Notifications of failed or partially failed load processes in the Data Exchange

Hello,
I've recently completed quite a few data integrations (to maintain coexistence) between external systems at my company and Oracle Fusion. The majority include data-out (Extracts and BI Reports), and data-in (via FBL from UCM).
I'm wondering what the standard is for notifications on failed FBL loads. After an FBL succeeds with the RIDC, the most information I know is the process ID of the process loading my data into Fusion. In order to check to see if it succeeded or not, I have to go into the Data Exchange and check the process manually in the "Load Batch Data" GUI.
Is there a way to get emailed notifications if a process finishes with any failures? The only automated way I know of to check on statuses is to schedule the seeded Batch Load Summary HCM extract and have something on our end check for anything that has failed. But this is pretty un-ideal when all I want is an immediate notification of failed or trouble FBL loads.
What's the easiest/best/quickest way to be automatically notified when an FBL load is having issues?
Thanks,
Tor

I am not an expert on FBL, but I think there is a ESS process involved, could you configure alerts to monitor the state and have incidents be sent to the interest parties, see Monitoring Oracle Enterprise Scheduler
Jani Rautiainen
Fusion Applications Developer Relations                             
https://blogs.oracle.com/fadevrel/

Similar Messages

  • Error-- failed to start a managed process after the maximum retry limit

    hi
    I installed oracle 10g application server. its installed fine. But now i am facing a problem in which i am getting the following error message when i try to start opmnctl from command prompt:
    opmnctl: starting opmn and all managed processes ..
    ======================================================
    opmn id=apps:6200
    0 of 1 processes started.
    ias-instance id=orcl.apps
    +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    ias-component/process-type/process-set:
    default_group/home/default_group/
    Error
    -->Process (index=1, uid=1845537884, pid=1320)
    failed to start a managed process after the maximum retry limit
    Log:
    D:\product\10.1.3.1\oracleAS_1\opmn\logs\\default_group~home~default_group~1.log
    Please help me in order to remove this, so that i can run oracle apps.
    Regards,
    Aqrs

