Problems in having common material and batch in different plants

Hi all,
As the material with the same batch is existing in different plants, we are facing some problems in processing the Process Messages.
If some user who belongs to a different plant is processing the batch for the material, the Process messages are not being sent the destination as we get an error message that the reservation is currently processed by user (who actually belongs to a different plant). This is effecting the Business.
Can anyone tell me how we can prevent this? Could the reservation and Batch status set as plant level control via standard IMG change ?
Regards,
Brijesh

Yes Rajanikanth,
But can you please let me know whether it is not possible to restrict this so that the batch processed in different plants should not affect in our plant?
Thanks.
Regards,
Brijesh

Similar Messages

  • How to unlock material and batch at MIGO

    hi all,
    My requirement is to post another transaction using BAPI_GOODSMVT_CREATE at MIGO in the background.
    let say after posting movement type 101..i have to post another transaction of same material in same plant and in same Batch Using BADI,
    The problem is, material and batch name were currently lock by movement type 101, So BAPI giving Error that Batch BHEL001 of material 1000000000004 is already locked by user01. i.e. from my ID.
    Is it possible to remove this lock object?
    These are the lock objects at SM12.
    E     MCH1     11000000100000000000400000XXXXX     0     1
    E     MCH1     11000000100000000000470206XXXXX     0     1
    I tried
    CALL FUNCTION 'DEQUEUE_EMMCH1E'
    'DEQUEUE_all'
    i don’t want to consider the wait options..
    My problem is to remove  lock objects in order to transact another movement type
    thanks for your responce..
    Pankaj

    Hey,
    I can think of something like this..
    *Read all the lock details in system
    CALL FUNCTION 'ENQUE_READ2'
      EXPORTING
        gclient = sy-mandt
        gname   = ' '
        guname  = '*'
      TABLES
        enq     = lt_enq_read.
    *We will search entry for table level lock for our table
    LOOP AT lt_enq_read INTO lw_enq_read
    WHERE gname EQ 'RSTABLE'
    AND   garg CS 'ZTEST_SHUKS3'.
      MOVE-CORRESPONDING lw_enq_read TO lw_enq_del.
      APPEND lw_enq_del TO lt_enq_del.
    ENDLOOP.
    *Delete table level lock entry for our table
    CALL FUNCTION 'ENQUE_DELETE'
      EXPORTING
        check_upd_requests = 1
      IMPORTING
        subrc              = lv_subrc
      TABLES
        enq                = lt_enq_del.
    You should first search for lock and manually delete them using above FM.
    Hope it helps
    Thanks,
    Nitin

  • Find material and batch based on batch characteristic name

    Hi,
    I need to fetch all material and batch that have a particular batch characteristic. Can someone let me know how i can establish this link. I only have a characteristic name with me, need to find batches that use them.
    Thanks & Regards,
    Naresh.

    HJi
    Try table MCHA.
    Pushpraj

  • Tables for production order number for material and Batch combination

    Dear Experts,
    Please suggest the table names for finding the production order for material and batch combination .
    Thanks in advance for your help...
    Best regards
    Nitishj

    Dear
    Please check in  AFPO-CHARG
    AFPO          Order Item Detail -Batch Number -CHARG
    AFFW         Confirmations -- Goods Movements w
    AFRD          Confirmations -- Defaults for Collective Confirmation
    AFRH          Confirmations -- Header Info for Confirmation
    Regards
    JH

  • Valuation Type is missing for Material and Batch

    Hi Experts,
    I am facing issue related to delivery.
    While creating Order to cash cycle for one sales area, there is no error at all, but when I am trying to repeat the same cycle with same customer and material, different sales area and document type, I am not able to save delivery document. and receive error as "Valuation Type is missing for Material X and Batch Y".
    Kindly suggest possible errors.
    Regards,
    Himmanshu

    Check whether the required Valuation type is maintained in material master.  Also, update the error message number.
    G. Lakshmipathi

  • Inspection lot summary when GR post to same material and batch

    Dear Experts,
    The business flow is, when material with same batch number come to plant, this batch may split and post to different storage location.
    we have tried setting control inslot parameter to "2 For each material batch and storage location" but it only work within one storage location.
    can any expert suggest idea about this thing, thanks a lot.

