Problem in Result Recording

Dear Guru,
During the production process I am having parallel operations. & All the operation having result recording process. So, I want to make the result recording for different operation simultaneously. So is it possible to make inspection for one production order?  Is there any provision for creating lot for different operation?
Guide me how to do the result recording for the same lot.
Srinivasan

Hello Guru,
I too agree with the previous answer.You need to do the result recording for each operations in samples .Since every production order create one inspection lot at a time result recording need to be done for every lot ,by selecting operations and samples.You could check the batch record afterwards for recorded results.
Regards
George

Similar Messages

  • Problem in results recording

    Hi,
    While results recording for every quantitative characteristic I am getting the options as Accepted / Rejected / No Valuation / Failed. I want the system to accept the numeric values. I tried to change the valuation mode in sample procedure, but no use.
    What might be the problem?
    Regards
    Ramakanth

    Try to tick on "Record Measured Values' in Control Indicator

  • Problems during result recording

    Hi,
    I am facing a problem in the result recording in the transactions QA11 for sample management. I make a sample from QPR1 and generate an inspection lot, then go to QA11 or QA32 for result recording. I record the results and save, the status of the inspection lot updates to RREC. But when i display the results or want to change them, the system shows me a blank screen to record the results again. Although the results are saved in the database table QAMR for the lot and the status of the lot is also RREC but on QA11 the system is not showing those and asking me to enter again. One thing is to be noted that this behaviour is for some materials' lots, for other sample management lots all is O.K.

    Hi,
    For Physical semple, when u r going to create any inspection lot Via QPR1, than u r very well known abt this that inspection point always use as far as physical sample is concern.
    So, whenever u execute physical sample  inspection lot via QA11, than during RR system ask u for a new inspection point values and its valuation.
    once u feed the results than lock ur lot by providing UD.
    if lot is opened and u want to feed new data against same lot than system allows for new inspection.
    I hope ur queery resolved
    Regards

  • RESULT RECORDING PROBLEM

    Dear Gurus,
    I am facing problem I have maintained formula for paricular MIC,e.g Zn-for this MIC i have to calculate the percantage as 100 minus balance of the remaining MICs eg i  have maintained in this form--1
    100-(C9010C9020C9030C9040C9050C9060C9070C9080C9090)
    Please note i have maintain the folowing parameters in control indicators for the MICs from 10 to 90 in the Inspection plan
    1) Sampling procedure
    2) Required chara
    3) single results
    4) Fixed scope
    5)Record measured values
    6)print
    7) documentation
    and only for the MIC which formula is maintain i have maintained CAL CHAR.
    when i creat a purchase and do migo an inpsection lot is gnerated.
    when go to t.code QA32 to record results in RECORD RESULTS CHARACTERISTICS OVERVIEW
    I HAVE NOTICED THE FOLLOWING PROBLEMS
    1) FORMULA IS NOT BEEN CALCULATED.
    2)INSPECTED COLCUMN NEXT TO SINGLE VALUE IS AN INPUT SCREEN.i.E-Number of Inspected Sample Units--(WHAT I MEAN ITS NOT GREY FEILD-THE VALUES HERE SHOULD BE 1 AND GREY )
    3)ALSO THE SINGLE VALUE TAB IS GREY NOT USUAL-IF CLICK ON IT THE TAB DROP DOWN.
    I HAVE RUN THIS SCENRIO IN MY DEVELOPMENT SERVER AND IT WORKED PREFECTLY,BUT MY CLIENT SERVER I AM GETTING THIS PROBLEM
    WHAT ARE SETTING I AM MISSING.
    Regards
    Ram
    Edited by: RAMKUMAR WARIYAR on Feb 24, 2009 4:41 PM

    Dear Ram
    1) As the sample size was 1 system was taking this as Summarised recording & that is the reason why the system is showing 3 tabs instead 4
    2) Please do the following setting in Config : SPRO>QM> Basic Setting> maintain setting for plant level>Plant> Result recording  > untick Summ. Recording n=1.
    If you had ticked this means that the results recording will always be summarized if n = 1 (for example when inspecting one unit or 1 ml).
    please do check now whether the formula is working for a new lot and you have 4 tabs in RR
    Was a good question to solve
    Regards
    gajesh

