Hi Experts,
I am using the net requirement planning strategy. i.e strategy 10. My requirement is I wanted the PIRs to be reduced when do goods receipt for the production orders.
I know this is possible in strategy 11. But how how do it in strategy 10.
Regards
Prathib
Hi Ayethebing,
What you mentioned in correct. System may do the wrong net requirement calculation. Let me explain what is my requirement.
I have planning plant, where I get the sales orders and the PIR from Depots. And the production for all these quantities should be done in production plant. I need to do the goods receipt in the production plant itself first and do a plant to plant material transfer to planning plant.
But all the control of production should be with production plant. So I cant use the production in alternative plant because in this case i need to convert planned order in planning plant and while doing goods receipt the stock directly updates in planning plant.
So I was thinking of loading the PIRs in the production plant directly and use strategy 10. But since the sales orders wont come to production plant, the PIRs wont recduce at all. So thought of thinking about reducing PIR during goods receipt.
But I realized from what you explained, it would lead to wrong PIR calculation. Full mark to you.
Now Iam thinking the solution in a different way. Please give me your inputs
Iam creating a recusrive BOM in planning plant and I will assign special procurement key 70. i.e withdrawal from alternative plant. I will assign alternative plant as production plant.
So when I run MRP in planning plant for the main product, I will get dependant requirement created in the production plant for the main material as I created the recursive BOM in planning plant.
But Iam having only one issue to be resolved here as I understand. The planned order created in the planning plant during MRP is convertible. Can I make it non convertible some how even if Iam having bill of material?
Thanks in advance for your valuable inputs
Regards
Prathib
Similar Messages
-
Error during Goods Receipt for Production Order
Hi All,
When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27. I have checked in Business Add-in using SE19 but there are no implementation present. I know that in Logistic Verification MIRO there is a transaction OMRM to set messages. I would like to ask is there anything similar for MIGO.
Or is there any other place in Configuration which allows me to add these Customize message.
Thanks.
Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AMHello Jiaul,
Sorry I may have mislead you. The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27". These two dates are the Start Date and FInish Date for the Production Order in CO03,
The Basic Start Date for the current Production Order is 2010.08.25
The Basic Finish Date for the current Production Order is 2010.08.27
I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order. Do you know where I can find the configuration for this message?
Thanks -
Serial data tab page missing during Goods Receipt for Mvt type 501
I have created and asigned the Seria data profile in plant data/Storage 2 of the material master record. Now i want to do the Goods receipt of this material with Mvtr type 501 w.r.t any documents for 5 no's and want the serial number to be createdment. I also have made relevant settings for automatic serial number and equipemnt number synchr, but wen i m in MIGO--Goods Receipt OtherMvt type 501 and enter, the serial data tab page is missing..
How can I activate this tab page....Any steps missing....
Can some one throw lights on this.....
Refered relevant threads but not much useful to my query....
Thanks
Murad ShaikhTry 501 with MB1C, OR
Check through Path SPRO -> Sales and Distribution -> Basic Functions -> Serial Numbers -> Determine Serial Number Profiles -> Select Profile 'MM' & double click on Serializing procedure at left & maintain obligatory(03) for procedure MMSL i.e. Maintain goods receipt and issue doc. Also press F1 in Serial Number Usage to read the usage. -
Excise tab page not displayed during goods receipt for material.
Dear All,
The issue is we are doing GR for a PO in MIGO.Now the excise tab page is displayed in case of all other matl except for one.The matl type is manufacturing matl for this particular matl.I have checked all the settings in J1ID, also checked the tax code they are ok.can anyone guide me with any other possible solutions to this.
Thanks in advance,
AkshaySame problem we have faced after implementation of budgetory changes.
SAP recommanded changes in program.
Check with sap support.
Regards
Vijay -
Error during goods receipt of Finished goods for production order
hi friends
pls help me iam struggle this issue and mentioned the issue .
when i do goods receipt for production order system getting error like
No price could be determined for material/batch FG/ plant ZTP
Message no. CK 465
Diagnosis
The system could not calculate a price for material/batch FG/ in plant
ZTP for valuation view 0, because none of the valuation strategies in
valuation variant 007 was successful.
System Response
User-defined error management enables you to specify whether the message
is an error message, a warning message or an information message.
o If you have defined the message as a warning message or an
information message, the costing item will be entered in the cost
estimate with a value of zero.
If you have defined the message as an error message, the cost
estimate contains an error or errors.
- In the case of a material cost estimate, the system sets the
status KF.
- If it is a cost estimate without quantity structure, or base
object cost estimate (that is, a unit cost estimate), the
system cannot proceed with costing until you have corrected the
errors.
