Production order from sales order with multiple line item(for one material)

Dear Gurus,
I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
(Here for one material, multiple line item is required for some specific reason)
Regards
Rajib Pathak

Hi,
This is not possible.
In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
Regards,
V. Suresh

Similar Messages

  • URGENT: Delivery with multiple line items for a STO

    Hi Gurus,
    We ar ecreating deliveries using VL10b for a STO. Teh TSO has 40 - 50 line items. But the delivery is created with one line item only an dit creates a delivery for each line item. How cna we allow the inclusion of multiple line items in delivery?
    We are using delivery type NL an ditem categor is NLN.
    Geratly appreciate any help in that.
    Thanks,
    KHAN

    The problem you face is called 'Delivery split'.
    For the STO scenario, one common cause is different delivery dates (in the past) in the STO line items. If so, then you should refer to SAP Note 377501 (from where I quote below):
    You can implement the source code specified in the correction instructions in copy routine 301 (or a copy of this routine in the customer namespace). This correction ensures that when you transfer data form the preceding document, backlogged delivery dates or goods issue dates are set to the current date. This prevents the system form performing a delivery split.
    Then a rescheduling of the delivery occurs. Since forward scheduling occurs for backlogged delivery items (that is, the picking date or the transportation planning date is set to the current date), the manipulation of the delivery date or goods issue date in the copy routine does not affect the result of the scheduling.
    If the dates are not the problem, then this Note refers to other Notes which deal with this problem, and should definitely solve your problem.
    Regards
    Nikhilesh

  • LSMW to create Sales Order refer to Quotation with multiple line items.

    Hi Gurus,
    I am new to LSMW, and my requirement is that, I have a file downloaded from another system, it is like this:
    Quotation No.  Sold to party  data        item no.       material no.     quatity
    556                         10000012                 10              19077                1
    556                         10000012                 20              19078                1
    557                         10000011                 10              19076                1
    And it is required I need to create orders in VA01 refering to quotations, and then delete all the items from quotation, and add the items in the file. I am now doing it through transaction recording in VA01, but I came to a difficult part, that is how I can process line items. Because the items number will only be decided at runtime, so I can not record a BDC for that. And I have read some guides on LSMW, one of it said that transaction recording in LSMW can not deal with deep structures. So could any1 help on this?
    Best regards,
    Vincent

    Dear SD Gurus n Experts,
    I have solved the above problem. But there is another problem appearing regarding the date format. Now system generating a message: Date . . is not valid.
    While I am using Date: YYYYMMDD format in flat file, which is SAP's Standard Format.
    In SDN Link: LSMW upload Sales Order using VA01/VA02     I have found that there are some date fields which are mandatory to filled. Here I have mapped
    VDATU - Requested delivery date,  BSTDK - Customer purchase order date,  PRSDT - Date for pricing and exchange rate,  BSTDK_E - Ship-to party's PO date, FKDAT - Billing Date, KORDT - Delivery Date,
    and PRGRS - Date type is Constant = D
    Can any one tell me, where is the priblem.
    With thanks,
    DSC

  • Where/ how do I set SNP to create Planned orders with multiple line items?

    Hi
    Currently our SNP is generating planned orders on a daily basis, it creates a single order with a single line item per location.
    Where/ how do set SNP to create planned orders on a daily basis to generate a single order with multiple line items per location, so therefore one planned order with multiple line items for a single location.
    Thanx
    Keegan

    Hi Keegan,
                   In SNP (APO) it is not possible to create order with multiple line items.
    But you can do some settings so that while planning system can do aggregation and disaggregation.
    But your requirment should be set on Aggregation/Dis-aggregation logic.
    Please follow the follwing links:
    http://help.sap.com/saphelp_scm2007/helpdata/en/2c/c557e9e330cc46b8e440fb3999ca51/content.htm
    Aggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/42/f731d078e73ee4e10000000a1553f6/content.htm
    Disaggregation:
    http://help.sap.com/saphelp_scm2007/helpdata/en/a6/ebefaf32e22e468355da304cc59387/content.htm
    Please be sure that the setting of this logic will be at planning area level.
    You can't change aggregation/disaggregation logic further.
    Regards,
    Santosh

  • Partial goods receipt for PO with multiple line items

    Hello All,
    While doing MIGO, for a PO with multiple line items, if one line item is having error, will we be able to go ahead with goods receipt? Or entire material document is blocked for doing MIGO?
    We will be doing a development - in case if there is problem in goods receipt (checking of any parameter, and if it is missing - we will be posting error message)...is it possible to ahead with next line item and still post the material document?
    If partial goods receipt if possible for PO with multiple line items, how do we do it?
    Regards,
    RJS

