Hi All,
I have couple of Project billing questions. Hope you can help
1)A wrong customer was attached to project billing agreement, funding and base line also completed for the customer.
Now we realized that its wrong customer and want to change it to correct customer.
What are the options we have here?
Can we delete or end date the billing agreement?
will the funding be release from the wrong customner after deleting or end dating the billing agreement?
2) Wrong customer attached to a project..agreements,funding,baselining are NOT done.
How can we delete this customer and add the correct customer?
The option to change the customer is grayed out.
Appreciate if you can help.
Thanks

Hi
On your first question you said the agreement was created for wrong customer. Since you already baselined the funding, I assume you have that customer linked to the project.
You can go the Agreement form and  enter a negative funding line allocated to the same project. The total allocated amount will be zero. The agreement is now not allocated and free to be allocated to another project. If it is a wrong agreement you may update the agreement amount to zero.  Now create a new agreement for the right customer.
The open issue is with the project. You have a wrong customer associated with that project. However, system will not allow you to remove the customer - project record.  Solution depends on the way the project was setup. Did you enable customer at top task? if so, end date the top task and create an alternative top task with the right customer.
If the project has been set with a single customer you better close the project and start a new one.
However, if you need an alternative solution, I can suggest a custom method. Go to Help > ..> Examine and change the existing customer of the project to zero contribution.
Now you will be able to add the right customer to the project and have 100% contribution on it.
Dina

Similar Messages

  • Inter Project Billing - Questions

    Hi,
    We have setup Inter Project billing and the process works as expected.
    But we still have questions about the Accounting Process - do the ap invoice and the ar invoice hit the same account? and how do we clear the Open Invoices on both AP and AR?
    Please Help!!!!
    Thanks,
    Akshaj

    Hi Dina,
    A couple more questions.
    Following is a table with example transactions below:
    GL     Cust. Proj     Internal Proj.     Consolidated
    Sales           400          
    IP-Sales               (200)     (200)
    COS               200     200
    IP-COS          200          200
    Clearing     (200)               (200)
    Net Income          200      0     
    1.     Should the UBR / UER be an internal UBR/UER. Would it not otherwise murky up the UBR/UER for contract projects?
    2.     How do the Internal Project and the Customer Project rollup on the GL ? Do we need to have a consolidation project to net IP-Sales and IP-COS
    3.     Also - how do we handle scenarios where COS in the internal project is greater than the revenue/billed amount? How does this rollup to the Customer Project?
    Please advise.
    Thanks.

