Dear Gurus,
We want to configure Procurement Card in SRM 5.0 Classic Scenario. Please help me with the following doubts:
1. Is it possible to configure P-card in Classic scenario?
2. If yes, then what are the steps involved to get P-card as payment option in SC and P-card settlement? (backend is ECC6.0)
3. Are there any enhancements/customizations required to get P-card in Classic scenario?
Will be grateful for a speedy answer.
Regards
Rajeev

Dear Gurus,
I am aware that Procurement card can be configued in SRM 5.0 Extended Classic Scenario. Can anyone tell me if it can also be done in Classic scenario?
Regards
Rajeev

Similar Messages

  • SRM 7 PPS Classic Scenario with Plan Driven Procurement?

    Hello experts,  I want to know if the combination of  SRM 7 PPS Classic Scenario with Plan Driven Procurement is possible? or if there any limitation to consider? Our client needs to create purchase requisition in ERP -> send this purchase requisitions to SRM (as shopping carts) create bids - > quotations  - > create contract from accepted quotations and then from the contract we need to create purchase order but this one must be created in ERP (classic scenario) Someone has experimented the same situation? Best regards and thanks for your Help.
    Liam

    Hi Lima ,
    Classic scenario wont support PPS .
            - Stand alone and classic scenario not supported
            - Shopping cart renamed to Purchase Requisition
            - Shopping cart generate (pre)commitment in funds management
            - Contract can create Funds Reservation (Earmarked Funds) in Funds Management as a Guarantee
            - Goods Receipt and Invoice created in ERP
            - Mixed PO: PO with lines that works like contract lines, a PO can be created from these lines
            - PO created from contracts or mixed-PO is named call-off PO. Only is a new name, is a "normal" SRM      PO
            - Goods receipt possible in SRM only in "easy" cases
    Thanks & Regards
    Pradeep Kumar Dondeti

  • SRM 7.0: Classic Scenario no PO is created only PR is generated

    Hi Gurus,
    I am working on SRM 7.0 - Classic scenario.
    When a shopping cart is complete in terms of price, vendor (assigned) and other required data, item stays in transfer process.
    If a SC is incomplete a PR document is created in backend without a problem but when a complete SC is oredered, the status of shopping cart remains I1111 i.e. item in transfer process. I can see in table BBP_PDBEI, backend object type (BE_OBJECT_TYPE) is correctly selected as BUS2012 and the document number of PO is also correctly selected.
    This is the case even for the SC ordered using catalog materials.
    I have checked following configuration and it seems to be ok.
    1.  'Define objects in backend system's
    2. Number ranges definition in SRM and ECC
    3. Document type attribute -BSA in PPOMA_BBP
    Configuraiton wise everything seems to be, I tried to manually transfer the SC using FM  BBP_REQREQ_TRANSFER but it does not change the status of SC it remains I1111
    RZ20 does not show any error for the SC with status I1111.
    Is there any sepcial FM to push the SC in SRM 7.0?
    Any help/tips would be highly appreciated. Thanks in advance.
    Best Regards,
    Amit

    Hi  Amit
    what is the setting here
    1. 'Define objects in backend system's
    is it a prefered vendor or fixed vendor
    update the partner function in bbp_pd here
    if it is 39 - you wil recive pr
    it is 19 you will get PO
    i am afraid , you stated that catalog sc stoo this problem but during debugging check what is the partne rfunction...
    there can be several reasons for creating PR instead of PO. Please see the FAQ note 1173815 for the possible reasons, and the guide for debugging under:
    https://wiki.sdn.sap.com/wiki/display/SRM/Howtoanalyzethefollow-ondocumentdetermination
    MOREOVER NOTE SAYS POSSIBLE REASONS ..
    Note 336658 - Purch req instead of purch order created in backend
    BR
    Muthu

  • Contract Creation in SRM 7.0 classic scenario

    Hi All,
    We are using SRM 7.0 Classic scenario with ECC 6.0 EHP 4 and CLM 2. We are creating contracts in SAP CLM and pushing into as Global outline agreement.
    Question is  -
    1)  Can we  create  contracts in SRM 7.0 Classic scenario ?
    2) Instead of transfering the ECC outline agreement to SRM , can we directly use ECC outline agreement as a source of supply in SRM while creating a SC.
    3) How  we can  transfer the SAP CLM 2.0 contracts into SRM 7.0 and use a source of supply there while creating a SC ( Considereing that these CLM contratcs are also transfered to ECC as a outline agreement)
    What are the mandatory fields required to transfer the CLM contracts contracts to ECC  outline agreement -  I know ,Vendor, Purchase org, Pur grp, company code are required - is product catagory is also a mandatory field.
    Rgds/Pawan

