Problem while print preview purchase order for new document type
Dear Experts,
I have got the problem as below and need your helps.
I created a new purchasing document type and then created a new PO with this document type. PO was created successfully in the system. I added a message to print out PO with the followed parameters as NEU output type, 1.Print Out medium , VN partner function, dispatch time is 3 ( Send with application own transaction).
Then, I clicked Print Preview button on the ME23n screen, the error message bellowed was shown
"The combination of document type
and Purchasing organization is invalid.
please check the document and change it.
unable to print the form"
I really want to print the PO with new purchasing document type on the existed purchasing organization, Could you please help me identify the problem and solution for this issue?
Appreciate for your responses.
Thanks,
Tinh Vo Trung
Edited by: Tinh Vo Trung on Sep 23, 2011 7:43 AM
Dear All,
Many thanks for your responses.
Regarding to maintain the condition record in MN04, I already done for that but the problem was not resolved.
Could you please come with the other posible causes and solutions for this issue?
Dear Bijay Kumar Barik,
Please let me know why we check the new document type in Program, Routine and From of NEU output type?
p/s: I compared the version the program, FORM and routine of NEU output type and found that there is no the differences btw DEV server and QAs server. However, An PO created susscessfully in QAs server, but the error was happend in DEV server.
Could you please come with the other posible causes and solutions for this issue?
Thanks,
Tinh Vo Trung
Similar Messages
-
Default Purchasing organisation for Purcashing Document type
Dear Gurus,
I need to make default Purchasing organisation for Purcashing Document type. How to configue this. Please advice me.
Thanks
RSHi,
You can do it with Personal Setting option which is available in purchase order header level.
Click on this button, Go in Defaults Values.
Enter material type, purchasing org. and other required detail.
Then always at the time of purchase order creation you got same material type and purchasing org.
Note: You can do it for only one material type and purchasing org.
Regards,
Mahesh Wagh -
Problem while creating a purchase order in JDEdwards worldsoft
While creating 'OP' and 'OA' purchase order in JDEdwards worldsoft 'G' type
btach header creating in F0011 table.
Anybody can tell me this is correct or not.
If not correct please tell me whether this is JDE bug or not and also provide
solution for that.Here is what I see:
Error analysis |
The following checkpoint group was used: "No checkpoint group specified"
If in the ASSERT statement the addition FIELDS was used, you can find
the content of the first 8 specified fields in the following overview:
" (not used) "
" (not used) "
" (not used) "
" (not used) "
" (not used) "
" (not used) "
" (not used) "
" (not used) "
How to correct the error
Probably the only way to eliminate the error is to correct the program.
If the error occures in a non-modified SAP program, you may be able to
find an interim solution in an SAP Note.
If you have access to SAP Notes, carry out a search with the following
keywords:
"ASSERTION_FAILED" " "
"CL_FPM========================CP" or "CL_FPM========================CM004"
"ADD_EVENT_TO_QUEUE"
If you cannot solve the problem yourself and want to send an error
notification to SAP, include the following information:
1. The description of the current problem (short dump)
To save the description, choose "System->List->Save->Local File
(Unconverted)".
2. Corresponding system log
Display the system log by calling transaction SM21.
Restrict the time interval to 10 minutes before and five minutes
after the short dump. Then choose "System->List->Save->Local File
(Unconverted)".
3. If the problem occurs in a problem of your own or a modified SAP
program: The source code of the program
In the editor, choose "Utilities->More
Utilities->Upload/Download->Download".
4. Details about the conditions under which the error occurred or which
actions and input led to the error.
| -
Problem while printing from SAP GUI for HTML
Hello,
We are trying to print a delivery confirmation from the portal using SAP GUI for HTML. We have followed note 771683 to do this. However we are facing the following problems:
1) The print action(PDF creation) is not triggered until the user performs some action
2) the PDF that is created is corrupted(does not open)
In order to correct this we tried to implement note 957292. However, the changes to the object FRONTEND_PRINTPOLL_FRONT_REQUEST.HTM mentioned in this note created problems. So we decided to do the changes to this object manually. But we see that the SAP note doesn't contain any information on changes that should be implemented for this object.
Question:
Is the note 957292 only way to solve the printing(PDF) problem? If not, how can we trigger the automatic creation of the PDF and remove the error from the PDF file?
If yes, any idea what is causing the problem during the note implementation?
We are on NW2004s - EP7.0 SP10
ITS 7.0
Thanks in advance.
Regards,
ReenaHi,
configure printer in SPAD , no setting for JAVA GUI
check note
605467:SAPscript/Smart Forms: Print preview in SAP GUI for Java
634158 SAPscript/Smart Forms: Print preview in SAP GUI for Java (2)
1024624 SAPscript/Smart Forms: Print preview in SAP GUI for Java (3)
regards,
kaushal
regards,
kaushal -
AMENDMENT NUMBERS WHILE PRINTING OF PURCHASE ORDER.