  • SAP QM: Copy Results recording error - Problem class medium

    Hi,
    Can anyone help me to resolve one error message u201CProblem class mediumu201D Number 1 during copying of Results recording from one IL to another IL as explained below.
    Origin IL and Target IL has same sample size qty:
    Origin IL - MIC's are valuated successfully in RR
    Please let me know if any other details required to resolve the error.
    Regards,
    Udaya Kumar

    Hi,
    Thanks for your response.
    Characteristics and MICs are properly assigned for  both Target and Origin Inspection lot materials, only thing is MICs are not in same order in both the inspection plans.. is this the reason for the error message.
    Regards,
    Udaya Kumar

  • Error in operation level result recording

    Hi,
    I need held; result recording of inspection type =03 (operation level Quality inspection)
    A product manufacture via three operations (10, 20, 30)
    All operation quality inspection active let operation no-10, all products reject and confirm as rework.
    Next operation level quality record is done but confirmation not allow Reason is operation -10, rework quantity, (Actual quantity is more than planned quantity)
    How to add the quantity after reworks for next operation quality inspection?
    Pl helps me finding the solution.

    Hi,
    As per your more clearence , As per Example  production order Quanity =1, passes 3 operation10,20,30
    Operation=10 require rework as per quality ,
    Operation =20 system raise the error message = Operation =10 rework .
    If want to operation =10 ok Quantity =1 then system raise error messges =Actual quanity more than planned Quanitity
    ( 1 Rework + 1 Ok ) .
    Supose rework order create and confirm then next 20 & 30 operation how complete .
    Real scenerio :- Rework on operation =10 then again Quality check then goes to 20 operation Quality check pass / Rework if rework then again quality pass then goes to next operation level
    I hope under stand my problem
    Need help- please

  • Recording Dates in Results Recording

    Hi.
    I have an inspection with a task list.  Several samples will be tested each time an inspection lot is created.  I have a number of MICs that are quantitative / calculated to determine results of lab testing - this is all working great.  The problem is that for each of my samples I need to be able to document general information about the sample.  The types of information that needs to be documented are, for example, dates and sample numbers (not serialized using SAP). 
    Primarily these dates need to be used to generate date range specific reports of the lab results.   It is for this reason that I do not want the users documenting dates in the inspection description field in results recording.
    Does anyone know if using the QM_INPUT_PROCEDURE BAdI can the result field of a quantitative MIC be formatted as a date?  Or has anyone had a similar problem that they have been able to solve?  Is Sample Management / Physical Samples the direction to take?
    Thank you very much in advance,
    Cristin

    Ok.  Here's one way around this.
    You can read this post: 
    http://sapfans.com/forums/viewtopic.php?f=27&t=14682&p=43885&hilit=datecharacteristicinspectionlot#p43885
    But basically you use numeric MIC and the date is recorded in the form yyyymmdd. So for today it would be 2010622.  You can even set a spec range at the begining of each year.  So the range would be 20100101 to 20101231.  This could help cut down on typos as well.
    This number then gets copied to the batch record to a linked hidden numeric characteristic.  A dependency is used to convert the number to the appropriate date.  The dependency then updates a second characteristic with the date.  It is this second date characteristic then that you can use in your reports.  If you want to make sure the date formatted characteristic is changed due to additional testing or sampling you can include an  IF NULL or an IF INITIAL statement in the dependency so once the characteristic has a value, it wouldn't be updated if the dependency was called again.
    I am guessing each blood donation is being set up as a separate batch number.
    FF

  • Decimal places display at the time of results recording

    Dear All,
    Please i faced one problem, At the time of results recoridngi/.e,
    In my insp. plan i defined Quantitative specification as 70.0 with '1' decimal place in Qunatitative data. but after results recording it displaying one more decimal place excessi.e., as 70.00. How can i solve this problem, due to what this problem is occure. Please if any, solve its urgent.
    Regards,
    Vijaya

