Overdelivery shipping for make-to-order production

Hello,
I have the following business scenario example:
We have a make-to-order production of carton boxes.
A customer places an order for 1000 UN.
Production is always planned with an overdelivery tolerance so the actual produced quantity for that particular order is 1050 UN.
The customer allows an overdelivery of 10% so it should be fine to ship the 1050 UN.
When I create the outbound delivery, the system creates it for the exact sales order amount: 1000 UN, even though there are 1050 UN produced for that order and item. So right now, the user has to manually modify the delivery quantity to match the actual stock.
Is there a standard way of configuring the system so that in the delivery creation the system selects the entire produced quantity (respecting the overdelivery tolerance)??
Do I need a user exit for this? In that case, which one should I use and what would be the logic for it?
Thanks for your help!

Hi,
Unfortunately there is no easy way to influence delivery quantity in delivery processing by user exit or customer function.
At creation of an delivery FORM USEREXIT_BATCH_DETERMINATION in include MV50AFZZ would be the best option to influence the delivery quantity. Despite the name of this user exit it could be used for changing normal items as well and the main advantage of this user exit is that the ATP check is done afterwards.
If you change the delivery quantity please be aware that you have to ensure the consistency of all delivery quantity fields at item level (LIPS-LFIMG, LIPS-LGMNG, LIPS-LFIMG_FLO, LIPS-LGMNG_FLO). You could use FORM LIPS_QUAN_SET (Include FV50XFLP_LIPS_QUAN_SET) to synchronize all the quantity fields.
Regards,
Harry

Similar Messages

  • Forecast Consumption in SNP for Make-to-Order products

    We are working on using APO-SNP for Make-to-order products (PlngStrategyGroup = "81" in R/3). We want to achieve normal forecast consumptino on FinishedGoodLevel and generate PlndOrders which shall derive component demand for purchasing (such PlndOrers wont be released to production - they should only function as demand driven on component level)
    What we have done so far: Forecast in APO-DP on Finished good level exists and has been released to SNP. The product gets "ciffed" from R/3 into APO material master with planning strategy group "20" (which is basically "make-to-stock") --> we were hoping this would allow us to use "normal" forecast consumption but nothing happens (FCST is not being consumpted by open Sales orders). Within the product view of such products APO is still "realizing" that this is a make-to-order product.
    Any other ideas / thoughts what could be done to achieve "normal" forecast consumption on FGI level for make-to-order products in APO-SNP ?
    Tks !

    I checked in /n/SAPAPO/RRP3 (Product View), unfortunately only FC exists there
    Seems that the open Sales Orders from R/3 are being created within another segment (the "element" Tab of RRP3 shows 2 segments:
    1) "Make-to-stock" (which contains the FC)
    2) "Make-to-order" (which contains the Sales Orders)
    That might explain the issue I see (FC and SOs are in different planning segment --> no consumption). Reading about planning segments in the help sounds like I need to find a way to bring Sales Orders for Make-to-Order products into the Make-to-stock segment  ... jus a thought .. any idea how to do this ? Does that mean I need to modify the CIF for Sales Order transfer for Make-to-order products ?
    Tks
    Thomas

  • Condition P101 for make-to-order

    For stock transport orders, you can use condition type P101 to pull the standard cost of the shipping plant into the purchase order.  Is there a similar condition type or routine that can be used for make-to-order product where we can pull the value from the EBEW table of the shipping plant?
    thanks,

    Hi,
    For transfering sale order stock to sub-contractor the movement type is 311-E. Here, you have to create the sub-contractor storage location & then transfer the stock (of BOM material) to sub-contractor storage location by movement type 311-E in transaction MB1B. While posting GRN of the upper material, system posts the consumption of the BOM material against the upper material.
    Hope this works.
    Regards,
    Prashant
    - Reward points if answer is helpful

  • Make-To-Order Production for Service Products

    Hi All,
    has anyone some experience with SAP R/3 (SD, CS, MM, FI,CO) Make-To-Order Production for Service Products?
    Does the Make-To-Order Production Scenarion work for Service Products?
    Is there any documentation about Make-To-Order Production Scenarion for Service Products?
    Regards
    Klaus