    You'll only be able to stop the second lot from being created.  You won't be able to update an open, existing inspection lot because of the different storage location.  SAP can't have two segments of inventory linked to the same insp. Lot.
    Are you using batch status at your plant? As an alternative, you could create the batches with a restricted batch status.  Then the whole batch, regardless of storage location shows as restricted stock.  Use the user exit to prevent creation of additional insp lots.  When the first insp lot is completed, the batch status can be changed via the UD stock posting to unrestricted stock.  When this happens, all stock of the batch in all other storage locations will change to unrestricted stock.
    FF

  • Material and batch characteristics

    Hi All..
    For the material and the batch i want to retrieve the material characteristics and the batch characteristics.
    Are there any function modules or bapi's available to achieve this..
    Appreciate your help and will reward the helpful.

    Hi
    Try  BAPI_MATERIAL_GETLIST
    BAPI_MATERIAL_GET_DETAIL
    reward points if helpful
    Regards
    Srikanta Gope

  • While assigning batch material  get locked in different plant.

    Dear Guru,
    After  implementation ,frequently  facing problem, In CO02  we are  assigning the  batch manually  to the  material  but  one material  is  configured  with valuation type  domestic / import. while  assinging the  bacth to the material  system  showes to another  user  who iis entering the same material in different plant  is  xxxx  user is locked the material  so  u cant  assign  the batch, but   batch we are maintiaining  in   material level. (batch maintianed in material  level.)
    currently we are going  in sm12 transcationa and removing the lock, but   we want to know why it is happening. what is the root cause for the error.
    Please  advice.
    Thx
    Nara

    HI
    It is Standard SAP at a time same material or its masters cannot be used by multiple users ids or with same user id also
    system gives error material is locked.You can unlock it thru SM12 but be careful while soing so some the data which the another user using may be or may not be lost.
    the better way is to ask the user to come out of that material or release it after doing his work
    Regards
    Anupam Sharma

  • Same material and customer but different prices for different regions

    Hi all,
    I have a scenario, wherein material and customer are same but different ship-to-parties.  Prices vary for the material for different regions.
    Kindly suggest how to maintain condition records in this scenario. I have tested for a material for different regions but with the same prices which is working fine, but now I have to do this with different prices.
    Your suggestion will be very helpful as this is very important in this business.
    Thanks and Regards
    Adithya

    Swapneal
    I have right now only four key combinations for PR00;
    1. Customer/Material with release status.
    2. Pricelist Category/currency/Material with release status.
    3. Material with release status.
    4. Price group/Material.
    Can this be done with the 2nd Key Combination?
    Item data; Sales B tab shows Price List as Retail and Wholesale; here we have only Wholesale Business. Kindly suggest.
    Thanks and Regards
    Adithya
    Edited by: Adi1976 on Jan 18, 2012 9:04 AM

  • Return STO and ISTO to different plant and company code

    Hello Experts;
    I have a doubt.
    Scenario:
    1) Plant A(company code 001) transfer the material to Plant B(company code 001) on the same company code;
    2) Plant B issue PO-(ISTO) to plant C(company code 002)  differente company code ;
    For some reason the GR at plant C can not due and the return must be at plant A(different comapny code), how to do at standard process? Or better exist standard process for this scenario?
    Thank you

    Hi,
    The Return from Plant C only comes into Picture if the Material is received ( MIGO ) at the Plant C from Plant A,
    Scenario 1:
    If the Material is received then Plant C can create a new STO to return the material
    Scenario 2 :
    If the Material is not received at Plant C , Then once the material Physically comes back to the plant location cancel the material Document.
    Revert in case of any query.
    Regards
    Mascot

