OKE Project Contracts - Generate Supplier invoice directly from Deliverable

Dear All,
In Project Contracts, Customer does not want to initiate requisition for the deliverables (Buy Contract - Non Item), instead they want Supplier invoice to be generated directly from the deliverables.
The process flow which the customer looking for in Oracle project contracts is as follows,
1. Create a Contract for Buy Intent - Non item deliverables
2. Authoring the Contract
3. Create Default deliverables
4. IN DTS, based on the deliverables, system should generate Supplier Invoice directly with contract and Project references.
Standard Flow - Contract Authoring > Default Deliverables > Initiate Requisition > Purchase order creation > Supplier Invoice > Interface costs to Projects
Proposed Flow - Contract Authoring > Default Deliverables > Initiate Supplier Invoice > Interface costs to Projects
Show some lights on this requirement.
Regards,
Kottee

Hi
As you may understand, the required flow is not delivered by Oracle.
You might consider a customization. Develop a program that finds the completed deliverables and create from them a supplier invoice. The program might insert the supplier invoice into AP open interface. From there you should import the invoice into Payables, validate and approve it.
Dina

Similar Messages

  • Can you modify the price of a contract in the ME32K directly from the item

    Hello,
    I am in ECC6.0
    I need to modify the price of an item in the contract (ME32K WK or MK) but it is grey (only in display). So I must do Item-Condition and then I can modify the price of the item.
    Can you modify the price of a contract in the ME32K directly from the item screen?
    I have try with several field selections but nothing.
    AKTV     Change
    MKK     Quantity contract (for MK)
    WKK     Value Contract (for WK)
    PT0K     Standard item contract
    Cheers,
    Marta

    HI,
    If you maintain any condition in the contract line item condition, like freight, discount etc. the landed price gets populated in the line item price field. So if you want to make any change in base price, it has to be changd in the line item condition.
    This is because, You can maintain different validity period in condition and maintain different price in each validity period. So which price you want to pick? So the system captures the price from condition and populate it in the item price field depending on the validity period price.
    Hope this helped you.
    Regards

  • How to print customer Sales Invoice directly from FI module?

    Hi,
    How to print customer Sales Invoice directly from FI module without using SD's t-code VF02 and VF03?

    hi,
    only way in FI is Correspondence functionality usage. Please config it and use F.61 or F.64 to print it.
    regds,
    raman

  • Product Contract and supplier data transfer from SRM to SAP XI

    Dear MDM Guru's
    I want to transfer product data from SRM system to SRM MDM catalog by executing the transaction BBP_CCM_TRANSFER. But not found any materials  or blog or articles on configuration and integration steps between SAP SRM and SAP XI.
    Need a same information on SRMMDM_CTR_TRANSFER - For contract data, Suppliers data.
    Please help.
    Regards
    Jacob

    HI Jacob,
    I believe below documents will give you the information which you are looking.
    [SRM-MDM Catalog Setup - Ready Reference|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/806f3d56-0d29-2d10-9abf-c0df6f0fdfe8]
    [SAP NetWeaver Master Data Management - SRM Catalog: Configuration for SAP NetWeaver Exchange Infrastructure - Ready Reference|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/601d4fee-719f-2910-4f86-fa030ab07358]
    [SAP NetWeaver Master Data Management - SRM Catalog: SRM - EBP Configuration|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/10d1bde2-699f-2910-8e86-f46bfe045fdc]
    Please revert if you still get any question, after going though these documents..
    - Shiv

  • AR Invoices directly from Legacy Sources

    We have legacy sources provide the billing information. The data provided by legacy is pretty complete and we can create the AR invoices with the data provided. Is it a good idea to create customer invoices directly in AR instead of processing the data through Order Management.
    Is there a white paper which suggests this? Does anyone have any idea about this?

