Problem opening Project/WBS Elements in CJ03

Hi Experts,
I have created an interface which posts PROJECT01 Idocs into SAP 6.0. Idocs are posted successfully and I can see Projects/WBS elements in tables PROJ and PRPS.
However, when I try to open a project/wbs through transaction CJ03, it throws short dump mentioning memory overflow. I checked by debugging CJ03 and found that the code is going into infinite loop.
Could anyone help me understand why this kind of problem is coming? What is the reason the code is going into infinite loop? If the project/wbs structure is not getting created properly, how can I check that?
Thanks in advance.
Netrey

The issue is resolved. The structure coming throug Idoc itself was incorrect.

Similar Messages

  • Problem in MRP run with Project/WBS Element

    Dear PP Gurus,
    I want to run MRP thro Project/WBS Element.
    I have created WBS Element & WBS BOM for Material. Then created sales order for that material and assign WBS element to sales order.
    Maintain Planning Strategy 21 ( Make to Order/Project) for Main Mtl.
    Now when I run MRP with MD51 then no requriements are generated for main material and its components.
    Is there any thing missing from PS-PP & SD point of view?
    Pl guide me for the same.
    Thanks in Advance.
    Umesh

    Dear Nagrajan,
    Thanks for your reply.
    There is no safety stock & un-restricted stock of that material.
    Also I don't want to assign this mtl to that wbs Network. If I assign the Material to WBS network then network req.is generated and thro Normal MD02 MRP generates the requirements.
    & in the plan order it will not show WBS Element
    But My req. is I want to run MRP with  MD51 & want WBS element as account asignment tab in plan order & production order too.
    IS there any config. missing from PP/ PS / SD ?
    Pl guide me for the same.
    Thanks ,
    Umesh

  • Problem while creating WBS elements using LSMW

    Hello experts,
    I am able to create Project Definitions using LSMW. (using recording)
    But there is a problem while creating WBS elements.
    Tcode CJ20 has table control and that will become problem for multiple rows (levels).
    Can anyone suggest a solution to mass upload WBS elements?
    Thanks for your valuable advice.

    Hi,
    Instead of using "BAPI_PROJECT_MAINTAIN", use following solution. We are using this solution and it is working pretty good.
    If the WBS element is already created and you want to create one more with same data, first get the WBS related information using BAPI_PROJECT_GETINFO as you are doing currently.
    I am using different sets of BAPIs to create project, create / change WBS element.
    I use function module from Function group CJ2001 ( Project related BAPIs ), CJ2054 ( WBS related BAPIs ) and PS_BAPI ( pre/post processing BAPIs ). There are specific order in which you need to execute these BAPIs.
    For example if you want to create / change the WBS element, the BAPIs sequence is:
    <b>1. BAPI_PS_INITIALIZATION
    2. BAPI_BUS2054_CREATE_MULTI ( to create  WBS )
             or
    2. BAPI_BUS2054_CHANGE_MULTI ( to change WBS )
    3. BAPI_PS_PRECOMMIT
    4. BAPI_TRANSACTION_COMMIT</b>
    Check the documentation of BAPI "BAPI_BUS2054_CREATE_MULTI " to see how these function modules work.
    Let me know if you need further information.
    Regards,
    RS

  • Runtime Error Project/WBS Element

    Hello,
    I am getting a Runtime error (statement message 'E') every time i search in the match code for either a Project or a WBS Element, regardless of what transaction they appear in.
    Can anyone help me with this?
    Stephen

    Did you make any changes to the project coding masks? This error could happen as result in changes to the mask. Project numbers which were valid as per earlier masks may not be fit as per new masks.
    If above is a reason implement the note 453280 - Conflicting coding mask and project/WBS element
    Regards
    Sreenivas

