Hi All,
        Please clarify the following will be grateful.
I have a inhouse material thatu2019s having alternative sequence. The above material uses order type PP01, so OPL8 (Order type dependent parameter) configured in such a way that ALTERNATIVE SEQUNCES is (Checked) and SEQUENCE EXCHANGE is u201C0u201D (i.e., No Selection).
For the above settings what I meant is, even though if a material is having alternative sequences that wonu2019t get copied in to the order.
But here is the issue starts for the following setting
u2022     ALTERNATIVE SEQUNCES is (Checked) and
u2022     SEQUENCE EXCHANGE is u201C0u201D (i.e., No Selection)
Alternative sequence operations are available for the order on COOIS screen for the following selection
LIST : Operations
Layout: 000000000001 (Standard)
Please explain me how ALTERNATIVE SEQUNCES and SEQUENCE EXCHANGE will work.
Thanks in Advance

Dear Madhan,
Assign value 2 for sequence exchange and check the impact at the time of order creation.
Check and revert back.
Regards
Mangalraj.S

Similar Messages

  • Inspection type in OPL8 (order type dependent parameters)

    HI,
          Inspection type we are giving in material master in inspection type field, why we need inspection type field in OPL8 transaction. Is there any specific reason the field having in OPL8. Please advise me if any one knows the reason.
    Srini

    Hi,
    Lets see it with the help of an example.
    Lets say there is a material - X, which is supplied to two customers - A & B.
    Customer A requires a quality certificate, while the customer B does not need any Quality Certificate or Quality Control. In such case, you can not assign the inspection type at material level.
    Here, in this case, you would have 2 order types, one with Inspection Type assigned and the other order type without any Inspection type to meet such requirements. And that looks more practical in terms of monitoring the specific orders, costs incurred for specific order etc.
    Revert for more clarifications.
    Regards,
    Rohit.

  • OPL8- Order Type Dep Parametes

    In OPL8
    what is the meaning of "Op Incre" and  "Reduction Strategy" in Planning screen

    Operation/activity Increment:
    In routing operations, how the increments of operations in the routing needs to be maintained say suppose
    In STD SAP, operation increments are in terms of 0010, 0020... 00N0
    Client wants the increments to be interms of additional 1's rather than 10's,
    then we go configure/maintain (0001,0002,0003,0004...000N)
    In reference reduction strategy, the reduction strategy is assigned
    Reduction Strategy:
    Reduction strategy comes into picture, when a production order is not able to execute
    the production orders on certain specific dates (like due on capacity constraints)
    The system tries to reduce/shorten the lead time based on the reduction strategy maintained
    You define reduction strategy in the OPU3 (scheduling parameters for an order type)

  • OPL8 Order type dependent parameters

    Hi
    In transaction opl8  routing selection some one changed the selection criteria  due to this while creating order routing is not picking hence  help me to capture the change done by whom and when.

    Hi srinivasch:
    I think that you can get this infor in the next path:
    Into OPL8 Tcode access to the entry in wich were done the changes, then, go to Utilities(M) -> Change Logs, so then:
    Enter the time period, the kind of changes taht you are tracking and execute it.
    You can view the changes acordding with you criteria selection.
    I hope this information be useful for you
    Please letme know.
    Regards
    Omar Perea

  • Setting in Order Type Dependent Parameters

    Hi Gurus,
    Can anyone tell me the importance of Setting in Order Type Dependent Parameters  ( T.Code OPL8)  -
    setting of purchase requisitions -
    Reservation / purchase requistion - 1, 2  or 3.
    What is the significance?
    Srini

    Hi,
    If it is mainteaind 3 then, if there is any external operation if your production order then the purchase requisition will be created immediately upon creation of the order.
    and the Collective request: Collective purch.req. enables collective purchase requisition per order for externally processed operations or non-stock items.
    Hope this helps..
    Regards,
    Siva

  • Chnages in order type dependent parameters for various production senarios

    Hello PP experts,
    Order type dependent parameters are are very important for configuration of order type. OPL8 is the tcode used for the same.There are three screens like planning, implementation and controlling in OPL8.
    Please let me know what will be the changes in these order type dependent parameters for following senarios,
    1. Make to order with sale order
    2. Make to stock with production order
    3.Make to stock with collecive order
    4. Engineer to order with the use of project and WBS.
    Which fields and parameters will be changed as per the senario changes.
    please elaborate.
    Waiting for your reply with cross hands.
    regards,
    Mona Tiwari

    Hi,
    For MTS with production orders Normal settings will be ok.
    For  MTS with collective orders apart from normal settings you need to enable the check box in opjh ( define order type) for the goods movemnts in collective orders.
    For MTO with sales order i think the normal settings will be ok.
    These different order types are linked to production scheduling profile in opk4
    Regards,
    nandha