    Hi
    i checked the log already but there is not such problem defined in it.
    Following is the log generated ion this error:
    Configuration information
    Running in D:\product\10.1.3.1\OracleAS_1
    Operation mode:Startup, App Server, No Enterprise Manager, Single Instance
    Oracle home:D:\product\10.1.3.1\OracleAS_1
    Oracle home name:Unnamed
    Instance name:orcl.apps
    Instance type:allProducts
    Version:10.1.3.1.0
    Uses infrastructure:false
    Not an infrastructure instance, no infrastructure information available
    Components:[j2ee, orabpel, oraesb, owsm, Wsil]
    2009-06-03 01:46:58.609--Begin log output for Mid-tier services (orcl.apps)
    2009-06-03 01:46:58.625--Processing Step: starting OPMN
    2009-06-03 01:47:07.921--Processing Step: starting OPMN managed processes
    2009-06-03 01:48:47.312--End log output for Mid-tier services (orcl.apps)
    An unknown OPMN error has occured
    oracle.appserver.startupconsole.model.ConsoleException: An unknown OPMN error has occured
         at oracle.appserver.startupconsole.control.OPMNController.doStart(OPMNController.java:140)
         at oracle.appserver.startupconsole.control.Controller.start(Controller.java:69)
         at oracle.appserver.startupconsole.control.GroupController.doStart(GroupController.java:47)
         at oracle.appserver.startupconsole.control.Controller.start(Controller.java:69)
         at oracle.appserver.startupconsole.view.controller.ControllerAdapter.start(ControllerAdapter.java:30)
         at oracle.appserver.startupconsole.view.controller.MasterControlAdapter.run(MasterControlAdapter.java:94)
         at oracle.appserver.startupconsole.view.Runner.main(Runner.java:39)
    Caused by: oracle.appserver.startupconsole.model.ConsoleException: There are some errors while stopping the following components. Refer to the generated error report for more details.
    ==================================================
    ias-component: default_group
    process-type: home
    process-set: default_group
    Error Message:failed to start a managed process after the maximum retry limit
    ==================================================
         at oracle.appserver.startupconsole.control.OPMNController.doStart(OPMNController.java:139)
         ... 6 more
    Caused by: oracle.ias.opmn.optic.OpticControlException: Error from opmn during process control operation
         at oracle.ias.opmn.optic.AbstractOpmnEntity.runCommand(AbstractOpmnEntity.java:174)
         at oracle.ias.opmn.optic.AbstractOpmnEntity.start(AbstractOpmnEntity.java:110)
         at oracle.appserver.startupconsole.control.OPMNController.doStart(OPMNController.java:97)
         ... 6 more
    Exception caused by
    There are some errors while stopping the following components. Refer to the generated error report for more details.
    ==================================================
    ias-component: default_group
    process-type: home
    process-set: default_group
    Error Message:failed to start a managed process after the maximum retry limit
    ==================================================
    oracle.appserver.startupconsole.model.ConsoleException: There are some errors while stopping the following components. Refer to the generated error report for more details.
    ==================================================
    ias-component: default_group
    process-type: home
    process-set: default_group
    Error Message:failed to start a managed process after the maximum retry limit
    ==================================================
         at oracle.appserver.startupconsole.control.OPMNController.doStart(OPMNController.java:139)
         at oracle.appserver.startupconsole.control.Controller.start(Controller.java:69)
         at oracle.appserver.startupconsole.control.GroupController.doStart(GroupController.java:47)
         at oracle.appserver.startupconsole.control.Controller.start(Controller.java:69)
         at oracle.appserver.startupconsole.view.controller.ControllerAdapter.start(ControllerAdapter.java:30)
         at oracle.appserver.startupconsole.view.controller.MasterControlAdapter.run(MasterControlAdapter.java:94)
         at oracle.appserver.startupconsole.view.Runner.main(Runner.java:39)
    Caused by: oracle.ias.opmn.optic.OpticControlException: Error from opmn during process control operation
         at oracle.ias.opmn.optic.AbstractOpmnEntity.runCommand(AbstractOpmnEntity.java:174)
         at oracle.ias.opmn.optic.AbstractOpmnEntity.start(AbstractOpmnEntity.java:110)
         at oracle.appserver.startupconsole.control.OPMNController.doStart(OPMNController.java:97)
         ... 6 more
    <?xml version='1.0' encoding='WINDOWS-1252'?>
    <response>
    <msg code="-82" text="Remote request with weak authentication.">
    </msg>
    <opmn id="apps:6200" http-status="204" http-response="0 of 1 processes started.">
    <ias-instance id="orcl.apps">
    <ias-component id="default_group">
    <process-type id="home">
    <process-set id="default_group">
    <process id="1848837552" pid="3128" status="Stop" index="1" log="D:\product\10.1.3.1\OracleAS_1\opmn\logs\\default_group~home~default_group~1.log" operation="request" result="failure">
    <msg code="-21" text="failed to start a managed process after the maximum retry limit">
    </msg>
    </process>
    </process-set>
    </process-type>
    </ias-component>
    </ias-instance>
    </opmn>
    </response>
    Could u plz guide now ?

  • Failed to start a managed process after the maximum retry limit

    Hi,
    Getting the following error
    /app/oracle/product/101202/opmn/bin (OID)>opmnctl startproc ias-component=OID
    opmnctl: starting opmn managed processes...
    ================================================================================
    opmn id=smtest02:6202
    0 of 1 processes started.
    ias-instance id=infra.smtest02
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    ias-component/process-type/process-set:
    OID/OID/OID
    Error
    --> Process (pid=26032)
    failed to start a managed process after the maximum retry limit
    Log:
    /app/oracle/product/101202/opmn/logs/OID~1
    Any suggestions
    Thanks
    Kedar

    Hi Alvarez
    I have managed to start OID
    stop the process using opmnctl stopall
    stop the database
    stop the listener
    stop emctl processes
    usind oidctl to stop OID instance
    start the listener
    start the database
    start the process opmnctl startall
    start emctl start iasconsole
    used oidctl to star instance for OID
    /app/oracle/product/101202/bin (OID)>cd ../opmn/bin
    /app/oracle/product/101202/opmn/bin (OID)>opmnctl status
    Processes in Instance: infra.smtest02
    ------------------------------------------------+---------
    ias-component | process-type | pid | status
    ------------------------------------------------+---------
    LogLoader | logloaderd | N/A | Down
    dcm-daemon | dcm-daemon | 7763 | Alive
    DSA | DSA | N/A | Down
    HTTP_Server | HTTP_Server | 6183 | Alive
    OID | OID | 6187 | Alive
    but when i am trying to start dbconsole ( command below) getting follwong error OC4J Configuration issue. /app/oracle/product/101202/oc4j/j2ee/OC4J_DBConsole_smtest02_OID not found.
    emctl start status dbconsole
    /app/oracle/product/101202/oc4j/j2ee/OC4J_DBConsole_smtest02_OID ---> /app/oracle/product/101202/oc4j/j2ee/OC4J_DBConsole_smtest02_ORACLEID
    where can i change the setting for the parameter so that i can log on to dbconsole from the browser, which config file ?
    the reason i needed dbconsole was to use Oracle Directory Naming GUI to configure db to replace old Names Server hence i need Db console GUI
    Kedar