  • Material Supply Received in Different Plant

    Dear Sir,
    We have following scenario :
    We have 2 plants , Plant 'A' and Plant 'B' . These Plants are located at differnt location and both Plant are on SAP .
    Plant 'A'  has placed the Purchase Order for a Material 'X' to some Vendor . Plant 'A' has also paid 50% advance to vendor .  Vendor has to make the Material Delivery to Plant 'B' . Plant 'B' will now do some value addition on this material and the finished component will be invoiced to Customer by Plant 'B' itself .
    Kindly guide us as what steps need to be followed in SAP to address the above scenario .
    Pl help me .
    Regards
    Sonia

    HI,
    This does not involve more complexity as such.
    Please proceed with the following transactions.
    1. Create a PO at plant A with the delivery address as plant B and release the PO to the vendor.
    2. There should be an information flow between these two plants for the confirmation of delivery
    3. Once delivery is confirmed, you can process the remaining 50% of payment to your vendor
    4. Meanwhile after value addition in your plant B there should be definetely a product code change for the material which you can bill it to your customer upon successful delivery of the same.
    Regards,

  • Material Master extension to different Plants.

    I am presently using BAPI_MATERIAL_SAVEDATA to create material master in a particular plant. Is there an easy way to extend these to another plant.
    or
    Do i need to use BAPI_MATERIAL_SAVEREPLICA and pass different plant numbers in the MARC table in the initial creation itself.
    Thanks in advance

    Hi every one,
    By using bapi : Bapi_material_Savedata u can achieve it..
    u have to pass only these values to extend material from one plant to another plant.
    Example Requirement : Material 100-101 is available only in plant 1000, So lets Copy material 100-101 to a plant 1200.
    Note :  Pass values in block letters only
    In headdata structure :
    1.headdata-material           " matnr : '100-101'
    2.headdata-ind_sector       " mbrsh : 'M'
    3.headdata-matl_type        " mtart  : 'HALB'
    4.headdata-basic_view      " kzsel  : 'X'
    5.headdata-purchase_view  "kzsel  : 'X'
    In Clientdata structure :
    1.Clientdata-base_uom    " meins  : 'PC'
    In Clientdatax structure :
    1.Clientdatax-base_uom   "meins  : 'X'
    In Plantdata Structure :
    1. plantdata-plant             "werks  : '1200'
    2. plantdata-countryori     "herkl   : 'DE'
    In PlantdataX Structure :
    1. plantdataX-plant             "werks  : 'X'
    2. plantdataX-countryori     "herkl    : 'X'
    By passing above data u can extend material from one plant to another plant..

  • Same material and vendor, but different prices

    Hello All,
    I want to keep two different prices for a material that is supplied by a single Vendor. The price of the material will be different when supplied by Sea and when suppplied by Air. hence, there is need to maintain 2 difffernt prices based on how the material is shipped.
    I had tried it with Subrange, but I have to make 'VSR' field manadatory in PO creation, which I want to avoid. I had tried with pricing conditions based on shipping instructions, but could not find 'shipping instructions' field in any condition table.
    Can some one help me on this?
    Regards,
    Amit G

    create freight condition and accordingly value ( by sea or by air) would be loaded on inventory. what you will achieve by maintaining different prices? MAP would be adjust accordingly.
    or if in inventory if you want to differtiate thet then activate split valuation and create valuation type as per shipping instructions.

