Position to Cost Center Relationship with time constraint 1

Hi,
I have a situation wherein:
1. There exists 2 records in PP01 with S-K relationship e.g. 01.01.2013 to 28.02.2013 and 01.03.2013 to 31.12.9999
2. There is a requirement to create another S-K record with dates; 01.02.2013-28.02.2013 automatically delimiting the first record.
Hence in all three records should exist
But when i try creating the 3rd record with end date 28.03.2013, it gives an information message stating End Date corrected to maximum end date of 31.12.9999. Thereby over writing the previous record(2nd one)
Do I need to change time constraint? Time constraint 1 should ideally allow this, as my records do not have gaps and exist at all times.
Please guide me through.

Hi Rohan,
Please check the table V_T777ZVK and the time constraint between S and A011 it must be 02 as per the standard system.
Then time constraint 2 means a maximum of one infotype record of the same type for the same object at the same time.
So if you change then end date must be 31.12.9999.
Regards,
Mithun K

Similar Messages

  • Cost center relationship with department

    Hi experts,
    I have one question to ask about cost center relationship.Let say one department use only one cost-center. Is it I have to key-in the relationship between department and cost-center only or I have to key -in all the position in that department with the cost-center.If I don't keyin the relationship between position and cost center, how about the report. It will automatically appear or not.

    HI MJ,
    Please assign the Org Unit to a Cost Center using A011 Relationship through IT1001.
    Secondly, the principle of Inheritance works here.....i.e.
    IF you have assigned a O-K relationship at the Org Unit Level, all the reporting Org Units & Positions will inherit the Same Parent Cost Center........except in cases where the O-K / S-K Relationship is changed for any other org Units...or Positions... in such cases, the reporting org units or positions will inherit that.....
    Cost center assignments are inherited along the organizational structure.
    Hope it is clear...
    Good Luck !!!!
    Kumarpal Jain.

  • Org Unit to Cost center relationship issue

    Hi All,
    When I assign a Cost center to an Org Unit, i dont have any issues and got created. But when I assign the same Cost center to a different Org Unit, it delimits the previous Org relationship and creates the new one.
    I checked the Relationship A011 time constraint and it is 2 which is with gaps.
    This is strange and should not work in this way.
    Thanks in advance.
    Cheers
    Vijay

    Thanks a lot guys.. I found the answer...
    Cheers
    Vijay

  • HRP1001 subtype A011....Position to Cost center data

    Hi Folks,
    I am new to HR data replication from HCM to ECC. I am trying to replicate the HR Organizational data from HCM to ECC, THough I am able to replicate all the organizational data I am having issue with HRP1001 Subtype: A011 (Position to Cost Center data). I am using the IDOC type HRMD_ABA and I see all the IDOCS successfully made it to ECC with status 3; but still when I look into HRP1001 (plan version 01, Object TYpe :S; subtype:A011) I see zero entries. As there are no failed IDOCs it is difficult to understand what is stopping the entries to be populated. Please advise if any one has any suggestions or if anyone has encountered similar issue.

    Kalyan,
    Shouldn't the object type be S. Anyway I even tried with O but still no luck.
    But I observed one thing, there are no entries in HRMDORIGIN and when I tried to run the program RHALEHRMDORIGINIT, I am getting a dump
    Category               ABAP Programming Error
    Runtime Errors         SYSTEM_LOAD_OF_PROGRAM_FAILED
    ABAP Program           RHALEHRMDORIGINIT
    Short text
        Illegal interruption of the event LOAD-OF-PROGRAM.
    What happened?
        Error in the ABAP Application Program
        The current ABAP program "RHALEHRMDORIGINIT" had to be terminated because it
         has
        come across a statement that unfortunately cannot be executed.
    Error analysis
        During the flow of the event LOAD-OF-PROGRAM (event for the
        initialization of an ABAP program), a condition occurred under which
        the event was to be left early. This is not permitted as it would
        result in an inconsistent status in the ABAP program.
    Trigger Location of Runtime Error
        Program                                 RHALEHRMDORIGINIT
        Module Name                             SYSTEM-EXIT
    Active Calls/Events
    No.   Ty.          Program                             Include                             Line
          Name
        1 EVENT        RHALEHRMDORIGINIT                   ???                                     0
          SYSTEM-EXIT

  • Is there any config for plant-cost center relationship

    looks like our new cost center is not defaulting on the PO accounting document. Is there someplace I should have set-up a plant/cost center relationship?
    Thanks in advance
    Satya