  • DAG - Backup failing on 1 DB only with error - The Microsoft Exchange Replication service VSS Writer instance ID failed with error code 80070020 when preparing for a backup of database 'DB012'

    Hi Board,
    i´ve search across the board, technet and symantec sites but did not found a hint about my problem.
    we drive a 2 node DAG (Location1-Ex1-mb1 
    Location2-exc1-mb1), on SP2 RU4 patchlevel with 40 Databases.
    Since some time the backup of one - and only one DB - is failing with these events, logged on the Mailboxserver on which the passive DB is hosted.
    Log Name:      Application
    Source:        MSExchangeRepl
    Date:          28.09.2012 00:37:17
    Event ID:      2112
    Task Category: Exchange VSS Writer
    Level:         Error
    Keywords:      Classic
    User:          N/A
    Computer:      Location1-Exc1-MB1
    Description: The Microsoft Exchange Replication service VSS Writer instance 1ab7d204-609a-4aea-b0a7-70afb0db38de failed with error code 80070020 when preparing for a backup of database 'DB012'.
    Followed by
    Log Name:      Application
    Source:        MSExchangeRepl
    Date:         
    01.10.2012 03:33:06
    Event ID:      2024
    Task Category: Exchange VSS Writer
    Level:         Error
    Keywords:      Classic
    User:         
    N/A
    Computer:      Location1-Exc1-MB1
    Description:
    The Microsoft Exchange Replication service VSS Writer (Instance 42916d80-36c1-4f73-86d0-596d30226349) failed with error 80070020 when preparing for a backup.
    The backup Application - Symantec Backup Exec 2010 R3 – states, this error
    Snapshot provider error (0xE000FED1): A failure occurred querying the Writer status.
    Check the Windows Event Viewer for details.
    Writer Name: Exchange Server, Writer ID: {76FE1AC4-15F7-4BCD-987E-8E1ACB462FB7}, Last error: The VSS Writer failed, but the operation can be retried (0x800423f3), State: Stable (1).
    Symatec suggests within http://www.symantec.com/business/support/index?page=content&id=TECH184095
    to restart the MS Exchange Replication Service – BUT the mentioned eventID
    8229 isn´t present on any of the both Mailboxservers.
    The affected Database is active on Location2-Exc1-Mb1 Server and in an overall healthy state. I found during my research, that below Location2-Exc1-Mb1 Server, there are not removed shadow copies present!
    This confuses me, since all Backups are normally taken from the passive copy of a Database.
    So my questions to the board are:
    * Does anyone is facing similar issues?
    * Can someone explain why snapshots are present on the Mailboxserver hosting the Active Database, whilst the errors are logged on the passive one?
    -          * Does someone know the conditions, why shadows copies remain and
    aren´t removed in a proper manner?
    What can cause the circumstance, that only 1 DB is facing such issues?
    Any suggestion is welcome!
    BR
    Markus

    Hi Lenora,
    I´ve encreases VSS / Exchange Backup Log levels to expert, before starting
    those things i´ve all tried now:
    - Backup from passive DB (forced within Symantec Backup Exec)
    - Backup from active DB (forced within Symantec Backup Exec)
    - Backup from passive DB without GRT enabled (forced within Symantec Backup Exec)
    - Backup from active DB without GRT enabled(forced within Symantec Backup Exec)
    All those attempts failed.
    But brought some more details - the backup against the active DB states, that there is still a backup in progress and therefore this backup is cancelled by VSS.
    The Solution was, that i´ve needed to restart the Exchange Replication Service on the Mailbox Server hosting the passive DB.
    Backups are working again on all DBs!
    THX for your replys.
    Best regards
    Markus

