Purchase Requisitions from APO to R3

Hi,
when iam transferring purchase requisitions from APO to R3, other snp orders are also automatically tranferring to R3 . How to prevent this?
Thanks,
Dhanush

Go to the following menu path
SPRO> APO>Supply chain planning> SNP> Cnfigure transfer to OLTP systems
Based on your requirement: only transfer SNP generated Purch Reqs and dono transfer SNP generated planned orders to ECC, you have 2 options
Option 1--Immediately transfer SNP generated Purch Reqs and never transfer any SNP planned orders
Config required: (1)SNP( Select Radio Button- Immediate Transfer)  (2) Check the " NO SNP PLANNED ORDERS" (3) Check whether the Dist Definition for the plant is maintained for External Procurement
(4) Check the CIF queues and clear or reset the status
Preferred Option2 for future projects in mind--- As this is a global setting, it is better to have periodic transfer set and then use C5 transaction to send the Purch Reqs to R3 using the Filter as Order Type.
This way you are not putting a hard stop for sending the planned orders to ECC as in OPTION 1.
Config Required: (1) SNP( select Radio Button- Periodic Transfer) (2) Run C5 transaction and give in your plant/product selection and APO order type=21(ext Procurement)
Thanks
Kumar

Similar Messages

  • IDOC or Standard prg to transfer Purchase req from APO to SNC

    Hi Experts,
    could you pls tell me whether any IDOC or standard program is available to transfer the Purchase requisition from APO to SNC.
    thanks in advance.

    Hi,
    You can use RSMIPROACT / RSMIPROACT2 report to send Purchase Requistion.
    With RSMIPROACT2, you can also use XML message (ProductActivityNotification) to send the data to SNC.
    PROACT (IDOC) needs to be configured for the logical system (your SCM system) in WE20 for this report to work through IDOC.
    Regards,
    Sandeep

  • Unable to transfer Purchase Requisition from ECC to EBP

    Dear Friends.
    We are unable to transfer PR from ECC to EBP. System issue stop message in SLG1 transaction for object BBP_EXTREQ
    Stop Message Type: Document type for determined backend system is missing.
    Warning Message Type: Grant 1111 does not exist.
    As per configuration guide we have performed following setting in EBP client
    1. We have created organization unit “Entry Channel” under company code.
    2. Under Entry Channel we create Local Purchasing Organization.
    3. Under Loc Purchasing Org we created Local Purchasing Group with
        - attribute BUK as backend company code
        - attribute BSA as backend PR type (NB)
        - this group is responsible for Entry channel procurement (setting in Function tab)
    4. Under Loc Purchasing Group we assigned RFC user which is same defined as RFC user in both EBP and ECC client.
        - attribute DP_PROC_TY defined as backend ECC PO type (NB)
    5. Attribute CUR define for entry Channel.
    6. Remote connection established with the same user defined under Organization Unit
    7. Remote user has profile sap_all and sap_new authorization.
    8. Material group, Material Type and Vendors are replicated from backend system.
    9. Sourcing always allowed is set for all product categories in “Define sourcing for Product Category”.
    10. Extended Classic Scenario is active.
    11. Defined Tolerance check and assigned TOG attribute.
    Performed following setting in ECC client.
    12. Defined RFC connection and user same as defined in Organization unit.
    13. Defined profile which reference to EBP logical system
    14. Maintained table V_T160EX with Material group/Pur group/ Profile combination.
    Finally transfer Purchase Requisition from ECC to EBP via report BBP_EXTREQ_TRANSFER. Further the outbound Queue fails with status ANORETRY. Also the log displayed the error ‘Application aborted due to serious problems’
    SLG1 in EBP issues stop message “Document type for determined backend system missing” and warning message “Grant 1111 does not exist”.
    Any idea what could be the reason?
    Please help!!
    Sandeep

    Hi
    It seems there is some problem with the Configuaration settings in SRM as well as R/3 side.
    <u>Anyways, please have a look at the following links, which might help.</u>
    <b>Direct Procurement</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Prerequisites for External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/18/db183d30805c59e10000000a114084/frameset.htm
    <b>Attributes for the SRM Scenario</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/84/a7e3389870c05ce10000000a114084/frameset.htm
    <b>Direct Material Scenario: Other Planned External Requirements</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/6a/4b9e3b891da20ee10000000a114084/frameset.htm
    <b>Number range settings</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/5d/fd7d3cb7f58910e10000000a114084/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/b7/15d4396898042fe10000000a114084/frameset.htm
    <b>Define Transaction types</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/10/fd7d3cb7f58910e10000000a114084/frameset.htm
    <b>Direct Material Scenario with Planning in SAP APO</b>
    http://help.sap.com/saphelp_srm50/helpdata/en/d3/4b9c3b122efc6ee10000000a114084/frameset.htm
    Hope this will help.
    Regards
    - Atul

