Purchase requisition date in SNP planning book and product view not in sync
Hello Experts,
We have an issue with display of purchase requisition date in SNP planning book.
We are manually entering the PR's for a perticular week from Monday - Sunday(01.09.2014- 07.09.2014), when the last PR is entered on 07.09.2014, it does not appear on the same day in planning book(cell becomes empty) and moves to 06.09.2014, thus quantity on 06.09.2014 is the summation of the quantities present on 06th and 07th.
The PR dates are appearing correct when we click on display details in planning book and they are correct in product view, MD04 as well.
Additionally, this is the same date on which daylight saving time comes into effect.
Kindly advise if anyone has faced similar situation earlier.
Many thanks,
Aditi
Hi Aditi,
Check the time zone that you have in your location in ECC and APO.
Also note it is recommended that you maintain the same system time zone in APO and in ECC. (check tcode STZAC in both systems).
Different time zones should generate this kind of inconsistencies.
Kind Regards,
Mariano
Similar Messages
-
APO SNP Planning Book Show Product View alternative UoM
Hi,
I have a base UoM of BTL and an alternative UoM of CAS.
I can change/save in my users settings the in transactions /SAPAPO/RRP3 (Product View) and /SAPAPO/SDP94 (Planning Book) to show the alternative UoM CAS as default.
The problem I have is when I enter the Planning Book, load a product, right click on the product (in Selected Objects), select Show Product View and then look at the stock tab, this always shows as the base UoM BTL. Can this be saved to show the alternative UoM CAS?Hi Linda,
Try changing you user settings for a product in RRP3 Screen.
Page Menu --> Settings -->General Tab -->General Panel -->enter AUOM value (CAS in your case).
Note - The conversion only takes place for the products, for which the alternative unit of measure entered is also entered as the alternative unit of measure in the product master, or for the products, for which the base unit of measure has the same dimension as the alternative unit of measure.
Caution: Test it , how its affecting for other products which doesnt have CAS as AUOM.
All products which have BUOM as BTL will be changed to CAS when AUOM is maintained for them in product master.
Thanks
Vinoth -
Read data from SNP planning book
Hi Frnds,
We are faced with a situation in which we need to read certain key figures such as PIR's, Goods Issue from SNP Planning book.
We tried using BAPI "BAPI_PBSRVAPS_GETDETAIL" to retreive data. But it seems that we are giving wrong input data to the BAPI. Could you please let us know what to be fed into the BAPI in simple terms? If there is any example code for the same , would be very much appreciable.
Orelse if there is some other way to retreive this data kindly suggest us accordingly...
Many thanks in advance.
Regards,
KarthickHi Karthick,
The parameters for calling BAPI_PBSRVAPS_GETDETAIL really depends on your Planning Area and Planning Book configurations. The planning book configuration will limit what Characteristics and Key Figures will you be able to read using BAPI_PBSRVAPS_GETDETAIL. Let me give you an example.
Assumptions: The planning book is configured as follows:
Name = ZPB1
Data view = DV1
The DV1 data view contains the characteristics 9AMATNR and ZCNTRY and Key Figures ZKF1 and ZKF2.
Assuming also that we have the following data currently in livecache:
9AMATNR-ZCNTRY-ZKF1-ZKF2
000001234-PH - 143 - 567
000007891-PH - 245 - 782
000007891-US - 124 - 890
Let's further assume that you want the data aggregated to country level (e.g. char ZCNTRY), you have 1 planning version 'ZPAV1' and you only want the data for Country=PH, then here are the parameters that you need to pass to BAPI_PBSRVAPS_GETDETAIL:
PLANNINGBOOK = 'ZPB1'
DATA_VIEW = 'DV1'
SELECTION = 9AVERSION I EQ ZPAV1, ZCNTRY I EQ 'PH'
GROUP_BY = 'ZCNTRY'
KEY_FIGURE_SELECTION = ZKF1, ZKF2
Hope this helps. Please post again if you have any questions. I can give you sample code if you can post your email address.
Message was edited by:
Emmanuel Nepomuceno (added planning version to selection) -
Date Mismatch of Planned Orders and Production Orders in APO & ECC
Dear APO Experts
When i am performing /SAPAPO/CCR , we are getting errors for Few Materials
Please kindly advice.
