Organizational Structure creation using HRMD_ABA
I am trying to set up the organizational structure in our SRM 7.0 system using our ECC 6 organizational structure. I have created all the required distribution models for SRM and ECC 6, and have set up the switch settings in SRM. The number range settings have been set to external.
As per OSS Note 36317, which concentrates on the initial distribution, and I am working through, I have run PFAL in ECC 6 only for object type O. The HRMD_ABA idocs have been successfully transferred to our SRM system, but all are at status 52.
The message for all the idoc segments is:
'You tried to create a relationship from object 01O 50000333 to object 01S 50000846. However, object 01S 50000846 does not exist or is not active in the period from 19000101 to 99991231'.
One thing I haven't done, which might be incorrect, is create an Organizational Plan in SRM. I specifically haven't done this because I am wanting to use external numbering, and therefore thought the organizational plan would get automatically created as part of the initial distribution.
Does any one have any idea how to resolve my problem?
Many Thanks
Claire
Hi Ashutosh
I intend to replicate 'S', as described in the note, but nothing has been created with my initial replication of 'O'. As per the note 363187 you are supposed to distribute type 'O' first before moving on to 'S'. Is there anything really fundamental I have missed that you are supposed to do in SRM either before or after the initial set of idocs for type 'O' are brought in?
I have also read the other 2 notes you mention.
Note 363187 stated:
'Perform the following steps in the sequence given if the target system is a
mySAP.com system (SEM, CRM, BBP/EBP):
1. If you want to use the change pointers for later changes, activate
them at once. During initial transport, you should not maintain the
data in parallel in HR because the distribution takes the blocking
mechanism into account, which can cause an incomplete initial
transport.
2. All objects of object type O are distributed with program RHALEINI. As
a transfer mode, the update mode with infotype 1000 selection should
be used.
This way you make sure that all objects of object type O are created
in the target system for existence checks.
3. As previous step but for object type C.
4. As previous step but for object type S.
So far all I have tried to do is up to step 2.
When running RHALEINI I have entered the following:
Objects - Object Type = 'O'
Reporting Period - Today is selected
Transfer Mode - Insert is selected, with the Update Mode infotype set to 1000
I did think making a setting under the Update Mode Infotype seemed a little odd, as I was doing an insert, but is this not what point 2 from the OSS Note is telling me to do?
Any thoughts would be really helpful.
Am I supposed to create a skeleton Org structure before pulling in the ECC 6 structure when I am using external numbering?
Thanks
Claire
Similar Messages
-
Organizational structure creation
[Organizational Structure creation using HRMD_ABA;
Appologies if you saw this message on Friday, because I did originally post it under the general area. I was hoping that if I re-posted it under this area I might get a few more responses. I have included the one response I got, plus my reponse, which does contain more detail about how I ran PFAL - program RHALEINI, and re poses the question about what needs to be created in SRM re an organisational structure, prior to doing an initial load using transaction PFAL.
Many Thanks
Claire
I am trying to set up the organizational structure in our SRM 7.0 system using our ECC 6 organizational structure. I have created all the required distribution models for SRM and ECC 6, and have set up the switch settings in SRM. The number range settings have been set to external.
As per OSS Note 36317, which concentrates on the initial distribution, and I am working through, I have run PFAL in ECC 6 only for object type O. The HRMD_ABA idocs have been successfully transferred to our SRM system, but all are at status 52.
The message for all the idoc segments is:
'You tried to create a relationship from object 01O 50000333 to object 01S 50000846. However, object 01S 50000846 does not exist or is not active in the period from 19000101 to 99991231'.
One thing I haven't done, which might be incorrect, is create an Organizational Plan in SRM. I specifically haven't done this because I am wanting to use external numbering, and therefore thought the organizational plan would get automatically created as part of the initial distribution.
Does any one have any idea how to resolve my problem?
Many Thanks
Claire
Re: Organizational Structure creation using HRMD_ABA
Posted: Aug 21, 2009 6:03 PM in response to: Claire Crosby-C... Reply
Hello Claire,
It looks like you are replicating "S". After the "O" replication you should run the "S".
Please refer to the OSS note 934372 u201CSRM/CRM: HR integration for business partner u2013 new featuresu201D & SAP Note # 550055 EBP/SRM: New integration for business partner as well.
Hope this is helpful.
Thanks
Ashutosh
Claire Crosby-C...
