OCM for Revesion level in the Material Master and for the BOM

Hello,
I use My SAP 6.
I have implemented OCM. It's used for 2 things:
- The first is for revision level in the Material Master.
- the second is for the BOM.
Today, the customizing is good, it's work.
My need is to have the same change number for those 2 evolutions:  for the material master evolution and for the BOM evolution.
It's possible, and how?
Thanks for your answers.
Bérenger

I do not think this is possible. Service level is usually used for safety stock planning.

Similar Messages

  • For a PR, check the material master

    Hi,
    I have a basic question.
    I have a requirement to check the material master to determine the existence of the material master after a PR is created. Can we create a PR without a material.
    What are the methods of creating PR apart from manual creation
    Thanks.

    > Hi,
    >
    > I have a basic question.
    > I have a requirement to check the material master to
    > determine the existence of the material master after
    > a PR is created. Can we create a PR without a
    > material.
    > What are the methods of creating PR apart from manual
    > creation
    >
    > Thanks.
    Hi,
    Here u can Extend the material master after creating PR,and u can create PR with Out Material master,but this is possible only with Consumable materials and services.
    Thanks & Regards
    suresh

  • Revision level issue in Material Master maintenance

    Hi All,
    When I try to change the revision level for a certain change number in our production client in the material master I get the following error
    Priority of revision level E is too small
    I have checked in CC13. But I could not find anything relevant.
    There are a number of revision levels available in the dropdown list.If I select some of the last revision levels available in this dropdown list in the material master the system accepts it readily but if I select any of the earlier revision levels in the list the system throws the above error message.
    Please can someone tell me what is wrong here.
    Regards,
    V S

    Hello All.......any clues???
    Does this belong to MM?......if not where can I get answers?.....which forum can I refer?

  • Automatic creation of  Warehouse No. data in the material master

    Hi all,
    I want the automatic creation of  Warehouse No. data in the material master record at the time of the first goods receipt is allowed.
    Similar to the way where we can do the same for Storage Location by clicking on Create SLoc. automatically in the plant parameters settings.
    can it be done..plz guide.
    Regards,
    Sandeep

    Hi Deepak ,
    Such facility is not available for Warehouse .
    Regards
    Ramesh Ch

  • Valuation class in the material master

    hi all, we maintain split valuation materials, namely domestic & imported. we are working on project based scenarion planning strategy 21 : MTO/project.
    in daily practice user convert unrestricted stock to project stock with 412 Q mvt type before MRP RUN.
    but for some when user try to convert stock following error occurs. I check stock available, it is available. but i do not understand why this error comes.                                                             
    Maintain the valuation class in the material master first
    Message no. M7232
    Diagnosis
    The system found that you have defined your own valuation classes for sales order stock and project stock in Customizing. However, these valuation classes have not been maintained in the material master record for the materials concerned.
    Procedure
    So that the relevant accounts can be posted upon goods movements, you have to maintain the valuation classes for sales order and project stock in the accounting view of the material master record for the material concerned.
    If you have authorization to do so, you can change the material master record.

    Hi,
    The normal valuation stock refer to relevant table valuation class field MBEW/MBEWH-BKLAS
    Special Sales Stock refert to MBEW/MBEWH-EKLAS
    Projeck Stock refer to MBEW/MBEWH-QKLAS
    Cheers,
    Girang

  • How is the Consumption tab will update in the material master?

    Hi Friends,
    How is the Consumption tab will update in the material master?
    what are the customization required if consumption tab wants update with respective the qty?
    Regards,
    Hari Shankar

    Hi Friends ,
    I am very thankful to u all for your quick response,
    I have tested the two materials with two movement types of 601 and 954.
    when i did the 601 movement type the consumption tab in the material master has updated automatically even though  i haven't maintained forecasting tab, but where as for the movement type 954 the consumption tab is not updated even though i have maintained forecasting tab view in the material master.
    Is the consumption view will update based on the Material movement types?
    where is the control parameter for updating consumption tab?
    could you pls help me regarding this?
    Regards,
    Hari Shankar.

  • Availability Check Changed on the Material Master Update Existing Orders

    I need to know if there is a way to update existing orders once changes have been made to the material.  Currently the only way that I know of is to go into individual orders change the plant save then change it back to the original plant on the order then the changes take effect.  How can I achieve this without touching every order individually.  Is there something to mass update existing orders to take a new snapshot of the material master settings for a material.

    Try with t.code VA05 - Open sales order list.
    Execute this list. In the output, sort the data by plant. Then go to menu Edit -> mass change -> new plant. Change the plant for group of sales orders that have similar plants. Then again do the same thing to bring the previous plant in the sales orders.
    This can help reduce the time instead of going one by one.
    Regards,

  • Screen Level Security for the Material Master

    We need to create security for the material master by screen views. The Purchasing group needs to be able to change the Purchasing and MRP screens but none of the other screens. How would we accomplish this with SAP security?
    Thanks!