    Hi,
    In order to do so, you can use AR open interface tables:
    ra_interface_lines_all: record invoice lines, freight and tax information
    ra_interface_salescredits_all: sales credit information
    ra_interface_distributions_all: record accounting information, if you do not want use receivables autoaccounting.
    You must set up imported batch sources, grouping rules and new interface transaction flexfield contexts. The first one, besides giving your transaction numbering, will define if you are going to send ids or descriptions in interface fields. The second one defines if lines are going to be grouped into one invoice or going to be divided in two or more invoices. The transaction flexfield context is commonly used to link receivables transactions to your legacy system.
    You may want read metalink note 220251.1, it is very useful.
    Regards,
    Ketter Ohnes

  • Email an invoice directly from SAP CRM 7 via ERMS

    Hi there,
    Is there a way to email a customer invoice from SAP CRM7 using SAP ERMS?
    With SAP CRM4, we are able to open up the invoice and click on the email icon. This will launch a new email from outlook with the bill attached.
    I'm looking for a more integrated way to email an invoice using ERMS within SAP.
    Thanks,
    Catherine

    Hi Catherine,
    What if you use the action profile for sending the email?.
    Thanks,
    Faisal

  • Documentation generator directly from C source files

    Hello,
    Is there any tool to generate HTML documentation directly from C sources files using Documentation Tags like "/// HIFN "?
    I know we can generate documentation with function panels documentation generator but that's not what I'm looking for. I'm looking for something like doxygen or javadoc with NI documentation tags support. 
    Regards,
    Aurélien.

    Hello AReeves!
    LabWindows/CVI features a documentation generation tool able to output HTML and XML format documentation from your C source files.
    You can use the source code documentation tags (e.g. HIFN, HIPAR, etc) to document your functions in the source code, similar to doxygen.
    The option is located in Build » Target Settings » Generate source code documentation. There you can select your output format.
    Here is a useful link related to generating documentation from source files using CVI:
    http://zone.ni.com/reference/en-XX/help/370051T-01/cvi/usermanual/tagsforsourcecode/
    Regards,
    - Johannes

  • Project contracts flow

    Hi,
    What is standard process flow for using Project contracts.
    Whether Project is to be created first then contract is to be created. if it is the contract is not awarded why i need to create a project for that.
    We are not tracking the opportunities cost.
    So if i create a proposal type contract can the type can be changed to awarded contract once it is awarded and then can we update the project number? or I need to create a new contract with awarded type?
    How agreement different from Contract
    The agreement represent the commercial contract between the customer and the company. How it is different from contract.
    Thanks
    Govind
    Edited by: GovindVenu on Oct 24, 2011 7:09 AM

    Hi
    An awarded contract entered on OKE (project Contracts) must be linked to a project. Therefore, you should create the project before entering the contract. You may create the project and leave it on Unapproved status until getting the award. Then After entering the contract to the system and approving it, you can go and change project status to Active / Approved as well.
    Note the project you enter on the Contract header form is the execution project.
    An agreement is a thin representation of the contract with the customer. The information of the agreement page include agreement number and type, customer name and addresses, and the total value. From the agreement in entered on PJB you should allocate funding to the project and baseline the funding. Only then you will be able to generate revenue and invoices.
    If you implement OKE you will be able to enter rich information about the commercial contract with the customer, including terms and condition, list of contract lines and deliverables. After that you can enter in OKE the Funding Source and allocate funding to the project. After approving the contract in OKE, user may hit the button Create Agreement. On that moment the system copies the funding Source and allocations from OKE to the agreement and funding in PJB.
    Dina

  • Project Contracts Deliverables : Unable to Ship Confirm

    Sub : Project Contracts Deliverables : Unable to Ship Confirm
    Hi,
    When trying to " Ship Confirm " for deliveries initiated from Project Contracts, Error Msg appears :
    Error : Some deliveries selected for ship confirm have errors or warnings.
    On clicking DETAIL buttton :
    Error:Delivery Details xxxyy in this delivery do not satisfy inventory controls.
    Warning:The Ship Confirm Option selected will unassign all the lines from delivery yyyxx.
    Regards
    adi

    Hi,
    Please check the metalink note: 227843.1 for this issue.
    Hope this helps!
    Thanks,
    Sathish Raju
    www.projectsaccounting.com