Following error for Planned Orders:
Order 0026037355 difference for receipt date: 06.02.2012 01:05:53(APO) <-> 04.02.2012 01:05:53
Message no. /SAPAPO/CIF161
Diagnosis
Order 0026037355 for material yyyy has a different receipt date in SAP APO and SAP R/3:
Receipt date in SAP APO: 06.02.2012 01:05:53
Receipt date in SAP R/3: 04.02.2012 01:05:53
Procedure
This data inconsistency can be rectified by choosing Send to R/3.
Note that the receipt date of the primary product is compared without taking into account the goods receipt processing time between SAP APO and SAP R/3.
Note the following if this message is issued for production/process orders:
In SAP APO, if the receipt date of the primary product deviates from the end date of the last activity of the order (for example, due to an offset or scheduling at the end of a fixed block), the receipt date always identifies this as inconsistent. You cannot rectify inconsistencies of this type by using the reconcile provided in the CIF compare/reconcile function.
In this case, you should deactivate the receipt date comparison. Alternatively, you can activate the order end date comparison if the primary product is assigned to the final operation.
Procedure for System Administration
You can use the business add-in /SAPAPO/CIF_DELTA3 Enhancements Comparison Report to deactivate individual comparisons.
In SAP Note 645597, you can find example coding with which you can activate the order end date comparison.
Following Error for Production Orders:
Order 000100163960 difference for receipt date: 14.01.2012 08:30:00(APO) <-> 23.01.2012 18:29:59
Message no. /SAPAPO/CIF161
Diagnosis
Order 000100163960 for material xxxx has a different receipt date in SAP APO and SAP R/3:
Receipt date in SAP APO: 14.01.2012 08:30:00
Receipt date in SAP R/3: 23.01.2012 18:29:59
Thanks
KanthHi,
Kindly check the SAP note mentioned on the message. Or you may reconcile the data by selecting the "send to APO" or "send to ECC" button on thhe CCR.
Also please check oss # 453244 if its releveant to your current system, otherwise please disregard.
Cheers! -
Planned order and Production order Not appearing cm21 transaction code
Hi
I have created a planned order for a material through MRP run
As soon as the planned order is created its available in the cm21 transaction code . But once i dispatch the planed orders , the planned orders can be seen only as a BAR in the upper right side of the screen .
1.Can any body please let me know how i can view the details of this dispatched planned orders in the same way when the planned orders were un dispatched ?
2.If i create a production order manually or convert a planned order to production order i cannot see these production orders in cm21 neither on cm22 , can any body please let me know what i have to do so that i can view these production orders as well in cm21 or cm22 transaction code.
Thanks and regards
Sankar NHi Pradeep
I have checked the generate capacity requirements and it worked ,Thank you
Presently i can view only the work centre details in cm21 screen extreme left , how can i see the details of the orders that are dispatched at this work centre ,in the similar way we see in the order pool, bottom left of cm21 screen .
Thanks
Sankar -
Data available in RRP3 view but not coming in SNP planning book
Hi All,
I am facing an issue in SNP book. I can see forecasts in RRP3 view. But when I load the same data in SNP planning book, the forecasts are not coming there (forecast KF)
I ran LC Cons check, PA cons check, OM17, but still the same result.
Any pointer would be highly valuable.
Regards,
Manotosh BhattacharyaHi
If you look at the standard Forecast KF 9ADFCST in your planning area, it is usually assigned the Category Group of DF1. This category group only contains the category FA for forecast. If you create Forecast in /SAPAPO/RRP3, this will create Additional Forecast or category group FC. Therefore any forecast generated this way will not appear against the standard planning book KF.
So you have two choices, if your forecast is only FC category then use the KF 9AAFCST Forecast (Addittional) in your data view or create a new Category Group with both FA and FC assigned to it and then assign this Categotry Group to 9ADFCST in your planning area.
Regards
Ian -
How to create a custom Button in a SNP planning book
Hi Experts,
I created my own Planning Book and Dataview in SNP with 3 Key Figures: KF1, KF2, KF3. Now I want to create one my own button with Macro so that when I press that button, the Macro will run to calculate: KF3 = KF1 + KF2.
I know that I can drag this Macro to one of default events like: Default, Level Change, Start. But actually, I want to create my own button so that I can handle the event as I want.
My question are:
1. How to create a custom button on the toolbar of SNP Planning book and writing macro for the button?
2. Please give me any document, material teaching about writing macro and relating to my above scenario.
Thanks very much!