    Hi Pawan,
    Please find the answered for your questions:
    Question is -
    1) Can we create contracts in SRM 7.0 Classic scenario ?
    Mitesh: Yes we can very well create in Classic Scenario as well in SRM 7.0.SC can be pushed to SOCO based on the Prod Category configuration in SPRO.From SOCO PO, Contract and RFX can be created for SC.
    2) Instead of transfering the ECC outline agreement to SRM , can we directly use ECC outline agreement as a source of supply in SRM while creating a SC.
    Mitesh: I dont think we can use ECC outline agreement as source of supply in SRM while creating SC.Contract replication in SRM 7.0 with EHP 4 ECC is eSOA based and ONLY Outbound to SRM (inbound to ECC).Contract cannot be replicated from ECC to SRM.
    3) How we can transfer the SAP CLM 2.0 contracts into SRM 7.0 and use a source of supply there while creating a SC ( Considereing that these CLM contratcs are also transfered to ECC as a outline agreement)
    +Mitesh: Standard intergeration of CLM/ESO to SRM 7.0 is very much there in roadmap for future releases of SRM/ESO.+
    +As of now there is a consulting solution available to integerate ECC and ESO/CLM.+
    +This logic can be leveraged to integrate ESO/CLM to SMR 7.0 (or lower version) requiring Developement effort from SRM functional,SRM technical,PI, Basis,ESO and java consultants.+
    +Such contracts can be forced to be used as Source of Supply or alternatively replicated to ECC Via standard repliation scenario.+
    Hope this helps.
    Regards,
    Mitesh

  • Questions about SRM PO in Classic scenario

    Hello All
    I have a number of questions about the SRM PO in classic scenario.
    1) If the Backend PO is changed in ECC i.e. if any quantity is added , can we have an approval workflow
    for the same?
    We currently have release strategies for other PO's in ECC. How do we accommodate the PO changes only?
    Our requirement is not have an approval initially once the PO is created, but only for the changes
    2) If the PO is sent as XML to the Vendor, is it possible to capture the PO response in ECC? What are the Pre-requisites
    for this to happen. Should SAP XI be required for this?
    3) In case the PO is cancelled/ reduced , does the Balance goes back to SRM sourcing cockpit?
    We are using SRM 7.0
    Regards
    Kedar

    Hi,
    1) If the Backend PO is changed in ECC i.e. if any quantity is added , can we have an approval workflow
    for the same?
    We currently have release strategies for other PO's in ECC. How do we accommodate the PO changes only?
    Our requirement is not have an approval initially once the PO is created, but only for the changes
    Sol: In ECC6.0 if the P.O is changed and release strategy is there in ECC6.0 then it follows the ECC6.0 Approval Route.
    2) If the PO is sent as XML to the Vendor, is it possible to capture the PO response in ECC? What are the Pre-requisites
    for this to happen. Should SAP XI be required for this?
    XI is mandatory
    3) In case the PO is cancelled/ reduced , does the Balance goes back to SRM sourcing cockpit.
    Once P.O is created in ECC 6.0 for the P.R in Sourcing Cockpit, cancelling/reduction will not have a updation in the sourcing cockpit in SRM.
    Eg  100 nos P.R is in SRM sourcing cockpit for which  you have createdaa P.O for 40 nos is ECC6.0
    for the remaining 60 nos PR ,you can create a P.O in ECC6.0
    Regards
    Ganesh

  • Does SRM 7 Extended Classic Scenario support PCards?

    Does SRM 7 Extended Classic Scenario support PCards as standard?  I know SRM 4 does not but wanted to know if that has changed.

    Paul,
    URL https://websmp208.sap-ag.de/support  ( service.sap.com) ...on header
    Go to 'Release& Upgrade Info' ..then sub item  'Release notes'....look for SAP Solutions on left scroll...then select SRM...
    Open pdf file ' Release Notes SAP SRM 2007, SP00 - SP04 '...and look for pg # 40...
    Let me know if you did not get it..
    Thanks,
    Rahul Mandale

  • SRM -MDM in classic scenario

    Hi,
    Please let me know if am using SRM MDM in classic scenario then
    u2022If I create a shopping cart in SRM do I need to maintain the product category of the items selected from MDM in SRM as well.
    u2022Also, if PO is created in MM then does it mean that all the products in MDM have to be created in MM as well. If not then what is the scenario like.
    Thanks,
    Manu
    Edited by: Manu Agrawal on Apr 24, 2009 12:15 PM