    Janet,
    It is hard for us to know how your authorization profiles or roles are constructed.  You really should consult your local authorization expert.
    The Authorization object you are looking for is M_MATE_STA.  It is probably contained in at least one of your Roles or Profiles that are currently assigned to your MM maintenance people. At a minimum, it should exist in standard SAP profile M_MATE_ALL in your system.  You can review all of these types of authorization info in the User Information System (transaction SUIM).
    You would have to create roles or profiles that narrowly define the "User department" fields for M_MATE_STA object.  You would also have to search for existing roles/profiles that contain "*" in this field, and determine if these entries are still appropriate in your new authorization business process you want to begin.
    Below is the SAP help about this authorization object
    M_MATE_STA
    Definition
    Maintenance status authorization for material master records
    The data contained in a material master record is divided into user departments or views (Purchasing, MRP, and so on). The maintenance status is a single-character key for the relevant user department or view.
    This object determines which user departments or views a user is authorized to process; that is, which data he or she may process from this view.
                                                                                    Note                                                                      
    To use material master functions, a user needs the authorization for at least one user department.
    Defined Fields
    Fields               Possible values      Meaning
    ACTVT                01                   User may create data.
                         02                   User may change data.
                         03                   User may display data.
                         06                   User may flag data for deletion.                       
                         08                   User may display change documents. 
    STATM                                     Here, you specify the maintenance status for which the user is authorized.         
    The maintenance statuses possible are as follows:
    User department                Maintenance status
    Work scheduling                   A
    Accounting                        B
    Classification                    C
    MRP                               D
    Purchasing                        E
    Production resources/tools        F
    Costing                           G
    Basic data                        K
    Storage                           L
    Forecasting                       P
    Quality management                Q
    Warehouse management              S
    Sales                             V
    Plant stocks                      X
    Storage location stocks           Z
    Notes
    This authorization object also determines:
    o   Whether a user may flag a material master record for deletion. In this case, 06 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may change the material type. In this case, 02 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may process an MRP profile or forecast profile. In this case, the following values must be entered in field ACTVT:
    -   01 to create
    -   02 to change or delete
    -   03 to display
    The maintenance status must be D for the MRP profile or P for the forecast profile.
    o   Whether a user may create an overview of all extendable materials. In this case, 01 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may call up the materials list. In this case, 03 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may create or change production versions from task lists. In this case, 02 must be entered in field ACTVT, and A in field STATM.
    Rgds,
    DB49

  • Open field for cost center on the material master

    We have a unique requirement in a facility we intend to implement plant maintenance in to track a cost center to a material by including the cost center on the material master somewhere.  Cost center is not a field on any of the material tabs we use for maintenance materials, but the requirement is just that it is tracked in a field, even if it's just an open field like a "user defined field" or another field not used often.  We realize there are disadvantages such as the field not being checked against active cost centers, but we are looking at options short of adding cost center as a field manually to a tab (which I believe would require ABAP assistance).  I don't think there are any other fields/tabs we are currently not utilizing but I could be wrong... The best option we can think of is adding it in a material characteristic so it shows on the classifications tab, but I thought I would see if anyone has any other ideas.
    Thanks

    Not sure what is the need of cost center on material master when you want to implement Plant maintenance module. Do you have any specific requirement for this?
    Ideally cost center will be derived from either functional location/ equipment (equivalent of material master) on to PM work order or notification.
    Can you elaborate the requirement?
    After all if you wish to go with cost center, then I suggest it should be at plant level as PM requires plant level distribution. You can add up a custom field and give the reference of cost center data element with help of developer.

  • Plant specific fields in the material master for product move

    Hi, SAP gurus,
    My scenario is we are moving a existing product in US plant to Brazil plant. What are the fields in the material master that are specific to a plant that will change. For ex MRP controller will change from plant to plant. Like that can anybody please provide me a list of fields that i need to be looking at?
    Thank you
    Anusha

    Hi Anusha,
    First of all, list down all your materials those you want to extend to new plant.
    a) Secondly, pay attention to those fields you will find "filled" in those materials at plant level.
    b) MARC comes handy for you to analyse which fields are at plant level.
    Intersection of fields with values between a and b are the ones you need to work out.
    Good luck,
    Regards

  • MRP TYPE for  Periodic planning in the material master.

