Provision that MRP is not be considered for specific line item of Sales Ord

Is their any provision that MRP is not be considered for specific line item of Sales Order in MRP run? (Ex: Planned order is also generated for free/ADC sample quantity entered in Sales order)

Dear
Go to Sales and distribution--> Sales --> Sales Documents -->Schedule Lines --> Assign schedule line categories.
Choose the item category (eg. TAN)  which is coming in the sales order and enter CN - No. Mat. Planning in the the manual schedule line category (MSL Ca) for MRP type PD.
This will enable you to choose while creating sales order in the Tab procurement column SL Ca.
Choose CN - No mat.planning for the schedule items which you don;t want MRP.
Regards
Soundar

Similar Messages

  • SD / Third Party Sales / 2 line items in PR for one line item in Sales orde

    Hi
    In a third party scenario, I have item category TAS .When I create a sales order, there are 2 Schedule lines for the item. The first SL has confirmed qnty as 0 and the second SL has confirmed qnty as full quantity ( say50). When I save the sales order, it creates a PR as expected. However the PR has 2 line items for this single line item of SO. Each PR line items have the same quantity, in this case 50. Why is this happening. Is it due to some configuration.
    All my SD configurations are fine for third party process. Please let me know if somebody faced this situation and solved it.
    In crux, one line item in third party process leads to 2line items in PR , each with the quantity as mentioned in teh confirmed schedule line.

    Yes interesting to see multiple scheudle lines during TAS processing.
    Also please check the scehdule line category. Should be CS. Also check the MRP type in your material.
    CS should have Order Type = NB , Item category = 5, Acct Assign Category = 5, incompletion = 31. Rest all fields should be blank or unchecked.
    Pur Requisition will be based on the scehdule lines. Since there are 2 schedule lines, you have two line items in the purchase requisition. If you can fix the multiple schedule lines problem in your order, then your requisition looks good.
    Please check note 210417 reg av chk for TAS.
    Regards
    Sai

  • MRP can be configured not to run for a line item

    Hi Folks,
    I have a question... Scenario is like this:
    We are getting a Sales Order in SAP from a Portal which is exposed to external customers. The Sales Order has say 10 line items. Usually this will kick off MRP for each of these line items right away. Now we do not want MRP to kick off as we do not know as yet the line items in there are valid or not. There is  another application which will confirm if the line item is valid or not. Once it confirms if the line item is valid the MRP will run for only those items which are valid and rest of the line items will be rejected.
    Question how we can stop the MRP to not to run for the for the line item once the sales order is created. Creating a Delivery block is not going to help in stopping MRP run...
    Looking for some out of the box solution without any customization.
    Thanks and Regards
    Roger

    Hi,
    Check your requirements class via transaction OVZG. Do they have automatic planning set? Is No MRP Set?
    Regards

  • Condition type not getting populated at first line item of Sales order

    Hi Experts,
    We are creating Sales order through IDOC(Inbound function: IDOC_INPUT_ORDERS) for Document type ZXX then condition type is geeting populated at both line item, i have tried creating the Sales order through IDOC for document type ZYY the condition type is not getting populated in first line item, but for secod line item condition is getting populated.
    we also checked pricing procedures related to this document types and we found these pricing types are mentioned in corresponding pricing procedures.
    Let us know  there are any other possible ways to find the same
    please help.
    Thanks!

    Hi Rajani,
    check the user exit in the FM..IDOC_INPUT_ORDERS
    check if any filters kept for condition type field..
    check the belwo user eixuts
    ORDCHG I VEDB0001 Sales Ord. Change
    ORDERS I VEDA0001 Sales Orders..
    Regards,
    Prabhudas

  • How to get report for deleted line items from sales orders

    Dear FRIENDS,
    please infirm the t.code or report for viewing the deleted line items from sales ordrers.
    Kindly do the neeedful.
    regards,
    N.M.PAWAR

    Hi,
    With transaction SE16 you can view table CDHDR for header changes and
    CDPOS for item changes. This includes deletion.
    OR
    GO to VA03 - Display Sales order -> Put order no : don't press enterbutton. -> Go to Enviornment -> changes -> You will get details
    Date ItmNo. SLNo Action
    Hope this help please close the thread if answers

  • Sales order create/change line item with reference to contract - Open quantity not getting deducted for copied line item from the contract

    Hi friends,
    Please provide some valuable inputs for the following scenario:
    When a sales order line item is created(VA01) or changed(VA02) with reference to a Contract the open quantity is deducted in the contract which is a standard functionality. If the referenced line item is copied (custom enhancement to copy line item), then for the copied line item the open quantity is not getting deducted instead ATP quantity i.e. Available-to-promise is deducted.
    Any inputs on how we can fix this functionality i.e. deduct the open quantity from the contract for the copied line item?
    P.S. : Custom enhancement to copy line item is working fine, but open quantity is not getting deducted if the copied line item was referenced to a contract.
    Thanks,
    Sandeep
    Message was edited by: sandeep