    Hi
    If my understanding is correct ,i  will reproduce your question again . If you create shopping cart from the supplier catalogue in a classic scenario how the Material group sync happens when PO is created in the Back end R/3.
    My assumption and the practice followed generally is that a  Fixed Material group is decided and automatically maintained via OCI interface when shopping cart is created .Which means we define the rule for all catalogue items to determine and populate respective material group automatically into shopping cart.
    As shopping cart is created since for the catalogue items there will be contract and source assigned in the ERP ,as soon as PR is replicated to R/3 as per classic scenario , the PR will have supplier assignment and if you run auto order transaction code system will generate PO in R/3 and sent to the supplier based on the condition records.
    For the Material group you will configure it in R/3 for all catalogue items and replicate it in SRM and also you will provide input for the BADI or FM which create shopping cart automatically from catalogue through OCI method.
    Hope this helps..
    regards
    Narahari

  • Is B/E ECC SoS in Local SRM PO in Classic Scenario Possible ( SRM7.0) ?

    Hi Experts,
    We are configuring SRM7.0 with ECC6 ( Ehp4) having Classic Scenario .
    Our Ultimate Aim is  - To maintain SoS in ONE system only (i.e. ECC) & use the same SoS in both ECC & SRM system, for all documents ( ECC PR, ECC PO, RM S/C, Local SRM POu2026etc )
    In Classic Scenario, B/E ECC SoS ( Supplier Contract & Pur. Info Record) are proposing in S/C ( Indirect Mat.) , but these B/E SoS NOT proposing while creating u201CLocal SRM POu201D which is by default  Ext. Classic.
    We  are exploring new CCTR functionality  ....but seems complicated and requiered PI...
    1.By doing any enhancement , can we pull B/E ECC Contract and Pur. Info Record as a SoS while creating u201CLocal SRM POu201D  ?, If it is possible , then we are ready to do any enhnacement and I'll be most happy
    2. Which BADi is used while creating Local SRM PO ?
    Can anyone suggest/confirm please.
    Thanks
    NAP

    Hello,
    In classic scenario, only backend contracts can be used as SOS.
    In extended classic, local contracts can be adopted as SOS.
    If you are using classic scenario, you should distribute local contracts to ECC. Then, while creating a shopping cart in classic scenario, ECC contracts (which have been distributed) will be considered as SOS.
    Regards,
    Ricardo

  • Procurement Card in SRM 7.0 Extended Classic with PPS

    Could sometime tell me if we can implement Procurement Card functionality when you have SAP SRM 7.0 Extended Classic with PPS enabled.  Appreciate any help in this regard.   Thanks, Alisetty

    Gurus:
    Anyone have any idea about using Procurement Card when you have SRM7.0 Extended Classic with PPS. 
    I didn't find any lead on this and appreciate your inputs.
    Regards,
    Vijay Alisetty

  • SRM & SUS in Classic scenario

    Hello SRM Gurus,
    I would be great if you could give your overview for below my quires.
    I have good idea of SRM with SUS for extended classic scenario.  But how would be the communication between SRM and SUS in Classic scenario. Because the PO will be created in backend.
    Now my question is in Classic scenario,
    What is the use of SUS in classic scenario?
    How the PO will be transfer to SUS system? Does the PO data from SRM or ECC?
    What is the communication data between SRM and SUS?
    Kindly provide me above information and also your thoughts.
    Thanks.
    Regards,
    Magesh.

    Hi Mahesh,
    If you are using SRM7.0 & ECC EHP4 version with classic scenario then you can user configuration gudie "Plan-Driven Procurement with Supplier Integration: Configuration Guide" (Release SRM4.0).
    But following keys points are to be noted for SRM7.0:
    1. "PO" and "service entry confirmation" will be handled using XML messages.
    2. To send PO's using XML messages to SUS from ECC activate the workflow in SWETYPV transaction by falging "Linkage activated" for object BUS2012(CHANGED & CREATED) for workflow ws3800008.
    3. take the help of PI consulatant to enalbed the PI messages to send PO and Serivce confiramtion bewtween SUS and ECC.
    ERP     PurchaseOrderERPRequest_out_V1                          PurchaseOrderERPRequest_In_V1                          SRM
    SRM     PurchaseOrderERPConfirmation_Out_V1     PurchaseOrderERPConfirmation_In_V1                         ERP
    SRM     ServiceAcknowledgementERPCreateRequest_Out     ServiceAcknowledgementERPCreateRequest_In     ERP
    ERP     ServiceAcknowledgementERPConfirmation_Out     ServiceAcknowledgementERPConfirmation_In     SRM
    ERP               ServiceAcknowledgementERPCancellationNotification_Out                                                                                    ServiceAcknowledgementERPCancellationNotification_In     SRM
    With Regards
    Manjunath