Hi Gurus,
After Releasing the Purchase Orders, some times wee need to change the Purchase Order line items or Purchase Order Text and we take the Print out of the Purchase Order. For such Purchase Orders we want the Amendment Number at the Header Level to be printed. For example we change the Purchase order 3rd time the Header should be " Amendment NO.3 to Purchase Order No.XXXXX"
And one more is even if the User change the Purchase Order text also it should go to the Release and presently when the PO text is changed, the PO is not going to the Release.
Kindly suggest me the required customization steps to do the needful.
Thanks and Regards,
SatyanarayanaDear
If you want po should go for release even if there is any change in the text then you have to implement the Workflow , Go for ABAP development No standard setting exist for the same -
Problem while creating Asser Purchase Order
Dear Xperts,
User has created one Purchase Order containing 2 line items.All the 2 line items are Asset with different Asset Codes. 1st one line item is having one Asset code & single account assignment & the 2nd line item is having 2 Asset codes with multiple account assignments.
Problem is that for the 1st line item accounting document has got generated but for the 2nd one no accounting doc has been generated for the same material document.When carefully checked the PO,have seen that GR Non valuated indicator is ticked for the 1st line item but not in the 2nd one.What could be the reason?
Regards,
SoumickHi,
Problem is that for the 1st line item accounting document has got generated but for the 2nd one no accounting doc has been generated for the same material document.When carefully checked the PO,have seen that GR Non valuated indicator is ticked for the 1st line item but not in the 2nd one.What could be the reason?
First basic thing ,If you have Gr-Non valuated indicator ticked then system will not generated any accounting document in MIGO and accounting document will generated at time of MIRO
moreover check following link also
[Fi Document is not generating in MIGO for multiple account assignment in PO;
Regards
Kailas Ugale -
Print Preview Purchase Order with release strategy
Hi gurus,
With release stratregy you can not print a PO before release through ME9F. The system will give error message 'No corrosponding document found'. However, you can print PO through 'Print Preview' by clicking on Print icon in ME22N, we need that "Print Preview"doesn't print PO without release. System it shouldn't print.
Thank you!Hi,
Hope you are using Z output type & print program for PO printing. You can restrict this by modification in program. Please do it with help of abaper.
Regards,
Sandeep -
BBP_BS_GROUP_BE for new document type and number range
Hi gurus,
I am working on Classic scenario in SRM and currently have used the above BADI to use a different document type and number range when creating the PO in the backend system. It all works fine. The only thing is I noticed that the BE_DOC_TYPE field in the shopping cart is still reflected as 'EC' even though the PO created in ECC is for example EC1. My question: Is this standard SRM? If so, is it common to leave this field as it is or is it advisable for us to change the document type to EC1 as well? Also, is there any implication in standard SRM reporting and downstream processes that you are aware of?
Appreciate any advice on the above.
Cheers!
SfWe have ended up having to populate the document type on a custom field or alternatively replace the existing one.
-
Problem with creation of purchase order with new implementation.
Hi Guru's of SAP MM,
i got this error when i implemented a new company with all co-code, plant and storage location.
i craeted the PO. even though i have assigned sloc to plant and plant to co-code. and co-code to purchasing org. it is telling in PO that, the purchasing organisation not assigned to the plant.
i checked regarding the org- structure with Enterprise Structure.Hi,
As per your posting it is clear that you are maintaining purchase organization at company code level. which means the same purchase organization can cater the needs of all plants which are under that company code, provided if the purchase organization is assigned to the plants which are under the company code.
bye
sridhar thota` -
Problem in Workflow in Purchase Order for Several Level of Release Process
Hello everybody,
I have to create a workflow in which a release steps are assined by the size of amount. so in minimum 2 to maximum of 4 level approval. When the first person approves the workflow shold go to the next person. I have used the standard task TS20000166 activity in a loop and each time i'm using different user as agent. But after the first person approves and saves the activity is trminated by the first release PO from the screen. But when it loops and comes to the activity of second release, even after the release the activity is not terminating. It shows it is in process. The event of 'release' which shold have terminated the activity shows a error message in 'Display Event Trace' that "No configuration for workflow WS98000003 version 0000". But no error is shown in the workflow log.
Could u please tell how to solve this issue?? or any other way to achive the requiremnt of different levels of release based on the size of the amount?? Required solution ASAP.