    Dear Vijaya,
    While entering Inspection Characteristics.. There is a field called DecPlaces on the right. its the  24th field on the item table.
    The field comes after
    Method, Insp Method plant, Version, Sampling Procedure, Sample Unit of Measure, Base Sample Quantity, SPC Criterion, Modification Rule, Test Eqpmt, Test Equip Short Text, Par Sample, DecPlace, Unit of Measure, Target Value, Lower spec Lmt, Upper Spec Lmt... and so on...
    Regards
    Vijay

  • Results Recording through QE 11  - Determine one MIC w.r.t another MIC

    Hi All,
    While doing Results Recording through QE11, one MIC (Say 'T') )needs to be automatically calculated ,whereas it was manually entered until now.
    The value for 'T' should be picked from some Z table depending on some key fields , of whiich another manual MIC (say 'A' )value is a key field.
    I can create the Function module and assign it to the MIC in formula. But I am not sure how to pick up the value for MIC 'A' at run-time.
    Before saving itself, when 'calculate' button near 'T' is pressed, the FM should be triggered and it should use the value for MIC 'A' for picking value for 'T' from Z table.
    Please advise if any FMs/BAPIS are there or any other method.
    An F1 at 'A' yielded field QAQEE-SUMPLUS in 'Result' field and QAMKR-ORIGINAL_INPUT from 'Orig. Val' filed of which both are structure fields.
    Thanks,
    Neethu

    I'm a maybe little late, but i will try to explain my own problem.
    I'm also working for QM.
    I want read data from QAQEE-ORIGINAL_INPUT and i cant and i did succed when i going to see inspection report.
    I just have to make some marks in field Accessories for report and u will get data from this field.
    But, if i want to read the same data in another place in sapscript i have problem.
    It simple i cant get data from structure, is this because the program for form is writen for specific point when it must be write out?
    Sorry for my english.
    Tnx.

  • Digital signature in Results Recording

    Hi all,I want to do results recording using a BAPI,but when the inspection lot need digital signature,the BAPI can't work,how can I deal with this problem?Thanks in advance.

    According the settings the digital signature is required. The user must key in the data. Using a BAPI or doing result recording in background with a btach user: This is not the desired business process. For a kind of automatically recording somebody has to redesign the business process first. Not to solve a problem with a wrong desinged process and a program.
    Rgds,
    JP

  • Want to change the Result Recording Result

    Hi All,
    I have a problem Please help me out or suggest me is it possible to do-
    Result Recording is done and saved for a particular lot and result is accepted and i did UD for that and accepted as well as i posted to un-restricted stock with Acceptance and saved.
    Now my client want to chance the result and reject it and post it to blocked stock again do UD.
    This is our normal requirement here.
    Regards,
    siddharth shanker

    Hi,
    You have to explain your  client the process and its pros and cons, once you give UD and post the stock then how will that be canceled. Keeping apart SAP, in actual domain practice also  when you accept the lot you can't reject it on same challan, you have to so separate process.
    Here best way is to assign 08 Insp type to that material and create the lot using 322 movement type (MB1B) and again reinspect and post it to block and send back to vendor. This is only if you need to record results again, otherwise you can directly post from unrestricted to Block stock using movement type 344 i.e. from unrestricted to block then purchase person will send it back to Vendor. You can raise notification to keep record of this movement.
    Best Regards,
    Shekhar

  • Lock in the results recording in QE51

    Hi,I use a BAPI to do results recording in QE51,but when someone inside the characteristic,results recording does not happen, and there is no error message appears.What should I do to deal with the problem? Should I use 'lock object' method? I know nothing about 'lock', would you please tell me the method in detail?
    For example,the inspection lot number is: 10000006313, the operation number is:0080 and the inspection characteristic number is:0010, I am inside this characteristic,but I want to do results recording using a BAPI.Results recording doesn't happan,and there is no error message appears.How can I deal with the problems.Many thanks!