If the system issues a termination message, the cost estimate cannot
be processed, and processing is terminated.
procedure
o Check the master data for material/batch FG/ in plant ZTP.
o If you have authorization for Customizing, check the valuation
strategy for materials in valuation variant 007.
Note
If the message is a warning message or an information message, there is
a danger that materials with errors will be ignored by the system.
If, because of this, you issue a warning message and at the same time
include materials with a zero value in cost estimates, you can make the
following settings for these materials in the costing view of the
material master:
1. Enter a very low price in the planned price 1, 2 or 3 fields
manually, for instance 0.01 USD. These prices are used for costing
purposes only; they are not read by other applications.
2. Enter the highest price unit possible, for example 10000.
Note: If you enter a new price unit that is higher than the costing
lot size, the system increases the costing lot size accordingly.
3. Change the valuation strategy, such as strategy 4, where you could
enter the planned price field in which you entered the low price.
The system now costs as follows:
Using the valuation strategy, the system finds planned price 1, 2 or
3. Due to the low price and high price unit, the system rounds the
value to zero. However, the cost estimate still obtains status KA
(free of errors), and no error message is issued.
This procedure can be used for all materials that have caused error
message CK465 to be issued.
with regards
dinesh
Edited by: code acess on Nov 8, 2010 4:06 AMhi ragavendra,
this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
with regards
dinesh
Edited by: code acess on Nov 9, 2010 4:01 AM -
Why decimal Places are allowed during goods issue and Goods receipt for mat
Why decimal Places are allowed during goods issue and Goods receipt for material with unit of measure PCS.
MY config allows consumption in decimal places.
How to restrict this?
Prem NivasHi,
Please check in customizing UOM (T code-CUNI).
In dimensions check the decimal point for the unit of measurement.
Regards,
Krishnendu. -
Automatic Batch determination at time of Goods receipt for production order
Hi SAP experts,
Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
I have done the following settings:
1.Specified batch level at material level
2.External batch number assignment
3.Defined production order condition table '501' (plant/material)
4.Defined production order access sequence (order type-plant -material)
5.Defined Production Order Strategy type.
6.Defined Batch search procedure in Production Order.
7.Assigned Batch search procedure to Production order type for a particular plant , batch check not activated.
Please let me know of any more settings to be checked for the same.
For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components is taking place for 1 EA qty. from 5 different batches.
So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
It is desired that the system should do GR for the qty. 1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
Thanks in advance. good day.
Best regards,
RBHI Rahul,
As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
I am not sure if i understand your requirement 100%.
But let me explain you standard behaviour.
When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
Check and Revert,
Santosh Sarda -
Quality Management During Goods Receipt (Inspection Lot)
Hi all,
>>>>>>>>>>>>
REQUIREMENT
<<<<<<<<<<<<
I have a requirement that i need to write an interface program which will receive a file from external agency (manufacturer) and process goods receipt until inspection results. The following steps need to be taken care of;
1) Create a equipment (Utilities - It is an unique identifier for each unit of the material).
2) Do Goods Receipt for the PO with the equipment numbers created.
3) Create Inspection Lot for the material document created during the GR for each equipment number.
4) Execute Inspection Result.
>>>>>>>>>>>>
INFO NOW
<<<<<<<<<<<<
Inspection lot can be created from MIGO directly by SPRO config and MM master data maintenance.
>>>>>>>>>>>>
DONE
<<<<<<<<<<<<
Called BAPI to create Equipment.
Called BAPI to create Goods Receipt.
Inspection Lot Settings to create lots during MIGO
1) New Inspection Type Created as SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection types. The maintenance is a copy of type 01.
2) Assign Inspection Type to Lot Origin at SPRO->QM->Quality Inspection->Inspection Lot Creation->Maintain Inspection Lot Origins and Assign Inspection Types. SG1 is maintained against lot origin 01 with variant 01.
3) Set Default values for SG1 at SPRO->QM->Quality Inspection->Inspection Lot Creation->Define Default Values for Inspection Type with parameters same as for 01.
4) In Material master for the record set the inspection setup in the quality management tab. put SG1 as active and preferred. Also set Post to insp Stock, Insp with task list, Auto Assign, Skips allowed, Serial Numbers poss, Control Insp lot as For each Material Doc Item.
I have to kow how to select the Inspection Plan for the lot and thus set the status of lot to released and get it ready for results.
I also have BAPI ready for Inspection Result.
