements created either daily or weekly that are transferred to MRP; but the documents processed in collective requirements cannot be individually identified from the availability overview (CO09). Collective requirements are useful to a business that deals with a large volume of sales orders per day, as it allows the business to have a clearer view of the availability overview and speeds up the response time within the system as well.
    7.     The system will automatically create individual requirements (irrespective of the collective requirements indicated in MMR) in case of special stock items such as consignment, returnable packaging, make to order stock etc.
    8.     The control elements that are used for Transfer of Requirements (TOR) and Availability Check are –
         the requirements class
         the requirements type
         the checking group
         the schedule line category
    9.     The requirements class is the controlling factor for TOR and the availability check for all sales document types. It determines if the system has to perform TOR, Availability check and product allocation to any particular sales order.
    10.     The requirements class is determined from the requirements type of the material.
    11.     The checking group in general is the criterion that groups together all the checking rules from all application areas for a material. In conjunction with the checking rule, it defines the scope of the availability check for each business event; that is, which stocks, goods receipts and goods issues are taken into account in the availability check, and whether replenishment lead time is checked. The checking group must be defined and allocated to the material master record in the sales: general/plant view in the availability check field.
    12.     for TOR to be carried out, you need to ensure the following criteria are met –
         The TOR must be switched on at the requirements class level.
         The schedule line category must be switched on for the TOR (fine tuning).
         A plant must be assigned to the sales document line item level.
         A checking group must be defined and allocated to the material master record in the sales: general/plant view in the availability check field.
    Planning materials –
         It is possible to create a common planning material and assign similar materials to it (MRP 3).Independent requirements are created for the planning material to cover the requirements that are expected for the materials assigned to the planning material. This means that you do not have to create independent requirements for each material. Instead create a material and assign the same to the planning material already created with similar properties.
         A valid material master record must exist for the planning material in the planning plant. The material master record of the planning material cannot contain a planning material as this procedure can only be carried out at single-level.
         An appropriate strategy group must also be entered in the MRP 3 screen for planning with planning materials. The strategy group groups all the planning strategies that can be used for a particular material. The planning strategy represents the procedure used for planning a material and is (technically speaking) controlled by the MRP types.
         Consumption mode defines whether and in which direction on the time axis – from the requirements date (corresponds to the date when the sales order items were created) the consumption of customer requirements with planned independent requirements should occur. Consumption period must exit between 1 and 999 days.
         Backward consumption only: starting from the requirements date, backward consumption is carried out within the relevant consumption period specified in MMR i.e. the system reduces the planned independent requirements that lie in the past. Likewise forward consumption only represents – starting from the requirements date, the system reduces the independent requirements that lie in the future within the consumption period.
         Backward/forward consumption: in this case backward consumption is performed first and forward consumption is performed later depending on the availability of the independent requirements in the past. Forward/backward consumption is vice-versa of the above.
    Stock requirements list –
    1.     Stock requirements list is the central table for planning and stock control. It is invaluable to the interpretation of the available stock and the situation of stock levels in a plant.
    2.     Menu path: MD04 – logistics – material management – inventory management – environment – stock – stock requirements list. Here you can see the order number or delivery number as well as the line item and schedule line placing the demand on the given plant. It also shows the required and available quantity of material per order.
    3.     Another view of the stock situation in plant can be obtained from MMBE (stock overview). This view will show you total stock per company code, then at the plant, storage location and at batch level.
    4.     A useful tool in MMBE is material movements, which can be viewed by selecting stock line and proceeding to environment, material movements.
    <b>Configuring Transfer of Requirements –</b>
    1.     IMG – sales & distribution – basic functions – availability check & TOR – transfer of requirements – define requirements classes.
    2.     Requirements class – (OVZG) is the controlling factor for the availability check and TOR for all sales documents. It determines whether the system should perform the transfer of requirements, availability check and product allocation when a sales order is created.
    3.     The system uses the entries used at this level as default and brings the data into the sales order. The same entries made at the schedule line category level (VOV6) are only used to fine tune the entries previously made at the requirements class level. The standard requirement class is 041 (order/delivery requirement).
    4.     Requirements type – (OVZH) – (displayed in the sales order beside schedule line category) requirements types identify the different requirements, such as sales order requirements, delivery requirements or individual customer requirements. The requirements types can be changed, for example, in order to represent customer-specific terms.
    5.     The first step in the process of configuring TOR is to define a requirements class (041 – standard) by copying the standard one. It contains the preconditions for performing availability check, TOR and product allocation.
    6.     Next step is to create a requirements type, which is based on item category and MRP type of the material and allocate the previously defined requirements class to it. A requirements class can be allocated to more than one requirements type. It is possible to change the requirements type manually at the time of creating the sales order.
    7.     MRP type in the MMR determines how a material is planned for requirements i.e. automatic reorder point planning, manual reorder point planning or forecast based planning.
    8.     Determination of requirements types using transaction: when a sales order is created, the system looks for a relevant requirement type by using its own search strategy. Either it uses the following search strategy or you can make the system skip this entire process and straight away search for item category and MRP type by selecting 1 in the Q field while configuring determination of requirements types using transaction.
    9.     First attempt is to find the requirements type using strategy group in MMR.
    10.     If strategy group is not found, it will look for MRP group (MRP group groups’ together material with similar planning requirements and allocates special control parameters for planning such as strategy group, planning horizon and the creation indicator for planning run.
    11.     If MRP group is not found, it will try to access MRP type.
    12.     If no requirements type is found using MRP type, the system will use material type when accessing the corresponding tables.
    13.     Failing to find the requirements type even at this stage, it will try to get the requirements type using the item category and MRP type.
    14.     If this doesn’t work either, then it will try to determine requirements type using only item category.
    15.     If the last attempt fails, the system determines the transaction is not relevant for availability check or transfer of requirements.
    16.     As discussed earlier TOR and availability check are fine tuned at the item category level. This is done at this stage i.e. define procedure for each schedule line category as a next step.
    17.     Block quantity confirmation in delivery blocks (linked to VD05 customer block): in the standard sales order processing, the system transfers the requirements to MRP, but in some cases you may need to block a transaction due to a bad result of the credit check.
    18.     When requirements are transferred to MRP, the confirmed quantity is also reserved for confirmed sales documents . If a transaction is blocked for delivery, the required stock will be blocked so it cannot be used elsewhere. To prevent this, you can block the transfer of requirements for a delivery block in this step.
    19.     You can set a limit on the number of days you would want the system to postpone this block on confirmation of requirements. This can be done by setting the number of days to the block in the Def. period column.
    20.     Maintain requirements for TOR: can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met. For example in a standard sales order processing, a purchase order may need to be created in order to meet the demands of the customer. This purchase order is used to purchase new stock in order to meet the demand on MRP for particular customer’s sales order. Here you define requirements that must be met in order for the purchase order or assembly order to be created.
    <b>Availability check</b>
    1.     Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2.     Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3.     Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4.     Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5.     Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6.     RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7.     there are three types of availability checks –
         Check on basis of ATP quantities.
         Check against product allocation.
         Check against planning.
    Configuring Availability check through Checking Groups –
    1.     The checking group + checking rule determine how the availability check is to be performed.
    2.     The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3.     The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4.     The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5.     Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6.     advantages of individual processing over summarized processing –
         Backorder processing is possible.
         You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
         The system automatically uses individual requirements in case of special stock items.
    7.     Required data for the Availability check to be carried out –
         The Availability check must be switched on at the requirement class level.
         The Availability check must be set at the schedule line level.
         A requirements type must exist by which the requirements class can be found.
         A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
         A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8.     configuring Availability check and defining Checking Groups –
         Checking groups are introduced into the sales order based on the setting in the material master record.
         SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
         Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
         Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
         The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9.     Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10.     Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
         However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
         This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
         If an entry exists, this default value is over written by MMR.
    11.     Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12.     These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13.     These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14.     It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15.     It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16.     Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17.     defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
         When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
         A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
         It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    <b>Reward points if helpful</b>
    Regards
    Sai

