No item generated for packaging material in delivery - packing (how?)
Hi all,
I am trying to customize packing for deliveries. I would like to have the packaging material as a line item in the delivery. I know this is possible but I can't seem to make it happen.
I have already ticked "Gen. pack.matl item" in my delivery type. Also, I have selected in the packaging type "B Item generation in first packed delivery" for "generatedlvItms" option.
Now, in the delivery after I packed the items, no line item was generated in the delivery for the packaging material. The "No. of Packages" in item overview is correct and the status is "C" completely packed. Btw, I am using manual packing here.
Is there some more configurations I missed here?
Thanks in advance for all your help.
Edited by: Ritchie Caleb Chua on Aug 9, 2011 3:53 AM
I assume that your basic HU configuration and master data have to be ok because you are able to pack your goods.
1) Are you able to add your item w/o HUM (=not by creating a HU, just adding the material as a simple item) to the delivery? /For this you need define a record in T184L (where usage "PACK" is not there)/.
If you are able it means that e.g. your delivery copy control settings are ok (V_TVCPLAK; delivery type: LF and sales doc type: DL --> HUPM/DLN item categories in your case)
2) If you are able to
- create the handling unit manually in the delivery
- add the packing item to the delivery (w/o HUM) and also have the T184L with usage "PACK"
- item generation is maintained for your packing material time "A" or "B" in field V_TVTY-KZPGN
- plant determination for packing material type ("A" or "B" in field V_TVTY-WERFD)
it should work in my opinion (for delivery type LF).
Edited by: Csaba Szommer on Aug 9, 2011 1:37 PM
Similar Messages
-
Item category for packaging material
hi guru's
i have a small query what is the item category for packaging material(VERP) and also controls of the item category
regards
srinivasHi,
Go to VOV4 ... this is the T code for Item category dtermination...
item category is assigned for the following combination
1. Order type
2. Item category group
3. usage
4. Higher level item category
Muthu -
Goods Receipt for packaging material - Item cat. ELP
Hi expert,
I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
1. I create PO order 1pc of Throttle
2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
3. After Pack complete, Item for packaging material is auto generated in inbound screen:
- Item Cat. of Throttle = ELN
- Item Cat. of Carton Box (Packaging Material) = ELP
4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
Thanks.i thnk u sould maintain material master with two units one is throttle and second is cartoon.
u shud maintain that how many throttle is equal to 1 cartoon.
this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
hope it will be helpful.
Thanks
Nisha -
HU Management Addition of packaging Material in Delivery
Hello All,
I have requirement-
In HU Mangament the Packaging material should get add automatically in delivery as a separate line item.
I have done the configuration to get the HU created automatically but how to add the line item in delivery.
Is any extra configuration required for that.
Please guide me on this
Regards,
Sujit BorseBelow is the exact solution on the concern issue------
1) Delivery type should be made
u2022 Automatic packing
u2022 Generation of delivery item
u2022 Have such a routine which can allow items without order reference
2) Packaging material type (YG01)
3) Allowed material types for packaging material groups
4) Packaging instruction creation (POP1)
u2022 Assign the material to a packaging material
5) Packaging transaction profile (already provided by SAP) this has standard packaging instruction determination procedure
6) Packaging instruction determination procedure; Condition types; Access sequence; Condition records (POF1) with assignment of packaging instruction
7) Item category for packaging materials; item category determination with usage = u201CPACKu201D -
Sloc for packaging material automatic determination
Hi
I am doing the following process.
Creating STO ME21N
Delivery VL10D
TR/TO LB01/LT04/LT12
Handling Unit ZHAND
VLMOVE Outbound Delivery Creation and PGI
When i am creating outbound delivery. It gets created by VLMOVE. When i click on PGI, I need to enter the sloc and site every time for packaging material. Why location for packaging material does not determine automatically from the delivery in PGI. Please suggest.
Same thing happens in case of inbund delivery.