Thanks & Regards,
Ajoadd loop end condition as release indicator = 'R'. Also dont forget to add the terminating event "Released" for the task you are using..
revert in case of prob
regards,
Sandeep Josyula
*Reward if helpful -
For new document type for pur. requisition
Dear cons
We have created two series of purchase requisition i.e. - ph-1, ph-2 for project. For ph-1 pur Requisition we have created WBS element. Also for ph-2 we have created separate WBS element. When we create a pur. Requisition for ph-1 if we entered WBS element of ph-2 the system is accepting which is creating a problem. Our point is that system will only accept WBS element of the respective phase. That means for ph-1 pur. requisition the system will accept only ph-1 WBS element not ph-2 WBS element. So pl. give some idea so that we can solve the issue. So where can we make the setting so that the issue can be solved.
thnks
nrpHi Nirupama,
You can control this though authorization
Find out the authorization object for docuent type and account assignment
And assign allowed wbs for doc type , take basis help on this
BR
Diwakar
reward if useful -
Error while creating a Purchase Order
Hi Friends,
I am new to SAP MM. I am getting a problem while creating a purchase order. I created Purchase Info Record, Source List, but while creating Purchase Order, price is not picking from the purchase order. I am getting an error i.e. Net Value must be greater than 0. I checked all the settings, but getting same error.
Could you please solve thisHi,
Give some price at the item level for the item in the PO.
And check the Pricing procedure in PO
Hope it helps you.
Thanks. -
Restrciting NAST entries while 'print preview' of VA02/03 sales order
Hi experts,
While doing 'printing preview' for the displayed VA03/02 sales order, an entry is created in the NAST table.
The requirement is to not create(or diffrentiate based on some flag) this entry in NAST table while doing 'printing preview' ..but for actual print the entry in NAST table should be created.
Finally the main aim is to differentiate between print preview vs actual print based on NAST entry.
I tried debugging but the parameters for print preview vs actual print are same.
How can the print preview action be distinguished from actual print in such cases.
ThanksHi,
The requirement is to not create(or diffrentiate based on some flag) this entry in NAST table while doing 'printing preview' ..but for actual print the entry in NAST table should be created.
For your requirement to differentiate, you can use the field VSTAT in NAST table, this has possible values of 0, 1 and 2.
0 Not processed
1 Successfully processed
2 Incorrectly processed
So as and when an output type for printing is attached, the status of the output remains '0' until the form is actually printed, so in case of print preview it will remain to be '0'. This will change to '1' once the Print command is actually issued.
Regards,
Chen -
Purchase order for the new license
We sent the purchase order for the new license to Oracle on last Friday
yet to receive the new CSI for the new server .
can we still move forward with deployment activity and later specify the CSI
or would that stop us suring the install process if we don't have yet the CSI ?
Kindly help me .
If you have any idea any metaline node pls let me know ..
Thanks an addvance..
j2vinoduser11197404 wrote:
We sent the purchase order for the new license to Oracle on last Friday
yet to receive the new CSI for the new server .
can we still move forward with deployment activity and later specify the CSI
or would that stop us suring the install process if we don't have yet the CSI ?
Are you asking from a technical or legal standpoint?
If technical, do you see anything in the installation instructions that mention entering license information? What happens if you try to go ahead and install? What could be the worst that could happen?
>
Kindly help me .
If you have any idea any metaline node pls let me know ..
Thanks an addvance..
j2vinod -
Define new document type for purchase order
Hello
I want to create a new document type for purchase ordre with also new number range.
And within my conditions, the shopping card will be generate either document type ECPO with number range 44 or document type ZOS with number range 33.
The document type is still a purchase order.
Is it possible to do that? To assign new document type for purcharse order?
If yes, is there any Badi to put my conditions of generation of my document type?
Thank you for your help.
Regards,
PeggyHi Markus
Thank you four your response. Unfortuntly, i do not want to create a new transaction type.
It is still a purchase order which could be visibled in standard transaction. The behaviour is still like standard PO, and could be visible in standard transaction PO.
I just want to create 2 types of purchases orders to identify them, so create a new number range and so a new document type for purchase order..
I have a condition to do "the shopping card will be created in this document type, and this schopping card will be created in this document type".
But standard document type is ECPO, and I don't really know if it is possible to create new document type for purchase order...
Peggy.
Maybe you are looking for
-
Can't get embedded AP on 891W to accept clients
Hi all. I have a very simple configuration that I'd like to do, which I have done before, but yet can't do now. I have an 891W router, the embedded ap801 instad. IOS on both is 15.2. I have an SSID set up, using wpa-psk. I have a fully working co
-
Black Magic Intensity Pro Play only Audio when edit in CS 5.5
Hi i have an problem, when i try to edit with Black Magic Intensity Pro in premiere CS5.5 i can play only Audio but not Video so i check settings on Premiere and control panel for Black Magic Intensity and everything is OK and i check connections the
-
Error running managed code inside DllMain or image initialization
I have a LabView 7.1 DLL, and am calling it from a Visual C++ application. I load the DLL dynamically at runtime using LoadLibrary. When I call the function, I get this: <mda:msg xmlns:mda="http://schemas.microsoft.com/CLR/2004/10/mda"> <!--
-
Changing self registration fields
Does any one know how to change the labels on the self registration page. I would like to change one of the titles to say location or can I add a field for input?
-
Aperture has a bug fix that is along the lines of many of the suggestions, removing the ProAppsSystemID file then re-entering both the new number and the previous installation number. This leads me to wonder if my problems are partly caused by having