    Hi Satya,
    You cannot directly assign a Cost Center to a Plant. But indirectly yes. A Cost Center is assigned to a Profit Center, a Profit Center is assigned to Material Master and the Material Master to a Plant.
    Hope this clarifies.
    Regards
    Sridhar

  • Cost Center Report with Cost Element wise Subtotal

    Hi All,
    We have a requirement where customer wants a Cost Center report with Cost Element wise Subtotal and selection options required are Company Code, Cost Center, Cost Element.
    KSB1 solves the requirement, but when executed for 2 or more company codes it is taking 3 to 4 hours.
    The other alternative report we tried is S_ALR_87013611- Actual/Plan but this report gives debit and credit values in seperate columns.
    Please let me know if we can copy the report S_ALR_87013611 and change it using report writer to have the output by Cost Element wise total.
    Also please let me how we can increse the speed of KSB1 report.
    Thanks
    Satish

    for KSB1 Report the following is my suggestion
    1. Please go to the selection criteria for the cost elements and de select the secondary cost elements in the the exclude range and try running the report this is generate the report faster.
    2. also check the date range please give the date range for 3 t months and if you want to run for multiple company codes. if you want to execute it for longer periods say 9 months or 6 months generate the report in 2 to 3 installments and download them to your excel and consilidate them in excel for your analysis
    Best Regards,

  • IT0009 with Time Constraint 1

    Hi Experts,
    We have defined IT0009 with a subtype whcih has Time Constraint value as 1. Ideally we shouldn't be able to delete the IT0009 with Time Constraint 1. But still we are able to delete all records for It0009. Could anybody tell why this is happening?
    Regards
    Niharika

    Hi,
    Time constraint Class for infotype 0009 is T  that means it will depend upon the subtype
    If you change this time constraint class to one  in table  V_512W_D you will not be able to delete the recods for 0009.
    Warm Regards,
    Kapil Kaushal

  • Configuring ISR Scenario SRK1 (Create Cost Center Request) with Adobe forms

    Hello,
    I am trying to configure the ISR scenario SRK1 (Create Cost Center Request) with Adobe Interactive Forms.
    However when I am trying to generate the form, it is giving an error TR015(Object can only be created in SAP package)
    Apparently by default it tries to create form Adobe form ISR_FORM_SRK1.
    Even if I change that name to ZISR_FORM_SRK1, it tries to create interface ISR_IF_SRK1 which is in SAP's namespace and I cannot generate the form. I cannot seem to be able to force SAP to use a different Interface name. The field for the interface is greyed out and is not picked up
    Am I missing any step or is there any fix to this problem?
    regards,
    Atul Kulkarni

    Hi,
    From the config it picks the formscenario(SRK1) and prefixes the same for adobe form.
    I think the best option would be to copy the Stnadard form scenario to ZSRK1 and proceed. This copy can be done from the config 'Manage Form Scenarios' under this select the option 'Copy form scenario'. This copies the entire config from SRK1 to ZSRK1.
    Regards
    Srikanth KV

  • Position to Cost Center Assignment

    Hi,
    Can any one shed some light on where (table/function)to find assignment of a new position to cost center?
    Regards

    adding on to what Lincoln & Sarika have suggested..
    data w_sobid type sobid.
    select sobid into w_sobid
                 up to 1 rows
                 from HRP1001
    where otype = 'S'
      and plvar = '01'
      and objid = < new position no>
      and istat = 1
      and rsign = 'A'
      and relat = '011'
      and begda le sy-datum
      and endda ge sy-datum.
    endselect.
    id sy-subrc eq 0.
    * w_sobid should have the Cost Center
    endif.
    ~Suresh

  • Cost center relationship in PCH logical database

    Hi Experts .
    According to what I knew theoretically ,
    External objects such as cost centers or users do not store data in the PCH logical database .
    But I created a position and Idid a cost assignment using relationship A11 to a cost center and went to SE36 and ran PCH for the selection of current plan version and object type K and object id of the cost center .
    After running for the evaluation path KOSTDIUP ( Account assignment usage ) , I could see the relationship of cost center with the earlier created position .
    So if relationships of cost center are not supposed to be in PCH logical database , then how come I can see the above result ?
    Thanks
    Rishabh

    This logical database generally enables you to report on all HR infotypes. However, you are advised not to use this logical database unless you want to report on Personnel Planning data.
    The Organizational Management uses the PCH logical database
    so S-Position is an object in OM, you can see the relationship.
    correct me if i am wrong !!
    regards,
    mohammed

