Project stock exist in a plant and WBS but with different company code

Hello,
As I know I can not create a PO in company A, but was assigned to a WBS maintained in company code B. The system will check if the WBS getting the same company code with the PO, and pop up  the error message if the company code was differect.
But seems the project stock could exists in a plant  but assign to  WBS was maintained with different company code. For example, A material stock was in plant A assigned to company code A, and it is also assigned to WBS belong to company code B.
Any one know it is correct?
Thanks!

I knew crossing company code to assign WBS element to PO is not allowed since i got the error message, and I think it's reasonable, cause the expense from the project PO should post to the same company code through the WBS element.
But why for  the inventory crossing company code is allowed?  The stock in plant A belong to company code A, was assigned to WBS element B belong to company code B. That means the inventory is in the GL balance of company A but under the profit center belong to company B.  How to understand it? I think it's wrong

Similar Messages

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • How to prevent settlements from AE to wbs with different company code

    Hi gurus,
    i'm currently facing a problem regarding settlements from activity elements to wbs above.
    we have one controllign areas with various company codes.
    For some projects, we have wbs assigned to company code A and activity elements assigned to Company A and B.
    We have an automatic settlement rule generation so that we settle all activity element costs to wbs. But, for activity elements assigned to company B, we don't want to settle the costs, we want to go through a sd/mm invoicing between the two companies.
    How can we prevent the settlement to take place, apart from manually removing the settlement rule for each activity element?
    can we put a validation rule that check that whenever the company code in the wbs is different from the one in the activity element, then the settlement doesn't take place? or remove the automatic settlement rule generation and use cjb1 to generate settlement rules only when an activity element as the same company code as the wbs above. would it be possible?
    would the WBS_SETTLEMENT_RULE BADI or badi proj be of any help?
    Any help is welcome.
    regards
    tim
    Edited by: Tim Ursulet on Jan 22, 2009 5:29 PM

    Hi Tim,
    The transaction CJB1 or CJB2 creates the settlment rules for WBS only, therefore the transactions and Badi WBS_SETTLEMENT_RULE BADI are NOT relevant for the settlement rules of activity and elements at all.
    For the settlement rules of activity (and elements) the default rule is inserted, as soon as the user navigate to the settlemenent rule overview screen, if the activity do not have the settlement rule at that time. I am not sure, if there is BaDi or substituation to prevent the system apply this default rule in certain case. Other alternative is to specify the objects during settlement,  e.g. using selection variant with the company code.
    Kind regards,
    Zhenbo

  • How to create group bom for multiple plants with different company codes

    Dear all,
    In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
    So how to do this?
    Thanks in Advance
    Bhushan

    For that first extend all the materials to all the plants... In one plant create a BOM for the material..
    In all other polants in CS01,   click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
    karthick

  • Stock transfer between Excise Plant and Non Excise Plant

    Scenario : Stock is imported from say Singapore. One of the import duties can be claimed back as CVD and pass the benefit to customer.
    Requirement : Stock transfer between Excise Plant and Non Excise Plant
    Question : i) If I do stock transfer from Excise plant to non-excise plant, can I transfer the CVD amount which I captured in RG23A - Part1/Part 2?
    ii) If I do stock transfer from Non- Excise plant to Excise plant, can I get the benefit of CVD and pass on that benefit to customer?
    Pls let me know the possiblity of above two in SAP and Legally?
    thanks in advance
    Sridevi

    Ok! Thanks for the replies. Pls let me allow to elaborate the earlier requirement.
    Trading Goods say A gets imported to India. Issue was :
    1) We need to issue Excise invoice only to few customers. So, we thought of treating one batch as excise batch and remaining as non excise batch per day.
    2) Stock price varies every day being batch wise produced in say Singapore.
    Means Mateiral is A but price varies evey day and because of the duty payment also gets varied. For a single material master we do have different prices for each batch and also excise/non excise scenario. So, how can I get material value for each of this combinations in the system and how to identify the same.
    Because of the above reasons, we thought of having two plants. I can not configure depot here because cleint requires single plant for each state as of now.
    Am I clear? If not, pls let me know,
    regards
    Sridevi

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • I have moved to uk from ireland and bought new iphone, set up using my existing Apple ID account and profile but won't let me buy install or update apps??