  • Project Supplier Invoice Account Generation from Sub Ledger Accounting rule

    Hi gurus,
    we are implementing project module with the financial.
    We need to customise the Project Supplier Invoice Account Generation.
    We are preferring the Sub Ledger Accounting generation rule in place of the workflow method(where we need to customize the default workflow for account generation from AP to PA).
    We have done the setup for the SLA to generate accounting (from AP invoices TO pa). But still we are getting the same error("the system cannot generate distributions for line 1 because payable account function Project supplier invoice charge account has not been customized. please replace the dummy function in default account generation process"
    Please help me.. to solve the problem..
    As Its a very urgent customization on the verge of going live..
    thnkz in advance
    Regards
    Vishal

    Hi
    Customizing the Payables and Purchasing Account Generator for project related documents is mandatory. The accounting rules in SLA is optional.
    Since you said you are pleased with the set up of the accounting rules by SLA, you might set up a very simplistic account generator rule, so it will generate a constant account. SLA will later on override the constant by the real rules.
    Dina

  • How Oracle Project Contract (OKE) is useful for construction business?

    Hello Experts
    I am new to Oracle Projects family. I am interested to gain knowledge in Oracle Projects particularly in the modules like Project Costing, Billing, Project Management and Project Contracts.
    I have some specific queries with reference to construction business requirements which are as under:
    1. In what way Project Costing, Project Management and Contracts modules can be helpful for a construction business?
    2. If the business is to construct the villas and then to sell those to different high worth individuals, what all modules from Project family should be implemented?
    3. Any construction business typically engage different contractors (suppliers) for various construction related services. These contractors may submit net or cumulative invoices for the services provided by them. As per terms there could be retainage and recovery of advance paid to the contractors. After applying the retainage and advance recovery, contractor invoice will be certified for payment. How this business requirement will get mapped into Oracle system and in which module? Do I have to use Purchasing module or only Project Contract module is sufficient? Pls specify if any other module is required to be used for mapping this business scenario.
    4. Which Oracle modules are required for handling contractors payment certificates?
    Kindly provide your inputs in detailed.
    Thanks in advance

    Hi Gurus
    Please reply to my following doubt. Eagerly awaiting your replies.
    Hello Experts
    I am new to Oracle Projects family. I am interested to gain knowledge in Oracle Projects particularly in the modules like Project Costing, Billing, Project Management and Project Contracts.
    I have some specific queries with reference to construction business requirements which are as under:
    1. In what way Project Costing, Project Management and Contracts modules can be helpful for a construction business?
    2. If the business is to construct the villas and then to sell those to different high worth individuals, what all modules from Project family should be implemented?
    3. Any construction business typically engage different contractors (suppliers) for various construction related services. These contractors may submit net or cumulative invoices for the services provided by them. As per terms there could be retainage and recovery of advance paid to the contractors. After applying the retainage and advance recovery, contractor invoice will be certified for payment. How this business requirement will get mapped into Oracle system and in which module? Do I have to use Purchasing module or only Project Contract module is sufficient? Pls specify if any other module is required to be used for mapping this business scenario.
    4. Which Oracle modules are required for handling contractors payment certificates?
    Kindly provide your inputs in detailed.
    Thanks in advance