Posts: 45
Registered: 3/22/04
Forum Points: 0
Re: Organizational Structure creation using HRMD_ABA
Posted: Aug 21, 2009 6:53 PM in response to: ASHUTOSH TRIPATHI Edit Reply
Hi Ashutosh
I intend to replicate 'S', as described in the note, but nothing has been created with my initial replication of 'O'. As per the note 363187 you are supposed to distribute type 'O' first before moving on to 'S'. Is there anything really fundamental I have missed that you are supposed to do in SRM either before or after the initial set of idocs for type 'O' are brought in?
I have also read the other 2 notes you mention.
Note 363187 stated:
'Perform the following steps in the sequence given if the target system is a
mySAP.com system (SEM, CRM, BBP/EBP):
1. If you want to use the change pointers for later changes, activate
them at once. During initial transport, you should not maintain the
data in parallel in HR because the distribution takes the blocking
mechanism into account, which can cause an incomplete initial
transport.
2. All objects of object type O are distributed with program RHALEINI. As
a transfer mode, the update mode with infotype 1000 selection should
be used.
This way you make sure that all objects of object type O are created
in the target system for existence checks.
3. As previous step but for object type C.
4. As previous step but for object type S.
So far all I have tried to do is up to step 2.
When running RHALEINI I have entered the following:
Objects - Object Type = 'O'
Reporting Period - Today is selected
Transfer Mode - Insert is selected, with the Update Mode infotype set to 1000
I did think making a setting under the Update Mode Infotype seemed a little odd, as I was doing an insert, but is this not what point 2 from the OSS Note is telling me to do?
Any thoughts would be really helpful.
Am I supposed to create a skeleton Org structure before pulling in the ECC 6 structure when I am using external numbering?
Thanks
ClaireHi Ashutosh
I intend to replicate 'S', as described in the note, but nothing has been created with my initial replication of 'O'. As per the note 363187 you are supposed to distribute type 'O' first before moving on to 'S'. Is there anything really fundamental I have missed that you are supposed to do in SRM either before or after the initial set of idocs for type 'O' are brought in?
I have also read the other 2 notes you mention.
Note 363187 stated:
'Perform the following steps in the sequence given if the target system is a
mySAP.com system (SEM, CRM, BBP/EBP):
1. If you want to use the change pointers for later changes, activate
them at once. During initial transport, you should not maintain the
data in parallel in HR because the distribution takes the blocking
mechanism into account, which can cause an incomplete initial
transport.
2. All objects of object type O are distributed with program RHALEINI. As
a transfer mode, the update mode with infotype 1000 selection should
be used.
This way you make sure that all objects of object type O are created
in the target system for existence checks.
3. As previous step but for object type C.
4. As previous step but for object type S.
So far all I have tried to do is up to step 2.
When running RHALEINI I have entered the following:
Objects - Object Type = 'O'
Reporting Period - Today is selected
Transfer Mode - Insert is selected, with the Update Mode infotype set to 1000
I did think making a setting under the Update Mode Infotype seemed a little odd, as I was doing an insert, but is this not what point 2 from the OSS Note is telling me to do?
Any thoughts would be really helpful.
Am I supposed to create a skeleton Org structure before pulling in the ECC 6 structure when I am using external numbering?
Thanks
Claire -
Organization Structure creation
Hello Experts,
We need your help and expert opinion for the below information.
Currently we are planning to create the organization structure for our client in CRM, as the client is not planning to Implement full blown HR now. We are evaluating the impacts if HR is implemented in near future.
In this regard can you please provide your expert opinion and inputs with respect to creating Organization structure now in CRM and implementing HR organization structure later in point of time in terms of Configuration changes, Impact on Master and Transactional data.
Note: However HR is being partially implemented for Employee master which will be replicated to CRM in the current implementation.
Thanks in advance.
regards,
KKHi,
You can go to spro->CRM->Master data->Organization management->Organisation Model->Create Organization Moodel.
This is to create a model in CRM.But as mentioned in this thread that once you import the structure from ECC,It may change or overlap the Model that you create in SAP CRM.So beware of that.
I hope you got the answers to both the questions.
Please allot the points once convinced
Puneet -
Modification of organizational structure
Hi,
is there a solution to modify quickly the organizational structure using a macro or a report or something like that.
thank you.Hi
You will have to write a Z programs for creating the following
first create a program to create the Organization Structure nodes using FM
GUI_UPLOAD
HR_ENQUEUE_OBJECT
HR_DEQUEUE_OBJECT
BBPU_CREATE_ORGUNIT_AND_BUPA
then use second program to update the attributes
RH_GET_ACTIVE_WF_PLVAR
RH_READ_OBJECT
so this can be achived through built in z custom program.
thanks -
Can anyone tell me PM Organization structure
Can anyone tell me PM Organization structure
actually im studying PM and i m aware of organisation structure but im not sure about that ...can anyone help me in this thanks in advanceHello Abhijit,
We can see organizational Structure By using T code EC01 .
