Procurement Type in MRP2 view - material master - configuration?

for the life of me, i cannot find how to configure this field. does anyone have any knowledge how to configure this field to have more options from a material type standpoint?
for example, if i use a VERP material type, i want to have the ability to choose in house (E) or external (F) procurement.
thanks in advance.

HI,
SPRO > Logistics - General > Material Master > Basic Setting > Material Types > Define Atrributes of Material Types.
Choose the desired material type > double click > on 'Internal/external purchase order' tab (section) please set '2' (or '1') for both external and internal PO.
BR
Csaba
Edited by: Csaba Szommer on Jul 10, 2008 5:36 PM

Similar Messages

  • Wrong procurement type showing in the material master

    Hi,
    I am creating a material Procurement type is comming as E in the MRP2 view, To where it is comming?
    I have checked the material type setting in the tcode OMS2 and it below are showing there:
    Ext. purchase orders   2
    Int. purchase orders   2
    Hence it's allowed int. and ext. proc. then why in the material master procurement type is comming E not X.
    How can I change it?

    Check to see if you have assigned an MRP Profile which has defaulted Procurement Type. If this is the case, you will have to remove the MRP Profile before you can change the entry. Or you can maintain the MRP Profile by deselecting "Write-protected in material maintenance" and selecting "Only default value in material maintenance" for Procurement Type. The Transaction is MMD2.
    BR,
    Krishna

  • Work scheduling view-material master

    Hi, wht is meant by lot size depenedent parameters and lot size independent parametrs? how to use that data in manufacturing industry? pls advise.

    Dear Yadav,
    case1: If you have maintained the Inhouse production time for any product in the MRP2 view,this get's automatically reflected
    in Work scheduling view as lot size independent Inhouse production time.
    At this point if basic scheduling is carried out during MRP then the date calculation will be based upon this number of days
    irrespective of the order quantity.
    case2:Once after maintaining the operation timings in the routing,you can update the same using CA97,for the relevant task list
    type ,group and group counter no and include the check box for update material master directly,you can find the timings
    maintained on hour basis in the setup,processing and inter operation (This calculation is based on the timings maintained in the
    routing and also your work center capacity details,like the number of hours this capacity will be available for a day).
    Once after performing this,even if you have maintained the inhouse production time in days,that value gets removed.
    This time will be considered for basic scheduling purpose during MRP.
    So in my understanding this will be helpful during the scheduling purpose for the date calculation.
    Check and revert back with your further queries.
    Regards
    Mangalraj.S

  • CLASSIFICATION VIEW / MATERIAL MASTER

    HI EXPERTS,
    I am facing a problem regarding classification view of a material master.
    In my organisation for a perticular material type I have to maintain CLASSIFICATION view. But by mistake I forgot to maintain classification view of some material.
    There are more than 1000 material , so it is not possible to check each material individually and if classification view is not maintained that I have to maintain it.
    Kindly reply me with some standrad method, so that I will check for which material classification view is maintained or not. According to that I will proceed.
    Regards.
    raghu.

    MM50 is the way.
    If you didn't add the classification for a material then you have to extend the material with the classification view. If you enter Maintenance Status C and your material type, it will lsit all materials that DO NOT have a classification view created.
    If however, you created the classification view, but didn't enter one of classification values, this will not help. You could try the tools in Classification System --> Environment -->Reporting.
    Rgds
    Richard

  • Old material number - Field in Basic Data 1 View Material Master

    Hai Techies,
    We have a field called old material number - MARA-BISMT in material master basic data 1 view. Is that field is just for reference of old material or does it have any effects in the SAP MM when using the material for purchasing or in BOM or so on.
    Could any one please highlight me the consequences of using this field to refer a old material number for the new number created.
    Thanking you in advance.
    Regards,
    Kris.S

    Hello Kris,
    Number under which you have managed the material so far or still manage it,
    for example, in another system or in a card index.
    You can use the old material number to systematically search for material
    master records via matchcodes.
    Your understanding for the use of this field is correct.
    regards
    Ray

  • GTIN & UPC Stored on the Material Master Configuration

    Experts,
    I am looking for a way to store the UPC code and the GTIN number on the material master in ECC.  Like the EAN/UPC field I am looking to know if there is a way to have both the GTIN and the UPC field stored in the same field with SAP calulating the check digit and prefix.  If not is there another field on the material master that I can store the value for the GTIN and have a way of storing the additional units of measure GTINs also.  Any documentation around the storing of the GTIN / UPC would be appreciative.
    Thanks!