>>>>>>>>>>>>
TESTING
<<<<<<<<<<<<
I have tested it and was working fine till last thursday. I have the above mentioned settings even now in the system. Can there be anything else which the functional consultants would have change that affected the process. Anyways now the inspection lot is not getting created for the Inspection during MIGO and I am really struggling to find the exact reason.
For your info, I am working mostly on Utilities and so do not have much idea about the quality management stuff.
>>>>>>>>>>>>
QUESTION
<<<<<<<<<<<<
Why the inspection lot is not getting created during MIGO for my scenarion?
How to select the inspection plan in the program?deleted
-
Goods Receipt for packaging material - Item cat. ELP
Hi expert,
I am facing a problem regarding receive Packaging Material Item i MIGO via inbound. Problem detail as below hope you can advise me:
1. I create PO order 1pc of Throttle
2. In Inbound Delivery Screen I do Packing for Throttle by using Handling Unit Function, packaging Material is Carton Box.
3. After Pack complete, Item for packaging material is auto generated in inbound screen:
- Item Cat. of Throttle = ELN
- Item Cat. of Carton Box (Packaging Material) = ELP
4. When i do MIGO via Inbound: there is only 1 item for Throttle is displayed. How to do Goods Receipt for Carton Box item? Do i Miss any setting for that?
Thanks.i thnk u sould maintain material master with two units one is throttle and second is cartoon.
u shud maintain that how many throttle is equal to 1 cartoon.
this u can maintain directlt in PO (In condition tab, with these two field : OUN and UN). in PO as a OUN ,give throttle n UN , give cartoon in item overview as well as condition tab.
and during delivery change the unit in cartoon. then while migo, material will show in cartoon.
hope it will be helpful.
Thanks
Nisha -
Goods receipt for import material
Dear all,
The excise tab does not appear during goods receipt of imported material. But when are doing the goods receipt for domestic material the tab does appear.
Even after posting goods receipt and while trying to capture excise details in J1IEX i.e. incase of imports CVD, CVD-Ecess, CVD-HEcess and additional duty, the system asks for the invoice number and then throws a message that PO does not contain any selectable items. We have defined as separate pricing procedure for imports.Have maintained the material and vendor details in J1ID.
Request to kindly suggest any settings that we need to check so that the excise tab appears for imported material also.
regards,
mahesh.Hi,
Import Process: -
1. ME21N - Create Import PO
2. MIRO - Customs Invoice
3. J1IEX - Capture Bill of Entry
4. MIGO - Goods Receipt
5. J1IEX - Post Bill of Entry
6. MIRO - LIV for Vendor Invoice
7. MIRO - LIV for Clearing Agent
Following condition types to be used in MM Pricing.
JCDB IN:Basic Custom Duty
JCV1 IN : CVD
JECV IN : Ed Cess on CVD
J1CV IN : H&SECess on CVD
JEDB IN : Ed Cess on BCD
JSDB IN : H&SECess on BCD
JADC Addnl Duty of Custom
Mandatorily, use a Zero % Tax Code in Import PO.
Import Duties will not come from J1ID, in J1ID only you have to mainatin material and Vendor (Customs Office and Import both) excise details.
Above all, check the Excise Defaults for CVD conditions in SPRO > LO > Tax on Goods Movement > India > Basic Settings > Mainatin Excise Deafults -
Prevent quantity updating during Goods Receipt
Hi,
We have a particular requirement for a type of subcontracting process (not the standard SAP subcontracting) as mentioned below.
We create a Purchase Order for a material (without a standard cost) and giving an account assignment category in the PO. The Net price mentioned in the PO is the processing charges for the vendor (service charges). It does not indicate price for the material.
When we receive the finished material from the vendor, we perform a Goods receipt. The stock gets updated and accounting documents are created.
Our requirement is to stop this quantity updating during Goods Receipt. But, at the same time, we would like the accounting documents to be created as we need to pay the vendor.
Is there any way of achieving this?
Pl let me know. Any inputs would be appreciated.Hi,
Thanks for the response!
I understand that in the standard process, the parent item inforecord takes care of the processing charges. But this is process that has been customized differently as the client has SAP as well as legacy systems talking to each other.
Turning off the qty updating at the material type level will turn it off for all purchase orders created for the material at that particular plant which is something we would like to avoid.
We would basically like to turn it off for particular purchase order type. The reason for turning it off is that after the GR is done, there is a separate process that comes from the legacy system and updates the same quantity of finished product and also posts the consumption of components.
So, our basic requirement is , is it possible to turn off qty updating for the GR of a particular purchase order document type and yet create accounting document. Material is not a valuated material and has a standard cost zero.