1. Click structure
2.Click on Navigation
then we will get organizational structure.
Thanks,
Sunil Boya -
Creation of Organization Structure
Hello Gurus,
Can you please send me the document for creating the organization structure in HR.
Thanks,
KaranDear Karan,
Org Structue is the central module for all other modules. You can create the Structure by any of these methods:
Org & Staffing Interface - PPOCE
Expert Mode - PO03, 10, 13.
Simple Maintenance - PPOC_OLD
Good Luck
Om -
ALE: e-recruiting organizational structure transfer
Hi friends,
I want to transfer the organization structure or the organization plan with O,S,C object types from one SAP system to another SAP system.
I have done the ALE configuration and using PAFL transaction to do the same.
I would like to know that model view i should use for the distribution also i would want to know the screen parameters in PAFL transaction.
I am doing the same for E-recruiting separate instance.
Regards,
Divya
Points would be givenHello,
We are still having a problem with failing iDocs everytime we pass over IT0105 Sty 1 records from our SAP system to E-Recruiting.
Would anyone happen to know where I should start looking to troubleshoot this error message?
"Password is not long enough (minimum length: 6 characters)"
Currently both systems require that your password be at least 6 characters long, which makes this message even more perplexing.
Having a better understanding of how RBDAPP01 processes inbound IDOCS in status 64 would help. We are using message type HRMD_ABA. Our data filter looks like....
Infotype: 1000
Object Type: C, O, S
Infotype: 1001
Object Type: C, O, S
Subtypes: A002, A007, A008, A012, B002, B007, B008, B012
Infotype: 1001
Object Type: O, S
Subtypes: A003, B003
Infotypes: 0000, 0001, 0002
Object Type: P
Infotype: 0006
Object Type: P
Subtype: 1
Infotype: 0105
Object Type: P
Subtypes: 0001, 0010
So the question is how is IT0105 Sty 1 being processed when RBDAPP01 runs?
Thank you for your help!
Ryan
Edited by: Ryan Hubbell on Mar 31, 2009 7:00 PM
Edited by: Ryan Hubbell on Mar 31, 2009 7:47 PM -
Error while creating the Organization structure.
Hi,
I am trying to create an Organization structure in SRM 5 sytem, I have created a Root for the structure and when i try to click on the Attribute Inheritance or the Check tab below i am getting an error "Start program BBP_LOCATIONS_GET_ALL first (see note 563180 and long text)" but i have replicated one plant from the R/3 system using BBP_LOCATIONS_GET_SELECTED and the material groups and all the other relevant datas from R/3. I can see in the table BBP_LOCMAP the plant been associated with the relevant company code. I am now struck in creating the organization structure. I am not sure where i am going wrong while creating the Org model.Please give me your valuable inputs to overcome this error.
Regards
GGLGo to transaction SM30, table T77S0
Add an X to the following entry:
Group = EBP
Sem abbr. = LMIGR
Val. Abbr. = X
Description = Locations Successfully Migrated
This tell the system that the locations have been replicated and the error indicating location get all needs be executed will go away.
thanks,
justin
Edited by: Justin Farley on Feb 25, 2009 7:16 PM -
FI organizational structure in ECC 6.0
Dear all,
I would like to know what is the suggested organizational structure in FI in ECC 6.0. For example, whether it supports multiple company code or single company code. If a company code is situated out of India, how the taxation and all will be consolidated etc. etc.
Kindly can any one provide me documents on the above subject related to Finance Module.
It will be very helpful If anyone sends the required documents
Email id : [email protected]
Thanking you in advance
VijayaHi Vijayalaxmi,
SAP 6.0 ECC is supports what data you doing in previous versions like 4.7 or 5.0 etc
you can set company in india or out of india and taxation also same what you doing in previous versions
differece is ECC 6.0 is some extra functions is added on advance purpose
Organizational Units and Basic Settings
Definition
Elements of the SAP System logical structure, important for Financial Accounting.
Organizational units are used to structure business functions and for reporting. The organizational units of Financial Accounting are used for external reporting purposes, that is, they fulfil requirements that your business is subject to from external parties, for example, legal regulations. The financial statements for example, are created based on the organizational units of Financial Accounting.
Basic settings in Financial Accounting are Customizing settings that you have to make in order to be able to carry out processes in Financial Accounting.
