Outline agreement or automatic schedule from scheduling agreement

Hello Master's,
Plz find the below workflow which will brief u abt the complete process;-
1.User raises indent(me51n) and then releases(me54n) else as per our MRP, indent/PR gets generated automatically.
2. Standard Practice is that we invite offers, negotiate and place order (me21n) else f we have rate contract for any item we go for direct ordering (me21n) and then get it released (me29n)
For around 20-30k material codes we have rate contract finalized with various suppliers for a period of time.
When we find any indent/pr falling into this category, we dont invite offer but go for ordering as per the finalized price. The price is maintained in excel or pdf format.
Problem is we want to map material codes with vendor and rates associated with the contract.
For this either we have to go for outline agreement(me31k) of scheduling agreement(me31l) so that whenever any indent/PR gets generated in this category, order/delivery schedule will be generated automatically in SAP.
Points in which i need help from you:-
1. How to generate automatic po from outline agreement or automatic schedule from scheduling agreement.
2. complete understanding of the difference between outline agreement and scheduling agreement.

Hi Nilson,
The data contained within the global outline agreement is distributed as purchasing contracts or scheduling agreements to the backend systems of the release-authorized purchasing organizations of the relevant corporate group. These purchasing organizations can then use the purchasing contracts or scheduling agreements according to the terms agreed centrally within the global outline agreement.
For more details.
http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm
Nishant

Similar Messages

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • Process chain: how to automatically remove from schedule?

    Hi All,
    Is there a way to automatically remove a process chain from schedule when it has failed?
    Thanks,
    Natalie

    I guess the easiest way is to access RSPC transaction and then remove it from schedule.
    --> execution tab --> remove from schedule.
    you can leave the process chain not active also, if it's triggered by an event, this event will not start it (if you dont want to delete or change trigger job)

  • Dates and quantities copied from Scheduling Agreement to Delivery Order

    Hi everybody,
    we're experiencing a problem with copying control for dates/quantities between Scheduling Agreement and Delivery Order.
    If we define a Forecast Delivery Schedule with more lines/dates into a Scheduling agreement, when I create a Delivery Order with reference to a specific date the system always copies the first forecast delivery schedule date, disregardful the date specified in the selection criteria for delivery creation and with the fact that this could have already been carried out.
    Here's an example:
    Forecast Delivery Schedule into Scheduling agreement:
    (Date) 12.03.07   (Quantity)  10 TO
    (Date) 13.03.07   (Quantity)  12 TO
    (Date) 14.03.07   (Quantity)  15 TO
    When delivery has to be created with reference to Scheduling Agreement, the system doesn't about the date specified in selection parameters (e.g. 14.03.07) and copies the quantity of the first forecast delivery schedule line (10 TO).
    Does anybody knows how to maintain Copying Control for dates and quantities between Scheduling agreement to Delivery Order?
    Thank you!
    Luca

    Dear Pattanaik,
    check data transfer from copy controls.for this T-code is VTLA
    here select your doc type and select details and check also item.check inside both types data trasfer wich is assigned change from this item to header.your problem may ve coming from here.
    hope this will helps you
    Prem

  • Schedule Lines deletion from Scheduling agreement

    Hello all
    There is a requirement of mass changes deletion of existing Schedlue lines from Schedling agreement ( from around 800 Scheduling agreement). 
    SAP  version is 4.7(Which doesnt have MEMASSSA-std t-code for mass maintenance of scheduling agreement).
    Please advise, how these can be deleted in bulk.
    Thanks & Regards
    Rajesh

    Hi
    Go to table :SE16 :
    Enter :EKET
    download to the excel file do the correction  then upload the file to to the table.
    Please check with your SAP ABAP team and with  your Client
    (or)
    do it manuallly .go to me38 enter the sch.agreement no and delete the qty and save . it is time consuming
    it willl  take a day or Two.
    This is the best solution
    Regards
    Ganesh

  • Automatic delivery schedule for Scheduling Agreement

    Hi all...........
    I like to create automatic delivery schedule both JIT & FRC schedules for Schedule agreement, means system has to suggest the schedule lines.
    I created SA and creation profile, when Im trying to generate JIT schedule system showing "Error generating release against scheduling agreement  (cause 2)".
    Pls let me know wht configuration I hve to do and pls let me know all the steps.
    I like to know output determination setting for SA releases also.
    regards
    Durga Ram