    CALL FUNCTION 'ENQUEUE_EQAVO'

  • Short Text Display of Insp. Char in Result Recording (QE01) Screen

    Hi All,
    I have created Inspection plans with MICs. MICs Short Texts are maintained in multiple languages. (Ex: EN & FR)
    I have created an Inspection lot with Login Language EN. When I want to result record this inspection lot (QE01) with login Language FR,  Display of "Short Text for the inspection characteristic" in QE01 is in EN rather than FR.
    Is it a standard SAP behaviour? If yes, what is significance of maintaining short texts in multiple languages?
    If not, How can this be corrected?
    Thank you in advance.
    Regards,
    Pradeep

    hi
    Not very sure but
    In Su3-->Parameters Enter
    CP13     BC Sets: List of languages for language-dependent values
    DYL     Screen language
    HLG     PC translation interface help language
    This might solve you problem
    Regards
    Sujit

  • Error while Result Recording-QM

    Dear friends,
    While RR for inspection lot I faced this error.
    Characteristic results cannot be recorded for inspection lot 06000000764
    Message no. QE181
    Diagnosis
    You cannot record any characteristic results for this inspection lot. The material master has been set up for the existing inspection type in such a way that results recording is not supported.
    Procedure
    Confirm defects for this inspection lot or select another inspection lot in which you can confirm the characteristic results.

    Dear Vipul,
    Check the System Status, it will be CRTD.
    Now select the material and click on Inspection Lot button.
    In this window , click on the Inspection Specification tab.
    Now click on the Task List / Spec. button.
    If this button now appears fainted after clicking then it is ok, then click on the Sample button , here click on the Smpl. button and this button will shown in fainted look. Now click on the Save button. It will bring you on the main screen of QA32 , now click on the Refresh button , you will notice its Status will change.
    If clicked on Task List / Spec. button and it shows an error message that No Inspection Plan Exists , then you will have to make an inspection plan using T-Code QP01. After making the Inspection Plan then follow the above steps.
    Hope this solves your problem.

  • Result field greyed out in result recording

    Hi,
    In Inpspection plan of a material I have two operations.
    In QA11 (result recording), I am able to enter the results and save for the first operation.
    But for the second operation, the result field is greyed out. I can see the MICs there and I can even save the result but without entering anything in the result field.
    Why is this field greyed out?
    Thanks and Regards,
    Raghu

    It is an issue of key dates.
    Problem solved.

Maybe you are looking for

  • N+1 and #of hosts per cluster

    Is thee a general rule on how many hosts shold be reserved for HA? Is N+1 the general rule based on how many nodes? when do I need +2 or 3? and should the +1,2,3 be in maintenance mode?

  • Weird iPhoto 09 Behavior on new i7

    All, I have been plugging away on my new i7 and I started having some problems with iPhoto. I tried to reinstall it with the bundled software disc but still getting them. What happens is I have been trying to go through my Photos section and delete b

  • Mdx Query performance problem

    Hi Is there any way to control the performance of Mdx expressions that use the Filter function? The following Mdx statement is an example of a query we are generating to return filtered characteristic values for users to make selections for variables

  • XMLTYPE : working in 9i not in 10g

    CREATE TABLE GTC_XML_TEST (XMLDOC XMLTYPE); Insert into GTC_XML_TEST (XMLDOC) Values (XMLTYPE('<uiiapi:vcServiceTestInfo xmlns:uiiapi="com.bt.uiiapi"> <uiiapi:ROW num="1"> <uiiapi:SERVICE_TYPE>21CN</uiiapi:SERVICE_TYPE> </uiiapi:ROW> </uiiapi:vcServi

  • BPEL cluster

    Would the BPEL cluster have any performance improvement? If I increase number of clusters from 1 to 5. Will I get 5 folds improvement in the BPEL servers performance? I want to know more information about clusters, load balancer. Could anyone please