Duyennx
Edited by: xuanduyen on Sep 6, 2011 9:20 AMHi,
Access the transaction "/n/sapapo/advm". In the list select your planning book/ data view and click 'Start Macro Builder' button.
In the Macro builder screen, drag and drop your macro from Macro depot to the work area.
Right click on your macro name and select 'properties'. In the pop up, next to the Assigned Push button field, there is a button 'Choose'. Click that. It will display all the available icons. In standard system, it displays more than 1000 icon. Choose any one icon which is suitable for your macro function. Close the pop up and save the macro. This will assign a push button to your macro.
In the Planning book tool bar, you can see the selected icon in the header tool bar. Just by clicking that icon, you can execute the macro interactively.
And I don't know whether we can include/design our own icon. But there are already 1000+ standard icons to choose.
Regards,
Manimaran M. -
The "Details All" view in the SNP planning book is not sorted
The "Details All" view in the SNP planning book should be sorted by Product Description in ascending order.
When all products in the selection ID are loaded into the SNP planning book, and then "Details All" is selected from the Header area, the product description list is not sorted in ascending order.
However when I load small number of products the issue does not occur they get sorted correctly by product description.
Is this hapenning due to standard functionality/Standard macro in Planning book?
Please let me know if anybody has faced this kind of issue earlier.
Edited by: Rohit Arun Bhosale on Jul 5, 2010 1:05 PMHi Rohit,
If you are using Detail All drill down then you wonu2019t get any option for sort as it will load all codes from the selection in the planning book and sorting will be based on product IDs.
but if you drill down from header on detail all -filter, even if you sort the display list there using ascending/descending button for Description, the list that you will get in the planning book after load will be based on the Product IDs agian.
I hope this is controlled from the selection we do in planning book where we select Location/Product, but if your planning is better driven by the description then you can remove the Product ID selection from header setting and have only description in drill down.
Regards,
Digambar -
SNP Planning book - Period Information Setting Issue
Dear All,
In SNP Planning book we have issue related to "Period Information" for
the buckets. The period labelling is not working properly.
Actually when we go to the SNP planning book and change the Period
Information Settings(refer attachment). Once Period Setting is changed,
it gets changed to all the users(globally). So it is behaving as if it is not
user specific settings.
Scenario is - Suppose I changed the Period information in SNP Planning
book to appear in particular format, and when other users goto SNP
Planning book their Period Information Setting gets automatically
set to the same format which was I changed to, and vice-versa.
FYI - We do not have - Use-Exit implemented for Period Setting.
Appreciate any input in this regard.
Thank you
Satish WaghmareHi Pawan
Thanks for the reply.
Here is what SAP has to say, this is as per reply to my OSS message.
Question- The period information settings cannot be
made user-specific; there is no customization possible. right?
SAP Says-------> Regarding the period information settings, there is really no
customization to achieve the result, unfortunately.
Question- When you goto Design of the Planning Book, inside the Dataview Tab,
Period Labelling field shows value as "A", However F4 drop-down list do
not contain u201CAu201D value for the selection. Only possible values in F4 drop-
down list are Blank, U, Z, B and E. Could you please clarify this?
SAP Says -
> Regarding the period labeling values, the 'A' value is blank in the
selection because you can also leave it blank for the system to use the
'standard labeling' option.
Sharing it for for everyone's benefit.
Thank you
Satish. -
Stock not in SNP Planning Book
Hi
We are doing a global implementation and we have seen the issue where stock exists in live cache, and is correctly considered in SNP Heuristics, but the stock on hand is not displayed in the SNP planning book.
This is NOT an issue with the stock category, as the same stock category is displayed for Poland and the UK locations.
This is leading me to think this might be a time zone issue?
What possible reasons can people think of where stock of the CC category is in live cache but not displayed in the SNP planning book. But another plant location is performing correctly for CC stock.
S SBI have answered my own issue. The stock on hand macro is initial stock + Receipts - Demands.
Deployment is running in the evening and pushing out the stock, the day rolls over to the next day and then the deployment STR demand is considered history and as per the above formula is netting off the stock.
This is a symptom of running the SNP run in the evening, not at 00.01am. (Deployment STRs of stock are instantly in the past) which then affects the stock on hand balance.
Hope that is clear to anyone else having this issue.