  • Set up/maintain order type dependent parameters for order type PI01

    hello all,
    i would like to know how to set up/maintain order type dependent parameters for order type PI01 for a particular plant.
    thanks,
    maxx

    Hi Maxx
    Order types are maintained in T Code OPJH
    Thereafter go to T Code OPL8 to maintain there dependent parameters and assign it to desired plant
    Hope this helps
    Rgds

  • Order type dependent parameters for process order

    Hello friends,
    In Order type dependent parameters for process order (T.C COR4), there is subscreen for Process data documentation.Inside it we have three options :a) Batch Record Required
                                                                        b) Order Record Required
                                                                        c) No Process Data Documentation Reqd.
    Through F1 help whatever information i have got regarding them, is not cleared.
    According to it, if i select Order Record Reqd, than first of all i will have to delete (archieve) the order record than only i can delete (archieve) the process order.The same is with Batch Record Required.
    So according to it if i want to delete the  process order than first i will have to delete order record.So guys may i know which order record firstly i have to delete?Than only the system status for process order will not have the status ORRQ (Order Record Reqd).
    And one more thing friends,if i select the third option No Process Data Documentation Reqd than which process data documentation system will not create?Or what will happen if  i select this third option?
    Thankingy you guys in advance.

    HI
    For process data documentaion pls check the following link:
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a43ea8461e11d182b50000e829fbfe/frameset.htm
    Thanks

  • Production order type dependent parameters

    Dear Frndz,
    plz help me out with the various parameters which can be set based on the production order type. and the step by step procedure to configure the same.
    Regards,
    Srini.

    Hi,
    Pls. find the step by step procedure as below :
    Define order type-dependent parameters
    In this step, you define the parameters that are valid for each order type and plant. The parameters are split up as follows on the tab pages:
    Planning
    Master data
    Here, you define the data that influences master data selection or order master data maintenance:
    You can decide whether production versions are selected automatically or manually.
    The task list application is predefined as 'P'. However, you can also specify an additional task list application.
    The routing selection ID defines, for example, the ranking order for routing selection.
    Routing selection defines whether routings are to be selected and if so, how (manually or automatically) and whether reference operation sets can also be selected.
    Alternative sequences and sequence exchange define whether alternative sequences are permitted and how the sequences are to be exchanged.
    The task list type defines which routing type is permitted for production orders.
    Operation dtl check defines whether operation detail screens are to be checked when the operations are transferred to the order.
    Routing text defines that the text from the routing header is copied into the order.
    You can activate the entry tool for operations to help you when you create operations.
    BOM application defines how the BOM alternatives are to be automatically selected.
    Search procedure defines how batch determination is to take place.
    General
    Substitute MRP controller/substitute production scheduler are proposed when you create production orders if an MRP controller or production scheduler are not specified in the material master, or if there is no reference to material.
    Reservation/Purch. req. specifies whether certain order objects (operation, components) are relevant to MRP.
    Collective purch.req. enables collective purchase requisition per order for externally processed operations or non-stock items.
    Inspection type defines how a quality inspection is to be carried out.
    Implementation
    Status change documents
    Here, you define whether you want change documents to be written if a status change occurs. You also define the level at which the change documents are to be written.
    A status change document contains the following:
    which status has been changed
    who changed the status
    whether the status has been activated or deactivated
    the transaction in which the status change has been carried out
    In the production order, you can define the status at the following levels:
    order header level
    operation level
    material component level
    production resource/tool level
    Status change documents can also be defined independently of each other, at each of these four levels.
    Note
    If you have defined these parameters such that status change documents are written for a particular order level, the SAP System only writes a status change document for a status change from this point in time if the order (or operation/component/PRT) has been created since the status change documents have been activated.
    Shop Floor Information System
    You can specify, for example, whether order data is to be stored in the Shop Floor Information System. You can carry out reports using this system, for example, for materials, orders and work centers.
    Documentation of goods movements
    Here, you can specify that goods movements are to be documented with reference to an order. Then you can display goods movements, for example, using the order information system.
    You can enter a profile for displaying documented goods movements on the tab page "Display profiles".
    PDC
    PDC active allows data to be exchanged with a PDC system.
    Workflow
    Workflow for PO chg. defines that a workflow is generated when quantities or dates that affect existing purchase orders are changed in the order. In addition, a default rule for the split is displayed on this screen.
    So that this indicator is also valid for production orders the appropriate settings must be made in Customizing for the Project System.
    Progress determination in orders
    You can determine that progress values are calculated for order progress reports.
    Controlling
    Controlling
    Here, you define the parameters relevant to controlling, such as, for example, costing variants for planned and actual costs and a results analysis key.
    Distribution rule
    Default (distribution) rule defines an automatically generated distribution rule for CO settlement.
    Display profiles
    Collective order display
    Graphics profile defines how the collective order is to be displayed.
    Graphic:
    Here, you define parameters for displaying graphics of operations and sequences in the order.
    Missing parts list
    ProfMissPrtsLstOrdNo/PrfMissPrtLstCollOr defines how the missing parts list is to be displayed.
    Documentation of goods movements
    Goods movements defines which profile is used for displaying documented goods movements.
    Activities
    Create the necessary parameters for the order type.
    HOpe this helps.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Oct 1, 2008 6:35 AM