  • Regarding marking of status for generate draft invoice for single projects

    Hi,
    1)
    I have read through the portion - "Automatic Invoice Approve/Release Extension" in the document - "Oracle® Projects APIs, Client Extensions, and Open Interfaces".
    Noticed the package - "pa_client_extn_inv_actions" and procedures - "approve_invoice, release_invoice".
    I understand that these procedure play role in the actually approving & release of the invoice but will this also play role in changing the status or some other code need to be written for changing the status.
    My requirement of customizing a workflow for approval also need to mark status as unapproved when not approved. Not sure if same procedure will help.I am completely new in Project accounting so not sure if I have put forward very basic questions.
    2) Second question is in regards to the way this procedure should be modified :
    This is the code for approve_invoice:
    /*----------------------------------------------------------------------+
    | Approve Customer Invoice Template |
    +----------------------------------------------------------------------*/
    Procedure Approve_Invoice ( P_Project_ID in number,
    P_Draft_Invoice_Num in number,
    P_Invoice_Class in varchar2,
    P_Project_Amount in number,
    P_Project_Currency_Code in varchar2,
    P_Inv_Currency_Code in varchar2,
    P_Invoice_Amount in number,
    X_Approve_Flag out NOCOPY varchar2, --File.Sql.39 bug 4440895
    X_Status out NOCOPY number ) is --File.Sql.39 bug 4440895
    BEGIN
    -- Reset the output parameters.
    X_Approve_Flag := NULL;
    X_status := 0;
    -- Add your Approve Invoice Logic here.
    -- If you want to Approve the Invoice set X_Approve_Flag to 'Y'.
    -- If it's null or set to 'N', Approval of Invoice will not be Done.
    -- Do not add 'commit' or 'rollback' in your code, since Oracle
    -- Projects controls the transaction for you.
    EXCEPTION
    when others then
    -- Add your exception handler here.
    -- To raise an application error, assign a positive number to X_Status.
    -- To raise an ORACLE error, assign SQLCODE to X_Status.
    RAISE;
    END Approve_Invoice;
    I have shown below what I understand on the modifications to be done on the same:
    Procedure Approve_Invoice ( P_Project_ID in number,
    P_Draft_Invoice_Num in number,
    P_Invoice_Class in varchar2,
    P_Project_Amount in number,
    P_Project_Currency_Code in varchar2,
    P_Inv_Currency_Code in varchar2,
    P_Invoice_Amount in number,
    X_Approve_Flag out NOCOPY varchar2,
    X_Status out NOCOPY number ) is
    BEGIN
    -- Reset the output parameters.
    X_Approve_Flag := NULL;
    X_status := 0;
    X_Approve_Flag := 'Y';
    -- If you want to Approve the Invoice set X_Approve_Flag to 'Y'.
    -- If it's null or set to 'N', Approval of Invoice will not be Done.
    EXCEPTION
    when others then
    X_Status = 1;
    -- To raise an application error, assign a positive number to X_Status.
    -- To raise an ORACLE error, assign SQLCODE to X_Status.
    RAISE;
    END Approve_Invoice;
    **Will this modification "X_Approve_Flag := 'Y';" result in the invoices to be approved if I put this after the APPROVE path and if I put "X_Approve_Flag := 'N';", does that mean that the invoice would be rejected/unapproved so that I can put it after the REJECT path ?
    3)
    Custom workflow launch procedure to be fired from billing extension screen. Presently what is done is in the project template screen, in the billing assignment, the billing extension is referred.
    That means for each and every project, billing extension name will be attached.
    Present flow is once the generate draft invoice runs, triggers the billing extension, which in turn invoke the custom workflow launch procedure. But my question is how my workflow launch procedure is going to identify the particular transaction which triggered the workflow procedure, because based upon some project number/id/invoice number, I will have a select fetch the data into variable and then setting those into workflow attributes between create process and start process.
    So question is how my procedure will identify the transaction which invoked the procedure to get the particular project number/invoice number may be.
    I am not getting much from my research so thought of sharing with you if someone can assist me on the same.
    Regards,
    Ad

    Hi Krishna,
    Yes. I am invoking my workflow from billing extension only. I have entered the procedure name in the billing extension. Now when the draft invoice runs , setup is such that billing extension gets invoked as a result of "draft invoice for a single project".
    Till now its fine because my workflow is actually getting launched from here.
    Now custom requirement is that the approve and release in invoice review screen will be disabled and the approval process will have to be custom.
    Till this also its fine.
    A scenario is when the custom notification reaches approver. He/she would either approved or reject. If he approves, then invoice should get approved and then released.
    For this we tried and it seems no API is available as mentioned by Oracle. So whats the way to update invoice statuses ?. Presently we are going with a not recommended way - insert into tables . But I feel something should be there on updating status as per custom logic.
    You can let me know what u did for changing statuses
    When we do release from invoice review screen, an RA invoice number gets generated. I also need to update the table with the RA invoice number while insertion in table. Now there is no d/b sequence for this number. I have tried to open the logic of Release button and could get on table name PA_IMPLEMENTATIONS which always have 1 row for per OU. and there is a field next ra invoice number which shows the RA invoice number to be used. This value will keep on incremented as long as RA number gets generated.
    I am stuck at this place , on how to get the RA invoice number with some proper recommended method.
    In short I need a way to update inoice statuses like approved, released other than direct insert in table
    and how to get RA invoice number to be utilised while the release logic
    Regards,
    Ad