    Sandeep,
    Yes, that was my original interpretation.  I was having a hard time believing that someone would ask such a question. 
    I guess, then, that you already know that you will have to add this logic to your enhancement. You should create your specifications and hand them off to a developer; ideally the one who created this enhanced solution in the first place.
    I do not provide advice in these forums about details of enhanced solutions.  Perhaps one of the other members will be more willing to do your work for you.
    Best Regards,
    DB49

  • Not able to add extra line item in sales order - va01

    Hi friends,
    At the time of creation of sales order via va01.
    I am appending the my extra line item in xvbap. But on screen I am not able to view that extra line item.
    Could you please help me out with this problem.
    My code is given below.
    I am writting this code in MV45AFZB &
    in that FORM USEREXIT_CHECK_VBAP USING US_DIALOG.
    it_free_goods is the table in which i am having data which needs to be uploaded in xvbap.
      IF it_free_goods[] IS NOT INITIAL.
        LOOP AT it_free_goods INTO wa_free_goods.
          wa_xvbap-matnr = wa_free_goods-matnr.
          RV45A-MABNR  = wa_free_goods-matnr.
          VBAP-POSNR   = vbap-posnr + 10.
          wa_xvbap-kwmeng = wa_free_goods-menge.
          wa_xvbap-meins = wa_free_goods-meins.
          wa_xvbap-pstyv = co_pstyv.
          wa_xvbap-posnr = vbap-posnr + 10.
          wa_XVBAP-UPDKZ = 'I'.
          MOVE-CORRESPONDING wa_xvbap TO xvbap.
          APPEND xvbap.
         ENDLOOP.
       ENDIF.
    Please let me know if somethings needs to be changed.
    It will be very helpful for me,
    Thanks,
    Best Regards,
    Prashant

    Hi Prashanth,
    I believe the use of
    USEREXIT_CHECK_VBAP
    This user exit can be used to carry out additional checks (e.g. for completion) at item level
    Please check the following link which has a similar requirement
    Re: VA01/VA02  screen exit
    Regards
    Byju

  • Pharma: shelf life with remaining 4 months should not be considered for planning

    Hi,
    Implementation in Pharma : FG Shelf life with remaining 4 months should not be considered for FG planning.
    How to exclude this stock while planning for FG. FG planning is Make to stock.
    BR
    Subbu.

    Hi,
    Thanks to Caetano, Kumar & Mani..
    We have achieved this with below with customized program....
    Exclude those batches from MRP run whose difference between the (expiration date &
    current date ) is less than or equal to its procurement time mention in MRP-2
    view of material master.
    Before running MRP, one need to execute the program with following option:
    Input data will be plant, material type or list of material:
       System should execute following logic:
    1) In a plant list all material with given material type
    2) Execute the BAPI for find out the characteristic value of EXB_MRP from class
    type 001of material class (BAPI_OBJCL_GETDETAIL_KEY)
    3) If EXB_MRP = Y , then list out all such material.
    4) For such a material identity those batches which are available in stock other
    than ‘9999’
    5) All such batches characteristic of shelf life expiry date need to be derived
    from BAPI
    6) Calculate ( Expiry Date  - Today’s Date)
    = Difference
    PLIFZ  ), batch of
    the material will be transferred to the 9999 storage location which will be
    excluded from MRP run.
    PLIFZ  ), batch of the material will be transferred
    to the 9999 storage location which will be excluded from MRP run.
       7) Run the MRP on materials
       8) Transfer posting from 9999 storage location to original storage location :
    Selection criteria
       On execution transfer the material back to required storage location.
    BR
    Subbu.

  • Can it not possible that i can retrive it for all line items in a single qu

    I have to make report for my application in which I am facing a following problem:
    In the application there are multiple suppliers and each supplier having multiple line items and each item having multipale events. each evant having three status GREEN,RED and BLUE.
    When a user select 'all suppliers' to show the the status time span for a supplier (i.e. for a supplier how many parts and upto how much time parts are in blue, red and green status)
    to show the cumulative status time span I have to find out a event for each line item which is having nearest lower entry time from the lower part of the given time span.for this i have write following query
    SELECT * FROM parts_events
    WHERE vendorid = ? AND partid = ?
    AND visible = 'visible' AND active = 1
    AND entrytime = (SELECT MAX(entrytime) as
    entrytime from parts_events
    WHERE vendorid = ?
    AND partid = ?
    AND entrytime < ?
    AND visible = 'visible'
    AND active = 1)
    the problem is that i have to fire this query for each line item, can it not possible that i can retrive it for all line items in a single query?

    maybe if you can post some sample data and output will help us analyze more youre requirement.

  • HT1807 I am out of the country. I turned my cellular data off and connected to wiFi . However, it is still showing that i am connected to a network.  How dan i be sure that i am not being charged for roaming?network , I am still showing a network

    I am out of the country. I turned my cellular data off and connected to wiFi . However, it is still showing that i am connected to a network.  How can i be sure that i am not being charged for roaming?