  • Creation of Purchase Requisition from a BID

    Hi,
    I am trying to create a purchase requisition from a bid instead of a purchase order. Does anyone have any idea on this?
    Thanks
    Sunny

    Hello,
    are you trying to create a local SC or a backend PR ?
    If you are in classic mode (so PR and not SC), you could try to derive the PO flow to create a PR instead.
    But this is not really clean.
    The best way is to add a new button "Create PR" in quote screen (or rename the create PO if you don't use it), linked to your own fcode processing and finally call the META_REQUISITION_CREATE in SRM (instead of META_PO_CREATE).
    The last point would be to create a link BID_INV>BID>PR to be displayed in document flow. You have to check if it is possible, because sometimes the system is designed for limited possible flows and does not take into account the flow you want to add.
    In standard, you can create directly a backend PO only if the bid was created from a SC in the sourcing cockpit. Otherwise use local or extended PO (replicated in R/3).
    If this is the case, FM BBP_PD_SC_TRANS_MULTI_BE_PO will transfer the initial SC items to next document, which is a backend PO. You would need to operate some changes here to create PR.
    Rgds
    Christophe

  • Creation of purchase requisition from Webdynpro Java

    Hi all,
        I have a requirement that i should create purchase requisition from webdynpro java. i imported all required BAPI in the webdynpro. But i am not getting what should i have to give as input paramater. I have imported the Bapi_Requition_Create. Please help me on thin what sould be the input parameter i should pass.
    Regards,
    Shreeharsha

    Shreeharsha,
    you can check out the fm inse37 and see what are the importing and tables parameters
    Thanks
    Bala Duvvuri

  • Purchase Requisition from CRM Service Order

    Hello Everybody,
    I am trying to create Purchase requisition from Service Order for Service(Material type DIEN) as well as Material (Material type HAWA). I have maintained all the necessary configuration in CRM as well as ECC, like in CRM,  Logistic integration we maintained settings for Purchase requisition and in ECC we have maintained Document type and schema for the purchase requisition.
    For information purpose, I have created Service Material in ECC as DIEN and item category group as LIES.
    As soon as we save the Service Order in CRM with that item category, it should create Purchase requisition in ECC and the document flow in CRM should get activated.
    Currently we are not able to create Purchase requisition in ECC.
    Kindly let me know if there’s any configuration settings missing in CRM as well as ECC or if note to be applied.
    Best regards,
    Anup Bansal

    Hi Anup,
    I am facing purchase requisition creation problem for service products from crm.
    I have seen your query which was posted on same issue, so i thought i could get some help.
    The problem here is when i am saving the service order i am getting the below message.
    Enter a (default) purchasing group for material group SUB_MC (Notification E CRM_SRV_LOG_EXT_OLTP 002).
    I have actually downloaded mat_dien materials from ecc to crm and for material purchase group is already assigned for one plant, but still not able to recognise.
    Please help me out.
    Thanks in advance.

  • Update Purchase Requisition from Sales Order

    Hi,
    My requirement is to Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    I have used Userexit         :- MV45AFZB
                     Customerexit :- EXIT_SAPFV45E_002
                     BADI             :- ME_REQ_OI_EXT, ME_REQ_POSTED
    for my requirement, but in vain.
    Of these Userexit  MV45AFZB, Customerexit EXIT_SAPFV45E_002, BADI ME_REQ_OI_EXT are getting triggered in Sales order creation but, Purchase requisition is not yet triggered and we dont have the VENDOR value with which i need to do perform some checks and update the Purchase requisition.
    After I SAVE sales order, BADI ME_REQ_POSTED is getting triggered.Here, the purchase requisition is created ( not yet inserted into the database ) .I also have required VENDOR value, but in the given
    BADI ME_REQ_POSTED I can make checks according to my requirement but not able to update the new values into purchase requisition.
    Literally speaking, Iam struck up..Dont know what to do.....
    Please let me know any Userexit/BADI/BTE where I can  Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    Thanks,
    Shivaa..