Simon. -
SNP - Planning Book/Data View not showing up in /SAPAPO/SNP94
Hi All:
I created a planning Book out of a custom SNP planning area. While I could see the Planning Book in the list of Planning Book in the /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books) I could not see the custom planning book in /SAPAPO/SDP94 - Interactive Supply Network Planning (all Books) . I could ony see the SAP supplied PB there. Will SDP94 transaction display only the standard SNP Planning book? How can I make sure that the custom PB is displaed in /SAPAPO/SDP94?
pl. help
Thanks
RyanHi Narayanan,
a couple of simple checks..
can you please check that you have not set a filter critera in the shuffler in planning book/data view?
you can also check if by mistake only a limited number of users are assigned to this planning book and data view ?
else you may want to check note : , 327371
Let me if this helps.
Rgds, Sandeep -
Key figure Explaination in SNP planning books 9ASNP94
Dear Experts ,
I am curious to know regarding SNP planning books key figures
when i am exploring sap standard Planning book
9ASNP94
Data view : SNP94(1)
I can able to see many KEY FIGURES Please refer below
I AM NOT SURE how they are used in planning , i mean what is clear definition of those key figures and i see some key figures are grey out and some or open for entry
how to find those detail information
when i go to T code SDP84 - define planning book
i can able to see those descrption and infocubes but not sure how to understand clearly , would be more thankful if some give me a clear explaination of it
Forecast TXT
Sales Order TXT
Distribution Demand (Planned) TXT
Distribution Demand (Confirmed) TXT
DistrDemand (TLB-Confirmed) TXT
Dependent Demand TXT
Total Demand TXT
Distribution Receipt (Planned) TXT
Distribution Receipt (Confirmed) TXT
Distribution Receipt (TLB-Confirmed) TXT
In Transit TXT
Production (Planned) TXT
Production (Confirmed) TXT
Manufacture of Co-Products TXT
Total Receipts TXT
Stock on Hand TXT
Supply Shortage TXT
Safety Stock TXT
Reorder Point TXT
Target Days´ Supply D
Target Stock Level TXT
Days´ Supply D
ATD Receipts TXT
ATD Issues TXT
Many thanks & Regards
RajHi
Please find below the short summary of each key figures.
Forecast TXT :- FCST which has been released from APO DP to APO SNP
Sales Order TXT :- Sales order transferred from ECC to APO via CIF.
Distribution Demand (Planned) TXT :- Dependent demand coming from other location to this location for same product. Network planning
Distribution Demand (Confirmed) TXT :- In case deployment , we confirm the Distribution Demand (Planned) will appear her.
DistrDemand (TLB-Confirmed) TXT :- Mainly used in case of TLB.
Dependent Demand TXT :- Dependent demand coming from parent product in case of BOM
Total Demand TXT :- The sum of all above demands is called as Total Demand.
Distribution Receipt (Planned) TXT :- SNP created Purchase req will appear in this key figure.
Distribution Receipt (Confirmed) TXT :- In case of deployment Distribution Receipt (Planned) will be get confirmed in the Distribution Receipt (Confirmed) key figure.
Distribution Receipt (TLB-Confirmed) TXT :- Mainly used in case of TLB.
In Transit TXT :- In will contain the in transit stock which will transfer for ECC via CIF.
Production (Planned) TXT :- Planned order will get created via SNP in case of domestic mfg.
Production (Confirmed) TXT :- In case of SNP deployment Production (Planned) will be get confirmed in the Production (Confirmed)) key figure.
Total Receipts TXT :- Total of all the receipt elements as been used.
Stock on Hand TXT :- Stock has transferred from ECC or R3 via CIF.
Supply Shortage TXT :- This will be calculated with macro based on total demand and total receipt.
Safety Stock TXT :- Based on SNP master data, safety stock will get calculated during planning run.
Reorder Point TXT :- Based on SNP master data, Reorder Point will get calculated during planning run. . There are different methods of calculating safety stock.
Target Days´ Supply D :- The safety stock defined in number of days appears based on SNP master data in APO.
Target Stock Level TXT :- Get calculated by macro based on Target Days´ Supply D and total demand in future.
ATD Receipts TXT :- Mainly used for Deployment.
ATD Issues TXT :- Mainly used for Deployment
If you require any specific information for any key figure please do let me know.
I hope this will be useful for you.
Thanks
Amol -
Demand on VC material not visible in SNP planning book
Hi Experts,
Is there any way to plan VC (Variant Configuration ) materials in SNP at the group level ?