  • Delta Load Error in the Data Extraction

    Hi BI Guru`s,
    The issue is with the extractor 2LIS_13_VDKON (Pricing conditions), The regular delta till 22.07.2010 has run successfully, But on 23.07.2010 the delta got failed with the error message " Data Package 58 : arrived in BW ; Processing : Processing not yet finished, entry 70 still missi" for one of the Datapacket. We have repeated the load even though we got the same error message, Since the client is retailer we will be having the delta records of 200 million ( approx. 23369612) in a day. Since because of this error we could't load any of the delta from that day onwards.
    Need Help on this:
    1. How to get the old delta
    2. How to re-initialize the process for delta. (Pls keep it in mind the volume of the records).
    Thanks in Advance,
    Venkat

    Hi,
    Here we need decrease the datapacket size as well as prallel proceesing .
    than we need to load the historical data through dalta repetition
    hope..helpful for you!
    Regards!
    Malli.

  • Updated Process for the Ideas Exchange

    Hey folks! Spotify Community team here.
    If you've been around the Spotify Community for a while, you've probably noticed that we keep tabs on your suggestions for improving Spotify through our Idea Exchange. 
    In an effort to keep the Idea Exchange as organized and up-to-date as possible, we've changed the way Ideas are submitted. We've outlined the new process with a step-by-step guide below. 
    We hope that you continue submitting ideas to make Spotify even better.  While we can't promise that we'll implement every idea that you submit, but we'll always do our best consider each one and provide updates wherever possible. 
    The guidelines:
    Search for previously submitted ideas.  Someone may have already submitted the same idea.
    One idea per post.  No double dipping.  
    Ensure the idea is implementable.  Avoid posting general feedback or questions in the idea exchange--the more specific the idea the better.  
    Use an intuitive title.  
    Submitting a new idea:
    1. Go to the Idea Submissions Board.
    2. Click the New Idea button.
    3. Enter an Idea Subject that includes one of the tags above. 
    4. In the Body enter a detailed description of your idea, including any screenshots or links you'd like to share. 
    5. Select one a platform label.
    6. Then select a subcategory label.
    7. Click Post. 
    8. One of our Idea Guardians in the Rock Star Program will analyze the idea and mark it either as a "Live Idea" or close it for a specified reason (duplicate idea, unspecified, etc). Allow us to introduce our Idea Guardians: Marco, FredJ, gprocess, Peter, dinomight, Anthony, pnc, Jordi, kbrooksc, Carina, OviiiOne, and Rodrigo.
    9. If your idea reaches the Live Idea board it can then start to gain kudos and comments from other users.
    10. Once your idea reaches 100+ kudos a Community Manager or Moderator will update the status to one of the following:
    The Idea statuses: 
    New Suggestion (no status/default one): the idea was just posted, it is waiting to be reviewed by an Idea Guardian.  
    New Idea: this is a new and unique idea, you can add your kudos here. 
    Inactive Idea: Ideas that could not gather at least 25 kudos per year will get closed - you can submit this idea again if you still feel the topic should get some attention. We recommend changing the title or description if posting the same idea again.
    Good Idea, give it some kudos: We like this idea. A decision has not been made but we want to see how much the Community continues to vote on it.
    Under Consideration:  This has been brought up internally. 
    Watch this space: This feature is coming. We have a rough pipeline for its release. 
    Not right now: We talked about this internally and it’s not on our pipeline for the next few months or more.
    Case Closed:  We talked about it, but we won’t be running with it. Thanks anyway!
    Implemented:  This feature has rolled out on the specific platform.
    Needs more info:  We need more clarity or information around this idea from the original poster.
    Curious for more information about the Ideas Board? Check out The Ideas Board: How your feedback reaches Spotify.
    Thanks for your continued feedback and contributions everyone,
    The Spotify Community Team 

    Ah, yes, now I see it. For those of us with less than perfect vision, how about putting the text in red in the center of the page as opposed to in only slightly darker green to the right. I've never used this page before so I had no idea there even was something to select on the right hand side. Also, the first link in the first post on this page gives me this: "You do not have sufficient privileges for this resource or its parent to perform this action.Click your browser's Back button to continue.Return to my original page"

  • (Urgent) form taking lots of time to load and fetch the data

    Hi
    I have very serious problem of perfomance. I have installed oracle portal and configured it properly.
    Now except form everything working perfectly. but only forms and links are taking lots of time to load
    as well as for fetching data. I try to tune my sga and aslo findout hits and miss but i didnt find any
    any problem for it. it is ok. can u help me pls. how can i make my form fast.
    My operation system is NT.
    version of database oracle 8.1.7
    Oracle Portal 3.0.8
    Thanks in advance
    raju parmar
    [email protected]
    null

    hi chetan
    Lots of Thanks.
    Now it working perfect.
    Raju
    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Chetan Kashyap ([email protected]):
    The workaround is provided at: http://technet.oracle.com:89/ubb/Forum81/HTML/000395.html <HR></BLOCKQUOTE>
    null

  • IMac only burning partial discs - not all of the data.