    Hi
    GTIN has existed for several years to allow packages of retail items to be identified without going to the detail
    of EAN-128. GTIN is essentially prefix indicating package type and then EAN-13 or zero plus UCC-12 (with check digit recalculated)
    See http://www.ean-int.org/products.html for more details
    SAP does not seem to have defined a GTIN outside of MDM and CRM
    We haven't implemented GTIN but do use EAN-13 and other EAN codes. For GTIN I would create a new EAN category as a copy of HE (EAN-13) and create a new EAN number range as 1001000000000 to 9999999999999 and assign the range to
    the new EAN code. All this assumes you will assign your GTIN externally. The range copes with GTIN based on both EAN-13 and UCC-12 (=UPC). You see more EAN/UPC fields in material master additional data.
    Read the OSS notes 119604
    Regards
    Antony
    Edited by: Antony James Vijay on Mar 17, 2010 9:28 PM

  • Views material master.

    Hi,
    where can I find all possible views for material master?
    What is the table containing the material master views?
    Best regards

    Hi
    You can find in the table MARA. Field PSTAT contains list views extended. for more information press F1 on the field PSTAT.
    regards
    Srinivas

  • QM view material master (Inspection Type)

    Hi there,
                 I didn't understood the pragmatic usage of the check box <u><b>inspection by configuration</b></u> &  <u><b>inspection by characteristics</b></u>.......that can be set for the inspection types..........
    Please enlighten me ......
    Thanks
    Kaushik
    Message was edited by:
            Kaushik Choudhury

    If you set this indicator, the system takes the configurations from the sales or production order into account when inspection lots are created and changes or supplements the inspection specifications in the task list or material specification.
    The indicator only works for the following inspection lot origins:
    o   01 Goods recipt for purchase order
    o   03 Production
    o   04 Goods receipt for production order
    The indicator cannot be used for the inspection lot origins 10 and 11.
    Example
    When creating the sales order, the customer defines that the pH value of the product to be manufactured should be between 5.0 and 5.5. When an inspection lot is created for the resulting production order, this tolerance is then copied into the inspection.
    Dependencies
    The specifications are only copied into the inspection lot if there is a link between the class characteristic and a master inspection characteristic.
    Hope this helps you.

  • With out accouting view material master

    hi,
    i wmt to creat a materail master with out accounting view. while doing gr how system generates the accounting documents. tell me step by step procedure.
    Regards,
    Sydanna

    Hi
    Accounting view mainteance is avoided for the non-valuated materials.
    Such case, while creating PO, u need to assign account.
    So during GR, system will post accounting doc for Dr to consumption account(which is specified in PO) and Cr to GR/IR account.
    If u have not maintained accounting view for other than UNBW, during PO creation system checks for account assignement.
    warm regards
    sairam akundi

  • Procurement Type X , and not using mix product costing.

    Hi,
    Does anyone know if I set the procurement type X in the material master and not planning to do mix costing, is it possible to configure product costing to either internal or external cost estimate with procurement type X?

    Hi Alice,
    You can configure product costing even though you have not maintained costing view in the material master. I guess this is what you want to know.
    Please confirm.
    Regards,
    Satyajit

  • Restrict the views in material master

    Dear Experts,
    In Material master(MM01), how to restrict the views like Basic data2, General plant data storage2, accounting2 views in which we are not entering any data. How to restrict these views while MM01 creation,only useful views shall come.
    These views(Basic data2,General plant data storage2, accounting2) are not dispayed in Logistic general/Basic settings/Material types/define attributes of material types.
    where to restrict these views which are not useful while material master creation.
    Thanks for the reply.
    Regards,
    Dayanand

    Hi Dayanand,
    Generally Main screens can be restricted at Material Type level.As But your requirement is regarding subscreen selection.This subscreen selection can be restricted in SPRO >Logistics General>Material Master -->Configuring the Material Master --> maintain User Settings --> View selection(Industry and Retail)
    Here you can delete the Subscreen Assignment to the main screen for the users.
    For Ex your screen sequence assigned is 21,Subscreen 8 is basic data2.
    Subscreen 19 is General Plant Data / Storage 2,Subscreen 22 is Accounting 2
    So delete these assignments.Take note that make changes in copied data only not the master.  
    Best Regards,
    khasim.

  • Multiple class types for material master classification display default.