  • Problem opening Adobe Photoshop Elements 13

    Problem opening Adobe Photoshop Elements 13

    After unzipping Photoshop Elements 13, I received a error message saying
    that PSE had detected an impending shutdown of my computer, and that I
    should shutdown and restart the computer.  I had two button choices:
    ignore or quit.  Given those choices, I quit, then shutdown the computer
    and restarted.  I again unzipped PSE and attempted an install.  This time I
    got a error message saying an installer was already running and I should
    shut it down.  Having no clue as to how to shut down an installer, I
    attempted (FOR 6 HOURS) to obtain assistance from Adobe technical support
    and either waited for a return call, waited on hold, attempted to
    communicate with someone who I could not understand from India, or was told
    technical support was not available on the phone for PSE.  I finally gave
    up and went to Chat.  There, attempting to explain what the problem was,
    (see above), I guess I took too long to respond, the chatter closed the
    chat, and I was not able to reconnect to chat.  After 5 attempts were
    denied, I contacted a friend who has computer operations experience.  After
    an hour of attempting various things, he told me to hit "ignore".  PSE
    installed correctly and I'm now using it.  This was an extremely shoddy
    performance by Adobe -- first a glitch in the install process, and then no
    help from tech support.
    On Thu, Nov 6, 2014 at 4:00 PM, Jeff A Wright <[email protected]>

  • Assign Project / WBS Element in Notification

    Hi,
    I have one specific requirement from my client that, the Project / WBS element number (created under PS Module) whould be used as reference object in same way as that when Purchase Order & Material document is refered.
    How can I achieve this?
    Regards,
    Prashant

    Hi  Prashant,
    I don't think there is a standard solution for this. You need to develop the solution with the help of Abaper.
    Regards
    Srini

  • Automatic creation of PS-project, WBS-elements in wrong sequence

    We have been able to build up a system where PS-project is automatically created once the cProject project is released. The PS project is successfully created and the WBS-elements correspond to the phases in cProjects project as wanted. However, the sequence of the WBS-elements is the other way round as the  sequence of the phase in cProject project. Is there an IMG node where we can define the sequence?
    We are using SAP RPM 4.5 (CPR Xrpm 450_700: Support package 0009)
    Any help appreciated

    Hi Antti,
    I may need some help from you.
    1. May I know how you are creating the PS project Automatically? based on Standard accounting integration.
    2. Are you creating the PD,WBS, Activity,Activity Elements etc in PS by mapping the PD,Phase, Task and Subtask of cProejcts?
    My client have a requirement to create the PS proejct in R/3 . Appreciate your immeadiate help.
    Thanks in Advance.
    psconsultant

  • Problem in Include WBS Element Screen

    Actually i got some steps for CJ01(Create Project).
    It is saying that after going to WBS Element Overview screen and  making all the entries for WBS element and description select the INCLUDE button .
    I tried a lot but i am unable to search that include button.
    Please help me.

    I also tried a lot but i didn't find any solution for this.
    The step also says that a message will appear like(in case i have entered 6 WBS elements and after selecting INCLUDE button)
    '6 WBS elements were included'
    in the create project: project definition screen.
    Can anyone tell me that when this type of message appears while creating WBS .

  • Projects/WBS elements with identification "A" exist

    Hi Experts,
    While attempting change of project ID key length in OPSK, the following error experienced,
    Please suggest the steps to change the length from 1 to 3.
    The details error message:
    Message no. CS084
    Diagnosis: The key can only be extended, if there are no project definitions or WBS elements that are only identified with their external number by the key of the project editing mask.
    Example: Project editing mask 'EB-XXX-000'. The key cannot be extended if the external number is only 'EB'.
    Procedure: You can only change this by changing the external number.
    Regards
    ramSiva

    I agree with Gokul.
    First you will have to archive all the projects with the existing key for coding that you want to change. Then lock the existing mask (or delete it). You cannot create a new mask with a longer key till you do this. You will then have to change the length of the key from 1 to 3 for project coding.
    Hope this helps.
    Regards,
    Ajinkya

  • Change of Project & WBS Element Definition

    Hi,
    Could you please let me know is there any function module to change the Project Definition ,WBS element Definition for an already existing Project and WBS element.
    Regards,
    Hemu Saini.