    It works using transaction OSID to define service products and using requirements class and type to control the creation of service orders or projects for sales document items. All business services can be implemented using these service products.
    We have inplemented Customer Center Solution based on this approch for a Atlas Copco (http://www.atlascopco.com/us) with cutomer center in more tham 70 countries.
    They make, sell, rent, finance and service
    Construction and Mining
    Compressors and Generators
    Industrial tools
    Regards
    Klaus

  • Material Training of AC520 (Controlling for Make to Order/Stock Production

    Hi,
    Is there anybody have the documentation (beside from SAP Doc) or training material of AC520 (Controlling for Make to Order/Stock Production ) ?
    I really need it urgently.
    Thanks

    Hi,
    I got the training material for other than AC520. Send me message to [email protected]
    regards,

  • Sales order does not allow make-to-order production

    Dear Friends,
    I am trying to do do planned order for sales order in MD50 it was showing the error message as
    "Sales order does not allow make-to-order production"
    Can any one solve this
    Shakthi

    Hi Shakthi,
    It is also possible to set the priority for Requirement Type determination like
    0 Material master strategy, then item category and MRP type
    1 Item Category and MRP Type
    2 as 1, with check for allowed requirement type.
    The transaction for this is same as "Requirement Type Determination :
    Sales and Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements --> Determination Of Requirement Types Using Transaction
    Look for "Source".
    In this transaction, Please, check "Requirements".
    Please, make sure of the following 2 things :
    1. If you do not set an indicator for maintaining the requirements class: Transfer of requirements is not carried out, irrespective of the specification you make at schedule line level for the transaction.
    So it is necessary to mantain the setting first at the Requirements Class. As mentioned in my earlier posts, the requirement class for the material can be found out from Planning Strategy / MRP3 view --> Main strategy (defined in the strategy group) --> Requirement Class for Customer Requirements.
    The IMG path for "Define Strategy" is Production --> Production Planning --> Demand Management --> Planned Independent Requirements --> Planning Strategy --> Define Strategy.
    2. Once the "Requirements" indicator is set in Requirement Class, the requirements indicator at the Schedule Line decides whether or not you require transfer of requirments for the relevant transaction.
    I hope this should solve your problem.
    Regards,
    Sandeep

  • Serial Number assignment in Delivery Note for Make-to-order

    Hi experts,
    In our current design, we have made it obligatory to enter the serial number in the delivery note for make
    to order stocks.
    We are also implementing PP and we would like to capture
    the serial number specified in the production order and
    automatically populate the serial number in the delivery.
    Any suggestions on how I can do this is greatly appreciated.

    Hi Karun,
    Thank you for your kind advice all the time. 
    I have been looking into it but the LIPS structure does not contain the serial number field...
    I have been looking for the routine in the copy control
    but have no luck finding such routine...
    Thanks for your continuous help and assistance.

  • What are configuration steps in implementation for make to order?

    please give the steps for normal production also.

