PO - Release without prerequisite step
Hi,
We have 4 levels of PO authorization for $ value. . To approve 4th level other 3 levels are prerequisite in the config.
Now the requirement is 4th level approver ( has authorize to 01 code to 04 code ) would like to release the PO with his code 04 without releasing other prerequisite code say 01,02 & 03
Can we achieve this with standard config OR security authorization level ?
Thanks
Dilip
Dear Dilip,
Hi,
Test below combination:
Code\release prerequis
01 02 03 04
01
02 X
03 X X
04
Release status:
01 02 03 04 Release indicator
0 Blocked
X 2 Released >> here
X 0 Blocked
X X 0 Blocked
X X 2 Released
X X X 0 Blocked
Regards,
LF
X X X 2 Released
X X X X X 2 Released
Similar Messages
-
Spotlight lists items and shows preview images. BUT what about showing the path/location address of an item in my computer.
Especially important if I've put the item in the wrong folder and what to locate it without multi-steps. iMac OS X 10.5 was more useful.
Old OSX Spotlight function automatically displayed path/location within the machine: e.g. desktop/folder/sub-folder/item.
Can I make Spotlight show the path?Press option-command and the path is displayed at the bottom of the little preview window. Press command-return and the enclosing folder opens.
-
Prerequisites & steps needed to connect SolMan to the Aris server?
Hi,
What are the Prerequisites & steps needed to connect Solution Manager system to the ARIS server?
Please help me with any type of documents and let me the the link in SMP
Regards,
NeniDear Neni,
SAP Note 984876 has all instructions on how to proceed. See below:
If you have purchased ARIS via SAP, proceed as described in note
1114046.
If you have purchased ARIS via IDS, proceed as follows:
The synchronization functionality completely depends on an Add-on
developed by IDS Scheer. Therefore, problems related to this
functionality are not handled by SAP support. Please contact IDS Scheer
support for help.
Best regards,
Guilherme Balbinot -
PR Release without classification
Hi ,
In case of a PR release without classification are following things possible
1] Like in PR Release with classification , we can maintain Currency as a characteristics & then system calculates rate equivalent to base currency maintained in value characteristics.Hence can I handle multiple currencies scenario with PR Release without Classification?
2] Release a PR at Header Level
Please answer,
Thanks & regards ,
PrasadHi Mohammed ,
How this will happen?
That means system automatically converts it or what .?
Can you pls. explain in detail , if possible.
'Ours is a free text based procurement scenarios , no material master >
Thanks & regards ,
Prasad -
hello good afternoon I have a 3g iphone in mexico activodo with baseband 05.16.05 and my brother would be released without my permission I know I can do split that q is again a function
No idea what you are asking.
-
Need step-by-step procedure for PR Release without classification
Hi,
Can any one please let me know the detailed/ step-by-step procedure for releasing a Purchase equisition without classification.
Thanks,
Prasuna.Dear,
Check: http://sapdocs.info/wp-content/uploads/2009/07/Step-by-step-guide-of-SAP-PR-Release-Strategy-configuration-a-case-study.pdf
Regards,
Syed Hussain. -
Release Procedure Configuration steps with screenshots
Hi,
Can anybody send release procedure configuration settings with screen shots.
Regards
RamakrishnaHi Ram,
Release strategy steps
SPRO-MM- Purchasing-Purchase Requisition-Release Procedure- Procedure with Classification
1.Edit Charatestic,(CT04), use Class 032
2.Edit Class(CL02)
3.Set up Procedure with Classification
3.1. Relesae Group,
3.2Relaese Code,
3.3.Relaese Inicator,
3.4Relaese Statergies
3..4.1. Relaese Prerequisities
3.4.2. Relaese Statuses
3.4.3. Classification
3.4.4. Realesae Simulation
Release procedure for Purchase orders here is process flow.
Go to spro>img>materials management>purchassing>Release procedure for Purchase orders
1. Create characterstics -Intially you will create characterstics based on which you would like to release a purchase order.
Charactrestics are like plant, purchase order value,purchase group etc.. Assign characterstics to release class 032.
2. Create Release group say 01 and create release codes like pm(project manager), gm(general manager) etcc..
3. Create a Release starategy say s1 and assign release group to it 01 and release class 032 and department to whom this release stategy applies say MM. define the order of release say first pm followed by gm etc..
4. under classfication define value limits for release of purchase order.
5. define release indicators
6. simulate the release
7. assign if there is any workflow.