I will explain the scenario more in details below
I have an VC material say X. Material X has end product Y attached to it (material variant). When material X is cifed to APO, it appears as configurable product in APO & is a top level product. Now when I create a demand on material X through DP, the demand appears in product view (RRP3). However the demand does not appear in the SNP planning book nor it gets selected during background planning run. The system is configured as Variant Configuration & not CDP.
Is it possible to plan material X in SNP ? If possible how can the demand be read in SNP ?
Thanks in advance
Regards
SandeepHi Sandeep,
One of the limitations of Characteristics Based Forecasting is, CBF results can only be used in PPDS and not in SNP, hence it is not possible to plan that material X in SNP. Even though you use MC90 transaction which is release DP to SNP, but the data will not be available in SNP
That material X will be planned only in PPDS, there are two ways to plan, those are
1. one way is by releasing CBF results to active version using MC90 transaction, during this release, you should maintain consumption group in release settings and in product master, in this case you have to use Forecast Check/Allocation check as a part of ATP/GATP, here you can not use CTP or MATP
2.the other way is by releasing CBF results to inactive version using MC90 transaction, during this release you should not define consumption groups, generate the dependent requirements in inactive verison using heuristics in PPDS , and convert dependent requirements from inactive version to Forecast - active version using /SAPAPO/DMP2 transaction, in this case you can use MATP/CTP as a part of GATP
-Deepak -
How to manually enter forcast/demand in SNP Planning Book
Hi experts,
Kindly help me there are two questions on my mind. First
1. How to create manually forecast in SNP planning book? and also in RRP3? (if the product is in house it automatically creates planned order, if externally procured PREQ but how about forecast using product view?
2. If the forecast is in the past but I want to upload that in the SNP Planning book?
Even if I change the period structure date it does not reflect the past dates in the planning book. Since the planning book of SNP is standard how am I be able to change the planning book time bucket start date.
Thanks and Best Regards!!!!Hi,
in /SAPAPO/SJKTST04 you set the type of order FCST, then you planning area and version, keyfigure to populate (your forecast keyfigure, probably 9ADFCST), the order type (usually FA)
In the details you set product, date to start, in horizon - the number of orders to create, if you set 10, you'll get 10 orders starting from your start date).
Unfortunately through here, you gan create orders with fixed quantity only and also for only one product/location combination.
If you already have DP available, even for testing I find it more easy to release forecast from there.
For your second question - at least for 4.1 (I don't have a 5.0 system to check) you cannot have past dates in a column other than "Initial"
Hope that helps,
br,
Mikhail -
User are getting kicked out of SNP planning book
Hello Experts
I hope you can help me out here!
From time to time we are experiencing strange issue for SNP user's .. User are getting kicked out from SNP planning book
Please help us.
Thanks
RameshHi Ramesh,
As far as I know, users should not get kicked out unless someone terminates their session.
Even if they lock some data and the same data is needed by some job, it's the job that would fail showing data lock. Similarly, if some other uses tries to access the locked data, the user who is accessing later would face the issue of not being able to go to edit mode.
It's possible to write programs that could specifically do this work of kicking out users before we run batch jobs, but let me assume that this is not the case with you.
One possibility is that there is issue in livecache and so users are not able to access livecache or get kicked out from their active session (e.g. your log area gets full, then users would soon get kicked out after seeing the system hanging initially). This you would need to check at the time when users face issue. This would also mean that other processes that need livecache should also fail e.g. GATP, or SNP planning or PPDS planning related jobs would fail at the same time.
If you could share exactly what error message the users are seeing, that could be helpful in resolving the issue.
Thanks - Pawan
Maybe you are looking for
-
Unable to view messages during transport request release
Hello ABAP Gurus, I am trying to transport an ABAP program (from BWD to BWP - there is no BWQ here). There are no activation or run time errors - I used ABAP program extented check and ensured that there are 0 errors and warnings for each of the chec
-
Internet Explorer requests Install of Flash Player
Hi, I'm testing my wed site development with Firefox, Safari and Internet Explorer on Mac and PC systems. When I use Internet explorer it asks me to Install Flash Player even though Flash Player is already installed on the PC. Is there a setting some
-
wheen ever I try to enter data properties my program freezes
-
Hi, i am a developer like most of you, and i work with a great team in San Diego for a radio station, that streams over the internet... we had great trouble deciding our platform and recently we decided to stick around with FMS and developed a flash
-
Maintain the Issue track in SAP Solution Manager
hi How to maintain issue track in SAP Solution Manager. give me description Thanks and Regards, YSR