    Hi
    'Propose all Items" is ticked so that MIGO proposes all the items irrespective of the delivery date and quantity. This means that even if the delivery date has not yet been reached or the complete qty has been received, the system will still allow you to do the GR.
    Hope this clarifies.
    Thanks

  • Info record creation from schedule agree, with all conditions

    HI
    We wish to create Inforrecord from schedule agreements, When we used Info update indicator B its creating Info record but not copying conditions from schele agreement only order history is updated
    Is there any way we can copy all conditions from schedule agreement to info record?
    Thanks

    I realized, standard SAP behaviour is
    Info record does not exist
    Quotation
    Time-dependent conditions and their supplementary conditions are adopted
      Scheduling agreement
    Is set as last document; order price history is updated
      Contract
    Time-dependent conditions and their supplementary conditions are adopted
      Purchase order
    Is set as last document; order price history is updated
    IS THERE ANY OTHER WAY TO ACIEVE CPYING OF ALL CONDITIONS FROM SCHEDULE AGREEMENT TO INFORECORD
    Edited by: Sasi nagireddy on Jan 12, 2011 5:37 AM

  • Scheduling Agreement: validity variation date on schedule dates

    Hello everybody
    I have a problem and  I appreciate your advice .
    There is an agreement “A” which validity date is from 01.01.2007 to 31.12.2007.
    And an agreement "B" with validity date from 01.01.2008 to 31.12.2009
    After the MRP has been run, It creates the Delivery Schedule based on agreement "A" . But in a specific item, it was created two delivery date which are out of the validity date; those were 07.01.2008, and 12.01.2008
    The question is why did the system create deliveries schedule out of the validity date base on agreement “A” and not based on agreement “B”? I mean,
    Why did the system create this Scheduling delivery date out of the range of validity of the Agreement?
    And, In the case that it had taken the validity date from Agreement "B" why did it put it on agreement "A"?
    Could you give me any tip or suggestion where I need to verify or check in order to find out the reason why this happened?
    I already verify the agreements, the source list and they seem to be ok.
    Thanks in advance

    Hi Adrianda,
    The creation of schedule lines through MRP depends upon the Agreement( no "A" or "B" in your case) and the validity period,and the period for which the MRP is run the system will create the SL according to the period for which the MRP has run,as per my knowledge there are no other place you can check,so double check the source list.

  • Master data for Delivery Schedules for Scheduling agreements

    At the link below, under the scheduling agreements with delivery schedules section, the integration section indicates that data comes in from 3 sources, one of which is master data.  Does this mean that the delivery schedule can be maintained in master data somewhere?  If so, where do you maintain it?  Getting the delivery schedule from EDI, or entering it manually, is not an option for our business requirements.
    http://help.sap.com/saphelp_47x200/helpdata/en/78/2085347860ea35e10000009b38f83b/frameset.htm
    All help would be appreciated.  Thank you.

    hi,
    the data you need from master data are:
    customer: KNVV-EIKTO, supplier account at customer
    customer inforecord: correspondance between customer material and your material number
    Roberto

  • Set Agreed Cumulative quantity in the Schedule agrement

    Dear All
    We have more then 5000 schedule agreement  in our system and we want to correct cumulative quantity end of the year for based on the vendor
    I can do it schedule by schedule but is it possible to do it by Vendor by vendor?
    Thank you for your help

    Hi,
    Pls try with ME88.
    Best regards,
    S.Karthick.

  • Opening Excel Workbook Fails when run from Scheduled Task on Windows Server 2008 Rw

    Hi,
    I have a little vbs script that instantiates the Excel.Application object and then opens a work book to perform some tasks on it. The script runs fine when run from the command line. When I attempt to run it as a scheduled task (it is supposed to update
    data that is pulled from a SQL Server at regular intervals), it fails with the following error:
    Microsoft Office Excel cannot access the file 'c:\test\SampleWorkbook.xlsm'. There are several possible reasons: .....
    The file does exist. The path reported in the error is correct. The account under which the task is running is the same account I use to run it from the command line. User Account Control is not enabled, and the task is set up to run with highest privileges.
    When I run the same script through the Task Scheduler from a Windows Server 2003 machine, it works without issue.
    I was just wondering if somebody on this forum has run into a similar issue in connection with Windows Server 2008 R2 and figured out what the magic trick is to make it work. I'm sure it is rights related, but I haven't quite figured out what which rights
    are missing.
    Thanks in advance for any advice you may have.