For more Check the links:
http://www.scribd.com/doc/531679/Release-Procedure-for-Purchase-Requisitions
http://www.sap-img.com/workflow/workflow-of-purchase-requisition-release-strategy.htm
http://www.sap123.com/showthread.php?t=59 -
11.1.2.3 maintenance release pre-req step
We are currently running Distributed installation of our production environment on version 11.1.2.1
Plan is to apply maintenance release 11.1.2.3 to existing 11.1.2.1
Going through document: Oracle® Enterprise Performance Management System Installation and Configuration Guide Release 11.1.2.3
Page 188
Apply any required PSEs before proceeding with maintenance the installation.
To review the list of defects fixed between earlier releases, use the Defects Fixed Finder. This
tool enables you to identify the products you own and your current implementation release.
With a single click, the tool quickly produces a customized report of fixed-defect descriptions
with their associated platforms and patch numbers. This tool is available here:
https://support.oracle.com/oip/faces/secure/km/DocumentDisplay.jspx?id=1292603.1
QUESTION:
=======
Ran the defect fixed finder tool as suggested above and it came up with list of defects fixed AFTER my current release 11.1.2.1
1) Since we are applying maintenance patch release 11.1.2.3 on top of 11.1.2.1 would it just suffice if we apply patches to address defects on top of 11.1.2.3 ALONE as a post maintenance patch step?
2) Since the instruction mentions "any required PSU's" -- is it ok we skip the PSU's for version 11.1.2.1 and proceed with maintenance upgrade -- will there be any problem with this approach. Please suggest.I would question the requirement to install PSEs because in theory the maintenance release should be deploying the latest set of files/fixes and I would think it only relates to patches for the release you are currently running, this requirement was not in previous maintenance releases and with the software being released only a week ago it is difficult to give a definitive answer, maybe one to ask Oracle.
Cheers
John
http://john-goodwin.blogspot.com/ -
Multiple IDOC to Multiple IDOC scenario without BPM steps????
Hi
Could you please give me the solution for this ???
I want steps for sending all IDOCs at a time- ---"Multiple IDOC to Multiple IDOC scenario without using BPM".???
thanks
3nadhHello,
Refer the below, for certain details!
/people/swaroopa.vishwanath/blog/2007/01/22/ale-configuration-for-pushing-idocs-from-sap-to-xi ALE configuration for pushing idocs from SAP to XI
/people/michal.krawczyk2/blog/2005/12/04/xi-idoc-bundling--the-trick-with-the-occurance-change XI: IDOC bundling - the "trick" with the occurance change
Regards,
Jilan -
Form fillable in Reader without Distribution step
I am taking a word doc, making a PDF form. I want to be able to copy that form and have Reader users be able to enter data. I can only make it work by taking the PDF and performing a Distribution step which creates another PDF. Can I make the first PDF fillable without the distribution step?
Reader users can fill in a form whether or not you distribute it or Reader-enable it. They won't be able to save the filled-in form unless it is Reader-enabled, which is part of the distribution process, or can can Reader-enable without distributing. Exactly how you Reader-enable a document depends on which version of Acrobat you're using.
-
Call external program without intermediate step
When I call an external program (Nik Color Efex) a window opens asking me wether I want to continue with the image having all Lr stpes applied etc. How can I circumvent this "annoying" step and directly call the external program without interruption?
Thanks, I understand that before transferring the file you need to do these preparations, but then the window shows up asking me wether I want to transfer the copy or the original... I am looking for a mechanism to supress that screen.
-
File to File-Without Pipline steps
Hi,
We have Scenario to send file from a system to another system. This process does not involve any PI Pipeline steps. No mapping nothing...just pick the file and post it another location.
We are trying to explore if we can do this with PI File adapter ( by passing the pipeline steps like we can do in IDOC). Also if we do that do we get any monitoring of the movement of file or any trace/log.
I explored the direct connection in 7.1 but it looks like it does not support File transfer.
RegardsHow to send any data (even binary) through XI, without using the Integration Repository
That answers your requirement.
VJ -
Release Strategy Prerequisite scenario
Good Day,
I have this scenario and can't seem to find a solution. This is for Release Strategy in PR
Release Codes
D1 - Department Head
D2 - Department Head Proxy
R1 - Releaser1
R2 - Releaser2
Level 1 - D1 or D2
Level 2 - R1 or R2
Here's the scenario
1] D1 releases
2] Either R1 or R2 releases
if D1 is unavailable,
3] D2 releases
4] Either R1 or R2 releases
How do I set up that R1 and R2 prerequisite is either D1 or D2?Good Day,
I have this scenario and can't seem to find a solution. This is for Release Strategy in PR
Release Codes
D1 - Department Head
D2 - Department Head Proxy
R1 - Releaser1
R2 - Releaser2
Level 1 - D1 or D2
Level 2 - R1 or R2
Here's the scenario
1] D1 releases
2] Either R1 or R2 releases
if D1 is unavailable,
3] D2 releases
4] Either R1 or R2 releases
How do I set up that R1 and R2 prerequisite is either D1 or D2?
