Planned order capacity requirement load on holiday

Hi ,
We have some cases , the planned order capacity requirements be load at weekend (holiday), but we have no same issue for process order , that's means the resouce set up is correct.
Is any customizing related with planned order capcaity requirment ?
Thanks !

Hi,
If you select the Workday indicator  = 1 (Working days (overrides factory calendar) at "Interval of available Capacity Screen" of Workcenter screen system will schedule the  Order during the Holiday.(CA02)
This is applicable for Both Planned Order and Process Order.
Pradeep

Similar Messages

  • Planned Order Capacity Requirement CM29

    Hi All
    This may be a trivial question for you guys, but I am couldnt find the problem, need your help again please:
    In CM29 my planned order and process orders are visible, and I am using the standard overall profile: SAPSFCG013.
    Earlier I use to see a continous red bar for length of the planned order / process order in the graph, but somehow now it just show up as a single line, irrespective of the order quantity.
    Can you please let me know how to resolve this!
    Thanks in advance!
    -Rahul

    Hi Vivek
    Here is the link for attached screen shot for CM29 with weekly and daily split:
    CM29 with weekly split:
    [CM29 Screenshot|https://picasaweb.google.com/110467857304221340164/CM29?authkey=Gv1sRgCNLYw_uHj8-lUA#5626401198199374018]
    CM29 with daily split:
    [DailySplit|https://picasaweb.google.com/110467857304221340164/Jul72011?authkey=Gv1sRgCLKtzPPn5_SARQ#5626402521518801586]
    I have trie changing hte qty to 1000 and more, the capacity (detailed capacity and roughcut capacity requirement) changes as expected but the graph does not moves
    Thanks in advance
    Rahul

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • MD03 / MD04 creation of separate planned orders per requirement

    Hello,
    I hope you can help me.
    Situation:
    - MD04: separate sales orders
    - MD03: Run MRP > based on requirements for sales orders >1 PR is created
    Material master:
    Lot size: EX / Availability check: 02 / Individual/coll.: 1
    How do I set the system in such a way that for each sales order, a separate PR (and later on a planned order) is created by running MD03?
    Current behaviour: 1 PR for all sales orders.
    PS: sales order stock is not possible due to situation and version (3.1i).
    BR,
    Dion

    Hi,
         MD03 - single item single level planning. So if you run by MD03, below only one level will be planned.
         MD02 - Single item multi level. If u run by this , it will plan upto the bottom level.
    Your requirement is separate PR for each sales order. What u have mention in the material master is correct, but in mrp 3 view use strategy 20.
        In this also if u are creating more than one sales order in the same date for the same material, system will create as a single PR only.
      MD50 - Multi level sales order.It plans only sales order item selected across the bom.
    Reward your points if it is useful.
    Regards,
    Dharma

  • Planned Order - Original requirement

    Hi everyone,
    I would be very grateful if someone could tell me how to obtain (at tables level or using any function module) the original requirement from which a planned order has been generated (by executing MPS).
    I mean I have a PRqRel (Release order for a stock transfer requisition) and after executing MPS a Planned Order was generated. I need to find a link between those objects (PldOrd and PRqRel).
    Thanks in advance and best regards.
    Ben.

    Thanks Murugesan,
    In the assigment tab is not the information I need. The relation I need to find is shown when I push the button "Pegged requirements" on the planned order in MD04.
    Anyway I was talking about tables.
    Greetings.
    Ben.

  • Where do I find planned order capacity

    We need to incorporated planned orders into our capacity.  I found the extractor for production orders but planned is not contained in it.  I found the table to get planned orders but thee is no capacity in the PLAF table.  any ideas where this information resides?

    Hi,
    Have you got this,
    We are also stuck at the same point
    Would appreciate your inputs
    Regards
    Lalan

  • Report on Planned order pegged requirement

    Hi
    I am building a report on Parent and Child planned order.
    I have 2 parent materials P1 and P2 and in both the materials I am using child material C1.
    Now, P1 has planned order PP1 and P2 has planned order PP2.
    At the same time, C1 also will have 2 child planned orders PPC1 for PP1 and PPC2 for PP2.
    In which table or, function module will help me to trace PP1->PPC1 and PP2->PPC2; parent and child planned order relationship.
    Your help is highyl appreciated.

    Hi Susanta,
    How u doing ?
    You can get it through t code MD09.
    Also you can get the linking through FM MD_PEGGING_NODIALOG and MD_PEGGING
    Revert if you have further doubt.
    Regards,
    Vishal

  • REM Planning table - Capacity requirements and Levelling.