  • Third party sales availabilty Checking

    Hello,
    I have configured third party sales . In the development system it is creating purchase requisition and purchase orders and working fine.  But when I transport to QA system , the sales order is performing availability check and confirming orders against the inventory . I can see the purchase requisition information in the schedule line , but purchase requistion is not getting created . Please help
    thanks in advance
    Tom

    Hi,
    Check the OSS notes  Note 210423 - Availability screen for third-party items.
    The details are;
    Summary
    Symptom
    The Availability Control Screen is displayed when you create a sales order even though no availability check should be carried out for a third-party item or individual purchase order item (item category TAS and TAB).
    Additional key words
    Third-party order, third-party, availability check, individual purchase order
    Cause and prerequisites
    Solution
    This is a standard functionality.
    The Availability Control Screen is confused here with the Purchase Order Scheduling Screen. You can tell which screen you are on by the header of the screen:
    Availability control: Availability check for non- TAS / TAB items
    Purchase order scheduling: Scheduling for TAS / TAB items
    The Purchase Order Scheduling Screen, like the availability screen, is always displayed if the requested delivery date cannot be observed because the realistic delivery date of the purchase requisition comes after the requested delivery date.
    If the requested delivery date of the customer is sufficiently far in the future, the purchase order scheduling screen is not displayed.
    Source code corrections
    Header Data
    Release Status:     Released for Customer
    Released on:     03-29-2000  22:00:00
    Master Language:     German
    Priority:     Recommendations/additional info
    Category:     Consulting
    Primary Component:     SD-SLS-SO-TP SD Third-party order processing
    Affected Releases
    Release-Independent
    Regards,