    Hi
    While doing MIGO, for a PO with multiple line items, if one line item is having error, will we be able to go ahead with goods receipt? Or entire material document is blocked for doing MIGO?
    No. You cannot post the MIGO, if even one of the PO line item is having problem or giving error.
    We will be doing a development - in case if there is problem in goods receipt (checking of any parameter, and if it is missing - we will be posting error message)...is it possible to ahead with next line item and still post the material document?
    If you skip a line irem and do GR with next line item, how will you match quantity & value with the vendor Invoice at LIV ?
    If partial goods receipt if possible for PO with multiple line items, how do we do it?
    Partial goods receipt is possible for PO line items. That means, if PO has 100 qty for line item 1 then you can do GR for 50 now and 50 later depending on the vendors delivery.
    Hope this is what you mean by "Partial Goods Receipt".
    Edited by: Arun R on May 10, 2010 2:03 PM

  • Create ecatt script for one sales order creation with multiple line items

    Hi ,
    I want to create a ecatt script for one sales order creation with multiple line items. Preferably SAP GUI.
    This selection of data will be from an external file/ variants which will have only one row of data in it.
    Firstly: I have to sort the external file having same PO Numbers in an order.Group them together.
    Second: I have to create sales order for those many line items having same PO Number.
    Best Regard
    Taranum

    Hi Micky
    Firstl you should upload the Line items for a particular sales Order in an Internal table
    and then pass that internal table to your BAPI during your coding corresponding to a particu;lar sales order
    In case of any issues pls revert back
    Reward points if helpful
    Regards
    Hitesh

  • LSMW program to upload the sales order with multiple line items.

    Dear SD and PP Gurus,
    I am new to creating LSMW Program.
    I want to create a LSMW program to upload the sales order with multiple line items. I have read on SDN that it can be done on two phases. First Create Header Data than line items. IS IT TRUE??, Or
    Is there any procedure by which we can load the sales orders with multiple line items in a single run (part).
    I want to use Batch process, not a BAPI or IDOC procedure.
    I have created a program with
    object 0090
    Method 0000
    Program Name RVINVB10
    Program Type D
    Source Structure 1 - For Header and Source Structure 2  for Line Items.
    Mapped Field INDET (With Fix Value 1), ORDERTYPE, SALESORG, DISTCHANNEL, DIVISION, CUSTOMER, PONUMBER , DELVDATE, PRCGDATE, PMTTERM
    INCOT1 INCOT2 with Source Structure - 1 and
    Field INDENT (With Fix Value 2),  ITEMNO, MATCODE, MATQTY, SUOM, PLANT, BATCH, AMOUNT with Structure-2
    than maintained Structure relation ship, field Mapping, Specified Files, Assigned files, Read Data and other process,
    At final stage (Start Direct Input program RVINVB10) it is giving a message - Table name not allowed.
    Please tell me where I am wrong.
    Thanks in advance.
    DSC

    Dear SD Gurus n Experts,
    I have solved the above problem. But there is another problem appearing regarding the date format. Now system generating a message: Date . . is not valid.
    While I am using Date: YYYYMMDD format in flat file, which is SAP's Standard Format.
    In SDN Link: LSMW upload Sales Order using VA01/VA02     I have found that there are some date fields which are mandatory to filled. Here I have mapped
    VDATU - Requested delivery date,  BSTDK - Customer purchase order date,  PRSDT - Date for pricing and exchange rate,  BSTDK_E - Ship-to party's PO date, FKDAT - Billing Date, KORDT - Delivery Date,
    and PRGRS - Date type is Constant = D
    Can any one tell me, where is the priblem.
    With thanks,
    DSC

  • Create production order from sales orders

    Hello,
    I am looking for some detailed documentation in order to make customizing in sales module. The aim is to create production orders from sales orders..
    Thanks  for your help

    See the following link from SAP help online:
    > http://help.sap.com/saphelp_47x200/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
    It contains lots of useful information on Make-To-Order Production.
    I hope this helps.
    Gerard

  • Production order from sales order

    Hi experts,
    I have created production order from sales order through t-code co07, there it shows error "Sales order has no CO object" like this.. how to resolve this.
    Thanks

    Hi,
    KA01 configuration is must for CO object And OKB9 config where we configured the Cost Element to Cost Center basing on the profit center as we have the Automatic Acct Assignment.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Creation of service order from sales order

    Dear gurus,
    I am creating a service order from sales order. the system is asking me the variant configurations for the said material.
    But i dont want to use a configurable material. I want to use a general material withour variant configuration and generate a service order using predefined tasklist.
    Please help!