Thanks & Regards
Kapil Nandahi Azat,
sloc is determined via transaction OVL3. There you have the field 'storage condition' which comes from material masterdata (MARA-RAUBE). Note that the field is editable at plant view, but the data is in MARA table (so general for the material code).
If you have different storage conditions defined for different materials, then you can configure only for selected ones automatic sloc determination.
However, can you explain why there is such a need? Because to me this is weird requirement..?
Regards,
Dominik Modrzejewski -
How Do I set Limit for packaging Material.
For eg: Packaging Material PALLET should only contain
50 units or less .Hi
After production order creation or release run the COMAC transaction with all VERP materials or with MRP controller selection as well
In mass processing - material availability check select scope of process. you can create variant here and schedule back ground job
after execution see the missing parts list with reqmt qty, committed qty and shortage in CO24 TCode
Regards
Dev -
Automatic Packaging material as delivery item
Hello Friends,
In the delivery document there was a automatic packaging material created and deleted in the delivery document, due to which the weight is pickedfrom that of item of delivery document and not from the Handling unit.
I would like to know in what circumstances the automatic packaging material get added to the delivery document, when i observe the changes for the document there were some changes in the Net weight and Gross weight.
Can you guage anything from the above statements, how is that an automatic packaging material is added.
Thank you.Hi,
Are you using automatic packing functionality in SAP?
As the name specifies, this can be used to pack materials automatically; based on pre-defined set of instructions. Once those instructions are configured, at delivery creation point, materials will be packed automatically.
Best regards,
Anupa -
Userexit to update sales order no for packaging material during PGI
Hi,
Scenario is like this:-
1.Sales order will be created for material X
2.Delivery will take place and packaging of material X will take place.
3.The packaging material will come as a line item and we do PGI by picking the quantity.
4.Now when we see the accounting document for PGI,we get the sales order reference for X.
5.We are not getting the reference of Sales order no for packing material while seeing the accounting document in PGI.
6.Since the packing material is not maintained in Sales order thats why the sales order no is not getting updated in the accounting document.
7.NOW I WANT TO UPDATE THE SALES ORDER FIELD FOR PACKING MATERIAL ALSO ONCE THE PGI IS TAKING PLACE.
Can any one suggest me if there is any userexit to update the sales order field for accounting document of packing material once PGI happens.
regards
SomnathHi,
Since packging material is not sales order item so it can't be accounted in PGI packging material is aour internal stock and not sellable stock.
Reward points if helps.
Thanks & Regards
Sasikanth.Ch -
Sales Process for Packaging material (VERP)
Hi All,
I have a business requirement to set up the sales process for Packaging materials and the material type is VERP.
But system will not allow me to create Sales order using the same material because material category VERP needs to be added for the Order type OR.
VERP materials not authorized to create sales orders. I think we need toset up new process.
Pls help me if you have any idea about to set up the nbew process.
Kindly help me..
Regards,
SKas mentioned earlier,
1. See to it that the material with Material type VERP has tabs Sales org 1, Sales org 2, Sales:General/ Plant.
This can be configured in OMS2. Maybe already there in standard configuration
2. In VOV4, assign the item category to your Sales doc type and It cat. gr. VERP
Then in VA01, test by creating a sales order. -
Zero pricing for packaging material
Hi All,
I have one scenario, In sales order there are two line items one is standard item and second one is packaging material.For second item I don't want to maintain price,that means zero pricing.Is there any solution for this.
Regards,
Hari Challa.Dear Hari,
You define new item category for the packing material through VOV7 transaction.
In the item category detail screen you maintain Pricing field as Blank - NO pricing under Business Data tab.
Do the itemcategory determination for the new itemcategory VOV4 transaction with the packing material itemcategory group+sales document type.
Now system will not consider price for the packing material.
I hope this will help you,
Regards,
Murali. -
Designing the consolidated and line item report for specific material
Hi
i have a R/3-report and it run only for 7-materials.That means we need to only those 7-materials in the selection screen of report.
