Prod Order Type Automatic selection

Dear Sir,
In MTO, after MRP run, during the conversion of planned order to production order, how system detect the production order type automatically if I have more that one production order type.
Thanks and Regards,
Chetan

Dear Chetan,
1.Check if the production scheduling profile/production scheduler has been assigned in the material master.
2.If only production scheduler has been maintained means,then in OPJ9,check whether this prod.scheduler has been linked to
prod scheduling profile(through which the default order type can be set),if only prod scheduling profile means then directly check
in OPKP for this profile what is the order type.
3.IF no prod.scheduler/prod scheduling profile has been maintained means check whether any MRP group has been assigned in
MRP1 view which has the default production order type settings in OPPR.
Check and revert back
Regards
Mangalraj.S
Edited by: Mangalraj.S on Aug 22, 2011 12:37 PM

Similar Messages

  • Want to select the Order type automatically when creating production order

    Hi Gurus,
    Please help to select the order type automatically while creting the production order..??
    Please what configuration settings are avialble to make this happen to me.
    THank you in advance.
    Naveen.

    Naveen,
    First priority is the order type defined in the Production schedulling profile(OPKP), assigned to that particular material in workscheduling view. If this is not maintained then,
    Second priority is configuration at MRP Group parameters in transaction in OPPR, this MRP Group if assingned to Material master MRP1 view.
    Third priority is Configuration at Plant level parameters in transaction OPPQ, this defines the order type when convert planned order to Production/Process order.
    Regards,
    Prasobh
    Edited by: Prasobh Karunakaran on May 28, 2009 8:49 PM..added MRP group paramters also

  • Order type automatically assign to product wise for order

    Hi all,
              I gave 4 types of Orders for one plant as per products.   The client ask me  assign that orders   automatically for each product in routing  how i will assign  please let me know.

    Actually routing has no relation to order type.
    You can use Production Scheduling Profile as well as Production Scheduler/Supervisor.
    Firstly, you need to create 4 Production Scheduling Profile and assign 4 Order Type to Prd Sch. Profile.
    Then you need to assign the Profile to material in Work Scheduling view.
    Another way is that you can create Production Scheduler/Supervisor and assign the Pro Sch Profile to the Prd Scheduler, then assign Prod Scheduler to Material Master in Work Scheduling view also.
    From now on, whenever a production order is created for material, order type will be get from the Scheduling Profile.
    To maintain the Prd Sch Profile and Prd Scheduler in IMG: Production > Shop Floor COntrol > Master Data

  • Prod Order Type - do not explode bom

    Hi Gurus,
    Can we set a certain order type not to explode bom at order creation? Thanks for the advice!
    Regards,
    Manoj

    I thnk you may create an alternative BOM which does not contain any components and select it for the order type, please go to customization OPL8, there is a field for BOM application for certain order type.
    Then, go to customization Production > Basic Data > Bill of material > Aternative determination, there are 3 transactions for determining BOMs associate with BOM application (e.g. selection ID etc), please try if you can confirue them to have the system select the alternative BOM.

  • In prod order multiple batch selection for my raw material /sf possible

    Dear All,
    One of problem I am facing is regarding multiple batch selection .
    Scenario is like this
    Finished prdt _ FMBLD003         
    RAW matl  -      2RCH001
    In prodn order my BOM requirement quantity for 2RCH001 IS 75 kg , I have material available in stock in  three diffrent batches
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg  
    I can select any one batch at a time. Is there any option or possibility available wherein we can select multiple batches .
    or Is there possibility that system should automatically split bom quantity as per the batch quantity available shown below
    40       0000111
    15       0000112
    20       0000113
    I tried but didnt found possible solution.
    Please suggest .
    Edited by: sapitheprabhu on May 3, 2011 7:28 AM
    Edited by: sapitheprabhu on May 3, 2011 7:48 AM

    Dear Prabhu,
    When do batch determination you maintain req qty against to batch number in batch determination co: select batch.
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg
    Jainashu

  • Automatic Order Type Selection

    Hi All,
    I have mentioned Production Schedule Profile and Schedular in Materail Masster. When I create Process Order in COR1, It is not picking Order Type automatically when I enter for Specific material.
    PLease suggest what other setting needed to be done.
    Regards,
    PRADEEP

    Dear,
    Have you assigned the production scheduling profile in work scheduling view of materail master of FG material?
    And check the order dependent parameters OPL8 for plant and order type combination.
    Also check converation parateter for order type for plant in OPPQ define order type here.
    Regards,
    R.Brahmankar