    I have moved to uk from ireland and bought new iphone, set up using my existing Apple ID account and profile but won't let me buy install or update apps??
    Can anyone advise me on what I need to do?
    My existing account is linked to ireland as my bank account details are there, does this make a difference?
    Please help!

    Until you get a UK bank account and credit card, buy and redeem UK iTunes gift cards for use in the iTunes and Mac App Stores. But you need to switch your region/country to the UK store in your account information, as you can't use UK iTunes gift cards in the Irish stores, the gift cards are country specific.

  • Plants and excise group in multple comany codes

    Hello SAP Gurus
    I need one clarification
    I have a depo Plant
    I have gone for multipls company codes so that eventhough it is one depot , I have created multple plants and assinged to each plant to each company code (1:1).
    Now can I have single  excise group for all the plants???
    rgds
    SAP12

    You can use same excise group for all plants of different company codes, provided
    1.     your all company codes is having same chart of accounts
    See IMG >Logistic general > Tax on Goods Movements > India > Account Determination > Specify G/L Accounts per Excise Transaction  .
    2.     you need all settings same for all plants related to excise group for the customizing  IMG >Logistic general > Tax on Goods Movements > India > Basic Settings > Maintain Excise Groups
    Otherwise maintain different excise groups.
    I will suggest you maintain different excise groups so that you will be having flexibility in future also.

  • Creating order with out Company code and plant - just for pricing -possible

    Hi gurus
    Just for creating sales order (let us say no delivery and no billing, client was not intrested in the initial setup) for just pricing thing, does we really need Company code and plant. with out that just with sales org setup(sale org+D.C) can I create an order to full fil the pricing scenario.
    Please I need help on this
    Thanks
    Kris

    hi kris,
            we cannot create a order with out company code and plant , due to the following reasons
          we do not require the company code to create the order , but we require the plant to create a material and use it in the sales order .and we require a company code to create a customer .
    the pricing procedure is determined depending upon the sales area(sales org+distribution channel +division).
    please reward the points if it is helpful
    Regards,
    Murali

  • Billing issue in case of stock transport between different company codes

    Hi all,
    In my project there are 2 different company codes - C001 & C002.
    C001 has plant K101 & C002 has plant K201.
    I am trying for the cross company code stock transfer. The plant K201 issues a stock transport order to plant K101. Now I created a delivery using transaction code VL10G & the system created a delivery successfully.
    I did the picking & PGI using transaction code VL02N successfully.
    Now I am trying to create a billing document in VF01 taking the reference of the delivery number created above but the system issues an error log stating
    "0080000020 000000 The document is not relevant for billing"
    The detail description is as under:
    Client...................................................210
    Group Number
    Sales Document Number.......................0080000020
    Item Number of the SD Document..........000000
    Schedule Line Number..........................0016
    Counter in Control Tables......................00
    Message Identification..........................VF
    System Message Number....................016
    Output Type........................................I
    Message Variable 01
    Message Variable 02
    Message Variable 03
    Message Variable 04
    Group Type.........................................F
    with best regards,
    Neeraj Kumar

    HI ,
    you just check the Billing type which is assigned for that Delivery type and also check what type of billing document it is i.e., in T.code VOFA
    1)Check SD document category ,whether it is invoice or Proforma invoice,
    2)check copy controls
    Regards
    Raghavendra

  • STO - Two plants within Different Company Codes

    Hello,
    Kindly help me out with this case, i want to create a STO for two plants within DIFFERENT company codes, so i've created all the required configuration and master data including creating the supplying plant as a vendor and the ordering plant as a customer, also all master data is maintained in both plants and i tried the scenario on the IDES system and it works okay so i know i'm on the right procedures. The problem is that i create the PO, but when i go to Transaction Code VL10B to create the delivery it gives me an error ( Delivery with no Line item not allowed ) even though there is more than enough stock in the storage location. Kindly help me out.