    Make sure data roaming and cellular data is turned off.  If you don't want to receive calls or SMS then put your phone in airplane mode and reactivate WiFi

  • When I go to download my iMovie to iTunes I get the following message "Unable to prepare project for publishing.  That project could not be prepared for publishing because a error occurred"(disk full).  What do I need to do?

    When I go to share my Imovie to Itunes after a couple of hours I get the following message.  "Unable to prepare project for publishing.  That project could not be prepared for publishing because a error occurred(disk full)".  What does this mean and how do I fix it?

    This is the forum for iOS (iPhones and iPads),
    I have refered it to get moved to the correct forum.
    But my guess is that you have to clear space on your harddrive.
    The video gets rendered when you out put it, so you will need lots of space to do so.

  • My itunes says that it is not correctly localized for this language please run english version. how do i do that?

    my itunes says that it is not correctly localized for this language. please run english version. how do i do that?

    Let's try a repair install of iTunes.
    Restart the PC first.
    If you're using Vista or 7, now head into your Uninstall a program control panel, select "iTunes" and then click "Repair".
    If you're using XP, head into your Add or Remove Programs control panel, select "iTunes", and click "Change". Select "Repair" and click "Next" as per the following screenshot:
    Can you launch your iTunes now?

  • RESERVED QUANTITY'S SHOULD NOT BE CONSIDERED FOR TRANSFER POSTINGS

    Dear Gurus,
    Reserved quantity's should not be considered for Transfer postings to subcontractor or Stock transfers.
    Example:  Material  XYZ    Total Stock =  1200 nos.

    as per standard SAP reservation quantity will not stop the goods issue. resevation has no control on stock issue.
    Try with abap development.

  • RESERVATION QUANTITY SHOULD NOT BE CONSIDERED FOR TRANSFER POSTINGS

    Dear Gurus,
    Reservation Quantity should not be considered for Stock Transfers or Transfer postings to Sub contractor.
    movement type : 541 & 641
    Example :  Total Stock = 1200 nos.        Reserved stock for production order = 1000 nos.
    Currently our system allows stock transfers/transfer postings for reserved quantity also.
    But we want the reserved quantity to be blocked and only free stock should be allowed for transfer postings.
    (i.e  1200 - 1000 = 200 nos  .     Only 200 nos should be allowed for transfer postings)
    Please suggest.

    as per standard SAP reservation quantity will not stop the goods issue. resevation has no control on stock issue.
    Try with abap development.

  • That application could not be lanched for debugging. ensure that the target device screen is unblock and that the application in installed

    what is the problems?

    Hi windows phone app can not debugging,
    >>that application could not be lanched for debugging. ensure that the target device screen is unblock and that the application in installed.
    Based on the error information, it seems that you are trying to deploy the application on the Windows Phone Device. Then what Windows Phone OS are you using? Can you run
    the application by using the Windows Phone Emulator?
    For deploying the application on the Windows Phone Device, first please try to make sure you have registered your phone for Windows Phone development. For more information, please refer to:
    https://msdn.microsoft.com/en-us/library/windows/apps/ff769508(v=vs.105).aspx . 
    After that please try to make sure that phone screen is unlocked and the project you want to run is set as the default Startup project.
    Besides, please try to refer to the following article about how to deploy and run apps on a Windows Phone device:
    https://msdn.microsoft.com/library/windows/apps/ff402565(v=vs.105).aspx#BKMK_device .
    Best Regards,
    Amy Peng
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

Maybe you are looking for

  • 3D Vision via bootcamp on Mac mini (continued)

    Hi Before I read this archived thread, 3D Vision via bootcamp on Mac mini https://discussions.apple.com/thread/2545736?start=0&tstart=0 I downloaded the latest NVIDIA driver 285.62 for my Mac mini server (2010,GeForce 320M graphic chip) for testing h

  • Outlook 2013 connecting to Groupwise 2012 any solution?

    I have been looking for an answer to this question, I have a MS exec that has just been hired in a company that I support. He wants his calender and scheduling to work with the outlook 2013 client. They currently have a Groupwise 2012 sp2 server inst

  • Contact pictures vanished.

    Firstly I notice that all the contact photos were missing from the iPhone after I'd gone to great length over time to have a large percentage of the 3000 contacts with a matching photo. I thought syncing the iPhone would replace them from Outlook but

  • IOS 5 Custom Vibrations not working

    I am trying to assign a custom vibration to a specific person in my Contacts on my iPhone 4.  I have activated, created and saved the vibration as instructed and I have assigned it in the edit contact screen.  (When in the edit contact screen I have

  • Static IP + DHCP in Preferred Networks - Kind of Stumped

    Hi, Here's my situation: I log onto 4 different networks throughout the day. Two of them have IP addresses that are managed by DHCP (school +lab), the other two are static IP. Right now, I have to go to Preference Pane\Network and change the TCP/IP s