  • Assign a New Order Type

    Hi
    When we release the shipment cost to FI, system creates a Purchase Order Type Automatically in the background. We want to assign a new Purchasing Document Type for PO generated because of release of shipment cost to FI. However, the same is not available in SPRO.
    Regards
    Sanil Bhandari

    Hello,
    Define purchase order types using
    SPRO u2013Materials Management u2013 Purchasing u2013Purchase Order u2013Define document types (for freight/carrier PO), Define carrier PO, number range and field selection NBF
    The user exit u201CV54U0006u201D will enhance the transaction code VI02.
    Instead of generating a standard service PO with document type u2018NBu201D , it will generate a freight specific PO with type u201C ZXXu201D
    Finally Assignment of purchasing data to shipment costs
    SPRO u2013 Logistics execution u2013 Transportation u2013 Settlement u2013Assign purchasing data
    Let me know if this helps.
    Thanks
    Naga Yarramsetty

  • Costing relevancy in prod order

    Hi.
    We have a production order with all the components fixed to relevancy for
    costing. sometimes we need to change the component at prod order level,
    If  we change the component, indicator / tick for "relevancy of costing" is disappering at general data of order.
    we have ETO , MTO & MTS scenario in our plant.
    Above mention problem is only for ETO order tyes prod orders.
    Is there any setting/config for order types to select costing relevancy tick.
    Thanks in advance.
    Jeevan

    Thanks for the reply, but costing relevancy is activated at operation level,
    normal prod orders are getting created correctly, but when we change the componentin CO02 then costing relevancy is getting disapper.
    Waiting for your reply.

  • Order type for conversion of planned order

    Hi gurus,
    I have configured 6 different order types for PPPI and not maintained any default order type for conversion of planned order into process order. But when I am trying to convert planned order into process order by branching out from MD04 to COR7 via the popup window, default order type PI01 gets selected which  cannot be changed. However, if I am converting the planned order into process order directly through COR7, then choice of order type is available.
    Could you please tell me how to ensure choice of order type while branching from MD04 to COR7?
    Regards,
    Abhik

    Hi Datta
    The order type is selected as below
    First it will look for any scheduling profile is maintained. If so it will select default from the profile.
    Next if the profile is not there it will look for any scheduler is assigned in material master. Through the scheduler it will select the profile and default order order type.
    Next it will look in plant parameter. With conversion from plan order to prod order  order type
    Next it will look in MRP group conversion order type,  if you have mainted it in Material master.
    This is the sequence. Please check have to maintained any of these.
    Hope this is clear
    Regards
    J . Saravan

  • Question on Search Help and Authorization Check for Sales Order Type

    Question 1:
    When I go to VA01 and click the search help, it shows only order type that are not blocked.
    However, when I have sales order type in select-options of a Z program,
    S_AUART FOR VBAK-AUART
    I click on the search help, it gives all the sales order types. How can I have a list with unblocked sales order type only?
    Question 2:
    I want to check whether a use can extract data from a sales order type (e.g. OR and RE)that he/she authorized to use.
    I have include the following in my program:
    AUTHORITY-CHECK OBJECT 'AUART'
    ID 'AUART' FIELD 'OR'.
    It always returns SY-SUBRC = 12.
    But order type 'OR' is granted to the user (he/she can create order with type OR in VA01)
    Please kindly give me some ideas, thanks.

    hi,
    ad1
    use following code:
    AT SELECTION-SCREEN ON VALUE-REQUEST FOR auart.
      PERFORM auartGet.
    FORM auartGet.
        CALL FUNCTION 'RV_HELP'
             EXPORTING
                  KEY            = VKORG
                  KEY2           = VTWEG
                  KEY3           = SPART
                  KEY4           = '0'
                  NUMBER         = '008'
                  FIELD_IN       = AUART
             IMPORTING
                  FIELD          = AUART.
    ENDFORM.
    ad2.
    example:
       AUTHORITY-CHECK OBJECT 'V_VBAK_AAT'
             ID 'AUART' FIELD 'OR'
             ID 'ACTVT' FIELD '01'. "01-create order, 02-change, 03 display
    check sy-subrc eq 0.
    regards,darek

  • Block creation of new Internal Order Type

    Hello,
       We have several internal Orders types and we want to block the creation of new IO. Is there any way through customizing to do that?
       I have considering to do it using an step in a validation but I think can be a better way.
    Thanks,

    Hi,
    Ravi is right, you can restrict through authorizations. To do that, you have to modify the role assigned to users that allow them to create internal orders of any type. Use the transaction SUIM, search the role by user or by transaction (KO01). Then, in the role, there is an entry that corresponds to Controlling (CO) -
    > CO-OPA: General authorization object for internal orders (K_ORDER) -
    >
    Order Type  (AUFART)   : Select for example RA01
    Internal order authorization  (AUTHPHASE) :
    Actions for CO-OM Authorizatio (CO_ACTION) :  0000  Master Data.
    Cost Element  (KSTAR) :    
    CO-OM Responsibility Area  (RESPAREA) : 
    Usually a BASIS do the modification of the role.
    Regards,
    David Z.

  • Conversion of prod orders

    Hi, when we convert planned order into production orders in md04 aftr mrp run, please advise how system knows that the prod order type is pp01 or pp03 etc?. what i mean is that since we will have n numbr of sfg/fg, how system knows that for certain material  sfg / fg it is pp01 or for certain materials it is pp03 etc? please advise.

    Dear Raju,
    1) Go to plant parameters i.e OPPQ , here
    2) give ur plant & execute
    3) Now u have maintain Plan orders option, just under that u have option Conversion
    4) Now click this, again an option is there plan order to Production order
    5) Click this, now for prodution order we can give PP01 or PP03 ( the conversion will take place from here
    6) another input will be OPKP, for ur plant & order type
    7) U can give Order type , just scroll down the mouse u will get under order type option
    8) make to Stock - here u can give ur order type
    Regards
    kumar

  • Number Range for Maintenance Order Type

    Dear All,
    Please help me in regarding for Number range  Change in Maintenance Order Type.
    I have different types of maintenance order...such as PM01,PM02, PM03, PM04, PM05, PM06, PM07, PM08.
    and i have to assign number range different for all the maintenance order type. kindly help how can i assign the same separately.
    also in case of Notification types also.
    Early response is highly appreciated.
    Thanks
    Sushant

    Greetings Sushant,
    Firstly, maintain all the Order Types you want in SPRO.
    To maintain the number ranges, you will need to go to t-code OION. Then select "Maintain Groups (F6)" and create a group with a number range for each of the Order Types that you require.  Each will be a separate interval. Then place the cursor on the unassigned Order Type and select "Assign Element Group (F7)" Repeat for each Order Type.
    Notification number ranges are maintained in t-code IW20

  • Number range for order type

    Hi Experts,
    Can anybody please help me,
    How to Maintain a number range for order type YB01.
    I have tried in CO82 but there is no assignment of order type YB01 to  any group.Please tell step by step.

    Hi,
    In CO82 only after creating the number ranges you need to assign it to group.Go to change group fist select the group and then click on your order type and select select element symbol and then click on element\group and then save it.
    refer this link
    http://help.sap.com/saphelp_45B/helpdata/en/35/71896486c2223ae10000009b38f984/frameset.htm
    hope it helps

  • Automatic selection of order type during conversion

    When i convert planned order to production order in CO40.Only i put order then press enter.Then the order type flow automatically where the setting has been made for automatic selection of order type

    Hi Debasish,
    The Order type is defined by the production scheduling profile that you maintain in the material master 'work scheduling' view.
    In customizing for the production scheduling profile (CORY), you define the order type associated with the plant, order type and profile combination.
    Regards,
    Pradeep.
    Edited by: Pradeep Rao on Sep 30, 2010 3:18 PM

Maybe you are looking for

  • Activation Server Unavailable for Acrobat 7.... Need Acrobat 7 Professional

       Only Standard is listed here: http://www.adobe.com/downloads/cs2_downloads/index.html Where can I get Acrobat 7 Professional???

  • 8.1.7 connectivity using database link

    I can't get my database link to work. It fails with ORA-12154: TNS:count not resolve service name I have set up an entry in tnsnames that allows me to successfully tnsping the target database and I can connect via SQL*Plus using user/password@service

  • Keychain error when trying to start backup on time machine

    I have not been able to get my time machine working. It appears to be set up but when I put my password in it says there is a keychain error -25299. I have tried repair, restart keychain back to factory setting. Does anyone have answers? Thanks

  • Another HTML editor

    I am trying to find a cheap alternative to DW as I use DW for my job however my content writer needs an editor as our newsletter wysiwyg is very unstable and cannot hold complex tables. I suggested editing the newsletter in an editor and pasting the

  • Safari 3 / Flash memory leak

    I recently upgraded to Safari 3.0.4 and am noticing a huge memory leak problem if I leave a Flash-enabled page open for any length of time. I monitor the Virtual Memory usage of Safari using Activity Monitor. Usage goes from around 280MB to as high a