Problem creating a sales order for configurable material in SAP ECC

I have a Variant Configurable material named X.
The structure of this VC material is
Material X has charatcertics CHARCTERISTIC1 and CHARCTERISTIC2.
CHARCTERISTIC1 has values VALUE1
CHARCTERISTIC2 has values VALUE2
I created a sales order manually from VA01 using configurable material and read the values of all configuration tables to be filled from BAPISDORDER_GETDETAILEDLIST. With the help of this data i got an idea how to fill the tables of BAPI BAPI_SALESORDER_CREATEFROMDAT2. But still i am able to create a sales order but the configuration data that i give is not getting populated in the sales order.
Where am i missing. please some body suggest. I am unable to debug and searched the forums
for this information but dint find solution for my problem. some body please tell me where am i missing?
Any help would be highly appreciated
Edited by: jessica sam on Jan 12, 2009 2:59 PM

Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
The setting in item category for configuration is.
Config. Strategy     01(Sales Order Strategy (TAC, TAM))
Mat. Variant Action  4 (Replace configurable material (Append and change))
ATP material variant 2 (Do not substitute if not completely available)
Structure scope      D (Configuration, poss. with BOM explosion)
I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
Please suggest if missing something.

Similar Messages

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Material variant replacement in sales order for Configurable Material

    HI
    I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
    Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
    Please help me out.
    Regards,
    Anand.

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Supress VC in sales order for configurable material

    Hi,
    this might sound like a weird request but I am looking for a way to prevent variant configuration for a configurable material in a sales order.
    For internal process purposes we would like to create an intermediate sales order with a custom document type and custom item categories.
    When we create the document we reference 'real' sales orders which contain configurable materials.
    When copying those items over to the new custom sales order type, I'd like to prevent the VC for this item in the new order.
    The custom item category I set up is not marked as configurable (no configuration strategy/structure scope/etc...)
    I tried to do this with custom code in copy control but it still is bringing up the VC screen which I want to prevent.
    Appreciate any ideas which could help.
    Thanks,
    Markus

    Hi Markus,
    I believe whether the configuration screen should appear or not depends on whether the material is marked configurable or not in the master data. Therefore, it may not be possible to realize your requirement via the item category settings. You probably need to do some debugging to figure out where the configuration screen is called and then add some item category based check there.
    Regards,
    Akshat

  • Error while Creating a Sales Order for a Configurable Material

    Dear Members,
                            When I am creating a Sales Order for a Material. After Entering the Sold to Party and Material(Variant Configuration) I am getting an error in popup that Derivatiion Rule not defined for the Country IN. Please can you help me out regarding the settings for this.
    Thanks,
    Farhan.

    It seems your issue relates to some non assignment in COPA settings.  Hence,  check this help link and I hope this will be helpful to you
    [Source and Target Fields |http://help.sap.com/saphelp_erp2004/helpdata/en/59/65a2b8dd1711d2a6110060087a7a87/frameset.htm]
    thanks
    G. Lakshmipathi

  • Create one sales order for two customers

    Hello to all.
    I have to plan the following development. Our client can create one sales order for one material and can bill it between two or more payers. 
    In SAP you would have to create one sales order for each customer and divide the material proportionately between the customers. The doubt is if there is any development with user-exits,badis,... so you can create only one sales order with two "payers" partner functions; you would put a % of participation in each payment so the sistem would create two invoices dividing the total amount of the sales order between the payers.
    Could anyone help me?
    Regards

    Tonnetti,
    If you want 2payers to  be possible in the same sales order, you  have to include the material as two line items. Then go to each line item, the partners tab and then change the payer there. So now the header partner will have 2payers, and there will be different payers for each line item.
    Now you can do a delivery or billing as needed. For a single sales order, two invoices will be created as the payers are different. These invoices can be send to respective payers and the payment can be processed from these payers.
    Hope this helps for your scenario.
    Reward if this helps.

  • Make to Order for Configurable Material & Error in Confirmation

    Hello, PP Gurus,
                       I am doing one MTO for Fabric business but during the confirmation I am getting error that
    SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
    *is it necessary to run MRP in this scenario?*
    Please see the all Details of Business so that U can give answer properly.
    One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
    is it possible to maintain raw fabric and Colored fabric with same mat.code?
    I have configured the material as well all pricing BOM, Recipe its working properly.
    How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
    Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
    Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but  I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
    My configuration is given below.
    MRP Type : PD
    BOM item Category:  L Stock Item.
    In dependency & Profile I have set radio Button as Single level Bom explosion.
    Order Bom selection in profile.
    Strategy : 25 make to order for configure material.
    How can I do ? please suggest any changes
    I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
    thanks to all SAP gurus..
    THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
    Regards,
    Bhavik dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Production order without referance to sales order in configurable material

    Dear all,
    I am trying to create a production order for a configurable material. I dont have a sales order for that. And I can not even create a sales order for some reason.
    While creating a production order the system asks for  a account assignment (either a sales order or WBS).
    The error which comes while creation is ,
    Standard production only allowed with ref. to indivual customer stock
    Message no. CO542
    Diagnosis
    Direct order creation for a material to be configured is only possible if it takes place in relation to sales order stock since a configurable material only allows production for sales order stock. A sales order or a WBS element can serve as sales order stock.
    Procedure
    You should enter a sales order or a WBS element for account assignment.
    How to solve this.
    Thanks in advanmce.
    Sumeet

    Hi
    1.Create a CIR with transaction with md61
    2.You will get a reference number
    3. with that reference number you will be able to create a Produ tion order.
    check and let us know if you have any issues
    reg
    DsK

  • Creation of IBase with reference to sales order for Configurable product.