    Greetings all. We are using 5 mid 07 iMacs in our publishing office. When archiving work we are starting to have problems with DVD burning. Once a DVD is finished burning, we are seeing numerous instances where data that was included before the burn, is not on the final disc. Some files are not even there. No messages pop up during the burning process and everything seems to work fine until you check the final burned disc. We have experimented with various types of media, and it appears no single brand is causing it. Sometimes everything goes just fine, other times not. Has anyone run into this and has an idea on how to remedy the situation?

    I am having a similar problem with burning CDs of files. When I drop all the files in a Burn Folder, all appear with the little alias arrow in the lower left corner, which is expected. After the CD burns, most of the files become normal (i.e., the arrow disappears), but some remain as aliases on the burned CD instead of burning a copy of the original. Very frustrating. I use TDK CD-R80 blank disks. Any ideas? I never had this problem until I updated from Tiger to Leopard.
    Thank you.
    Diana

  • Failing to load processes after installing patch 10.1.2.3

    I have installed patch 10.1.2.3 after Oracle advised that it may resolve some database adapter problems I was getting in 10.1.2.0.2. However after installing the patch, many of the BPEL processes are now failing to load when I bounce the OC4J component and I am getting ORABPEL-05215 errors.
    I turned on debug logging and an extract of the log file is as follows, has anybody got any ideas on how I might resolve these errors;
    <2008-07-09 15:32:33,311> <ERROR> <default.collaxa.cube.engine.deployment> <CubeProcessLoader::create>
    <2008-07-09 15:32:33,310> <ERROR> <default.collaxa.cube.engine.deployment> Process "DRSSecuritiesReader" (revision "1.0") load FAILED!!
    <2008-07-09 15:32:33,375> <DEBUG> <default.collaxa.cube.engine.dispatch> <BaseDispatchSet::receive> Receiving message log process event message afa47b51cbfc4dfa:4ee70b:11b0
    83c6e51:-7ffc for set system
    <2008-07-09 15:32:33,376> <DEBUG> <default.collaxa.cube.engine.dispatch> <Dispatcher::adjustThreadPool> Allocating 1 thread(s); pending threads: 1, active threads: 0, total
    : 0
    <2008-07-09 15:32:33,378> <DEBUG> <default.collaxa.cube.engine.dispatch> <QueueConnectionPool::getConnection> Fetched a queue connection from pool java:comp/env/jms/collaxa
    /BPELWorkerQueueFactory, available connections=24, total connections=25
    <2008-07-09 15:32:33,403> <DEBUG> <default.collaxa.cube.engine.dispatch> <DispatcherBean::send> Sent message to queue
    <2008-07-09 15:32:33,403> <DEBUG> <default.collaxa.cube.engine.dispatch> <QueueConnectionPool::releaseConnection> Released queue connection to pool java:comp/env/jms/collax
    a/BPELWorkerQueueFactory, available connections=25, total connections=25
    <2008-07-09 15:32:33,404> <DEBUG> <default.collaxa.cube.engine.deployment> <CubeProcessHolder::bind> Exception while loading process
    java.lang.AbstractMethodError
    at com.collaxa.cube.engine.core.BaseCubeProcess.loadActivationAgents(BaseCubeProcess.java:946)
    at com.collaxa.cube.engine.core.BaseCubeProcess.load(BaseCubeProcess.java:310)
    at com.collaxa.cube.engine.deployment.CubeProcessFactory.create(CubeProcessFactory.java:66)
    at com.collaxa.cube.engine.deployment.CubeProcessLoader.create(CubeProcessLoader.java:391)
    at com.collaxa.cube.engine.deployment.CubeProcessLoader.load(CubeProcessLoader.java:302)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.loadAndBind(CubeProcessHolder.java:882)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.getProcess(CubeProcessHolder.java:790)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.loadAll(CubeProcessHolder.java:362)
    at com.collaxa.cube.engine.CubeEngine.loadAllProcesses(CubeEngine.java:910)