    Hello Prashant,
    if you do not want to use configurable materials in sales order:
    make sure the material cannot be configured (material master view 'basic data2')
    make sure the customizing for the item line does not require configuration (remove the 'configuration strategy' in the customizing for the item line)
    Link your sales material to your task list using transaction OISD
    If you do not wat to configure your task list as well, just make sure it is not linked to a configuration profile.
    Does this help?  
    Nicolas

  • Automatic posting of purchase order from sales order

    hiii
    experts,
    i m doing automatic purchase order from sales order. i have generated purchase requisition number from sales order now when i m trying to do automatic po the system says no suitable purchase requisition available.I have maintained info record, source code,automatic po tick in material master and in vendor master.what could be the problem .waiting for ur valuable inputs.
    warm regards
    thanks
    subhash kulkarni

    Hello,
    Please check all the things mentioned by our experts e.g Source allocation ,infor record, source list.
    Beside that I would suggest check document flow whether already PO is created or not.
    If every thing is in place then try to create PO with reference to PR by transaction ME21N & see what error you receives.
    Hope this help you ,
    Regards,
    Prashant

  • Same material can exist on multiple line items for the same order.

    Hi
    Is there any specific customising setting or web shop setting through which we can restrict user to add same material on multiple line items for the same order ?
    Regards

    No.
    But if this is a must requirement, you can do an elaborate check during order save in ORDER_SAVE BAdI and return error. So, it will be only during order save.
    Eawar Ram
    http://www.parxlns.com

  • Creating POs with multiple line items

    Hi,
    Is it possible to create a PO with multiple line items from the Sharepoint. The developer guide shows sales order creation with a single line item. If yes, please let me know how it can be done.
    Thanks,
    Pranil

    Hi Pranil,
    You can achieve the user case to create a PO with multiple line items in 1 step by creating a custom solution UI in SharePoint. This is not possible if you simply use the out of box UI (as depicted in the guide).
    It depends on how to define the ESR data type. You can create a data type with header details of PO and collection of items with cardinality as 0..n and create a complex BDC model using SPD --> then create a custom UI.
    Other option would be keep it as 2 lists (2 step action). First create a PO header and then add item by item in 2 steps as foreign key relationship. You can see the example of Account and Activity in pre-shipped contents to get an idea.
    Thanks,
    Girimurugan

  • How to Restrict Single Delivery Date for PO with Multiple Line Items

    Dear Experts,
    How to Restrict Single Delivery Date for PO with Multiple Line Items.
    System needs to through Error Message if User Inputs Different Delivery Dates for PO with Multiple Line Items in ME21N Tcode.
    Can we achive this by Some Enhancement in SAP or Not ???
    If so how to do it.
    Any Inputs is highly appreciated.
    Thanks and Regards,
    Selvakumar. M

    Hi Selvakumar,
    we can resrict the PO to have a single delivery date in all the line items by means of giving a error message or overwiting the delivery date keyed/determined in the line item.
    You can use the BADI -> ME_PROCESS_PO_CUST. In which you need to implement the method PROCESS_SCHEDULE.
    (for technical aid - This method will be called for each and every PO line item, From the imporing parameter im_schedule we can get all the details of current PO line, even we can change the data in the current PO line. )
    Regards,
    Madhu.

  • Unable to create PO with multiple line items through LSMW-BAPI method

    Hi All,
    I have a requirement of creating PO through LSMW. I can't use LSMW standard batch input program since there are some fileds not available and also it has many limitations. I'm using LSMW-BAPI method ( Business object BUS2012) which create IDOC and uses BAPI_PO_CREATE1 to ultimately post the PO in the system. I am trying to create PO from a single file which contains both Header and Item data.
    Now my problem is that everytime PO is being created with Single line item only. Everytime I am giving multiple item data in the source file LSMW is preparing multiple IDOCs for multiple line items. As per my understanding this is happenng since header and item is in the same hierarchy level of IDOC type PORDCR102 and the control record is inserted for every line item in the source file.
    It seems that through LSMW-BAPI  it is not possible to create PO with multiple line items. Can anybody provide some input regarding this? Thanks in advance.
    BR,
    Atanu Mukherjee

    Solved by myself.
    Earlier the problem was that LSMW was not being able to recognize items under same header. It was creating new IDOCs every time it gets a new item. To enable this we need to create two structure HEADERDATA and ITEMDATA.  Two additional identifier fields with identifier value 'H' and 'I' should be added in these two structures respectively. Then we need one sequential file with the identifiers field followed by the header and Item data. Example:
    H~header data
    I~item data
    I~item data 
    This would help the standard program to understand what are the items under same header and ultimately create PO with multiple line items.
    BR,
    Atanu Mukherjee

Maybe you are looking for