Use
You create your company-specific organizational structure in the SAP System by defining the organizational units and making the basic settings. Defining organizational units for Financial Accounting is obligatory, that is, you have to define these units in order to be able to implement the Financial Accounting component.
Organizational unit
Definition
Client
Obligatory
Company
Optional
Company code
Obligatory
Business area
Optional
Basic setting
Chart of accounts
Obligatory
Fiscal year
Obligatory
Currencies
Obligatory
Integration
In the SAP System, you define the relevant organizational units for each component that you are implementing. For example, for Sales and Distribution, you define sales organizations, distribution channels, and divisions (product groups). Similarly, for Purchasing, you define purchasing organizations, evaluation levels, plants, and storage locations. The organizational units are independent of one another at this stage.
Components and Organizational Units
Component
Organizational unit
Sales and Distribution
Sales organization, ...
Logistics
Purchasing organization, ...
Financial Accounting
Company code, ...
Controlling
Controlling area, ...
Human Resources
Employee groups, ...
To transfer data between the individual components, you have to assign the organizational units to each other. You only need to make these assignments once in the system. Whenever you enter data subsequently, it is automatically transferred.
For example, invoices that are posted in SD are transferred to FI.
Below link will give total structure of organisational structure
http://help.sap.com/saphelp_470/helpdata/en/e5/0779ee4acd11d182b90000e829fbfe/frameset.htm
Hope this infirmation will helps you
Prem -
Restrict Item Category Item Creation using Reference Only
Hi All
Here is the scenario, I want "Restrict Item Category Item Creation using Reference Only"
a.Retrieve document number VBELN from sales order header table VBAK for the current order. Check if the sales order is of type ZAB referencing field AUART in table VBAK.
note : Any changes to existing sales order "ZAB" will be performed in thesame sales order type(ZAB) in VA02 transaction.
b.If step a is passed, check internal table structure for sales order item level as XVBAP-PSTYV for possible item category values of 'ZDEF' for the entered line item and document number (XVBAP-VBELN).
c.If the cancel/change item category values are found on the line item, check internal table structure for document flow (XVBFA) if the cancel/change item category was created as reference:
i.Check if entry exists in XVBFA for the preceding document number field VBELV with value equal to value in the subsequent document number field VBELN. This value must equal the current sales document number VBELN in table VBAK.
ii.The above check must be done in conjunction with the following check:
1.Check if entry exists in XVBFA for the preceding document type field VBTYP_V with value C equals subsequent document type field VBTYP_N with value of C.
d.Once the above checks are passed, collect the item number from internal table XVBAP (Field: POSNR) for the change/cancel item category line item added to the sales order.
e.Check if the item number retrieved in the previous step exists in table VBAP (Field: POSNR) with an item category that is not part of the list of cancel/change item category defined in step b.
f. Check if the item number collected in the previous step exists in the subsequent item number (Field : POSNN) in internal table XVBFA for the row that passed checks in steps b and c.
g.If item number exists, check if this subsequent item number field equals the preceding item number field value (Field: POSNV) in table XVBFA.
h.If step g fails, generate an error message stating that the user needs to the create the cancel/change item category line item with reference to the original line item and do not allow the user to proceed with the transaction.
i.If step g succeeds, allow the user to proceed with the transaction.
can any one send me the logic for this scenario.
Rgds
ChinnaHi Chinna,
Please use BADI "BADI_SD_SALES_ITEM" to achieve your requirement..
Let me know if you have further questions..
BR
Rakesh -
Vendor master record creation using interactive form
hi all,
i have a requirement to create a vendor once the user enters the data related to vendor similar to xk01 data on an interactive form and submits it .it goes thru a series of approvals and then at the final approval if the form is approved and say submit it has to create a vendor in the sap system i have searched for good bapis for vendor creation but found nothing . also searched the forums but I didnt get any idea or solution. i thought that i can use the bapi in the service call i use in webdynpro component and create a context for the form similar to the structure in bapi.
could you please help me out on how this can be done . i just need to post all the vendor data into sap and get a new vendor created automatically in background and get the vendor number again back to form to notity the person that it has been created.
appreciate if you could reply me asap.
thanks.
regards
sp
Edited by: SOHA PATHAN on Jun 6, 2011 12:40 PMHi Ashwani,
thank you for replying . my question was how to post the vendor data entered on the form into sap i.e using xk01 as u have done in your project. i have created a structure with all the fields required by user and required for a vendor creation in xk01 to create a vendor . this structure iam using in my form context. now iam not sure about how to post the data, can you please give me an idea of what code the FM's shoild have and also please tell me how to initiate workflow with the submit button and i want to send the URL of the form and not as PDF attachment , the approving person will click the URL and modify the interactive form and then clicks approved button in the same form.