Then we will get each material corresponding line item details(material no, profit center, variable cost, quanity, price, financial loss(this is calculated based on quantity) , Utility Consumption(calculated based on price, variablecost) ) in one report.
Another report will give same for consolidated values of financial loss, utiliy consumption.
<b>so how can i design the consolidated and lineitem details report for each material.</b> pls let me know
kumar0VENDOR_ATTR - Vendor Master Data Attributes
0FI_AP_51 - Check Register Line Items
0FI_AP_4 - Accounts Payable Line Items
It should be noted, however, that this won't get you everything that you need, so you may have to create enhance one or more of these DataSources and create User Exit ABAP code to get the required data. Also, the 0FI_AP_51 DataSource isn't available if your source system isn't ECC6 EHP3 or higher. If your source system is less than that, you're going to have to create a generic DataSource for the data from the PAYR table. -
Urgent:Material Type for Packaging Material in WM and MM
Hi
There is a place in SPRO where i can define the material type for packaging.
Logistics - General -> Handling Unit Management -> Basics -> Define Packaging Material Types
How can i create a material using this material type? What is the use of material type here?
Whenever i create material in MM01/MM41, i get the standard material type list.
Thanks & REgards
KapilHi,
In T.code: OMS2, you can get standard material type list.VERP is the standard material type for packing material.You can copy VERP and rename to ur material type( as it is ur business requriement or else u can use same VERP)
What is the use of material type here?
With the help of ur Material Type , u can craete material like The material type,will be used while defining the material
master.At that time,in Tcode:MM01,first screen we need to
mention,(material type)it show the nature of material
ex:-engineering product,finished products,semifinished
product,etc.,
It also play vital role on material numbering,material type in comination with plant & valuation class, play vital role in inventory & accoputning.
To Create Material,use t. Code: MM01,
Step-1
Enter Material Code: ( example-Polythene Bag, If External Number Range or leave it blnak)
Enter Industry Sector: ...................
Enter Material Type: ..........................(VERP- Packing)
Step-2
Select
Views you required( like eample:basic data-1, like basic data-2,purachsing, purchase order text,General plant data, accounting-1, accounting-2 etc)
Step-3
Enter Plant,
Enter Storage location
{{{Enter Sales organization & Distribution channel(if sales view selected)}}}
Step-4
You will have views like (example-1, basic data, enter Base unit of measure, material group and other details as required field,example-2,Accounting data, enter valuation class, price control; S or V & price)
Step-5
Save.
Note: Before creation material you must know which Industry Sector, Material Type ur going to use and material numbering is internal or external.
For more, check the following link for creation of material
http://www.synactive.com/docu_e/doc_multi_mm01.html
Regards,
Biju K -
Item Category for returns order and delivery
Hi,
We are using BOM. As we know basing on the Item cat group ERLA, LUMF there are 4 different item categories TAQ,TAE,TAP,TAN respectively for main item and sub items. Now my business wants to do return process for a BOM item which has been already delivered and invoiced.
Please could any body tell me what would be the item cat for BOM item in return process?
Is there any SAP standard item cat available for this?
Can we configure an Item cat for the same?
Your quick answer would deffinately appreciated.
Regards,
Revan.Hi Revan,
In standard procedure there is no item Category assigned for the returns of ERLA or LUMF material. You may have to define new Item category similar to REN but with the structurescope defined as 'A' or 'B' as per the requirement.
Regards,
Karthik. -
Multiple PR's generating for same material after MRP
Hi Guru's,
As per my business scenario, i am creating project with WBSE, Activities and BOM.
By using the reference points, i am transferring the BOM to Project, then executing MRP run.
But after MRP run i found that multiple PR's generated for the same Material.