    17.01.2010     Stock                            10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     StLcSt     SLFR     10.500,000      0,000      10.300,000
    13.01.2010     Order     Totals record     100,000-     100,000      10.300,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.300,000
    17.01.2010     BtchSt     123     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    17.01.2010     BStLoc     123       /SLFR     10.500,000      0,000      10.400,000
    13.01.2010     Deliv.     Totals record     100,000-     100,000      10.400,000
    This is the whole table.
    This is what i got. i believe that it is an availability check problem, i just can't see what is the solution.
    SLFR is the Storage location of the issuing plant.

  • Urgent: Maintain std cost for plants under different company codes

    Hi all,
    Company code(s)/Plant(s): C1/P1, C2/P2, ..., CnPn
    BOMs and Routings are maintained under P1. I believe that unlike BOM routing can't be made available across plants. So how does one maintain std cost across plants under different company codes?
    Thanks.

    Hi,
    You have to maintain individual BOM, Routing and varaint for all plants.
    Best Regards
    Ashish Jain

  • Cost center validity change and assign it to new company code

    Hello
    We are having 10 Cost centers  in 1000 Company code, And validity of these cost centers is .01.01.2001 to 31.12.9999.
    Now business want to create one more company code 2000. and wants to extend these same cost centers to 2000 company code also. But as per SAP std Cost center extention is not possible , bcz cost center can use by only one company code.
    Now Company is saying that..they wants the same number for new company code from 23.09.2010 to 31.12.9999..
    system is not allow me to change validity period of these cost centers, bcz  these saying that the cost center is already defined for given period.
    Beacuse new company code will start working from 24.09.2010. so i,e the reason , we want to make example "2561 cost center  validity 01.01.2001 to 22.09.2010 for company code 1000. then after words 23.09.2010 to 31.12.9999 the same cost center 2561 will for 2000 company code.
    but system is not allowing me to change the validity
    Regards
    Mahesh

    Hi Mangesh
    What you wish is not possible.. You will have to create new cost center and assign to the new company code...
    may be for simplicity sake, you can add a prefix or suffix to the existing cost center no i.e Cost Ctr 2356 can become N2356 in new comp code
    Regards
    Ajay M

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

  • Same WareHouse  Assigned to different plants under different company codes

    Hi Guys,
                 I assigned a warehouse to two different storage location under two plants under two different company codes. I did do the movement in one plant and i could do TR and TO
    but when i post a material movement in other one. I cant c the TR created for the next one.
    Any idea y?
    thanks a bunch

    Yes i did extend the material master for both the plants and extended to the warehouse too...
    pls help
    thanks a bunch for the reply

Maybe you are looking for

  • Diff between Log files and Trace files

    hi What is the exact differences between Log Files and Trace Files. And the relevant informative URL/reference materils would be highly appriciated. Thanks Sekhar

  • Java 1.6.0_19  MD2withRSA is disabled issue

    Some of our clients have been upgraded to the latest jre 1.6.0_19. They get the following exception: javax.net.ssl.SSLHandshakeException: sun.security.validator.ValidatorException: PKIX path validation failed: java.security.cert.CertPathValidatorExce

  • Suddenly getting write errors, iTunes randomly deleted my playlists

    Last night I started having problems with the iTunes store, and today the problem is getting even worse. Initially I had a 'write error' that screwed up two different downloads/purchases from the store. Today, upon opening iTunes, my entire library w

  • Difference between 2.2 and 3.0 substitution variable behaviour?

    What would cause a difference in the determination of substitution variables between 2.2 and 3.0? In 2.2 the following code works: select nvl(get_last_change(v('APP_ID'),v('APP_PAGE_ID')),'no date recorded')from dualIn 3.0 the code does not work, and

  • Successful update this morning.

    Although I successfully downloaded 2.0 on Friday (after several attempts) and 3 apps, I decided not to install them. I've been monitoring this discussion group since then. This morning I decided to give it a go. The preparation/backup/firmware instal