    Hi,
    Below is the requested info:
    Make-to-Order (MTO) Production
    Purpose
    The planning strategies explained in this section are designed for the production of a material for a specific individual sales order. In other words, you do not want to produce finished products until you receive a sales order. This means that make-to-order strategies always support a very close customer-vendor relationship, because your sales orders are closely linked to production.
    The same relationship exists between the sales order and production that exists in a make-to-order environment. Make-to-order is also used in the following environments.
    Production using variant configuration
    Assemble-to-order
    Prerequisites
    Choose a make-to-order strategy, if:
    The materials are segregated. In other words, they are uniquely assigned to specific sales orders.
    Costs must be tracked at sales order level and not on material level.
    Make-to-order strategies should always be combined with lot-size key EX (lot-for-lot. Rounding values should not be used. If you maintain rounding values, they have no effect due to the make-to-order properties of these strategies.
    Process Flow:
    There are extensive options that enable you to procure components especially for specific sales order items.
    You may, however, want to use a different planning strategy to procure components without sales orders. This allows you to keep your replenishment lead time to a minimum. You can do this by:
    Planning on the basis of the finished product (see Planning Without Final Assembly (50) or Planning with a Planning Material (60))
    Planning at component level (see Strategies for Planning Components)
    Using consumption-based or Kanban-controlled components
    Customer stock can exist on any BOM level. See Stockkeeping at Different BOM Levels for more information.
    Because production is closely linked to sales orders, this results in a customer section in the stock/requirements list.
    Unplanned goods receipts (such as returns) cannot, as a rule, be used for other sales orders, even if they are in working order, unless they are adapted to meet a customer's needs.
    In the basic make-to-order strategy, Make-to-Order Production (20), no specific product structures are required. This means that it does not matter if the material has a BOM or not. The material can be produced in-house, or it can be procured externally. No planning is involved in this strategy.
    Planning Without Final Assembly (50) and Planning with a Planning Material (60) do require a specific product structure (i.e. a BOM, which means materials are always produced in-house). These planning strategies assume that you want to plan procurement (production or purchasing) of your components by planning the finished products. This means that you need to have a fairly stable demand for your finished products. If, however, you can plan more easily at component level than at finished product level, see Strategies for Planning Components.
    Configuration Settings:
    Create material master by maintaining general item category group- 0001(make to order)
    Availability check - 02
    Transportation Group - 0001
    go to va01 and raise sales order
    item category:TAk
    Schedule line category : cp
    Requirement type KE
    Requirement class 040
    Check TOR and avalability check
    special stock : E
    VOV7
    of TAK
    billing relivence : A
    Pricing :X
    go to mb1c
    maintain stock with a special stock indicator E
    mavement type 61
    Special stock E
    specify sales order number line item number and saveit
    go to VL01N main data
    Go to VF01
    save it
    Thanks
    Ram

  • Explanation on use of Strategies for Make to Order/ Make to stock scenario

    Hi Gurus,
    I have a scenario. In the BOM, the final Finished Product was to be made for make to order. There are two semi finished material below that. One I want to use it for make to stock and another for make to order. There is one more raw material at the bottom level which I want for make to stock. So I want to know what are the strategies I can use in the material master at all the levels for this scenario. Can anyone explain how can I do it in SAP?
    Regards,
    Brijesh

    Dear Brijesh,
    This indicator will determine the component how it should get produced either individually or collectively
    Example
    Fert 1 - strategy 20, requirement for this fert Via sales order is 10
    Fert 2 - strategy 40  requirement for this fert Via sales order/demand management is 10
    ROH is used in both Ferts and mainatined in BOM and also set to indicator 2 ( Colletive ) in MMR
    ROH requiement for fert 1 -1 ( BOM )
    ROH requiement for fert 2 -1 ( BOM )
    after MRP system will create only 1 PR for total qty 20
    If ROH is set to 1 ( individually ) then
    after MRP system will create 2 PR's as 10 each
    Hope it answers your query
    Regards
    Madhu

  • Schedule Line for Make to Order Item.

    Hello
    In make to order scenario,  there are 2 schedule lines for the MTO item in create mode of Order. 0 confirm quantity on the req
    When I save the order, i can see only one schedule line with confirm quantity 0.

    Hi,
    Make-to-order production is controlled by the requirements type. The requirements type is
    determined on the basis of the MRP group and the strategy group in the material master record.
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    Hope this helps.
    Regards,

  • User Steps for Make to Order & Make to Stock

    Hi Sapians,
    Please guide me as to the users steps to be done in product costing for make to order & make to stock.
    Regards,
    Viki
    Moderator: Please, read the rules of SDN before posting. You can search for Wiki material or explore help.sap.com for basic process description

    Hi there,
    Make to order is when you manufacture or procure the material only upon order. Stocks are not maintained for those items in the storage loc. As & when the order comes, a production run is triggered through MRP. After the production, stock is posted as reserved sales order stock. Stock is then made available to fulfill the delivery.
    Other items are make to stock. Usually for fast moving or consumer goods, stocks are always mainatined in the plant storage loc. As & when the order comes, availability check is done. If stock is available to meet the delivery date, delivery is proceesed or a confirmed delievry date is proposed basing on the replenishment lead time in availability check.
    Regards,
    Sivanand