    at com.collaxa.cube.admin.ServerManager.loadProcesses(ServerManager.java:284)
    at com.collaxa.cube.admin.ServerManager.loadProcesses(ServerManager.java:250)
    at com.collaxa.cube.ejb.impl.ServerBean.loadProcesses(ServerBean.java:219)
    at IServerBean_StatelessSessionBeanWrapper14.loadProcesses(IServerBean_StatelessSessionBeanWrapper14.java:2466)
    at com.collaxa.cube.admin.agents.ProcessLoaderAgent$ProcessJob.execute(ProcessLoaderAgent.java:401)
    at org.quartz.core.JobRunShell.run(JobRunShell.java:141)
    at org.quartz.simpl.SimpleThreadPool$WorkerThread.run(SimpleThreadPool.java:281)
    <2008-07-09 15:32:33,419> <ERROR> <default.collaxa.cube.engine.deployment> <CubeProcessHolder::loadAll> Error while loading process 'DRSSecuritiesReader', rev '1.0': Error
    while loading process.
    The process domain encountered the following errors while loading the process "DRSSecuritiesReader" (revision "1.0"): null.
    If you have installed a patch to the server, please check that the bpelcClasspath domain property includes the patch classes.
    ORABPEL-05215
    Error while loading process.
    The process domain encountered the following errors while loading the process "DRSSecuritiesReader" (revision "1.0"): null.
    If you have installed a patch to the server, please check that the bpelcClasspath domain property includes the patch classes.
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.bind(CubeProcessHolder.java:1270)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.loadAndBind(CubeProcessHolder.java:883)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.getProcess(CubeProcessHolder.java:790)
    at com.collaxa.cube.engine.deployment.CubeProcessHolder.loadAll(CubeProcessHolder.java:362)
    at com.collaxa.cube.engine.CubeEngine.loadAllProcesses(CubeEngine.java:910)
    at com.collaxa.cube.admin.ServerManager.loadProcesses(ServerManager.java:284)
    at com.collaxa.cube.admin.ServerManager.loadProcesses(ServerManager.java:250)
    at com.collaxa.cube.ejb.impl.ServerBean.loadProcesses(ServerBean.java:219)
    at IServerBean_StatelessSessionBeanWrapper14.loadProcesses(IServerBean_StatelessSessionBeanWrapper14.java:2466)
    at com.collaxa.cube.admin.agents.ProcessLoaderAgent$ProcessJob.execute(ProcessLoaderAgent.java:401)
    at org.quartz.core.JobRunShell.run(JobRunShell.java:141)
    at org.quartz.simpl.SimpleThreadPool$WorkerThread.run(SimpleThreadPool.java:281)

    I forgot to mention that I did flush the JAR cache to make sure the new JAR's would be downloaded.
    Gerrit

  • Failed to delete file after processing FTP

    Failed to delete file after processing. The FTP server returned the following error message: 'com.sap.ai i.adapter.file.ftp.FTPEx: 550 Unexpected reply code *.txt: The process cannot access the file because it is being used by another process. '. For details, contact your FTP server vendor.
    I got this error many times for the same interface. Not sure what is the reason for this.
    Searched on internet go comments that this is because of FTP version!
    Please help

    It is the "Msecs to Wait Before Modification Check" in the Sender Adapter that ensures this. It works like this: PI starts processing, finds a file, then waits the number of miliseconds specified and checks the file again to see if it has changed over the waiting period. If so, then it waits again to make sure the file is written completely. Only if no changes took place over the waiting period, it starts processing the file.
    And the fact that your file was successfully processed at retry only confirms that it might have been still written to by the sender system. You can try comparing file's creation timestamp (in OS level) with its processing start time in PI - this could prove me right.
    Edited by: Grzegorz Glowacki on Jan 13, 2012 2:15 PM