  • Project Billing "write-off" options

    I'm attempting to determine the best method of "writing off" transactions on direct projects that have been reported as billable, accrued revenue but will never be billed. Please consider the following narrative as an example:
    A consultant (consultant x) charges April time and expense to project 10001 in a billable capacity (charged transactions to a billable task). The transactions are cost distributed, revenue distributed and an invoice is subsequently produced. All cost and revenue transactions are produced, interfaced and ultimately posted to the general ledger in April. The month of April is closed in PA and the invoices for the April billing cycle are produced. Project 10001's draft invoice includes those charges reported by consultant x and is distributed to the project manager for approval. The project manager reviews the invoice review and determines that consultant x's transactions will never be billed and instructs the accounting group to write off the transactions.
    Challenge: we need a way to "write-off" (reduce revenue and change billing status) transactions that will allow for consistent reporting and measurement. Specifically, we need to be able to determine all write-off's (revenue/billing reductions) in a given period that relate to original transactions from an earlier or different period. In short, we want to establish a policy and procedure for consistently processing and reporting these types of conditions.
    Proposed Options:
    1) use the "special" non-billable adjustment option from either expenditure inquiry or invoice review to change the billing status from billable to non-billable.
    Pros:
    a) transactions will remain on the project in the capacity they were reported by the employee
    b) an adjustment record will be created in the PA_Expend_Item_adj_Activities table which will include the adjustment activity code (i.e. Billable Reclass, Non-billable reclass, billing hold, billing hold release, etc.)
    c) history of who created original transactions and adjustments is available (full audit trail)
    d) a reversing revenue entry will be created in the PA_Cust_Rev_Dist_Lines_all table which will allow us to track the dates (gl period) of the revenue adjustment and compare it to the original transaction dates.
    Cons:
    a) to the average users the transaction on a billable task flagged as non-billable with no corresponding revenue may look unusual because there is no description explaining why the adjustment existed. the only way to determine that revenue existed and was subsequently reversed is to look at item details- revenue details.
    b)The revenue write-off will be charged to the same accounts (revenue and inventory) that the original transaction was booked to but in reverse. we don't have the ability to deflect the "write-off" to a bad debt account versus a direct write-off of revenue.
    c) The employee's utilization calculations will be impacted by changing the billing status of the transactions and reducing the corresponding revenue. we may need to update the utilization report to reflect these types of transactions differently.
    2) use the "special" transfer adjustment option to transfer the transaction from the originating billable task to a non-billable destination task on the project in question.
    Pros:
    a) the average user will easily see that the transaction in question has been reversed and b) the revenue subsequently written off by the negative revenue on the reversal transaction
    c) an adjustment record will be created in the PA_Expend_Item_adj_activities table which will include the applicable adjustment activity code(s) (Transfer Back-out, Transfer Originating, Transfer Destination).
    d) history of who created original and adjustments is available.
    a reversing revenue entry will be made via e) the negative reversal entry created in the PA_Cust_Rev_Dist_Lines_All table.
    Cons:
    a) the original transaction is being altered (transferred) by accounting. the integrity of the transaction as it was submitted by the source employee may be compromised.
    b) there is no easy way for the average end user to know where the transaction was transferred to. the information is available via ad hoc reporting from database tables but looking at expenditure inquiry for a given project you will not be able to determine where the transaction went if it was transferred to another task and many tasks exist or if it was transferred to another project entirely.
    c) The revenue write-off will be charged to the same accounts (revenue and inventory) that the original transaction was booked to but in reverse. we don't have the ability to deflect the "write-off" to a bad debt account versus a direct write-off of revenue.
    d) The employee's utilization calculations will be impacted by changing the billing status of the transactions and reducing the corresponding revenue. we may need to update the utilization report to reflect these types of transactions differently.
    e) As a common practice, each project will need at least one "non-billable" task to capture such write-off transfers.
    3) use a write-off event (both revenue and billing) to reduce the project by the aggregate amount of all transactions in question.
    Pros:
    a) employee specific transactions and ultimately utilization results will not be impacted by the independent event transaction.
    b) by modifying our autoaccounting rules we will be able to book the "write-off" to an account other than a revenue account. (I believe, more research necessary)
    Cons:
    a) No link back to actual transactions.
    b) original transactions will remain untouched and will appear as though they were billed and will show up on the invoice and detail reports to the client along with an aggregated event for the total write-off amount.
    Any thoughts or opinions you can provide about the best practice in Oracle will be greatly appreciated.
    null