    This is truly killing me ... trying to get it working on Windows Server 2012 without success.
    I desperately need to automate running Excel macros in a "headless" environment, that is non-interactive, non-GUI, etc.
    I can get it to work using Excel.Application COM, either via VBScript or Powershell, successfully on many other Windows systems  in our environment - Windows Server 2008 R2, Windows 7 (32-bit), etc.,  -BUT-
    The two servers we built out for running our automation process are Windows Server 2012 (SE) - and it just refuses to run on the 2012 servers - it gives the messages below from VBScript and PowerShell, respectively- 
    I have tried uninstalling and re-installing several different versions of Microsoft Excel (2007 Standard, 2010 Standard, 2010 Professional Plus, 32-bit vs. 64-bit, etc.), but it makes no difference.
    Would be extremely grateful if any one out there has had any success in running Excel automation on Server 2012 in a non-interactive environment that they could share.
    ( I have tried adding the "%windir%\syswow64\config\systemprofile\desktop"
    folder, which did fix the issue for me when testing on Windows Server 2008 R2, but sadly did not resolve it on Windows Server 2012 )
    [VBScript error msg]
    Z:\TestExcelMacro.vbs(35, 1) Microsoft Office Excel: Microsoft Office Excel cannot
    access the file 'Z:\TestExcelMacro.xlsm'. There are several possible reasons:
    • The file name or path does not exist.
    • The file is being used by another program.
    • The workbook you are trying to save has the same name as a currently open work
    [Powershell error msg]
    Exception calling "Add" with "0" argument(s): "Microsoft Office Excel cannot open or save any more documents because th
    ere is not enough available memory or disk space.
     To make more memory available, close workbooks or programs you no longer need.
     To free disk space, delete files you no longer need from the disk you are saving to."
        + CategoryInfo          : NotSpecified: (:) [], MethodInvocationException
        + FullyQualifiedErrorId : ComMethodTargetInvocation
    You cannot call a method on a null-valued expression.
        + CategoryInfo          : InvalidOperation: (:) [], RuntimeException
        + FullyQualifiedErrorId : InvokeMethodOnNull

  • Price not picking from vendor agreement to project

    Hi Guruu2019s,
    I have a problem in where am not receiving the price from vendor agreement to the projects. Let me know what are all the settings to be done for this to get rectified.
    Please revert back for any further inputs.
    Looking forward for your valuable inputs.
    Regards,
    Kumar.S

    hi,
    if my above requirement is not clear then please refer my req as mentioned below,
    Whether the system takes the agreement (Which i have manintaned in ME33)price in the network pur.req. automatically or not?If yes then please tell me what settings i need to maintain.
    Expecting the step by step process to fix this issue.
    Regards,
    Kumar.S

  • Bank of America and JPM Chase Agree to Erase Debts From Credit Reports After Bankruptcies

    http://www.nytimes.com/2015/05/08/business/dealbook/bank-of-america-and-jpmorgan-chase-agree-to-erase-debts-from-credit-reports-after-bankruptcies.html?hp&action=click&pgtype=Homepage&module=first-column-region&region=top-news&WT.nav=top-news&_r=1  Two of the nation’s biggest banks will finally put to rest the zombies of consumer debt — bills that are still alive on credit reports although legally eliminated in bankruptcy — potentially providing relief to more than a million Americans.Bank of America and JPMorgan Chase have agreed to update borrowers’ credit reports within the next three months to reflect that the debts were extinguished.