  • SRM PPS using classic scenario

    Hi SRM Experts,
    I am exploring the possibility of implementing PPS in SRM 7 using the classic scenario.
    Please let me know if it is possible and how can it be achieved.
    Earlier threads mention that PPS is only available using extended classic.
    Thanks.
    Regards,
    Amish

    Hi Amish ,
    PSS scenario is not supported for classic scenario ,
    changes in procurement process of SRM  7.0
            - Stand alone and classic scenario not supported
            - Shopping cart renamed to Purchase Requisition
            - Shopping cart generate (pre)commitment in funds management
            - Contract can create Funds Reservation (Earmarked Funds) in Funds Management as a Guarantee
            - Goods Receipt and Invoice created in ERP
            - Mixed PO: PO with lines that works like contract lines, a PO can be created from these lines
            - PO created from contracts or mixed-PO is named call-off PO. Only is a new name, is a "normal" SRM      PO
            - Goods receipt possible in SRM only in "easy" cases
    Thanks& Regards
    Pradeep Kumar Dondeti

  • SRM 7.02 Classic Scenario - Transfer of Purchase Order to Backend

    Good day,
    I would really appreciate some assistance on the following matter:
    We are implementing the classic scenario of SRM7.02 with ECC6.04 as backend.
    Our process is as follows: Purchase
    Requisitions are created in ECC and transferred to SRM by means of report BBP_EXTREQ_TRANSFER (we do not have PI/XI). These Purchase Requisitions are
    converted to shopping carts in SRM and goes to the Sourcing Cockpit. RFX's are created and responses are entered on behalf of vendors. When I now want to
    create a purchase order from the RFX response, I get a warning “PO xxxx is inthe process of transfer to backend system”.
    When executing transaction SM21, I get a warning “XI unable to access SLD:"Could_not_determine_SLD_access_data".  We do not have PI/XI and I would really
    appreciate if somebody can assist me with the exact entries that must be maintained in table BBP_FUNCTION_MAP to transfer purchase orders from SRM to ECC.
    I changed entries BUS2012 / CreateFromData1 /ERP_4.0/ERP_5.0 and ERP_6.0 from /SAPSRM/CL_SOA_ADPT_PO_CRT_ERP to L_BBP_BS_ADAPTER_PO_CRT_ERP10 and the PO replicated from SRM to ECC, but now in ECC, the purchase ordercannot be changed. It gives an error : Purchase Requisition xxxx can only be
    ordered in system SRDxxxx (which is the SRM system).
    Can somebody also please confirm that once Ihave replicated the Purchase order from SRM to ECC, the Purchase Order can be changed in ECC.
    Thank you in advance,
    Marinda

    I managed to resolve this by changing the system landscape from ERP6.0 to ERP 6.02

  • SRM PO creation classic scenario

    Hi,
    I have some requirements & need direction
    Scenario#1
    Classic scenario: SC created for multiple lines with multiple product categories. This fetches corrosponding P Groups based on the config. When PO is created it creates multiple POs based on P Groups. We need to create single PO out of this SC by passing a dummy P Grp while PO creation
    Scenario 2 #
    Same example but all the product categories are same so there will be one P Grp passed on while PO creation. However, we need to pass a dummy P Grp while PO creation. Ideally in this scenario system would have created single PO but we need to pass this dummy P Grp. In short any PO generated out of SRM will have same P Grp. We dont want to touch current config & need development
    Scenario 3#
    SC -PO scenario. SOurced SCs. Once SC is approved, it will create PO as a standard functionality. However, we want to hold Po creation & subsequently run a batch job which will collect all SC approved during some period say 3 Hrs & group them based on vendor & plant & create POs accordingly.
    Example:
    Sourced SCs
    SC-1 with vendor 123456 created for qty 100
    SC-2 with vendor 999999 created for qty 200
    SC-3 with vendor 123456 created for qty 100
    We need to create 2 POs grouping first & third in one & create another PO for SC-2
    Please advise
    arjman

    Dear Poster,
    As no response has been provided to the thread in some time I must assume the issue is resolved, if the question is still valid please create a new thread rephrasing the query and providing as much data as possible to promote response from the community.
    Best Regards,
    SDN SRM Moderation Team