Answer:
The release strategy is not possible in the standard. Use the following user exits:
M06B0001
To determine the person in workflow responsible for requisition approval.
M06B0001
The USER EXIT is called up if a release code has the workflow indicator "9". Objects from human resources planning can be passed on as "persons responsible": e.g. "US" (user) in the field "Object type" and a user name in the field "Processor's ID".
Example of determination of person responsible via customer-specific table: you can create a customer-specific Customizing table along the lines of T16FW, via which the person responsible is determined on the basis of the characteristics "release group", "release code" etc.
Example of determination of person responsible via cost center: The cost center can be read and the person responsible for the cost center used as person responsible for release purposes via the requisition account assignment. -
Did you really release without coords working?
I have posted already two posts on the topic of SDO_COORD_REF_SYSTEM. For some reason, Oracle 10G R3 does not allow the ability to create an exact replica of a projection and specify param values.
I have tried numerous permutations of inserts on SDO_COORD_REF_SYSTEM and the OPS table with params. In all cases, looks as if this does not work with a custom copy of an existing. I am suprised that Oracle has released Spatial with these problems. Although, WKT is deprecated, there looks as if there are still dependencies in the latest release. No where is this documented except in random posts to the board. Also, the above is simple, copy an existing, specify a new coord ops with same method but different param, and viola, should work.
I challenge anyone to create a copy of an existing EPSG NAD83 to Lambert projection with specified param values per a chosen geographical area (not the EPSG one) and the correct parallels. Perhaps, I am wrong, or maybe there is an important step not documented. To this end, I look forward to SQL that does the above posted to the forum in 10G.
Much appreciated and thank you in advance for a working example.Or, another example:
INSERT INTO SDO_COORD_OPS (
SELECT
2000000000,
'my op',
COORD_OP_TYPE,
SOURCE_SRID,
TARGET_SRID,
COORD_TFM_VERSION,
COORD_OP_VARIANT,
COORD_OP_METHOD_ID,
UOM_ID_SOURCE_OFFSETS,
UOM_ID_TARGET_OFFSETS,
INFORMATION_SOURCE,
DATA_SOURCE,
SHOW_OPERATION,
IS_LEGACY,
LEGACY_CODE,
REVERSE_OP,
IS_IMPLEMENTED_FORWARD,
IS_IMPLEMENTED_REVERSE
FROM
SDO_COORD_OPS
WHERE
COORD_OP_ID = 15031);
INSERT INTO SDO_COORD_OP_PARAM_VALS (
COORD_OP_ID,
COORD_OP_METHOD_ID,
PARAMETER_ID,
PARAMETER_VALUE,
PARAM_VALUE_FILE_REF,
UOM_ID) (
SELECT
2000000000,
9812,
PARAMETER_ID,
PARAMETER_VALUE,
PARAM_VALUE_FILE_REF,
UOM_ID
FROM
SDO_COORD_OP_PARAM_VALS
WHERE
COORD_OP_ID = 19958);
UPDATE
SDO_COORD_OP_PARAM_VALS
SET
PARAMETER_ID = 8806
WHERE
COORD_OP_ID = 2000000000
AND
PARAMETER_ID = 8816;
UPDATE
SDO_COORD_OP_PARAM_VALS
SET
PARAMETER_ID = 8807
WHERE
COORD_OP_ID = 2000000000
AND
PARAMETER_ID = 8817;
INSERT INTO SDO_COORD_REF_SYSTEM (
SRID,
COORD_REF_SYS_NAME,
COORD_REF_SYS_KIND,
COORD_SYS_ID,
DATUM_ID,
GEOG_CRS_DATUM_ID,
SOURCE_GEOG_SRID,
PROJECTION_CONV_ID,
CMPD_HORIZ_SRID,
CMPD_VERT_SRID,
INFORMATION_SOURCE,
DATA_SOURCE,
IS_LEGACY,
LEGACY_CODE,
LEGACY_WKTEXT,
LEGACY_CS_BOUNDS) (
SELECT
2000000000,
'my crs',
COORD_REF_SYS_KIND,
COORD_SYS_ID,
DATUM_ID,
GEOG_CRS_DATUM_ID,
SOURCE_GEOG_SRID,
2000000000,
CMPD_HORIZ_SRID,
CMPD_VERT_SRID,
INFORMATION_SOURCE,
DATA_SOURCE,
IS_LEGACY,
LEGACY_CODE,
LEGACY_WKTEXT,
LEGACY_CS_BOUNDS
FROM
SDO_COORD_REF_SYS