    Hi Experts,
            Can any one tell me How to create Ibase with reference to sales order for Configurable Products. I know we can create this using IB63, but what i need to do in this Transaction code and what settings i need to do in SPRO.
    pls send ur replies to [email protected]
    Thank you..

    Hi
      You can create IBase using T-Code-IB53 and in there you can give Parent and child products.
    A)Define Installed Base Category and Installation Rules-CRM
    B)Define Object Families
    C)Define default settings for equipment replication
    D)Define Serial Number Profiles-ECC
    E)Txn BF31-ECC
    F)Set up attributes for individual objects
    G)Set up set types
    H)Set up category
    I)Set up views
    J)Allow reference product for IO
    I hope it helps
    If you require further help let me know.
    Cheers
    Raj

  • How to create a sales order for Onetime customer with Tax code?

    Hi everyone,
    Can I use sd_salesdocument_create for a one-time customer? From the standard bapi, which field can I use for the Tax Code ?
    pOints will be given.

    I have the same problem... should I use a different function module on this? if yes, what is it?
    I need to create a sales order for one onetime customer with tax code... help me pls....

  • Can we create a sales order for party_type='PERSON' ?

    can we create a sales order for party_type='PERSON' ?
    Thank you,
    Cheers,
    Naveen.

    Hi
    Yes You can create a SO for a Party_type of Person, But it should have Customer account (i.e) The Person should have a Bill to / Ship to site
    Hope this helps
    Regards
    Sivakumar

  • Sales order for pipeline material type..

    Hi All,
    How can we raise the sales order for pipeline material..
    Is schedule lines will be there for the sales order raised for pipeline material???
    Rgds,
    Pavan

    Hi
    Seems you working on  IS Utilities, please corerct if Wrong and if I am wrong to guess you are working on IS Utilities then the next story dosn't make any sence.
    PIPEline material type is used for Materials such as oil, power, or water that flow into the production process directly from a pipeline, line, or other type of conduit. Since pipeline materials are always available, they are not planned.
    To answer specifically what you asked would be as follows:
    1. The fact that material type is PIPE from an SD standpoint is irrelevant
    2. lets consider your PIPEline material is power, your UOM should be Kilowatt hours and establish price for it.
    3. "deliver" the material and bill it.
    However, taking the whole business context of sale of electricity into account why you want to sell PIPEline material without using IS Utilities. Typically electrical utiltity requirements have some unique challenges not easily met by SD:
    1. Amount to be billed to the customer is from meter readings.
    2. The bill to the customer ( at least in North America) is not so much of an invoice as opposed to statement of accounts that includes meter readings, consumption history etc.
    I will suggest to look into IS Utilties first before getting into SD.

  • Material staging time in Schedule line of Sales order for GATP material

    Hi Experts,
    In a sales order for a material on GATP, there is time 23:57 coming as material staging time.
    Can any body explain how is this time calculated.
    For the shipping point there is no working time maintained.

    Hi,'
    The following link
    http://help.sap.com/saphelp_scm70/helpdata/EN/3a/92e217b3f54a5eae7a4ac8a99e5e87/frameset.htm
    details on material staging in GATP.
    Regards,
    Mrinal

  • How to create a sales order for one-time customer

    Hi all,
    I have a requirement where in creating a sales order, I have to add the tax code for one-time customer. This is not the tax jurisdiction but it is a text field that you can see in Further attributes and it will store in VBPA3 table.
    My plan was create sales order first using SD_SALESDOCUMENT_CREATE or BAPI_SALESORDER_CREATEFROMDAT2. Then I used BDC of va02 for changing the salesdoc. But the problem is, we can't proceed because there's a message "TAX HAVE REDETERMINED"  that it doesn't included in recording a transaction.
    Another one is, instead of calling the standard bapi, I used BDC for VA01. Again, upon recording there was anothe message popped up "FREIGHT REDETERMINED". And it's not in the recording so we can't proceed.
    Would you know what field is for the tax code when I use SD_SALESDOCUMENT_CREATE or any standard bapi? Is there other way aside from calling a standard bapi or bdc?
    Points will be given..Thanks!

    Good afternoon Bella,
    We are in a project that exactly need this solution. Could yoy please explain me how you solve the issue ?
    Kind regards

  • Make to Order for configurable Material  Costing Procedure and Stage Trans.

    Hello, PP Gurus,
    I am doing one MTO for configurable Material.
    For each sales order I am preparing Production order so when the costing should caried out?
    What is the Order settlement & closing procedure? 
    how the cost is tranfered to the Sales orderand cost transfer is possible
    Please inform me Costing procedure in this scenario and transaction.
    Thanks & Regards,
    Bhavik Dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan