Hello Gurus, 
                      I want the details like....In production support what are the our usual works(roles), and what we have to do. 
                      If we are getting tickets, in which manner we have to respond for those tickets.
                      What are the exact daily works in a production support  project. And what are the exact daily works in a implementation  project.
                      What are the t-codes we have to be perfect in support and implementation.
Please help me
Thanks and Regards
Kumar.

Hi,
It may vary in different projects.
I can just give you a couple of general roles.
Migration project
• Designing mapping documents in order to check the need of creation in BW.
• Developing various objects like Cubes, ODS, Info Sources, InfoObjects etc.
• Designing Transfer Rules and update rules including start routines, update routines and Transfer routines as per the requirement.
• Scheduling Info Packages to carry out the data loading process. Involved in data loading from SAP R/3 to Source layer ODSs into BW. Loaded data using Data mart, as the Business layer and Report layer ODSs get loaded from source layer ODSs using data mart functionality of BW.
• Involve in the backfilling of historical data from present sys to SAP BW .
• Developing the Master/Transactional data process chains considering the dependency among the BW objects and automated the triggering and monitoring of the same on daily, weekly and monthly basis.
• Transportation of various BW components.
• Performing unit testing and data validation of newly developed and enhanced objects in Quality BW system in terms of providing an efficient solution.
• Responsible for overseeing the Quality procedures related to the project.
• Responsible to deliver (Transport into Prod) the object as per the scheduled deadlines; with accuracy of deliverables by considering the quality norms.
• Involving in the Client/Onsite communication for any client side clarifications, for assignment of work, for discussing on project status related issues, etc.
Support project
Data Load Monitoring:
1.Carried out data load on a daily, weekly and monthly basis using Process chains from both SAP Source systems as well as Non-SAP Source systems such as Informatica.
2.Resolving Data load error such as Invalid characters, Time period conversion, Currency conversion, Duplicate records, etc
3.Ensuring the availability of the updated data in the datatarget on time.
4.Spooling out data through Infospoke from SAP BW to systems like Trillium, Ariba (Reporting Tool)
Ticket Resolution:
1.Process chain modification: Working on “Optimizing Process chain” by creating new process chain considering the load dependencies.
2.Reloading of R/3 data from different clusters – Reconciliation issues
3.Enhancements as per Business requirement.
Additional responsibilities:
•Preparing design documents from the Business Requirement docs and identified the relevant data targets for satisfying the customer requirements.
•Creation of Operational manual: BW Run & Maintain Support.
•Process Chain Detail Documentation (Sequencing & Dependency within Local Chains).
•Monitoring checklist Document (From Process Chain Perspective)
•BW Doc checklist preparation
•Table space activity with basis team.
•Data load analysis taking into account the CPU utilization.
•Applying Support packs and performing ORT.
Most projects have different number of cubes with varying volume of data. You cant generalize this.
hope this helps,
Refer
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/08f1b622-0c01-0010-618c-cb41e12c72be
Roles & Responsibilities for Junior & Senior consultants(Technical)
Thanks,
JituK

Similar Messages

  • Ask the Expert: Plan, Design, and Implement Mobile Remote Access, the Cisco Collaboration Edge Architecture

    Welcome to the Cisco® Support Community Ask the Expert conversation. This is an opportunity to learn and ask questions about planning, designing, and implementing mobile remote access (Cisco Collaboration Edge Architecture) with Cisco subject matter experts Aashish Jolly and Abhijit Anand.
    Cisco Collaboration Edge Architecture is an architecture that provides VPN-less access of Cisco Unified Communications resources to Cisco Jabber® users. This discussion is dedicated to addressing questions about design best practices while implementing mobile remote access.
    For more information, refer to the Unified Communications Mobile and Remote Access via Cisco VCS deployment guide. 
    Aashish Jolly is a network consulting engineer who is currently serving as the Cisco Unified Communications consultant for the ExxonMobil Global account. Earlier at Cisco, he was part of the Cisco Technical Assistance Center (TAC), where he helped Cisco partners with installation, configuring, and troubleshooting Cisco Unified Communications products such as Cisco Unified Communications Manager and Manager Express, Cisco Unity® solutions, Cisco Unified Border Element, voice gateways and gatekeepers, and more. He has been associated with Cisco Unified Communications for more than seven years. He holds a bachelor of technology degree as well as Cisco CCIE® Voice (#18500), CCNP® Voice, and CCNA® certifications and VMware VCP5 and Red Hat RHCE certifications.
    Abhijit Singh Anand is a network consulting engineer with the Cisco Advanced Services field delivery team in New Delhi. His current role involves designing, implementing, and optimizing large-scale collaboration solutions for enterprise and defense customers. He has also been an engineer at the Cisco TAC. Having worked on multiple technologies including wireless and LAN switching, he has been associated with Cisco Unified Communications technologies since 2006. He holds a master’s degree in computer applications and multiple certifications, including CCIE Voice (#19590), RHCE, and CWSP and CWNP.
    Remember to use the rating system to let Aashish and Abhijit know if you have received an adequate response. 
    Because of the volume expected during this event, our experts might not be able to answer every question. Remember that you can continue the conversation on the Cisco Support Community Collaboration, Voice and Video page, in the Jabber Clients subcommunity, shortly after the event. This event lasts through June 20, 2014. Visit this forum often to view responses to your questions and the questions of other Cisco Support Community members.

    Hi Marcelo,
       Yes, there are some requirements for certificates in Expressway.
    Expressway Core (Exp-C)
    - Can be signed by either External or Internal CA
    - Better to use a cluster name even if you start with 1 peer in Exp-C cluster. In the future, if more peers are added, changes would be minimal.
    - Better to use FQDN of cluster as CN of certificate, this way the traversal zone configuration on Expressway-E won't require any change even if new peers are added to Exp-C cluster.
    - If CUCM is mixed mode, include security profile names (in FQDN format) as Subject Alternate Names
    - The Chat Node Aliases that are configured on the IM and Presence servers. They will be required only for Unified Communications XMPP federation deployments that intend to use both TLS and group chat. (Note that Unified Communications XMPP federation will be supported in a future Expressway release). The Expressway-C automatically includes the chat node aliases in the CSR, providing it has discovered a set of IM&P servers.
    - For TLS b/w CUCM, IM-P & Exp-C
      + If using self-signed certificates on CUCM, IM/P. Load Cisco Tomcat, cup, cup-xmpp certificates from IM-P on Exp-C. Load callmanager, Cisco Tomcat certificates from CUCM on Exp-C.
      + If using Internal CA signed certificates on CUCM, IM/P. Load Root CA certificates on Exp-C.
      + Load CA certificate under tomcat-trust, cup-trust, cup-xmpp-trust on IM-P.
      + Load CA certificate under tomcat-trust, callmanager-trust on CUCM.
    Expressway Edge (Exp-E)
    - Signed by External CA
    - Configured Unified Communications domain as Subject Alternate Name
    - If using a cluster, select FQDN of this peer as CN and FQDN of Cluster + this peer as Subject Alternate Name.
    - If XMPP federation is being deployed, enter the same Chat Node Aliases as entered in Exp-C.
    For more details, please refer to the Certificate Creation Guide for Cisco Expressway x8.1.1
    http://www.cisco.com/c/dam/en/us/td/docs/voice_ip_comm/expressway/config_guide/X8-1/Cisco-Expressway-Certificate-Creation-and-Use-Deployment-Guide-X8-1.pdf
    - Aashish

  • New tab for Contract for data about products and product sales.

    Looking for ideas to implement a new tab on the Contract (RECN)
    We have some basic data about products and product sales that we want to have implemented on a screen tab for a contract.  The user needs to be able to enter information about a product, quantity, year grown, and tax info. And then each of these products may have one or many sales records showing date of sale, quantity sold, and a brief note.
    So a contract can have 1 or many products and a product can have one or many sales records.
    The user needs to be able to enter, update and delete any one of these records.  And, ideally, enter multiple of each before saving.
    Do any of you have ideas about how to go about this?  Using ALV grids? or table controls? I'm still wet behind the ears regarding doing screen development in SAP so am open to any and all suggestiions.
    SAP 6.4 is the version we are at.
    Thanks
    Laurie

    Maybe the original order to renew and keep unlimited data was cancelled because it was not an option. It wasn't a "bait-and-switch" The order was cancelled, it wasn't switched. When you called to reissue the order they told you the correct options so they did not switch you without your knowledge. The second rep was correct, he didn't lie, the first rep did. Verizon cancelled the order because if they didn't you would have been set up w/ new 2 year agreements on a tiered data plan, which would have been illegal. Thats why they cancelled it. So you can either not make the change, keep the unlimited data and buy the phones outright. Or switch, go to a tiered plan, and get new phones. By glitch they meant the system accidentally allowed you to keep the unlimited plan, though it was not an option. Verizon has had this rule since they removed the unlimited plan back in '11.
    << Full name of rep removed >>
    Message was edited by: Verizon Moderator

  • Re: Rational Rose product and Forte

    We use Forte 3.0 with Rational Rose 4.0 since more than one year on a
    medium size project (10 developers). I have not tried Rose98 with Forte,
    so what I have to say may or may not apply to Rose98.
    In general I am very satisfied with the Forte support of Rose. The code
    generation facilities are sophisticated. For example from one attribute
    in Rose you can generate a virtual attribute and the corresponding get
    and set methods which implement the virtual attribute. You can even
    change the naming conventions (how to generate the name of get and set
    methods). You can also model all components of a Forte application like
    interfaces, events, eventhandlers, constants, domain types etc.
    Since access to the Forte repository is difficult, Rose does not read
    from or write to the repository. Instead you must export a plan as a
    .pex file, regenerate the plan from Rose and reimport the generated file
    into Forte. Rose correctly preserves the code that you have written as
    well as other information like GUI layout etc. Nevertheless this process
    is a bit tedious and prone to errors.
    Rose can import a Forte .pex and produce a model from it ("reverse
    engineering"). This works O.K. but I use it only on small prototypes
    that I developed in Forte to get a "first cut" of a model. The analyzer
    has only a few global options (for example whether you want to model
    object-valued attributes as associations or as attributes). In addition
    it names all attribute types and method parameters with fully qualified
    class names so that your methods tend to have very long signatures like
    Add(input source:Framework.IntegerData):Framework.IntegerData
    instead of
    Add(source:IntegerData):IntegerData
    On the other hand Rose generates correct Forte code if you use the short
    form in your model. So I use Rose mainly for forward generation.
    I find the combination of Rose with Forte very valuable, mostly because
    Forte does not allow a convenient documentation of plans, classes and
    attributes.
    If you have additional questions, I will be happy to answer them.
    Robinson, Richard wrote:
    >
    Has anyone used Rational Rose products and Forte? Could you post a short
    summary that explains how easy/hard it is to work with and whether or not
    the reverse engineering features work well?
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>--
    Dr. Thomas Kunst mailto:[email protected]
    sd&m GmbH & Co. KG http://www.sdm.de
    software design & management
    Thomas-Dehler-Str. 27, 81737 Muenchen, Germany
    Tel +49 89 63812-221 Fax -444
    To unsubscribe, email '[email protected]' with
    'unsubscribe forte-users' as the body of the message.
    Searchable thread archive <URL:http://pinehurst.sageit.com/listarchive/>

    I'm having the same problem. The last version of Forte known to work with Rose is Forte 3.0, but I can't find that version for download.
    Let me know if you've found any other solution.
    Adam Southall

  • Create product and product category

    hi,
    can anybody explain me how to create product and product category in gateway services.
    thanks&regards in advance,
    Haritha

    Hello Haritha,
    I do not know about the logic which are supposed to be used to accomplish ur business scenario.
    But Once u know the underlying code/standard FM to be used, then u can follow the below which will help u get info on how u can consume those business logic inside GW and expose it as service.
    1.Let’s code CRUDQ and Function Import operations in OData service!
    2. How To Batch Multiple Operations Into A Single Request
    3.How To... Create Complex Business Entities using the Gateway OData Channel
    4.Purchase Order: Create OData Service in the SAP NetWeaver Gateway System for CRUDQ Operations
    5. Implementing  Expand Entity/Entity Set
    6. Detailed step by step procedure for Creating Gateway Service with all the CRUD Operations and testing them in Service Explorer Part1
    7. Step by Step development for CREATE_DEEP_ENTITY operation
    U can also search in the forum for additional  info as well.
    Regards,
    Ashwin

  • XI products and software components in SLD

    We are starting to implement XI in order to exchange messages between R/3 systems.
    Is it better to create a custom software component within the standard SAP R/3 Product (in the SLD), or do you suggest to create also a custom product (even if the systems involved are SAP systems) ?
    Which are advantages and disadvantages ?
    Thanks in advance.

    I am not sure if the question is answered. I am trying to see what is correct. SAP appear to say build under the specific Product supplied. Or else, what is that used for ?
    I am not a seasoned XI developer by far, however, upon reading XI books and documentation, i see that S/W components are attached to Products, and the Products are Imported into the Intergration Builder. I have also seen, and been told, that it is common practice to create a Product that reflects the Project, and then attach the S/W components under that, for which XI would be interfacing. For example, if I were working on a new project, say, "myProj" I would create a product called "myProd", then attach the S/W components involved, say, CRM under that. When the Product gets imported into the Intergration Builder, I continue my developments under a new namespace, that is under the Product "myProj".
    Is this right?
    In reality, "myProj" is not a Product, it is a project.
    I hope this is clear
    thanks
    Glen

  • Product and Software component in SLD

    Hi,
    What is the basic concept of product and Software component.I have few questions.
    If our company is going for Sap implementation of ISmedia
    and XI as middleware for interfacing with other systems then what do we need to do for product and SWC.
    Do we need to create a third party product and SWC for this project in sld?
    We can create differnt Software component under the existing Product of SAP ISM
    What are the best practices
    Thanks,
    Naveen.

    Hi,
    about Software Product and component go thru this part of SAP help-
    http://help.sap.com/saphelp_nw2004s/helpdata/en/a2/2999ef97ea2b4790165f9ca5c05c41/frameset.htm
    <i>Do we need to create a third party product and SWC for this project in sld?</i>
    >>yea, you can create a thridparty product.
    <i>We can create differnt Software component under the existing Product of SAP ISM</i>
    >>>You can create software components for the product.
    I think, the documentation will help you understand this.
    Regards,
    Moorthy

  • Products and locations in DP

    Hi,
    I am just implementing DP and the Product and Location characteristics (9AMATNR and 9ALOCNO) are in the MPOS.
    I created a cube (the cube has all the characteristics of the MPOS, Product Location and others) for the actualsales. When I want to create a combination I see the values of the characteristics except the values of the Product and Location characteristics. Do I have to bring these values through the Core Interface to APO, so that I can create the CVCs in DP?
    Thanks in advance

    Hi,
    For creating a cube u need to have dimensions in sense characteristics in APO....The characteristics can be product type location type , time characteristics , uom etc.,,
    The values of the characteristics are nothng but the master data of the APO that comes from ECC.So even when u create u r MPOS these values should be present in APO data mart.If u r using the same characteristics in infocube then u will not have to transfer again the data from ECC.If u want to see the CVC'S that u generated in apo u can look into T-Code :/sapapo/mc62.
    If u want u r CVCs and keyfigures to be displayed in cube using T_Code : listcube.
    Hope this answer will help u.
    Thanks

  • SAP third party Pre-delivered SLD Content - Product and SWCVs

    Hi All,
    I have started this thread on LinkedIn and I wanted it to be viewed by all of you for your valuable suggestions and thus from SAP too... The thread is [here|http://www.linkedin.com/groupAnswers? viewQuestionAndAnswers=&discussionID=20482912&gid=81282&commentID=16700717&trk=view_disc ]
    VJ
    Edited by: VijayaShankar Konam on May 22, 2010 12:12 PM

    Here is the thread content until now -
    Hi All,
    I have been working on integration of our product with SAP. We wanted our SLD objects for the product and the swcs to be delivered as part of SAP's pre-delivered SLD content, so that the client could simply import our design objects in to their PI landscape (Similar to how SAP provides PI content on service market place. We do have partnership with SAP and this product integration was not yet certified by SAP. However, they SAP agreed to supply our product and SWCs as part of the standard SAP CIM modal content).
    How ever, even when we gave our SLD export to SAP, when the latest CIM modal for SLD from SAP got released, we were surprised to see that, our product and SWCvs are created with the vendor name "sap.com". This absolutely makes our product and swcvs unusable as we would not be able to look at them in the SPROXY on application systems. This was the same case with an older client that I worked with too..!! Any one had similar experience with this? Shouldn't SAP
    be creating them with vendor as "<vendor>.com"? At least, our product is not owned by SAP..!!
    We all know that, if sap.com is the vendor for SLD objects, only SAP could provide the proxy implementations through an SAP support pack.
    Could someone from SAP PI Techies understand my point and care to respond?
    Regards,
    VJ

  • What's the most efficient way to extend product and catalog classes?

    If I have additional product and catalog properties in a new database table, should
    I create a new class and extend the ProductItem and Catalog classes or should
    I manage these properties via the set/get property methods on the existing classes?
    Is there a difference in performance with the two approaches?

    Performance wise using the set/get property methods is going to be more
    expensive... However, I would recommend the property approach. You really
    don't want to modify or extend the provided source code. I have done this
    and the approach works out fine...
    Another approach that I have used is to create additional tables and classes
    that key of the product and catalog classes. Again with the intension that
    we don't modify provided stuff... For example, we implemented related
    products using this approach.
    "Bill" <[email protected]> wrote in message
    news:3fbcf598$[email protected]..
    >
    If I have additional product and catalog properties in a new databasetable, should
    I create a new class and extend the ProductItem and Catalog classes orshould
    I manage these properties via the set/get property methods on the existingclasses?
    Is there a difference in performance with the two approaches?

  • Production and Test Servers

    What is purpose of having a test and production servers ? in devlopment for example ... exactly what is the scenarion of making a benifit of them?
    is there in interaction between the two servers?

    i need to know why we have a test serverThe test server is mainly used to test the deployoment script which are developed by the development team and do proper functional/testing after you apply patches.
    how a test server and why its used during implementation ? only for batching?To verify the setup during the implmentation and to test the patches (usually, there is a separate instance to test the patches, and once the patches are applied successfully it will be promoted to the test server for testing before it goes to production).
    and what things i can not do to the production be4 i test them?If all the testing is done successfully on the test instance, it goes to UAT instance (for another testing) before it goes to production. For production, just make sure you have a valid backup before you patch the instance or move any setup.
    and if iam to clone a prod to test ....is it a backup only?Run preclone on production, copy/restore the files to the test server and run postclone on the test instance -- I believe you are aware of the cloning docs.
    and another thing after the cloning will they have the same instance name?No, production name is usually PROD and test instances is usually called TEST.
    Thanks,
    Hussein

  • Architecture and Implementation

    Hello All,
    I am kind of new to this field and I have started building applications, and now I have two terms that I would like some to explain to me. Sounds simple and crazy but, what do the terms "architecture" and "implementation" mean in the perfect Hyperion sense. For example, what does an Essbase architecture do, for example, does he design cubes? etc and other question is about "implementation" what does it mean when someone says "I have implemented 3 planning applications?
    If someone could spare a little of their precious time to explain these terms that would be wonderful. A link would be great as well.
    Thanks

    Its recommended to maintain three environment.s
    1. Development Environment ( BOD )
    2. Quality Environment ( BOQ )
    3. Production Environment ( BOP )
    BOD : Development environment where you do all development. This environment may not be as same as Production with respect to server, resources and so on.
    BOQ: Quality environment where Business users do testing. This environment is expected to be same server, same version when compared with Production. Resources such as memory and number of servers could vary.
    Once approved by Business Users, content will be migrated from BOQ to BOP.
    BOP: Production environment only meant for usage not for any development. UAT happens here once again to check the functionality of reports & other objects
    In general, the BOQ and BOP content is always same except the objects which are under Business Users testing.
    When it comes to backup, we must take frequent backups for CMS database, Input FRS, Output FRS and Audti Database.
    The fequency depends how frequently the production environment is being updated.
    Best Regards
    Gowtham
    [My site|www.xpert4ms.com]
    [Business objects version history|http://xpert4ms.com/viewtopic.php?f=11&t=142]

  • New Blog: "SAP Sales Configuration in the Cloud is Here – Sell Configurable Products and Solutions more Efficiently"

    http://scn.sap.com/community/industrial-machinery-and-components/blog/2013/07/12/sales-configuration-in-the-cloud-sell-configurable-products-and-solutions-more-efficiently

    Hi Ali.
    You can use this document below:
    Best Practices for Implementing CTS+Doc.
    http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/10456aac-44f7-2a10-1fbe-8b7bcd7bcd58
    Regards.
    Bruno

  • I was using the trial cloud products, and trial ran out in some of my apps . In the mean time I had paid for 1 yr cloud products ,so when does my membership start .I am only riecieving a message in illastraters saying my trial has ended. I was on the comp

    Your Adobe ID[removed... Mod]Case Description:CC Revert to Trial
    [personal information removed... Mod - https://forums.adobe.com/docs/DOC-3731]
    [This is an open forum, not Adobe support, please do not post personal information]

    This is an open forum, not Adobe support... you need Adobe support to help
    Adobe contact information - http://helpx.adobe.com/contact.html
    -Select your product and what you need help with
    -Click on the blue box "Still need help? Contact us"

  • Sales forecasting scenario for production and procurement

    Hello Gurus
    We have currently one scenario  need your inputs and expertise
    We have a requirement for the Sales forecast for the production and procurement planning. More over its like demand planning but sales needs to have a 6 months or yearly sales forecast in the system.
    Is there any option or functionality available for the same.in  SAP-SD
    Thanks inadvance
    Regards
    Venkat

    Hi KV chalapathi
    check this link
    How to maintain Sales forecast or projection in SAP
    hope clear your issue
    Regards,
    Krishna