    Hi Max,
    It just struck to me...
    As suggested by you, I thought of calling BAPI BAPI_REQUISITION_CHANGE  from user exit USEREXIT_SAVE_DOCUMENT in MV45AFZZ .
    I f I give PReq no. , BAPI BAPI_REQUISITION_CHANGE  will take the particular PReq no., from database and then change it according to our requirements...
    But, in our scenario I am calling the BAPI BAPI_REQUISITION_CHANGE  and passing a PReq no..which doesnt exist in the d/b itself.....
    Anyways, let me try......
    Meanwhile ,please suggest any other options for resolving the issue in question......

  • Purchase requisition from sales document' not possible due to a credit bloc

    hi experts,
    i have to confirm delivery date and quantity for some purchase order items but i'm not able because i receive following message:
    Subsequent function 'Purchase requisition from sales document' not possible due to a credit block'
    Purchase requisition belongs to a sales order which has customer 10000.
    The customer 10000 was block from FD32 but now i have unblock the customer from FD32, i have assigned customer to a category risk which is only a warning. (in OVA8 risk category 002 static check, reaction C, status/block uncheck )
    There is any possiblilities to confirm quantity ?? I mean ... i understand that sales order was created when the customer was block due to credit limit exceded ... but now the customer is not blocked.
    What should i do?
    Thank you.

    Hi Dan
    If you want to  confirm the delivery date then change the static check reaction to B . in OVA8 . But if you change the static check reaction to A , you can do Delivery and billing also
    Regards
    Srinath

  • Import Purchase Requisitions from one Operating Unit to a different Operati

    The need is to import Purchase Requisitions from one Operating Unit to a different Operating Unit.
    There are 2 operating unit with one inventory orgs in each. But the 1st is OU( It is a club) merely creates Purchase Requisition, and its not a advisable process to have a separate Purchasing process in that OU as it is too small ( but for financial reasons it has to be defined as a separate OU). So we want the Purchase Requisitions created in the 1st OU to be imported in the 2nd OU. Is there any way we can achieve this. Note: Since Order Management is not implemented we cant use the Internal customer setup and we wont like the PO to be created in the 1st OU as we do in standard Intercompany invoicing process.
    Any solutions/Pointers/workaround for this.
    Regards,
    Manoj

    As long as you have the same master org in the 2 operating units, all you have to do is
    INSERT INTO mtl_system_items_interface
                (organization_code, segment1, transaction_type, set_process_id, process_flag)
       (SELECT '&new_Org', msi.segment1, 'CREATE', 100, 1
          FROM mtl_system_items_b msi
         WHERE organization_id = &old)And run the Import Items request.
    Hope this helps,
    Sandeep Gandhi

  • Creating Purchase Requisitions from within PS (ie from network)

    When creating purchase requisitions from within Projects Systems (ie activating them from a network) is there a "standard" way to put a cost center on the Purchase Requisition?  Currently no cost center is put on the account assignment.  We are looking at doing a custom field on the network header to hold the cost center and then a user exit to take this cost center and put it on the purchase requisition (and reservations) but before we go to all this trouble thought maybe I should check to see if I am missing something obvious?  Is there a more straight-forward way to accomplish this?  We know that we cannot edit the account assignment in ME52N becuase the PR originates from the network and therefore can only be changed from the network.
    Any input welcome.  Thanks.

    Dear Laura,
    When you will create Purchase Requistion through Network, system automatically takes account assignment category as "N" i.e Network. This you can not change in ME52N transaction.
    So this is a standard practise for generating Purchase Requistion through Network in PS Module.
    As you said putting Cost Center in Network Header as a Account Assignment Category which will go up to PO creation by using some User Exit which will not be possible in PS Module as per my knowledge is concern.
    But you want to keep Cost Center as as a Account Assignement Category you need to create manual Purchase Requisition through ME51N transaction.
    Hoping this will be useful to you.
    Regards,
    Sandeep

  • Creation of Purchase Requisitions from Forecasting Values

    Dear Friends
    I coud do forcasting and generated the forecasting values and the values are also visible in the MD04 Stocks/Requirements List. Please guide me to create the Purchase Requisitions from the forecasting values.
    Thanks and Regards
    Suresh

    Depending on the MRP type in the material master you'll need to run either MRP or MPS.  I'd start with single item single level which will just plan the one material.  The Tcode is MD03 for MRP items and MD42 for MPS items.  It sounds like you're new to this so you should look around at the settings in the MRP1 - 4 views of the material master to understand the different settings that control the output of MRP (e.g. MRP Type, Lot Size Data, etc).  Lastly, check the MRP Control parameters that are entered when you run the MRP transaction.  Specific to your question, running it with Create Purchase Req 1 or 2 will create Purchase Reqs directly.
    Hope this helps.