  • How to carry out / trigger defined substitution

    Hello,
    Can you tell me why I can not carry out the substitution, which is defined as following:
    Tcode: OPSN
    Applicatn area  PS       Project System
    Callup point    1120     Network activity
    Prerequisite:  AFVGD-STEUS = 'PS01'
    So when I change the some user fields of the (internal) activity in a project, when I save the project, the substition is not carried out, can you tell me what else I need to implement the trigger of substitution.
    Thanks a lot!
    Jing

    Dear,
    For first Query:
    1) Create a value assignment type with type u201CAu201D Node with class with all the tick marks for activate indicator a
    Path: SPRO>>Environment, Health and Safety >> Basic Data and Tools >> Specification management >> Specification Data Base Structure >> Settings for value Assignment >> Specify value Assignment Types.
    Here you will find total value assignment Types available in the system.
    Double click on the value assignemnt type, which you would like to change.
    In this screen you need to select the value ***. Category as "A". after selecting the category "A" you need to enter the class in the column class(valAss.). Select the last 2 check boxes (New VA Active & Change Active) out of six.
    If you want to create a new one go to "new entries" and follow the steps mentioned above.
    For second Query:
    2) Run Table based value assignment creation make sure the check edit is ticked ok
    Once the updations or changes happened in the value assignments, you need to do this activity.
    Path: SPRO>>Environment, Health and Safety >> Basic Data and Tools >> Specification management >> Specification Data Base Structure >> Settings for value Assignment >> Set Up Table-Based Value Assignment
    Here you will find 2 rows
    1. Create Entries for the Value Assignments
    2. Set Up Table-Based Value Assignment
    You need to select "Create Entries for the Value Assignments" first
    double click on this. You will find a execution button. execute it.
    system asks "Do you really want to change value assignment type entries?"
    click on "Yes".
    system updates the information in the value assignment tables, what ever you did the updates in value assignment types.
    you will find the message of "number of new entries and number of entries deleted"
    Go back...........you will find the activity performed tick mark.
    you have to do the same thing in the second line "Set Up Table-Based Value Assignment". Here execution is not required.
    Kamal

  • Availabilty check and Transfer of order

    hi friends
    what is Availability check and Transfer of order
    thanks

    ATP
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMG&#61664;SD&#61664;Basic fncs&#61664;Availability check and TOR&#61664;Availability check&#61664;Availability check with ATP logic or against planning&#61664;Define checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    TOR
    IMG &#61664; SD &#61664; Basic fncs &#61664; Availability check and TOR &#61664; TOR
    A line item in the sales order creates a schedule line. The schedule lines in the sales order transfer the requirements through to MRP. You can select the docs on which you want the TOR to happen. For ex, not for quotations.
    The TOR aims to ensure the ordered materials are available for the requested delivery date. The TOR can be set for individual or for collective requirements (materials master&#61664;sales/plant view).
    The TOR is dependent on the following data:
    The reqts type, reqts class, checking group and schedule line category.
    The reqts type and class are determined in the strategy group (material master&#61664;MRP3)
    For TOR to be carried out, a few criteria need to be met:
    Plant assigned to line item level, schedule line category should be switched on at TOR, TOR must be switched on at the reqts class level, checking group must be defined and allocated to the material master record (sales/plant view in the availability check field)
    The reqts class is the controlling factor for the availability check and the TOR for all sd types.
    Configuring the TOR:
    1)     Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
    2)     Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
    3)     Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
    You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
    4)     The TOR and Availability check can be selected/de-selected at the schedule line category level.
    5)     Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
    6)     Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
    Availability Overview = CO09 &#61664; order qty, sd doc no, item no, requirements class.
    Stock requirements list = MD04 &#61664; sd no or dly no, line item, schedule line placing the demand
    Stock overview = MMBE &#61664; total stock per company, then plant followed by storage location, and finally a breakdown per batch.
    Regards,
    Rajesh Banka
    Reward points if helpful.