    Diana,
    Here's another response from a (very) senior Projects consultant. Her comments are in CAPS, so they can be dinstinguished from your comments:
    "I recommend following the approach she outlines in Section 2, with the following additions:
    SECTION 2) use the "special" transfer adjustment option to transfer the Transaction from the originating billable task to a non-billable Destination task on the project in question. CORRECT.
    A) SET UP THE WBS TO HAVE A TOP LEVEL NON-BILLABLE TASK, ON EVERY PROJECT, WITH A TASK NUMBER OF :"WRITE-OFF".
    B) WRITE AUTOACCOUNTING RULE , BASED ON TASK NUMBER, TO ENSURE THAT ANY TRANSACTIONS CHARGED (TRANSFERRED) TO "WRITE-OFF" TASK WILL BE POSTED TO A "WRITE-OFF/BAD DEBT" ACCT IN GENERAL LEDGER.
    C) CREATE A DFF AT THE EXPENDITURE ITEM LEVEL WHICH CAN BE POPULATED AT THE TIME OF TRANSFER, TO INDICATE WHERE THE TRX IS BEING TRANSFERRED TO. IT IS TRUE THAT TRANSFER ACTIVITY REPORT WILL TELL YOU THIS AS WELL, BUT IF YOU
    WANT TO SEE IT ONLINE DURING EXPEND. INQ, THEN DFF IS FINE.
    D) AS TO CONCERNS ABOUT "THE INTEGRITY" OF THE TRANSACTION AS IT IS SUBMITTED BY THE EMPLOYEE BEING COMPROMISED, THIS IS CERTAINLY POSSIBLE, BUT IF THIS IS A SERIOUS BUSINESS CONCERN, THEN I WOULD CONSIDER CREATING AN ALERT TO THE EMPLOYEE WHO ENTERED THE ORIGINAL TRX, ADVISING THEM OF THE CHANGE AND REQUESTING THEIR REVIEW AND OR APPROVAL OF THE TRANSFERRED TRX. I CAN SEE THIS BECOMING QUITE CUMBERSOME THOUGH, AND, OVERALL, ACCOUNTING DEPARTMENTS MANIPULATE TRANSACTIONS FOR ACCOUNTING PURPOSES ALL THE TIME AS STANDARD PRACTICE, SO I'M NOT SURE WHY THIS IS AN ISSUE HERE.
    E) AND LASTLY, IT IS TRUE THAT AS A COMMON PRACTICE, EACH PROJECT WILL NEED A
    'WRITE-OFF" TASK AS A STANDARD PART OF IT'S WBS-- SO WHAT? IT'S JUST ONE MORE TASK IN YOUR WBS. BUILD IT INTO YOUR PROJECT TEMPLATES, AND MAKE IT NOT CHARGEABLE UNTIL WRITE OFFS BECOME NECESSARY. AS TO UTILIZATION, THERE IS NOT ENOUGH INFO IN THE CLIENT QUESTION TO ADDRESS THAT ISSUE PROPERLY.
    THAT'S ABOUT IT. HOPE THIS HELPS.
    BEST REGARDS, PAT"
    null

  • Project agreement question(pls help, a little bit urgent)

    hi,
    I created a project on PM and project funding agreement on project billing.
    But after I allocated it to a project and saved it, it shown that the amount I entered is allocated but not baselined.
    My question is why it is not baselined? what is the meaning of 'baselined'? how to operate to make it to be baselined?
    Thanks a lot in advance! ^_^

    After i made revenue budget. it is baselined.
    question solved. thanks.

  • Project Management Question - timelines for Production system deployment

    Hi
    I need an expert advice on setting up timelines for establishing an Oracle Apps Production environment. We are implementing Oracle HR & Payroll at an organization.
    Our system architecture is a 2-node application tier and 2-node DB tier (RAC). RAC is configured by another party and we only have to prepare the application tier (2 nodes)
    We would be installing Oracle Apps R11i (11.5.10) with jserv load balancing on the 2-nodes
    Can anyone suggest how much time this should take to install/configure & patching of the application tier (on 2 nodes)?
    Regards
    Saira

    Duplicate post (check your other thread):
    Project Management Question - timelines for Production system deployment
    Re: Project Management Question - timelines for Production system deployment

  • Projects Cross-charge functionality Vs Inter-project Billing

    Hi,
    We are currently evaluating the funtionalities of Project Cross Charge Vs Inter-project billing. Our setup is such that we have 3 Legal Entities, 3 Business groups, 3 SOB's and 3 operating units, each tied to their own legal entity, Business group and Set of Bools. When reviewing the documentation, it looks like the Cross charge functionality does not support operating units that are in two different business groups. Does that imply that we have use the Inter-project billing to charge projects across operating units.
    We will really appeciate, if one can provide some additional insight in this regard.
    Regards,
    - Vasu Krishnaswamy -

    Hi,
    It is possible to have cross charge across the Business groups. It is also mentioned in Oracle Projects fundamentals guide. Please refer to the Global Project Support Chapter. Below is the extract from it.
    Providing Data Access Across Business Groups
    Global enterprises have resources and projects that are located, managed, and accounted
    for in different business groups or different countries. To meet the needs of these
    enterprises, Oracle Projects provides the following functionality:
    • Globally located resources can charge their time and expenses to projects that are
    owned outside their respective business groups.
    • Resources can manage and administer projects located in different business groups.
    • Oracle Projects produces appropriate accounting entries, intercompany invoices, and
    management reports even if the resource organization and project owning
    organization have different accounting calendars and job definitions.
    This functionality is provided through the use of global organization hierarchies, global
    jobs, and cross charge functionality.
    Hope this helps!
    Thanks,
    Sathish
    www.projectsaccounting.com