Any inputs in this regard will be helpful.
Regards -
Automatic Creation of Purchase order during Goods Receipt
Hai Guys,
Can you please tell me is there any ways to get a Automatic PO during Goods Receipt???
Regards
Jino.Config
1.Automatic PO generation must be activated for the movment type in IMG>Inv Mgmt & Phy Inv> GR>Create PO automatically. ( Note that automatic PO is only possible for mvmt 101 & 161)
2. The plant you are working with must be assigned to a standard purchase organisation.
3. A default PO document type must be specified for the GR in IMG> MM>purchasing>specify default vaues for document types.
Master Data
1.In mateial master Auto PO is to be set.
2.in Vendor Master Auto PO generation or agreed with him an indicator is to be set.
3.Info-Record should exist with the combination of material,vendor and the auto PO flagged in info record. -
Batch number issue when posting goods receipt for Subcontracting PO
Dear expert,
I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
No batch number will be proposed during PGR in MIGO...
I dont quite understand where is the issue??
My understanding:
We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
Then Vendor will finish the end product and send us back the end product.
We consumption the components use 543 O movement type? And GR the end product..
So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
Where are the issues???
Thanks.Hoo Laa wrote:
I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
>
> I am thinking maybe they didnt active the batch determination for 543 movement type..
>
> Thanks.
Hi Hoo,
You are right!!
Setting of batch number determination has its importance in Mvt Type be it 541, 543....
The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
Cheers!!
Shiva -
Document type during Goods Receipt in Intercompany Transfer flow
Hi,
We create a PO, Delivery and GI in company A
We do a Goods Receipt in company B.
Can we customize that FI document type ZZ is used during Goods Receipt in company B?
Document type ZZ may only be used in the Intercompany flow.
Where can I customize this setting?
Thank you in advance,
Best regards,
Eric van Zundert.Hi,
The following are the standard steps to create an accounting document type and assign it to a transaction.
1) In T-code OBF4, click on "Financial accounting document types" and create a new document type.
2)On the same T-code, Click on "Goods receipt document type" and assign the document type to the transaction.
3)On the same T-code, Click on "Financial accounting No range" and assign the number range for each document type based on company code and fiscal year.
Thanks and Regards,
Maheshwari -
Quantity related Scale pricing not considered during Goods receipt
Hello Group,
First thanks for looking into my issue. I tried to follow the solution in SAP Note 401941 on assessing the right unit price as it relates to the quantity received during Goods receipt, but my ABAP developers are very green at this time and they cannot figure out where to place this code fix and how it would work.
Background on issue.
From quantity of 1 to 99, I want the price to be 4.00 each
From quantity of 100 and above, I want the price to be 3.00 each.
When doing goods receipts for quantities that have not reached 100 yet, it is still assessing 3.00 each. I found the OSS note above that is really not helpful and was wondering if anyone else is using scale pricing and how their GRs are calculated for correct unit price.
Thanks all for your assistance.
SamanthaThe scale pricing cannot be used to influence price during goods receipt. Goods Receipt will pick up the price from the purchasing document.
Suppose you want to have that the price be determined based on the quantity received over a period of time, you need to use rebate agreement.
The OSS note mentioned in your question says that you can determine the price based on the schedule line quantity during GR (not quantity at the time of GR). It will not solve your requirement.
Lakshman
Maybe you are looking for
-
Where can i find edited adobe photoshop files in time machine after update?
i was having issues with my computer, brought it in to apple store. they suggested i back everything up on external using time machine before doing a erase/re-write. i did so. HOWEVER, my edited photos in photoshop & bridge are gone. after the re-wri
-
Adobe Reader 9 crashes when opening approximately 10% to 20% of the pdfs in my collection. The remaining 80% to 90% work without problems. The pdfs are launched by double-clicking the pdf file from Windows Explorer. The crashes occur with both v9.0 a
-
Before you say yes... I am using a crio device in scan-mode interface. The values that the scan mode returns are in double-precision floating point. Apparently I am supposed to be able to choose between double-precision floating point ("calibrated")
-
How do I Change/adjust my mbps?
Hello everyone. I am new to this wonderful software, and still learning the ropes. I make movies with games, and so far with every clip I put on Premiere pro, I get a terrible stutter/lag issue. The clip is smooth as gold, but when I play it on APP C
-
IPTC data in Bridge not linked to Lightroom 2.7...
I have found that including data in the IPTC fields of metadata that I add in Bridge (CS5) does not update the IPTC information in Lightroom 2.7 and I can not find anything that will allow me to link that information from bridge to Lightroom. Am I mi