  • Mrp for make to order scenario

    hi gurus,
          I have got a different and challenging scenario in make to order planning. production planning has to be made on sales order basis.for eg : a particular finished product, a sale order of 100 nos is generated. but all 100 nos cannot be produced in single plant. so it has to be distributed to 2-3 plants. one more thing is, for make to order scenario, there is no fixed lot size. based on sale order quantity, planned order is created irrespective of fixed lot size maintained in material master. IF my batch size is fixed, for make to order also based on fixed based size, planned order has to be created.
      Can anybody suggest a better solution for this scenario?
    Thank you all in advance. all useful replies will be rewarded.
    regards,
    senthil

    Hello,
    For MTO, Lot for Lot order quantity is defaulted..
    So your receipt element will be as per your Sales Order.
    Try this:
    In T. Code : OMI4, for Lot Size : EX
    Change the MTO Lot size to "1" Lot-for-Lot with rounding.
    (Which is Blank by default - lot-for-lot)
    Maitain the Rounding Value in MRP-1 Screen or Use Rounding Profile..
    This Helps..
    Regards,
    Siva

  • Make to order production - schedule line not confirmed

    Hi,
    I created a  " make to order production " having few normal materials & few supersession materials.
    created PO, GR,invoice, all done.PO is updated in sales order.
    Schedule line is automatically confirmed for normal materials, but not confirmed for supersession materials.
    can anybody tell me , how schedule line can be automatically confirm for supersession materials.
    Thanks.

    Is your scenario a third party one? After you finished GR for the PO, have you checked inventory of those materials? But I still didn't understand what's difference between new material and "supersession" old one? New for what and old for what? Could you be more specific or any example will be helpful.

  • Item category determination for make to order item

    Hi experts,
    how can I determine item category(tak) for make-to-order. mean what should I put in ITEM CAT.GRP, USAGE AND HIGHER LEVEL ITEM CATEGORY GROUP. Please advice.
    Thanks in advance.

    Neel,
    Goto VOV4 and create new entry with
    your sales doc type + itm cat group + usage + higher leve item cat = TAK
    Just check your item cat group in material. If you have created TAK without copy then also check your SL assignment with VOV5.
    Suhas

  • Customer return for make to order material

    Dear All,
    I am doing return process for make to order material.
    while doing return delivery, delivery qty has not come.
    when i enter it manually it shows error
    Only 0 NOS of material ABC001  available
    Message no. VL150
    Can anyone tell me the solution for this................
    Thanks in advance.............
    Babs

    Dear Babs,
    Pls go thru following thread:
    https://forums.sdn.sap.com/click.jspa?searchID=20199089&messageID=5745458
    Regards,
    Abhee.

Maybe you are looking for

  • Sending email using phone signal not wifi

    Dear all, I would appreciate any help. I have two pop email accounts set up on my iphone. When connected to wifi both send and receive emails. However when connected via O2 signal (Uk) then the accounts will only receive and not send. In stead i get

  • L7580 found but does not connect with ver 14 software

    Lenovo R61i LaptopWindows XP SP3.  connecting wirelessly from laptop to router, printer is connected via ethernet cord through a D-Link Dir-655 Router. Updated to Version 14 of all in one driver for L7580.  In set up the setup sees the L7580 on the n

  • Bad user experience/errors with Adobe Air widget installation

    I'm having a nervous breakdown at work (it's 10pm and I'm still in the office), an Adobe Air widget application I've built is somehow causing the client to panic (they can't install or run the Adobe Air installation or the widget and now they feel al

  • How to connect to web services from iOS to get list using anonymous access

    Hello This is a public facing web site that I would like to have access to a list file to get data in an iOS app however I get 403 forbidden because I do not have a username and password.   How can I get this list with anonymous access?   Under my ad

  • Please help.. after May Windows Updates no sound from rear speake

    Hello!?My rear channels stopped working, I am thinking it might have happened because of the recent windows update. I have Audigy2 ZS Platinum Card and Logitech 5. speakers. Please help, I tried drivers from CD and the one on the website, no luck