WHERE
SRID = 29873);
COMMIT;
CREATE TABLE source_geoms (
mkt_id NUMBER PRIMARY KEY,
name VARCHAR2(32),
GEOMETRY SDO_GEOMETRY);
INSERT INTO source_geoms VALUES(
1,
'reference geom',
SDO_GEOMETRY(
2001,
4298,
SDO_POINT_TYPE(
(115 + 48 / 60 + 19.8196 / 3600),
( 5 + 23 / 60 + 14.1129 / 3600),
NULL),
NULL,
NULL));
INSERT INTO USER_SDO_GEOM_METADATA VALUES (
'source_geoms',
'GEOMETRY',
SDO_DIM_ARRAY(
SDO_DIM_ELEMENT('Longitude', -180, 180, 10),
SDO_DIM_ELEMENT('Latitude', -90, 90, 10)),
4298);
commit;
SELECT GEOMETRY "Source" FROM source_geoms;
CALL SDO_CS.TRANSFORM_LAYER(
'source_geoms',
'GEOMETRY',
'GEO_CS_2000000000',
2000000000);
INSERT INTO USER_SDO_GEOM_METADATA VALUES (
'GEO_CS_2000000000',
'GEOMETRY',
SDO_DIM_ARRAY(
SDO_DIM_ELEMENT(
'E',
-100000000,
100000000,
10),
SDO_DIM_ELEMENT(
'N',
-100000000,
100000000,
10)),
2000000000);
set lines 210;
SELECT GEOMETRY "Target" FROM GEO_CS_2000000000;
CALL SDO_CS.TRANSFORM_LAYER(
'GEO_CS_2000000000',
'GEOMETRY',
'source_geoms2',
4298);
INSERT INTO USER_SDO_GEOM_METADATA VALUES (
'source_geoms2',
'GEOMETRY',
SDO_DIM_ARRAY(
SDO_DIM_ELEMENT('Longitude', -180, 180, 10),
SDO_DIM_ELEMENT('Latitude', -90, 90, 10)),
4298);
SELECT GEOMETRY "Source2" FROM source_geoms2;
DELETE FROM USER_SDO_GEOM_METADATA WHERE table_name = 'GEO_CS_2000000000';
DELETE FROM USER_SDO_GEOM_METADATA WHERE table_name = 'SOURCE_GEOMS';
DELETE FROM USER_SDO_GEOM_METADATA WHERE table_name = 'SOURCE_GEOMS2';
drop table GEO_CS_2000000000;
drop table source_geoms;
drop table source_geoms2;
DELETE FROM SDO_COORD_REF_SYSTEM WHERE SRID = 2000000000;
DELETE FROM SDO_COORD_OP_PARAM_VALS WHERE COORD_OP_ID = 2000000000; -
No Release without Purchase Requisition in Process Order(subcon)
Hi All,
We have one requirement :
The creation of purchase requisition happens during the creation of process order which is basically governed by control key.
But in case the creation of purchase requisition didn't happen , because of any issue with master data set up in recipe
or say wrong data .
We DO NOT want , the system should allow the release of that process order.
Is there any standard way to achieve the above requirement.
Thanks in Advance!!!!!!Hello
You can implement your own logic to check the purchase requisition during the release using BAdI WORKORDER_UPDATE. There is a method specific for checks during the release.
BR
Caetano
Maybe you are looking for
-
Report a serial number in work order operation
Hello Gurus, Some of our production orders for a serialized assembly, may have the quantity of 20 or even more. Although the entire quantity tends to stay together for one or more operations, they quickly disperse as some take a little longer to buil
-
Synching ical with coworker ical
Looking to synch my ical with my business partners. Help Please
-
Cumulative quantity has exceeded still billing have condition value.
Hi, Requirement – One discount condition which will be applicable up to a certain quantity at billing. Issue – Condition is getting determined at billing while cumulative quantity has exceeded.( I am using pricing type C in copy control delivery to b
-
IMovie '09--Can you add an object (like an Arrow) over the video?
I have a sports video stored in one on my projects and want to add an object like a circle or an arrow to highlight a particular player. Is that possible?
-
Hello Experts, As successfully processed synchronous messages cannot be archived in PI and I have gone through the various documents and threads(mentioned below) in SDN which also confirm this point. XI: synchronous messages can be archived? Can sy