    BAPI_BUS2054_CHANGE_MULTI      for WBS
    BAPI_BUS2001_CHANGE                  for Project
    Regards,
    Chandra

  • Project WBS element cost allocation

    Dear All,
    In a project we have created 10 WBS elements out of which one is used for common expenses and rest other or individual works carried out in the project. Now i want to allocate the Common cost of one WBS element to other nine WBS elements.
    Can anybody explain how this can be done and is there any possibilites of costing gets doubled in the project if the cost transffered to other WBS elements.
    Thanks and regards

    Thanks for the reply,
    I have another query also, i had transferred the WBS element cost to other WBS element cost in the same Project.Whether it will double the Revenue or Cost incurred
    For ex, WBS Element A got 100 and i had settled to WBS Elements B and C , now B and C got 50 50 each
    now my project will have
    a) WBS Elements A-100, B-50 and C-50   or
    b) WBS Elements A-0, B-50 and C-50 ,  for my understanding option (b) will be right. Your views pls
    Edited by: aspirefico on Apr 30, 2009 12:59 PM

  • Runtime error on Project/WBS element release

    Hi All,
    I am trying to release a WBS element, however the system hangs and eventually causes a runtime error. How do I rectify this?
    Thanks in advance.
    Regards,
    PS_PS01

    Hi,
    I have done that already. This problem is 4 days old. Everyday I log off, then log in.
    The error meassage reads: "time limit exceeded. The program "SAPLCJDW" has exceeded the maximum permitted runtime without interruption and has therefore been terminated."
    Is there perhaps a note I can apply to correct this?

  • Problems opening project if I 'log on' with new id

    Someone told me that my problem may be fixed if I logged on as a new user. I assume because they thought the problem might go away if I did so. But now when I'm logged on as a new user, I can't open the project. I get the forever beach ball???
    Maybe I'm just not waiting long enough, but it seems to be crashing my system.
    Any advice??
    Bryce

    The log in as a different user manuever is intended to determine if the FCP application itself , not any particular project, is at issue. This manuever involves only logging in as a different user and then starting FCP. If you get an un named project and normal start-up, that tells you at least that FCP is working OK. In turn that informs you that the preferences used as the "real" user may be the problem. If the project you are working on is not available to the "different" user and the different user tries to open it,an assignment that has to be made in advance of the switch, you could get a beachball and learn very little. You would have to make all components of the project(everything) available to the different user to try to start the project.
    But the search for problems within projects are not revealed in this manuever.

  • User Exit / BADI to change Project WBS Element/Task data

    Hi,
    We are using BAPI BAPI_PROJECT_MAINTAIN to create Project in R/3. We are passing Company Code to Project Definition Structure ( BAPI_PROJECT_DEFINITION ). BAPI updates Header company code at line item ( WBS element / Task ) level also. We do not want company code at line item level.
    Is any User Exit or BADI available in the above BAPI to change WBS/Task data. Also I would like to know whether we can control data flow ( from header to Line item ) through customisation.
    Thanks in advance.
    Naren

    Hi,
    Thanks. BADI WORKBREAKDOWN_UPDATE has import parameters. It does not have export parameters. I can not change import parameter data.
    I am looking for user exit or BADI to change WBS/Task data.
    Regards,
    Narendra

  • Projects/WBS elements with the editing mask A still exist.

    Hi All,
    I am trying to create a New Coding Mask with Project ID "A" in Dev client 100. ( Ex: A.0000.XX)
    But System is giving an error says that"There are still projects or WBS elements with edit mask A in the system. Therefore you cannot change them".
    But there is no WBS or PD's with this coding mask existing in development client 100.What to do?Is there anyone faced this problam earlier?Any refresh activity required for this?
    Thanks in Advance!
    Thanks
    Suresh Kumar.

    Hello,
    You need to check whether there are any projects in the system starting with "A" using CNS41.  If at all there are any project existing in the system which starts with "A" then the system wont allow to create coding mask which starts with "A"
    You can try to delete these project if possible and then try out if the system allows you to create the coding mask.
    Thanks and Regards,
    Anish