  • Create Cost Center relationship usin SAP-PD

    Hi all,
    SAP_PD is allowing to deal only with O, S and C object. How we can create new relationship to  Cost Center (K)  using SAP_PD.
    Any ideas?
    Thanks,
    Oleg
    Edited by: Oleg Sokolov on May 26, 2010 2:26 PM

    You can 'start' an SAP_PD service with an Position, Job, or Org Unit. But you can update ANY relationship to that object (even cost center). Play around with it a bit and I'm sure you'll stumble up on the solution.
    Derrick Banks
    Banks & Company, LLC

  • Copa assessment from cost center posted with zero values

    Hello all,
    We are running for the first time in my clients system assessment cycle for actual values from cost center t copa
    The cycle at the test run shows the values and the reciever tracing factor allright but in update run the document created with zero values
    Can anyone adress me why this happnes
    Thanks
    Michal

    Hi,
    You must be getting some errors in update run, like profit center update (if new gl active) or other, please check and revert.
    Br

  • MSS different cost center by approved time sheet

    Hello,
    In Table CATSDB seen we the results from time entry. The fields Send cost center and receiver cost center. An employee has an standard costcenter as masterdata. When this person works a couple of hours on a cost center that differs from his standard (master data), he giving in the cost center were he works on. Every thing is ok in ESS.
    In MSS in the team viewer this person belongs to a team. Bij the approval of time sheets he displays standard (master data) and the u2018differentu2019 cost center. This situation we want to avoid. The u2018differentu2019 cost center is somebody else his responsilibility.
    I try something with Cost center responsility. Can someone help me?
    Thank you

    Dear Dilek Ersoz 
                    I have the same requirement where i have to default the Sending cost center and Actiivty type from infotype 315  in the CAT2 sending cost center and activity , but in the cats profile defaults section i have kept the Cost Center and acitivyt type checboxes being checked , still iam not getting the values of the 0315, please could you let me know how to default the values in cat2.
    regards
    sai.

  • Routings/Work Centers to Cost Center Relationship

    Hi,
    For routing, work center and cost center master data setup, is there a limitation on the number of:
    Routings to cost centers?
    Work centers to cost centers?
    I want to find out if there are only a certain # of routings allowed when tie to a cost center, and same with work centers.
    Thanks,
    Alice

    Hi,
    Routing
    A routing is a description of which operations (process steps) have to be carried out and in which order to produce a material (product).
    Thus in routing  contains details about the work centers at which they are carried out, standard value  and component.
    Therefore there is no limitation for assigning number of time for same work center.
    Regards
    Suresh

  • OTL  Cost center in Payrol time Card

    Hi
    In the seeded Payroll template for the Cost center LOV to be populated with Value should we modify the ldt file or is there any seeded value set that can be used
    I know by using the Alternate name and Alternate name mapping we can able to bring the cost center LOV in the Time Keeper screen. i am just wondering is there a way to bring the cost center value in the self service time using the seeded payroll layout card without modifying the ldt file
    Please let me know.. thanks for the time
    Regards
    Ramesh S

    Ramesh,
    As we discussed, Where exactly the value will go is determined by the attribute defined in the layout and the corresponding location after transfer process is governed by the mapping components. So check if the mapping component is correctly defined for the costing field, whether it is pushing the cost field info to the segment of the costing.
    --Shiv                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

Maybe you are looking for

  • Making a field in ALV as display only in FPM

    Hi , I have a requirement where in I need to make a field(which is a dropdown) in ALV as read-only field in one of the webdynpro application(WDC_WSGM_GR)  called in FPM_OIF_COMPONENT. Can somebody help me find the place/method where we can make this

  • Colour profiling

    is it possible to use colour profiling on Elements 10?  if so, how.

  • Memory card keeps ejecting itself

    Dear Apple experts, I have had an iMac with OS x 10.6.7 for a year now and for the last 2 weeks, whenever I connect a memory stick pro duo via a memory card reader, the card keeps ejecting itself every few seconds and an error message comes up "disk

  • Can't delete 'Flock'

    I downloaded the browser 'Flock' and then decided I don't like it. I then put it in the trash and emptied it, but it said: The operation can't be completed because the item "classic.jar" is in use. Any help would be greatly appreciated. Thank you.

  • I am receiving an error message when attempting to open a pdf.

    It says I dont have permission and to contact owner or administrator. I am the administrator on this computer and all the file permissions are enabled and I even tried running adobe reader as admin. the file is encrypted but Im never asked for a pass