  • Opmnctl failed-"start managed process after the maximum retry limit"-URGENT

    Hi All,
    I tried to start the opmn process after configuring BIGIP and securing the OMS.But opmnctl startall failed saying unable to start "HTTP_Server".
    [aime@stamt02 ~/TC3]$ ./oms10g/opmn/bin/opmnctl startall
    opmnctl: starting opmn and all managed processes...
    ================================================================================
    opmn id=stamt02:6200
    5 of 6 processes started.
    ias-instance id=EnterpriseManager0.stamt02.us.oracle.com
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    ias-component/process-type/process-set:
    HTTP_Server/HTTP_Server/HTTP_Server
    Error
    --> Process (pid=30117)
    failed to start a managed process after the maximum retry limit
    Log:
    /scratch/aime/TC3/oms10g/opmn/logs/HTTP_Server~1
    log file says :
    [aime@stamt02 conf]$ tail -f /scratch/aime/TC3/oms10g/opmn/logs/HTTP_Server~1
    07/04/24 04:29:24 Start process
    /scratch/aime/TC3/oms10g/Apache/Apache/bin/apachectl startssl: execing httpd
    07/04/24 04:29:29 Start process
    /scratch/aime/TC3/oms10g/Apache/Apache/bin/apachectl startssl: execing httpd

    Same problem for me also.
    I could start all other process except HTTP
    while starting that it is show a mesg as follows
    ------------------------------------------------+---------
    ias-component | process-type | pid | status
    ------------------------------------------------+---------
    DSA | DSA | N/A | Down
    HTTP_Server | HTTP_Server | N/A | Down
    LogLoader | logloaderd | N/A | Down
    dcm-daemon | dcm-daemon | N/A | Down
    OC4J | home | 3596 | Alive
    [oracle@mrk bin]$ ./opmnctl startall
    opmnctl: starting opmn and all managed processes...
    ================================================================================
    opmn id=mrk.mydomain.com:6200
    0 of 1 processes started.
    ias-instance id=ias_hns.mrk.mydomain.com
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    ias-component/process-type/process-set:
    HTTP_Server/HTTP_Server/HTTP_Server
    Error
    --> Process (pid=3860)
    failed to start a managed process after the maximum retry limit
    Log:
    /u01/Oracle10gAS/opmn/logs/HTTP_Server~1
    Please any one help me.
    mail me at [email protected]
    Thanks in advance

  • Financial/Project Analytics Load - Some of the Tasks TRUNCATE Table Fails

    Oracle Business Applications 7.9.6.1 - Financial and Project Analytics
    DAC Load for Project Analytics fails with most of the tasks failing at Truncate Table Tasks.
    I am implementing OBIA Financial Analytics and Project Analytics, I am able to configure and run the Out of the Box Loads without any isssues for Financial Analytics. After making sure everything is fine with Fin Analytics i configured the Project Analytics and ran the Load only for the Project - ORA12.
    Financial analytics : Load went through fine without any issues.
    Project Analytics : Majority of the Tasks fail with 'TRUNCATE TABLE table_name' itself.
    No log of Informatica Session Files are Created
    No Log of Workflow logs but taskname.log.bin files are Created.
    I am assuming the loads are failing because it is unable to truncate the data loaded by Financial Analytics Load and due to Foreign Key constraints,
    I did the integration as per the document by unchecking in the Configuration Tags.
    Do i need to run the load together, As i am unable to figure out what is happening due to the absense of the log files i.e Session, Workflow.
    DAC logs are not providing much info.
    Any inputs are appreciated.
    Thanks

    hi
    you need to create a new execution plan that contains fin & project subject area. Do not forget to build the new plan,
    thx

  • Data load process for FI module

    Dear all,
    We are using BI7.00 and in one of our FI data source 0EC_PCA_1 we had data load failure, the cause for the failure was analysed and we did the following
    1) deleted the data from cube and the PSA
    2) reloaded (full load) data - without disturbing the init.
    This solved our problem. Now when the data reconciliation is done we find that there are doubled entries for some of the G/L codes.
    I have a doubt here.
    Since there is no setup table for FI transactions (correct me if i am wrong), the full load had taken the data which was also present in the delta queue and subsequently the delta load had also loaded the same data
    (some g/l which was available as delta).
    Kindly provide the funtioning of FI data loads. Should we go for a Down time and how FI data loads works without setup tables.
    Can experts provided valuable solution for addressing this problem. Can anyone provide step by step process that has to be adopted to solve this problem permenantly.
    Regards,
    M.M