    Dear gurus,
    i need planned the materials in the periodic modality, are there the type MRP in the material master for create the planned file ( table MDVM) one once a month or in the specific period chose ?
    Example :
    I need that the material master don't create a file planned ( MD20- TABLE MDVM) for a change of the requirement situation new , but i would like that the flag in the table ( MDVM) or file of the planning MRP created when the today date is in the period specific.
    31.3.2011  (or period 1.4.2011- 10-4-2011)Date for the create a file MRP and after when run MRP planned the material, for others scenary the system must not planned the material.
    Are there the MRP type for my problem? Or the customizing setting?
    Thanks a lot
    Dani

    Dani,
    Not sure if MRP type or customizing can help here. And even if we are able to achieve this requirement it will be applicable at plant level.
    However, try exploring option of periodic lot size (weekly, monthly, etc). This will work according to period you've set and should give you the results you are looking for.
    Regards,
    Himanshu

  • Service Level in the Material Master

    Hi -
    Can the service level field in the material master MRP view be used to drive additional demand independant of safety stock?  Meaning, is there any way I can enter a service level and have it increase demand even if I am not using it to calculate safety stock?
    Thanks

    I do not think this is possible. Service level is usually used for safety stock planning.

  • Authorisation object for "PO text in the material master"

    Hi,
    My requirement is as below:
    "All users can see the Purchase Order Text as usual, but only a few users should be allowed to create / change the PO Long Text.
    For other users, the same should appear in display mode only (both in creation & in change mode, MM01 & MM02)."
    Please let me know, How to map this.
    As per my knowledge thsi is possible only thru authorisation. But I want to know what is the authorisation object for "PO text in the material master" (Pl note that only for PO text in the material master field). we want control on "PO text of material master"
    Regards.
    Chinna

    Hi,
    The authorisation object is "M_MATE_MAT", pl check
    Regards
    Merwyn

  • SAP standards for retriving the Material Master Data

    Can someone provide me list of all SAP standards for retriving the Material Master Data with respect to views.
    Standard Reports
    Function Modules
    RFC's
    BAPI's.
    T.codes
    Sample code's
    useful answers will surely be awarded.
    Regards
    Vinayak

    Hi,
    These are the standard BAPI's for Material master.
    BAPI_MATERIAL_DELETE Flag Material for Deletion
    BAPI_MATERIAL_DISPLAY Display Material
    BAPI_MATERIAL_EDIT Change Material
    BAPI_RETAILMATERIAL_CREATE Create Material
    BAPI_RETAILMATERIAL_DELETE Discontinue Material
    BAPI_STANDARDMATERIAL_CREATE Create/Extend Material
    BAPI_MATERIAL_SAVEREPLICA BAPI for Mass Maintenance of Material Data
    BAPI_MATERIAL_SAVEDATA Create and Change Material Master Data
    BAPI_MATERIAL_EXISTENCECHECK Check Existence of Material
    BAPI_MATERIAL_GETBATCHCERT Create Quality Certificate for Batch in Portable Document Format (PDF)
    BAPI_MATERIAL_GETBATCHES Create Batch List for a Material
    BAPI_MATERIAL_GETCHARMERCHHIER Supply Characteristics of Retail Material for Material Group Hierarchy
    BAPI_MATERIAL_GETINTNUMBER Assign New Internal Numbers for a Material Type
    BAPI_MATERIAL_GETINTNUMBERRET Assign New Internal Numbers for a Material Type for Retail Materials
    BAPI_MATERIAL_GETLIST Supply List of Materials for Search Criteria Transferred
    Thanks.,

  • Cost variance for the material master

    Hi all,
    This is very urgent requirement.
    How to maintain cost variance for the material master?
    I will assign the points
    venu

    Hi,
    Material Variance key will be assigned in Material master Costing data tab
    Best Regards
    Ashish Jain
    Message was edited by:
            Ashish Bohara

Maybe you are looking for

  • WebI issue with hierarchy display and aggregation

    Trying to wrangle what looks like a defect in WebI's handling of hierarchy display and aggregation. We just completed an update cycle and are running BOBJ 4.1 SP4. The hierarchy is a standard FM Commitment Item hierarchy in which both the nodes and l

  • RE: Encore Buttons are not displaying correctly

    Hi, I am having an issue with Encore Buttons which I have been trying to sort out for the past few days but not having any luck. When I add the button in photoshop PSD layer it looks fine but when I import it onto Encore and preview it it keeps the s

  • Strange redaction issue with no color fill for redacted area

    I have it set for No Color in the redacted area fill color.  When I mark my redaction, choose apply redaction, the selected area is still shown.  When I save the file, exit, and then re-open, the redaction is gone like it is supposed to.  Now if I ch

  • Print report parameters and report contents in separate pages.

    Hi , I Have a report with more than 10 parameters and while printing i am supposed to print all the parameters in the first page and then the report contents in a separate page(next). This is an old report developed by some one else. i need to change

  • Mute background track so you can hear video clip sound?

    Using iMovie '11, on a project with mixed stills and video, I want to mute the background music I have added while the video clips are playing so you can hear the audio on the clip and them=n bring the volume back up for the still shots.  I can see h