    gdale6 wrote:
    http://www.nytimes.com/2015/05/08/business/dealbook/bank-of-america-and-jpmorgan-chase-agree-to-erase-debts-from-credit-reports-after-bankruptcies.html?hp&action=click&pgtype=Homepage&module=first-column-region&region=top-news&WT.nav=top-news&_r=1  Two of the nation’s biggest banks will finally put to rest the zombies of consumer debt — bills that are still alive on credit reports although legally eliminated in bankruptcy — potentially providing relief to more than a million Americans.Bank of America and JPMorgan Chase have agreed to update borrowers’ credit reports within the next three months to reflect that the debts were extinguished.From that NY Times article:Under federal law, once a borrower has erased a debt in bankruptcy, banks are required to update the credit reports to indicate that the debt is no longer owed, and remove any notation of “past due” or “charged off.” - I had a bunch of those, showing 60-90-120 late & then CO (charge off) after filing, and some even showing CLS (closed) in 9/2010 when I filed, but then resumed late & CO reporting after that, mostly from Chase & Citi & the 1 BoA account. I disputed every one saying that reporting late after I filed was an attempt to collect a debt under automatic stay jurisdiction of a U.S. Federal BK Court. TU & EQ promptly cleaned them all up, while EX refused. As a result I get an "A" for payment history on TU & EQ with no lates, while I get an "F" on EX w/30 some lates. Hopefully this will get EX to clean up their act.

  • Need Automatic Lead-time scheduling in Planned Order using MD11

    All,
    Our users have a requirement that when they create a planned order using MD11, they would like system to do automatic lead-time scheduling based on the "basic finish date" entered by the user. Currently the system is taking 3 days from the in-house time maintained in material master to calculate the basic start date. But users want to use the 100 days that have been maintained in the routing.
    Currently users have to click on "manual scheduling" on the planned order for system to pick up 100 days from routing which is an additional step for the users. Hence users want an automatic way in which system would do lead-time schedule when they enter the basic finish date.
    Thanks,
    Swapnil

    Dear Swapnil,
    In my understanding it is the standard SAP behaviour even if you have made the necessary settings in OPU5 for the planned
    order type.
    If my understanding is correct, then as per this setting the MRP behaves for the particular plant and order type combination.
    Whenever you create a planned order manually you have to do a detailed scheduling and then you get the production dates
    for the planned order.(This might be because generally when a planned order is converted into production order the system
    carries out a lead time scheduling.- Check the same and correct me if I'm wrong)
    Even if you update the material master through CA97,you will not get the detailed scheduling done along with the production
    dates.So you have to perform this manual activity during MD11.
    What is the reason of setting the in-house production time as 3 days,if the exact production time is going to be more?
    Check and revert
    Regards
    S Mangalraj

  • Can not schedule from InfoView

    Hi,
    I have a newly installed BusinessObjects Enterprise XI 3.1 with SP2 installation and I have loaded my first Crystal report into a folder for testing. This is not the first installation of this type I have done and I followed a set of install instructions that have been used for other successful installations.
    The problem I am experiencing is that when I attempt to schedule my Crystal report from within InfoView it correctly shows me the schedule options page, but does not allow me to move off the 'Instance Title' tab. When the schedule page is first shown there is an error icon in my browser (IE8) in the bottom left hand corner which when clicked on shows 11 or 12 'Object expected' error messages for schedule.aspx.
    If I try to schedule the report through the CMC i don't get this problem.
    I can view the report without any problems from InfoView.
    Looking at the event log on the server I only get a few warnings relating to a missing yui folder (same as on some of my other installations and I have a call open with SAP on this subject).
    The installation is entirely using IIS and no TomCat or java interface was selected during the install process.
    Any ideas what is going wrong on this server that's stopping me from scheduling reports?
    If no ideas, then any suggestions as to where I can look to get more information on this error?
    Thanks,
    Mike

    Looking at the www log at the time I request a schedule I can see that there are a number of 404.0 errors recorded. These relate to the following requested files:
    /PlatformServices/js/callback.js.ashx
    /PlatformServices/js/utils.js.ashx
    /PlatformServices/js/_iframehelper.js.ashx
    /PlatformServices/js/_singlePageActionSetSingleActionUtils.js.ashx
    The /PlatformServices/js/ fodler exists and the configured user has permissions to access and read from that folder. The xxx.js files exist in the folder, but they do not exist as xxx.js.ashx extensions. I think that the ashx extension is an indication of a script but  Idon't know if this is how it should be called. Is it likely that my problem is caused because of this naming convention?
    Mike