I hope you got my questions.
Thanks,
Soha. -
Calculation of minority interest in matrix organization structure
Hello-
We are currently implementing sem-bcs and have a matrix organization structure in place. We use company code and profit center as consolidation units. Company code being the currency carrying unit.
We are facing an issue in minority calculation-
Let us take the following example -
Investee A - books equity in pc A
Holding entity B books investments in pc B
The above information were entered in AFD and was also pulled in BCS as RFD..
The first consolidation happens as per our expectations.
For subsequent consolidation, the retained earnings account (additions movement) could have multiple profit centers. The system calculates minority interest correctly for combination of retained earnings addition @ PC A. However for all other combinations (I.e retained earnings for PC other than A), the system treats the entire amount as minority interest (even though that's not the case)..
Kindly advise.
Thanks!Hi,
Thanks for your reply...
The PC hierarchy is already in place..I maintained Additional Financial Data for the other combinations (of Cons Unit and PC) with 100% share and zero value. The system considered that and calculated minority interest correctly.
I wish to know if the above approach is ok..
Thanks -
Regarding workflow organization structure
hi Gurs.
How to create Organization Structure, Create Workflow with Multiple Approval based on Organization Structure.
this is my requirement i dont no how to create organization structure in which tcode i have to build and what all steps.
pl help me.
Regards
vijayHi,
Your thread has had no response since it's creation over
2 weeks ago, therefore, I recommend that you either:
- Rephrase the question.
- Provide additional Information to prompt a response.
- Close the thread if the answer is already known.
Thank you for your compliance in this regard.
Kind regards,
Siobhan -
Organizational structure graphical view
Hi Friends,
we have problem with the organizational structure graphical view in OM. the system can not read the texts fonts, we don't use english characters. what should we do?
ThanksHi there!
Hope you both don't mind but I am piggy backing on your OM discussion. You both sound like have good experience in working with Turkey. I am trying to find a standard infotype to store a Turkish Identification no, SSN, and Local ID card numbers. I am leaning towards IT0185 but first want to check around to see if there are Turkish infotypes specifically for these types of documentation. Your feedback is greatly appreciated.
Thank you in advance.
Dina -
Organizational Structure Search Help in Webdynpro ABAP
Hi,
I need an organizational structure search help in webdynpro abap.
It should list the organizational structure in tree view like RH_OBJID_REQUEST lists.
I tried to use RH_OBJID_REQUEST function in webdynpro but I got " A RAISE statement in the program
"CL_GUI_CUSTOM_CONTAINER=======CP" raised theexception condition "CNTL_ERROR" short dump.
Is there such a function for webdynpro abap and how can I achive this with select options?
Thanks in advance..
MERALGreat article. I also had this probelm a year ago. My problems questions are:
Is it possible to select more then one entry in the tree?
What about selecting all childrens with one click?
In my solution I inserted this tree, into a table and the table had a checkbox, row, so the user can check the required org units, (more then one) and there was a separate button, for "select all children"
Maybe you are looking for
-
Regarding-Purchase requisition
Dear All, While creating the purchase requisition user is changing the delivery address. So I need to block the changing options to user. Once we enter the plant name delivery address will extract from the data. Kindly suggest me how can I block the
-
Revision: 663 Author: [email protected] Date: 2008-02-26 13:56:08 -0800 (Tue, 26 Feb 2008) Log Message: Fix SDK-14201: Performance: embedded images are written into the swf one byte at a time. This changes the way swfs are written out when they conta
-
Problems about 8i on solaris2.6 $ORACLE_HOME/rdbms/lib/ins_r
When i tried to install O8i for solaris (CD from OTN )on Sun Solaris 2.6,I've met such problems: Error in invoking target install of makefile $ORACLE_HOME/rdbms/lib/ins_rbms.mk C Complier used:/usr/ccs/bin/cc,make I appreciate your help null
-
Check whether rman backup can be used for restoration
Hi, RMAN-08044: channel eprprod_t1: finished piece 1 at 10-oct-2008_05:42:20 RMAN-08044: channel eprprod_t2: finished piece 1 at 10-oct-2008_05:44:46 RMAN-00571: =========================================================== RMAN-00569: ===============
-
Trying to play videos on my MacBook- All I get is grey screen!
My MacBook will not play videos I have bought from the iTunes store. None of my T.V. shows or Movies will play, but music will. When I select the video, all I get is a grey screen with no audio. The time meter goes, but I don't hear or see anything.