    Hello,
    We are running on R/3 4.7.  We use several different class types for our material masters (001 and Z01).  The problem this creates is the end user having to constantly tell the system which class type to use when going to the classification screen for different materials with different class types.  If a user views one material's classification page with a particular class type (001) then looks at another material with a different class type (Z01) the system tries to pull in information from the last materials class type (001).  The system tells the user there are no assignments for the class (001) in the material their viewing but there is one for class type (Z01).  The user then has to select the class type that applies to the material master their trying to view.  Is there a way for the system to automatically see when a material has only one class type assigned to it for it to automatically default it in without the user having to specify the class type?
    Thanks,
    JRW

    Hi,
    Check the configuration, have you maintained default class type for material type.
    Logistic General> Material Master> Basic Setting> Material Type> Define attributes of Material Types>Select the material type> Double click on material type--> Class type
    Edited by: P. Dhamane on Jun 4, 2010 3:21 PM

  • Label Data view in the material master

    Hi all,
    I read this SAP help portal that said "The Label Data view in the material master allows you to display or  edit label data that is specific to the material. "..
    may I know where I can find this view in the material master?
    Thanks
    Karen

    Dear Karen,
    This "Label Data" is one View in Material Master.
    While creating the Material using T.Code MM01, when you are on the Selection screen of Various views, it is Last Option.
    i.e. Lable Data
    If this view is not there while creating the Material. then it is MM Configuration.
    That view is assinged to Material Type.
    See in Material Master, Industry Sector and Material Types controls these Views. So with the help of MM Consultnat you
    have  to get that View Configured to your Material Type.
    If you find my answer satisfactory, please grant me the points.
    Regards,
    Amol Joshi

  • ADD subscreen for material master view

    dear all,
    kindly tell me from where i can add subscreen to material master view. also tell me from where i can see which industry material master is activated
    Regards,
    qsm sap
    Edited by: qsm sap on May 3, 2008 9:42 AM

    Hi,
    Follow the path below:
    SPRO --> Logistics - General --> Material Master --> Configuring the Material Master
    Here you can maintain the Mainscreens, Secondary screens etc..
    SPRO --> Logistics - General --> Material Master --> Basic Settings --> Material Types --> Define Attributes of Material Types.
    here you can activate the Material Tab Pages with refernce to your Material Type.
    Hope this helps..
    Regards,
    Siva

  • MM01 Create New Material Master without Basic view

    Hi,
    The SAP system allow us to create a new material master Purchasing View only (without Basic views). We execute T-code MM01, select Purchasing view only, enter the purchasing view data and save. Material master created with only the Purchasing view.
    We want to control whereby Basic view must be created first before any plant/organisation material views (Sales, purchasing, Accouting etc) can be created. That means user cannot create Purchasing view ONLY if the Basic views is not created, can this be done??
    best regards,

    Hi,
        For most of the standard SAP material types the basic data 1 view is configured as mandatory, but that can be turned off in the configuration. The first place I would look would be in SPRO under 'Logistics - General -> Material Master -> Basic Settings -> Material Types -> Define Attributes of material types'. In this transaction, highlight the material type being used and click on the magnifying glass. The section 'User departments' shows what views can be created for a material. You need to check 'Basic Data' is selected here.
    If that isn't the problem, then I would suggest that you look at the screen sequence and also the field selection configuration for the material type, which you can find under 'Logistics - General -> Material Master -> Configuring the Material Master'. This configuration dictates what fields are shown on the material master and the status of each field, i.e. whether it is mandatory or not.

Maybe you are looking for

  • Non US-ASCII characters in download file names

    I am trying to implement a simple file download in a JSP, and trying to get IE, Firefox and Opera to all display and handle non US-ASCII characters in the suggested download file name. Only concerned with Windows platform for now. Here's the code I a

  • Repetitive structure In ABAP HR

    hi all ,     Am getting syntax error for the code below. Am using 4.7 .its says "p0041-dar01" and "date" are type-incompatible. however when i compile the same code in 4.6 its workin fine. here is the code.. *& Report  ZTEST_REP                      

  • Having swatches from one document be in another w/out having to add them

    Hi, I'm working on a project where I need to use the same custom swatches across more than one document. B/c they are different sizes, is there a way to bring them into a document of a different size without doing a save as from a document w/ the swa

  • Spa9000 AA when phone busy

    Hello everyone, please help me to solve this problem: I have extensions 11..19 (SPA921 phones with call waiting disabled) AA DP1: (<:1>xS0) AA Script1: factory default - when I press e.q. 1 in the AA, ext. 11 is ringing, that's ok - if I'm trying thi

  • Icloud applications on my mac

    im missing my notes, i message, etc on my mac. i recently installed a new hard drive and and reinstalled the os on my mac and have missing apps