    Hi i have few queries in REM planning table.
    In REM planning table MF50 my selection is based on entire plant. Here in total capacity data tab for any particular plant it will show the list of work centers which are maintained in particular plant to know the capacity details as per our requirement.
    1.When i select any WC line and click on change capacity display from CRP it is giving break up with required and available capacity hours for any particular WC available time is assume 22.5 hrs per day which is given in operating time in capacity header in WC but in MF50 it is showing 23hrs.I have defined shift sequence in OP4A and assigned in capacity header grouping which have 3 shift with 30 mins break in each shift which results in 22.5 hrs working for a day so in shift sequence and operating time it is mentioned as 22.5 hrs is the time available for day but in MF50 it is showing 23 hrs available for day?
    2.What is due% in MF50 total capacity data for any work center and how required time would be calculated?
    Appreciate if any one has any example.
    Cheers
    KK

    Hi bump for any suggestions?
    i have noticed one thing the time available is a round up value actual time available as per capacity header is 22.5 but in MF50 it is showing as 23..if i change to 21.5 then it is showing 22hrs available per day is this the standard behaviour?
    can anyone tell me how the required time is calculated?
    Cheers
    KK

  • Technical data for planned order dependent requirements .

    Dear All,
                  I have to call the dependent requirements created by MRP run in my report. Can anyone please tell me that where these dependent requirements are stored in the database or is there any function module to get these values?
    Thanks.

    Dear,
    RESB Reservation/Dependent Requirements Link with PBED for FG and SFG releation. Function module MD_STOCK_REQUIREMENTS_LIST_API
    Also refer this link,
    Dependent Requirements report required
    Regards,
    R.Brahmankar

  • Planned order Diplay Requirement - MD16

    In Transaction MD16 I would want to bring the following information for planned orderss.
    1) Planning plant
    2) Fixed vendor
    3) outline agreement
    I see the info in the relevant table PLAF but I am unable to find how do I pull these filed to be displayed in MD16 list. Can some one help me?
    Regards - SS

    Not possible without developement
    But you can get all the information by writing Query for Table PLAF .
    use SQ02 to define info set for table PLAF
    then use SQ01 to write the query

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • Planned Order Creation using MD_PLANNED_ORDER_CREATE

    Hi ,
       I am using the FM MD_PLANNED_ORDER_CREATE , to create planned order .
    The start date of the planned order changes based on the factory calendar, is there some way to avoid this the FM has a parameter ECM61S used to pass the scheduling paramaters , but using that also does not help.
    Can any one please suggest me some way of doing it.
    Regards
    Arun

    Hi Mangalraj ,
    Thanks for the details.
    Even when i try to create a planned order using the transaction MD11 , if i enter 01.01.2008 , it then changes the date to a working day .
    Can you provide me with some more input on the use if the parameter ECM61S in the FM MD_PLANNED_ORDER_CREATE .
    Is there some setting the factory calendar where we can set it such that planned orders are created even on holidays , kindly also tell transaction to view a factory calendar.
    Regards
    Arun

  • MPS run, planned orders were created for all levels ?

    Hello PP members
    I ran a small scenario
    material    MRP Type     Low Level    SG           M/T Type
    A      M0         000             40              FERT
    B               PD              001              40             HALB
    c               PD              002               10             ROH
    Maintained PIRs(MD61) for material A, and ran MD41( Single Item Multi level Planning)
    As material A is an MPS item, I was expecting that it should create planned orders only for material A, but in this MPS run it created planned orders for material B & C. (Looked into MD04, where I see planned orders were created
    for all the levels)
    As per the MPS run, it will plan only for one level of BOM (in this scenario for material A)
    Any suggestions, why planned orders were created for material B & C
    please clarify

    Just check
    System must have created a dependent requirement planned order and not the planned order for requirement you put in demand management for B and C
    i.e. if you enter a demand in MD61 for B and C, run the transaction, system will not consider this requirement during MPS run. MPS run will consider the requirement if the requirement for the child is comming from parement where parent is MPS item.
    Hence you need to run MRPm for B amd C if teh requirement(not dependdent requirement from A) is to be considered.
    I hope you are clear
    Edited by: Rajesha Vittal on Jan 28, 2008 8:06 AM

  • Planned order is creating before planning bucket for a specific material.

    Planned order is creating before planning bucket for a specific material.
    Eg: Planning Bucket future: 12 months & Start date- 01/02/2012, but Planned order Availability/Requirement date is 12/23/2011.
    What causes this, how to fix it? Please suggest u2026
    Thanks
    Ravi

    Since your planning bucket start date is in the future, so this is normal that the system is trying to satisfy the demand in jan2012 bucket by creating a receipt on Dec23, 2011.
    Reasons for RECEIPT to be generated earlier is
    (1) There might be a FIRM HORIZON( SNP PROD HOR)
    OR
    (2) There might be a GR time and the system is considering that time
    In Customizing for Advanced Planning and Optimization -> Supply Chain Planning -> Supply Network Planning (SNP) -> Basic Settings -> Maintain Global SNP Settings, in the SNP:GR for Plnd Ords field, you have selected Processing Time.
    Blank out these times and see if it works, else do one of the following:
    (1) Set Period Factor(LOT SIZE TAB of PRODUCT MASTER) to 1, so that the receipts get created at the end of the bucket.
    OR
    (2) Create your demand at the end of the planning bucket period
    Thanks
    Kumar