  • Exchange Rate Entry of goods from a Supplier Invoice Reserve

    Dear friends,
    I have a problem. Each time we generate the entry of goods pulling the information from the invoice of reserve from supplier or vice verse, it also pulls the exchange rate from the base document, that is, from the invoice of reserve. Our currency is Peruvian Nuevo Sol.
    For example:
    On October 09th 2011, we generate an invoice of reserve in EURO currency with an exchange rate of 3.925
    On October 14th 2011, we make the entry of goods into the system, either from the invoice or pulling it from the entry, with an exchange rate of EUR: 3.800.
    At the moment of the entry of goods, the Accounts Department informs us that the exchange rate should be the one from the entry (completely logical). If the entry is done on October 14th then the exchange rate should be the one from that same date.
    However, it doesnu2019t happen this way.
    The exchange rate is pulled from the base document, it means, the one generated on October 09th with an exchange rate of 3.925
    The worst of all is that I cannot modify the exchange rate. I donu2019t know if it is a problem of parameters or if thereu2019s any failure with this SAP version. We use SAP B1 8.8 SP:00 PL: 15 system.
    I need your help in this particular case.
    Kind regards,

    Thank you very much for your reply Gordon but does not generate accounting exchange rate difference. Accountants do not know if you win or lose by the exchange difference should exist.
    As explained to make the entry of goods in a different date is not generated difrencia change.
    Do not know if anyone has a similar case?
    regards,
    Jesus

  • Error in default workflow Project Supplier Invoice Charge Account

    Hi,
    We applied the patch for E-Business Suite extended support requirements in our clone server and we advise users to test the modules. On the AP-PA module, we received an error saying "The default workflow for the Oracle Payables account function Project Supplier Invoice Charge Account has not been customised. Please replace the dummy function in the default process for account generation by your own account generation method."
    Our problem is that we do not know what has been customised and what are the setup being done. On the unpatched server, the said module/process is working.
    Need your help...
    Thanks,
    Benjo

    Hi,
    do you have projects module being implemented? if that exists,the issue happens when the user is trying to enter project related information in the invoice distributions.
    Ideally the systems looks in the Project supplier invoice work flow for generating the distribution CCID when the invoice is Project related.
    you need to customize the standard Project supplier invoice work flow through work flow builder, by adding your Accounting flex filed segments in it and how they will get picked up ( Like Look up , parameter, constant).
    Doing this will resolve the issue.
    Thanks
    Vijay

  • Steps and setup for Creation of Project Contract from Scratch

    Dear All,
    Steps and setup how to create contract from oracle project contracts?
    Thanks
    HNP
    Edited by: user12197222 on Aug 1, 2012 1:30 AM

    Please refer Ch 2 Creating New Contract Documents on below link from user guide:
    http://docs.oracle.com/cd/B11454_01/11.5.9/acrobat/115okeug.pdf
    thanks

Maybe you are looking for

  • In me21n tcode pr field as validate

    hi guru's in me21n tcode in item level i want to check purchase requestion field initial or not if its not initial it should trow the message 'please enter pr' how to do it .... it can be done by user exits r badi .. if it possiable please sen the co

  • Printing to A4 Tracing paper on HPt120

    When I try to print to A4 tracing paper from the multi sheet tray the printer prints to the left hand side of the page. With exactly the same print setting, if I put A4 plain paper in the multi sheet tray it prints correctly.  Any suggestions?

  • Unable to open Aperture

    Unable to open Aperture. I get the spinning beach ball of death and then I must force quit.

  • Selecting STO Order Data: 2 Questions

    I have to pass data out of SAP to an external system 1)What would be the best table (BAPI, FM, or other?) to select STOs (stock transport orders) from in SAP for the fields below? 2)How can I validate that it is a type STO  (stock transport order)? t

  • ALV field display issue

    Hello All, I am working with a program that is using the FM REUSE_ALV_GRID_DISPLAY and have an issue with the field display when the layout is changed.  For example, I have a date field that will appear blank when the program is run initially.  Howev