  • Deleting order type dependent parameters

    While deleting ordr type dependent parameters, the system is giving the foll error:
    Deletion not permitted. An order still exist for plant XYZ and order type XYZ

    I don't know if your project lead has approved of the steps you're taking. All I can say is you're setting yourself up for more trouble.
    I don't know how far you have proceeded with this process & what all you have deleted, but if there is still time, I would strongly suggest to disband your present approach & instead work with your basis team to remove authorization for all activities pertaining to this plant for PP scope. At a later date if you wish to re-start the activities relating to PP, basis would just need to re-assign back the roles.
    Anyway the above is just my personal views, I leave it your wise judgement.

  • Overhead/order type - DEPENDENCY

    Hi all,
    I have created a cost sheet. We have 3 different processes in our operation and each process have different overheads rate.
    I have assigned the dependency: overhead/order type D050 for each overhead in the cost sheet.
    But when I executingCK11N the system is not calculating the o/h for the material. Itu2019s showing zero value for the o/h but in the process order it is showing the cost estimation value.
    Can any one please guide me through this, whether I have missed out anything any where?
    We have only one cost sheet and we are in ECC6.0 version.
    Regards
    SAP4ME

    Hello
    You have to define the different dependency based on the requirement and under each dependency you have to configure the different types overhead with different validity period and different percentage. Similary the samy may be assigned to the costing sheet. While assigning the costing sheet, ple clearly specify the base, what are the overheads willbe costed and enter the cost center as the credity key.
    Please check all these above settings and come back if it is not solved.
    Regards
    Madhav

  • How To Control Usage Of Purchase Order Type Depending Upon Material Group

    Dear All,
    Basically, we want that items belonging to some particular material groups must be ordered thru Order Type NB. Rest of all the materials must be ordered thru Order Type "ZNB". How can we achieve this....?
    Any such provision in the configuration side...? Please advise further.
    With Best Regards,
    Sanjeev Chugh

    Hi,
    Standard SAP not possible.
    This requirement will be fullfilled by USER EXITS / BADI (ME_PROCESS_PO_CUST).
    Take help of ABAP team for this as no standard configuration is available for the same in SAP.
    Rgds
    Utsav

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Default value of order type is taking in COR1

    Dear All,
    I am facing problem while manual creation of process order. Actually I  have created 2 plants say 5999 & 6999 and two order type say kkp1 & kkp2 both are similar but number ranges are different. Allready I have assigned order type to respective plants in order type dependent parameter. My material type is ND. Now I am creating process order of material in plant 5999 with order type kkp1.As i enter this order type changes to kkp2 and giving the error message " order type kkp2 dependent parameter is missing in plant 5999. Whicjh is not required. We create manual process order.
    I do not know why this happening??? Please guide me further on this..
    Thanks & Regards
    Kundan Kumar

    Hi,
    First step in Cost Estimate is Run the cost estimate in Tcode : CK11N by providing the details like Material / Plant / Costiong Variant  and run . System will display the cost of the material.
    Second step is goto Tcode : CK24 and in the selection fields provide the Posting Period / Fiscal Year...
    Compant code / Plant and Material and click the Marking Allowance and execute, system will display the cost details in the new screen. Now come back and Click Release and execute. System will update the proce in material master.
    Hope this will help you.
    regards
    radhak mk

  • New order type creation ?

    Hi,
    While creating a new order type what points we need to remember ? And what information we need to get from the user.
    As per my knowledge i can create the order type as
    01) Define order types
    02) Order type dependent parameters
    03) Define number range to the order
    04) Scheduling parameter
    05) Conformation parameters for order.
    Other than this is there any other points we need to consider.
    Please guide me.
    Regards,
    Mastan.

    Hi Mastan,
    Added to experts suggestion also refer the below.
    PRODUCTION ORDER CONFIGURATION STEPS
    Production Order Type Selection - ERP Operations - SCN Wiki
    Thanks & Regards,
    Ramagiri