  • Project Billing - 1 time holds (how does it work)

    Can someone tell me how does the 1-time hold works in Project Billing? We thought it puts the items on hold until the invoice have been released to AR and it automatically releases the hold.
    However, our users have been reporting some inconsistency in the functionality. My guess is that Oracle will put them on hold until the invoices is APPROVED rather than released.
    Please advise.
    Thanks in advance.

    Hi Dena,
    extremely sorry for troubling .......... can u kindly mail me these document .... Accounting entries(Debit/Credit) in Oracle Project Suite , at [email protected]
    in advance thanx alot
    regards
    umais

  • Can we have UPK on Oracle Project billing ie for Contract Projects???

    Can we have UPK on Oracle Project billing ie for Contract Projects???

    Iin the pop up I need to have only one field, say Search field
    - Create the ViewCriteria for the LOV ViewObject, consisting of that one field you want to search.
    Then, in the List UI Hints for LOV VO, adjust 'Include Search Region" to the criteria you just created in the previous step.
    +On entering a value in Search field and clicking on 'Search' button it should try to match the value in empid, projectid and deptid. It should return all the records wherever these values match.+
    - Create two bind variable for LOV VO, and create another one ViewCriteria for LOV VO, consisting of another two fields attributes (empid, deptid).
    In that criteria, set attribute values to appropriate bind variables.
    Them, when you place a View Accessor for that LOV, click 'Edit (selected View Accessor)' button.
    On the dialog box that appears, move the View Criteria you just created from Available to the Selected list.
    At the same dialog box, you need to set Bind variable values.
    Assign them the values of the EmpId, DeptId respectively.

  • I in need of oracle project costing,project billing and project management setup documents? can you please help me.

    I am in need of project costing and project billing and project management setup documents with screen shoot? Can anyone help me?

    I have no clue about recovering the info, but when you say you save you should always use Save As. That clears unneeded info from the file. With the file size you have, that may be an important need.

  • Standard reports - Project Costing and Project Billing

    Does anyone have a document they can share that lists the standard reprorts in Project Costing and Project Billing along with descrptions.
    Thank you!

    Hi,
    Refer Project Fundamandals user Guide Page 459 : http://download.oracle.com/docs/cd/B53825_08/current/acrobat/121pjfug.pdf
    Thanks
    Govind

  • All I want, is a simple email address to ADOBE, where I can ask a billing question. PLEASE HELP!

    I need a simple email address to SOMEONE in Adobe, where I can ask a billing question. It seems very clear that this is not smething the Company wants to attend to. After 30 minutes of ebing looped around and around through the menus, I cannot find a single, simple, email address where I can ask a question.  Can anyone help?
    Here is the background. My membership is paid for vie my University. The University is tax exempt, and I need to speak to, email, send a form do something to remove $1.40 from the invoice. Yes, $1.40  It is not my issue, it is the University's and I need to get this done.  However, I cannot find an email address, and I refuse to wait for 37 chatters ahead of me. There simply must be a smarter, better, more customer friendly way for Adobe to support.
    Does anyone have a secret email, or can you tell me the necessary key strokes and menue choices that will get me to a Customer Service rep?
    Thanks.

    ~graffiti wrote:
    Foxit reader seems to be plenty for most.
    http://www.foxitsoftware.com/pdf/reader/
    Make sure that you Decline the spyware 'Ask Toolbar' that comes bundled with it.

  • Project BIlling  - Billing Extension

    Hi,
    I am pretty new to project and I need to know about billing extension.
    Can anyone have some documents/links on billing extension?
    Thank you.

    Hi
    You may want to start with reading Oracle Projects User Guides.
    Look at both - Oracle Projects Billing User Guide and Oracle Projects API's Client Extenstions and Open Interface.
    You may also review presentations and white papers presented on OAUG or Oracle conferences. which described use cases and solutions.
    For example, you may review a presentation of Project Partners available on their site - http://www.projectp.com/demos/index.cgi?product=oaug
    Dina

  • Project billing

    Hi gurus,
    Is there any in PS which can give us Project wise Report on Billing to the  customer including taxes.