  • Inforecord price for SRM originated orders - CLASSIC scenario

    Hi! Few months' back, I have posted some questions re the behaviour of the price on the PO when orders are generated out of SRM in a classic scenarioI have just completed testing and ended up with the following results:
    1. If I create a shopping cart with material number for direct consumption and have a vendor defaulted from vendor list, the price reflected in the PO is from the inforecord. So, effectively, I could have $1000 on my shopping cart but PO showing $950 as this is the value in the inforecord. The $1000 comes from the material condition record in SRM (extracted via EBP_GET_BACKEND_PRICES).
    2. If I create a shopping cart with material number for STOCK and have a vendor defaulted from vendor list, the price reflected in the PO is that maintained on the shopping cart. Is this behaviour correct? Note that in this case, the master PO is in SRM even in a classic scenario and I wonder whether it is because of this that the pricing behaviour is different.
    Other observation: For stock purchase, I know that if I have multiple vendors (from vendor list and some from inforecords) and if I picked one of the vendors, the price will be adopted at the point of shopping cart so that the user has a 'confirmed' view of the price and there should be no discrepancies of prices between the shopping cart and the PO.
    Can someone please shed some lights as to what should the standard behaviour be?
    Cheers!
    SF

    hello SF
    rule :- shopping cart price is a material  price and it comes from your report and prices are stored in COMMPR01 .(  EBP_GET_BACKEND_PRICES BY this report).
    really the prices are picked from source of suooly like infor record , vendor list  or contract while creating the purchase order.
    i create a shopping cart for 100 USD since material price is 100 usd but PO created for 75 USD.
    since contract material price is 75  usd.
    With regards to using report EBP_GET_BACKEND_PRICES to upload the
    prices from the backend system into EBP. Please refer to the online
    documentation of this report:
    'Under "Price reference per product", you can specify if the average
    value of all valuation groups/plants is to be calculated or if the
    valuation price from the first valuation group/plant is to be used. If
    the average value is to be calculated, choose "Average of all prices".
    If you wish to use the first valuation price, choose "Use first price".
    The standard setting calls for the "Average of all prices" to be
    calculated.'
    This is how this report works. If you want to take another price you
    have to change the coding according your requirements.
    You will need to debug into the backend through
    RFC-Call for backend-table MBEW
    CALL FUNCTION 'RFC_READ_TABLE' DESTINATION iv_rfcdest
    in FORM read_mbew and see the select statement that reads this table.
    The report is taking exactly one price out of the data
    package extracted out of R/3. If this could also be a moving average
    price is more a question which kind of data is extracted out of of R/3
    and how the R/3 config looks like - and if this moving average is in thelist.

  • Material PO confirmation at supplier side (SUS) not taking place in SRM SUS Extended classic scenario

    We have configured extended classic scenario SRM with SUS, and all functions are working fine. However, at the time of PO confirmation of material item at the Supplier side (SUS), the material line item disappears when we click on the Create Confirmation button in SUS. The functionality is working fine for Service Items. The total value of PO is also displayed correctly in the Items overview section.
    Please provide some help in solving this issue.

    Hello,
    This is the correct behaviour of SUS - confirmations can only be created for service items which in turn create service entry sheets (Trx: ML81N in ECC).  And accepting the SES in ML81N will generate GR posting.
    For material items, you have to create ASN which will in turn create inbound delivery in ECC which you can post and will generate goods movement documents.
    So basically, for service items you create confirmation and for materials you create ASN.
    Regards,
    Prasanna

Maybe you are looking for

  • Help needed with Image Events problem

    Hi there I'm writing what I thought was a simple script to convert a folder full of images from jpg to tiff. But the script fails when trying to convert the first image in the folder. Instead of converting the image, Preview opens with the image show

  • My How can I sync my bookmarks with my browser of choice on PC so i can have same bookmarks and bookmark-folders in my PC browser as I have made on my iOS device?

    I have saved bookmarks on my iOS device and neately organized them as well. I want my IE or Chrome to import those bookmarks so i can have a copy of each in my computer. Plus I would prefer the same arrangement in my browser as on my iOS device. Is t

  • Mail Not Working After 10.9.4 Update

    Is anyone else having mail issues after the 10.9.4 update this week? Neither my iCloud or Cox email account is able to send or receive email after this update.  The small exclamation mark appears to the right of each account, both for incoming and se

  • Issue in Installing Oracle Database 11.2.0.2

    Hi All- I am trying to install Oracle Databse 11.2.0.2. I have downloaded patch - 10098816 for 32-bit windows version from Oracle Support. I am installing it on 32-bit Windows Server Enterprise, Service pack 2 machine. When I install it process till

  • Use custom Decimal Notation

    In user master there are three default decimal notation. We want to define a new decimal notation format. Is it possible to define a custom decimal notation format. We changed the domain "XUDCPFM" & add one new format. New format is visible in SU01 d