    Hi Magesh,
    The FI datasources do not involve Setup tables while performing full loads and they do not involve outbound queue during delta loads.
    Full load happens directly from your datasource view to BI and delta is captured in the delta queue.
    Yes you are right in saying that when you did a full load some of the values were pulled that were also present in the delta queue. Hence you have double loads.
    You need to completely reinitialise as the full load process is disturbed. Taking a down time depends on how frequent the transactions are happening.
    You need to.
    1. Completely delete the data in BW including the initialisation.
    2. Take a down time if necessary.
    3. Reintialise the whole datasource from scratch.
    Regards,
    Pramod

  • Automate the Cube loading process using script

    Hi,
    I have created the Essbase cube using Hyperion Essbase Studio 11.1.1 and my data source is Oracle.
    How can I automate the data loading process into the Essbase cubes using .bat scripts?
    I am very new to Essbase. Can anyone help me on this in detail?
    Regards
    Karthi

    You could automate the dimension building and dataloading using Esscmd/ Maxl scripts and then call them via .bat scripts.
    Various threads available related to this post. Anyways, you could follow the following steps.
    For any script provide the login credentials and select the database.
    LOGIN server username password ;
    SELECT Applic_name DB_name;
    To build dimension:
    BUILDDIM location rulobjName dataLoc sourceName fileType errorLog
    Eg: BUILDDIM 2 rulfile 4 username password 4 err_file;
    For Dataload
    IMPORT numeric dataFile fileType y/n ruleLoc rulobjName y/n [ErrorFile]
    Eg: IMPORT 4 username password 2 "rulfile_name" "Y";
    Regards,
    Cnee

  • Error while loading the data

    Hi,
    We are trying to copy data from one cube to another(it's exact copy). There are more than 11 million records so we have used calendar month as filter and divided the data in to many parts.
    While loading the first request to the target cube, it failed resulting in a short dump. I checked in ST22 and it showed "Runtime Errors DBIF_RSQL_SQL_ERROR , Exception CX_SY_OPEN_SQL_DB" and I also found a message "ORA-00060: deadlock detected while waiting for resource" in the description of the Short Dump.
    I found many threads here relevant to this exact issue but the only solution that I could find is to include a delete index and create index process in the chain before and after the data load process to the target cube. In our case, the target cube has no data and this would be the first request to the cube so there is no need to delete index in the first place but still the data load is failing.
    For each load there are 50 data packages and 50k records for each packages. Only one or two packages have failed. Is there any way to recover only these two separatly instead of deleting the whole request and repeating the process.
    If you have encountered a similar issue or if you have any suggestions, Please do help.
    Thanks..

    Hi,
    Can you see which data packages have RED status? Click on the live of the RED data package, and you have to find an ICON with update manually, or go to MENU -> REQUEST -> POST MANUALLY.
    if you are lucky, it helps. Do not forget that this runs in DIALOG process, so don't leave BREAK.POINT in your transformation.
    If you need any help, please let me know.
    (The DEADLOCK problem: change the DTP BATCH setting, because it has problem with paralel loading, and there os a database deadlock. I suggest you to load in one process so: open DTP. after it, go to GOTO menu -> SETTINGS FOR BATCH MANAGER -> NUMBER OF PROCESSES, overwrite with 1. With that, deadlock may not occur.)
    Regards,
    Laszlo

Maybe you are looking for

  • Display Filename in PDF File

    Hi there, hoping for some help on what I think is quite a simple issue. I want to create a blank single page PDF file which has a text field automatically and dynamically completed based on the file name of the pdf document. So for example if the fil

  • How to change filed length for Infotypes IT0197

    Hello Gurus, I have a requirement from my client regarding IT0197 (malaysia specific) In the above infotype there is a field called SOCSO number. Currently the filed length defined is 20 characters in SE11. But on the screen level, if we see it is al

  • Notify users before password expires

    Hi, We have some Vibe external users that need to be notified when their passwords are about to expire, so they can ask us for a new password (their accounts are created in our tree) I can't seem to figure out any way to allow this so please help...

  • About the List of Supported CUDA Cards

    [Moderator's Note: more info from Wil Renczes (Adobe)] Here's the link in the help  documentation: http://help.adobe.com/en_US/PremierePro/CS5/Using/WSd79b3ca3b623cac9-e423b201260  b3b62c9-8000.html Unfortunately, there wasn't a screenshot - so  here

  • Okay well i dropped my ipod in water saturday night and i was wondering if apple would be able to give me a replacement on my ipod4g

    okay well i dropped my ipod in water on saturday and was wondering if apple would be able to give a replacement?