    Hi,
    If you need reports related to revenue,  you have many reports under PS-> Information System -> Finanicals.
    Under these reports (for instance S_ALR_87013531) select tab 'goto' and execute line item reports.
    However, please remember that project billing always happen throgh sales order and ultimately you may have to depend on sales related reports for full-fledged reports which gives taxes etc.
    Murali

  • Project Billing-only / standalone implementation

    Does anyone have the experience of implementing Project Billing as a standalone module - ie without using functionalities of Project Costing?
    I understand that we would still need to do the project fundation setups, but we don't plan to use any feature of Projects except using Billing to drive some complex billing and revenue recognition activities.
    Any suggestions, tips and tricks, or whitepapers would be deeply appreciated!
    David Sun from NeoPassage

    We are in a manufacturing environment. If we truly want to collect cost into Projects, we would need to turn on Project Manufacturing, which would significantly alter our business process since we don't really track cost by project today.
    Therefore, we would like to set up the minimal Project Billing functions, somehow feed sales order and service contract data to a project, and bill/recognize revenue from the project. The specific requirements include 1) progress billing, billing and earning revenue by event, 2) FMV recognition, recognize revenue according to fair market value instead of sales order unit price, and 3) sales and service grouped on one bill, using an umbrella (in this case a project) to cover both.
    Thanks!!

  • Project COGS question

    Hi Dina,
    We have the following situation: -
    This is about a barge construction scenario - say, there is a contract of building 10 barge. We create one master project and 10 child project for each barge. Costs get collected over the period time against each project and accounting entries are made. Costs will go to WIP account.
    Once say a barge is ready to be delivered, the costs for the corresponding project should be charged against cost of goods sold account.
    How can we achieve this?
    Please help me.
    Deborah

    Hi
    The solution could be based on Revenue Based Cost Accrual method described on Projects Billing User Guide.
    The basic setup is as follows;
    Create two event types, one is called "credit wip" and the other is called "debit cogs".
    Setup Auto Accounting rules so the credit account of the events will be based on event type. The "credit wip" event type should be map to a GL account that offset the project WIP account. The "debit cogs" event type should be map to a GL account that is considered Cost of Sales.
    Process:
    When barge is delivered and you generate invoice and revenue for that item, you will need to enter also a pair of additional events. One event of type "credit wip" for the amount of total cost incurred on the project. The second event will be of type "debit cogs" and its amount should be negative amount of the first event. As a result, accounting will move project cost from WIP account in GL to COGS account in GL during the same period your project earns its revenue.
    I have described the process as a manual procedure. You might consider automating that by developing your own billing extension, or utilize Oracle delivered extension for Revenue Based Cost Accrual.
    Dina

Maybe you are looking for

  • COPA reporting using costing keys

    Hi, I am using costing keys to access the different cost estimates in COPA. I have done the necessary configuration - created valuation strategy and assigned a point of valuation and assigned two costying keys - one for current and one for future cos

  • Order Frauded (Error Id: 10000)

    Hello. I tried up upgrade a previously purchased app today on my Curve 9300, and received an "Order Frauded (Error Id: 10000)" message.  After some searching here and elsewhere on the web, I tried a number of things including: Change payment from Pay

  • LR and IPTC fields

    I have been running a photoblog at Digital-Photo for over 3 years now. I have noticed that ever since I have started to use Lightroom it gave me an added value of populating IPTC fields in Gallery 2 (web gallery I use). The IPTC seems to be very broa

  • CBS News App

    The CBS News App just had an update on iTunes. Of course, I allowed the update. Now, I've got a "badge" on the App that won't go away. I've gone into and out of the App several times and don't understand why the badge doesn't go away. Anybody know wh

  • C1400 printer - all-in-one trouble shooting

    Hello,  I've recently purchased the C1400 printer - all-in-one, and it started having problems. For some reason whenever I try to print something (for instance, a simple 1 page document), the printer activates, then prints a single page with some wei