Please find my BOM structure
BOM-->Assembly + raw material
Assembly is consists of
Sub-Assembly+ 2 raw materials
Sub-Assembly consists of
1 Raw Material.
as per this i should have 4 PR's after MRP but system is generating 8 PR's.
Please tell me where i am doing wrong
Regards,
BhadraHi,
I find the reason why it is creating the multiple PR's for the same component.
It is because of the BOM status. Please find the attached scree shots for the BOM structure and BOM status.
As per my requirement the Planned Orders should be created for "BOM" and "Assembly" and 3 PR's should be generated for Components.
Initially i maintained BOM status as "4" for "BOM" due to that system is exploded the BOM twice i.e., for "BOM" and "Assembly" and generated PR's twice and two planned orders for "BOM" and "Assembly" along with their components.
Now to avoid the duplicates PR generation, i have maintained BOM Status as "5" for "BOM"and run MRP.
This time system is generated 3 PR's and 2 Planned Orders.
As per as PR's is concerned there is no issue. Coming to the Planned Orders there is a issue that, the components are not copied into order which is generated against "BOM" (BOM Status-5) and components are copied into order which is created against "Assembly"(BOM tatus-4)
But as per my requirement, the components should copied in both the orders.
So please tell where is the wrong in this..
Regards,
Rao -
System bifurcated revenue on line item basis for different material in invo
Hi Friends
When i reaised a invoice for three material system showing three line item for the revenue in accounting document. Where revenue G/L is the same. As per my client requirement he want all revenue must posted in one line item in accounting document.
e.g line item posting key G/L amount
1 01 (Customer) XXXXXXXX 6000
2 50 (Revenue) ABCDEF -3000
3 50 (Revenue) ABCDEF -2000
4 50 (Revenue) ABCDEF -1000
Where as per requirement it must post to accounting document
line item posting key G/L amount
1 01 (Customer) XXXXXXXX 6000
2 50 (Revenue) ABCDEF -6000
Please help me to solve me the issue.
Regards
Shambhu SarkarHi Friends
When i reaised a invoice for three material system showing three line item for the revenue in accounting document. Where revenue G/L is the same. As per my client requirement he want all revenue must posted in one line item in accounting document.
e.g line item posting key G/L amount
1 01 (Customer) XXXXXXXX 6000
2 50 (Revenue) ABCDEF -3000
3 50 (Revenue) ABCDEF -2000
4 50 (Revenue) ABCDEF -1000
Where as per requirement it must post to accounting document
line item posting key G/L amount
1 01 (Customer) XXXXXXXX 6000
2 50 (Revenue) ABCDEF -6000
Please help me to solve me the issue.
Regards
Shambhu Sarkar
Maybe you are looking for
-
Most of the time, my DVD player works without a glitch. But for some reason, on certain DVDs (eg anything Doctor Who- Other BBC discs are fine, though), it plays the introductory messages/any trailers, but where it would normally go to the menu scree
-
How to change my background?
I want to change my background and can't find it anywhere. Not the wallpaper, I found that one. I have been using the iphone since inception but I have never tried to change the background. I was looking at the new ios 4 pictures and thought it would
-
Aperture 3.0.2 Opening Problem
When I try to open Aperture 3.0.2 I get a Warning window stating "There was an error opening the database for the library "/Volumes/Drive 3/Aperture Library.aplibrary" with the only option being to Quit. This is a new problem-Aperture 2 versions work
-
Hi ABAPers, Can you please tell me how to concatenate this two select qureies. select ebeln knumv from ekko INTO TABLE tt_knumv where ebeln = p_ebeln. select ebeln knumv from eslh INTO TABLE tt_knumv FOR ALL ENTRIES IN tt_esll where packno = tt_
-
Can't create panel shortcuts in InD CS6?
Hi all, I recently installed InDesign 6 on my laptop, which is running Windows 8. I'm currently working on a file, and when I go to the F11 panel to create a new style it won't let me create a shortcut for the style. I've tried ctrl+ and num+ and all