  • How do I restore and carry out maintenance on external drives

    Under OS9 I used to regularly carry out optimising and maintenance on my mac and external hard drives. Now that I'm on OSX, I can't use Norton Utilities - that doesn't seem to work at all. Techtool Pro doesn't seem to fix external hard drives connected by firewire. Neither does Diskwarrior. How do I do maintenance for my mac and my drives. I have an external LaCie 160GB porsche firewire drive - that seems to have stopped working but I can't carry out any serious diagnostics as I have nothing that seems to work - DiskUtility doesn't carry out a full test and comes back with errors. I also have a Formac Oxygen 160GB external drive connected by Firwire which has also recently stopped working (when I mean stopped working, I mean that the mac no longer sees all the files I have stored on the drive and asks me if I want to initialise the drive - to which I obviously say no). I need to access the files on these external drives but can't get the mac to do this. Any help?

    Hi Naz,
    Norton Utilities does not work with OS X -- in fact it often makes problems worse. I fear NU has corrupted your external drives' directory structures.
    * Remove Norton: How to manually uninstall Norton SystemWorks for Macintosh 2.x.
    * Boot from your install CD/DVD and run Disk Utility. Repair Disk for the external drives. If DU can't repair, you can attempt DiskWarrior (it DOES work on external drives).
    Good luck; let us know how it goes.
    John

  • HT204088 How can I check my purchase history, carried out directly by the Apple TV?

    How can I check my purchase history, carried out directly by the Apple TV?
    I am being charged and can not confirm it is correct.

    Email iTS and ask them to send you invoices....
    iTunes Store Support
    http://www.apple.com/emea/support/itunes/contact.html

  • Availability check should not be carried out in Quotation VA21

    Hi,
      While creating the quotation we want that availibility check should not be carried out when user enter the material code on VA21 screen, as per the material lead time system should directly set the delivery schdule date, as in many cases if some other user is working on the same material then system save the quotation with confiirm quanity as zero in the schdule line, thsi we want for only one lant.  what setting can be made for this.
    regards,
    zafar

    how to know all the categoru which are applicable in quotation
    For this, first you need to identify what item categories are assigned to quotation which you can find in VOV4.  Next for these item categories, you need to list the relevant schedule line categories from VOV6
    G. Lakshmipathi

  • Document Cancellation can not be carried Out

    Dear SAP experts,..
    I met a problem when carry a document cancellation..
    We had a material which incidentally exist without batch management and so, the material don't have batch number and so its Shelf Life Expiration Date.
    The material was used as usual. (Used for production process by Goods Issue for Production Order)..
    The condition keep going for about 3 weeks until the end user had a mistake with her data entry and so the document must be cancelled.
    The cancellation can't be carried out, and the message shows "Enter Shelf Life Expiration Date".
    My Question :
    - Why was Goods Issue transaction could be carried out without SLED and the cancellation must be carried out with SLED ..??
    - What is the best action to solve this problem...
    Regards,
    Hachi

    Dear,
    Are you getting message 12019?
    Have you maintained the SLED in Plant storage view 1 in material master?
    Set customizing so that it is not necessary to enter such a date for the used movement types. Maintain the data by using Transaction SM30 in View V_156_MHD.
    Or
    Deactivate using Customizing
    Customizing via the following path:
    Materials Management --> Inventory Management/Physical Inventory  --> Goods Receipt --> Set expiration date check.
    You should  deactivate the check for the used movement types,
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Changes to write optimized DSO containing huge amount of data

    Hi Experts, We have appended two new fields in DSO containg huge amount of data. (new IO are amount and currency) We are able to make the changes in Development (with DSO containing data).  But when we tried to tranport the changes to our QA system,

  • Please help !!! iPod malfunction, very frustrated

    I got the black 30g vid iPod and everythime i connect it to the cp, its has no reaction: -the do not disconnect screen does not come up -it wont charge and the battery is dead -not in iTunes -no update The main reason is that when i plug it in the cp

  • Windows 7 and Nvidia driver installation time-out

    Hey everyone... I'm having issues installing my drivers... I've overclocked the 9600 GPU in my 15" unibody quite some time back in windows vista. The thing is, after moving to windows 7, the official drivers from nvidia dont seem to install right. Th

  • Oracle 8.0.5 certified on GLIBC 2.1 system (e.g., RH 6.0)

    Oracle 8.0.5.x is certified on GLIBC 2.1 system and a patch is available for this. The patch available for download contains two files - README including instructions for applying the patch and the patch file glibcpatch.tgz (compressed tar). Follow t

  • Without looping: Determine number of unique values in a set

    Hi all, I was wondering if anyone has any advice on determining the number of unique items in a set. For example: If I have an ArrayCollection public var someData:ArrayCollection = new ArrayCollection([ {id:"1", color:"Red", value:5"}, {id:"2", color