  • Sales Order and Production in different plants

    Dear Experts,
    I have a scenario where Customer specific Sales orders (MTO) will be created in one common plant, whereas production can happen in 2 other plants.
    The common plant doesn't physically exists and is created in SAP to cater common requirements (raw materials, plant equipment, shared services, common items etc).
    There are 2 ways to create Sales order:
    1. Create order for both production plants in individual plants. (In SO line, specify the individual plant)
    2. Create order for the common plant. The requirements should be distributed to both the production plants.
    If I go with the 2nd option, SD, LE and QM will not have pain areas.
    But, when i run MRP, the SD requirement will show in common plant. How can I transfer that to production plant?
    I do have PIRs in individual plants. The same should be reduced as well.
    I can create an so specific order though CO08, which is not preferred. Is there a way to auto-convert the requirement to another plant?
    Thanks
    Prem

    Hello Prem,
    Quota arrangement with special procurement type P ('Production in alternative plant')
    As suggested you can use the Quota arrangement  in this case along with special procurement key production in alternative plant
    Production in Alternative Plant - Special Planning Processes - SAP Library
    The customizing for the special procurement SPRO -> Production -> Material Requirements Planning -> Master Data -> Define Special Procurement Type for both required plants.
    For quota arrangement which has a special procurement P - Prod. other plant" defined in MEQ1, you should make sure that the field "procurement plant" is correctly maintained and percentage.
    Quota usage should be 4 in material master. Please test this for PIR consumption BAdi 'MD_PIR_FLEX_CONS' will be helpful
    Please see note  1967124 - BAdI enhancement for flexible primary independent requirements consumption/reduction.
    Best Regards,
    R.Brahmankar

  • Problem at while issue the BOM components to different plant

    Dear SAP Experts,
    I have a scenario, kindly suggest me how to map this scenario in SAP.
    PLANT : A
    In plant A, I have a parent material i.e KIT(16000000) with quantity 1 and Value Rs. 50000
    I have 4 child materials for KIT i.e Spares 16000001 with quantity 1 and value Rs. 8000
                                                                      16000002 with quantity 1 and value Rs. 7000
                                                                      16000003 with quantity 1 and value Rs. 15000
                                                                      16000004 with quantity 1 and value Rs. 20000.
    PLANT : B
    If i wants to issue any one of the child material(spares) to plant : B, respective quantity and value has to reduce from the parent material(16000000) as well as from the child material aslo.
    Kindly suggest me, how can we map this scenario in SAP?
    Thanks&Regards,
    Amruth.
    Edited by: amruthraoch on Mar 21, 2011 5:59 AM
    Edited by: amruthraoch on Mar 21, 2011 7:09 AM

    Hi,
    1) Check for all plants, whether any SPK's are in Place in MRP-2 view
    2) Before Running MRP, some user might have assigned Special Procurement Key
    3) i ur sure there is no SPK then
    4) Re-Run MRP giving parameter as delete & Re-create planning data, Planning Mode
    Regards
    kumar

Maybe you are looking for

  • Windows Live not working after upgrading to Windows Live 2011

    Hi, I upgraded app the application under Windows Live to 2011. All the installation goes well, without any failure. Hurray!!!! However now its behaving very strange. None of the applications are instantiated upon executing their executables. While ex

  • In Pages, is it possible to make a page continuous?

    Hi, folks! So I'm working with Pages 5.2.2 and I need to make a page continuous. What I mean is that I don't want Pages to separate the pages as I keep writing, imagine it as one big scroll of paper. Is that possible? Thanks!

  • Returning complex types with arrays (Java / EJB via WSIF)

    Hi all, I'm writing some WSIF bindings for existing EJBs, and I've struck a bit of a problem. Basically I've got complex types that contain arrays, and while instances of these types can be passed to the EJBs, return variables typed similarly cause t

  • Union of 2 columns in OBIEE 10g

    I have 2 columns, Global Amount and Opening Amount, The requirement is to get both sets of amounts into one column. I know I have to do a union of the two but when I try to combine two similar requests, it gives me an error. What is the best way to g

  • SCREEN problem!! / solution for use

    hi Falling object has left my powerbook screen unusable......computer is still working though....Q is there a way to link up a monitor to the laptop for continued use..... without needing ORIGINAL SCREEN TO CONFIGURE? rg