  • How to create a purchase requisition from the EP

    1. How to create a purchase requisition from the EP & What are the pre-requiste?

    Hi,
    You need to create a SAP transaction iview for purchase requisition transaction and link it to the role and to the user to view purchase requisition transaction.
    First you need to create a system in portal to link to the R/3 system. For creating system check this link.
    http://help.sap.com/bp_epv260/EP_EN/documentation/EP/N03_BB_InstallGuide_EN_US.doc
    For linking portal with R/3 and view the Purchase requisition check this link
    Configuring EP for connecting to SAP R/3
    Regards
    Arun

  • Pushing Purchase Requisition from ECC to SRM via XI  in PPS

    Dear Experts,
    Environment SRM 7.0 ECC 6.0 ep4 and PPS 33.0
    We are having an issue with pushing the Purchase Requisitions from ECC to SRM 7.0 via XI  using the SOA.                              There is an Application error on the receiving side in SRM (Faulty exchange Data)  when pushing the PR from XI to SRM using the inbound interface Purchasing RequestERPSourcing_In.                                                                                The outbound interface from ECC to Xi PurchasingRequest_ERPSourcing_Out is working fine without any errors.
    Please let me know if any one has similiar issues in a PPS public sector implementation and any resolutions?
    Thanks in advance for the help,
    Scott

    HI ,
    If you have the xml in srm having status "Transfer to external application" then you can use the Forward Error Handling (FEH) concept in SOA. If you have done the required configuration for FEH and use transaction /n/SAPPO/PPO2 in SRM you will be able to see the actual error why xml is failing. Also rememeber to change the value for field Mode of postprocessing Order to 0 in the screen you get after running tranaction /n/SAPPO/PPO2
    To configure FEH refer note: 1270081
    Hope this helps.
    Regards
    Sam
    Edited by: Sam Chacko Ninan on Feb 12, 2010 10:06 AM

  • Error transferring a purchase requisition from R/3 to SRM

    Hello to all,
    Im trying to transfer a purchase requisition from R/3 to SRM using bbp_extreq_transfer report. The last error i have found debugging the outbound queu is BBP_PD 055 "FI logic system is not found; alert system gestor".
    Does anyone know where i have to include this data, in spro or in ppoma_bbp transaction
    Thanks in advance,

    Hi
    Kindly check once again whether Logical system has been currently declared / configured.
    In SRM
    SPRO - Supplier Relationship Management - SRM Server - Technical Basic Settings - Define Backend Systems
    In R/3 back-end
    Transaction - SALE
    Related link ->
    Backend system
    Kindly let me know any clarifications, Do you want document for how to create Logical system.
    Regards
    - Atul

  • Creation of Purchase Requisition from VA01

    Hi,
    I have a requirement to apply block Id in me52n from tranasaction VA01 while creating sales order.csan you tell me how purchase requisition is generated from VA01 as this information will help me impose block in me51n from VA01.(Prior to that i have tried various badis and user exit but none of them are really helpful).
    Thank you.

    First of all you need to define the schedule line categories and then assign them to item categories. The system will automatically creates the purchase requision based on the item category/ schedule line.
    I guess, you need to look at the copy control process between sales and purchase.
    also look at the sales order user exit (Save document prepare / Save document) in MV45AFZZ
    Good luck

Maybe you are looking for

  • FPS problem with StageVideo (iOS)

    In my app the StageVideo works otherwise just fine, but the problem is that it drops the FPS to 40 from the original 60 and it does not come up to 60 even when the video has ended. I have tried to clear everything related to video after it has ended:

  • Signature problem - adding symbols to some messages

    I have a user who will sometimes have a > in front of each line in her signature. I've been able to determines it only happens when replying to Plain Text messages - other formats are fine. Any suggestions?

  • Adobe Flash 11.5

    I have just downloaded the most recent Adobe Flash on my toshiba laptop using Windows 7.  Adobe Flash is not supported by Toshiba Media Controller plug in. How do I fix this?

  • Displaying Shared Volumes on network

    I have a network of 3 macs running 10.5.4. I set up file sharing on one of the machines and allowed sharing of its external drive. Everything works fine. My question is, how can I get that volume to automatically show up under the "shared" area on th

  • Active state

    The Muse team scrambled nicely with a hotfix for the active state problem. But an earlier problem with active state still pesists. It's a little more nuanced but it definately should be considered by anyone doing a one page Muse site using scroll fea