QM activation for a plant

Hello gurus and friends,
can anybody tell me how to activate QM for a plant for results recording.
how to ensure that result recording does not stop any further process, ie, material should be posted to unrestricted stock instead of quality stock. Please tell me what are all the settings required for this.
thanks and regards,
Ram

Hi,
Thanks for the quick response.
I am in need of clarification for these questions
1) are there any plant level settings to be made. If so how ( either Tcode or menu path please and the data to be maintained)? In OMS2 I have checked that the QM is activated for the material.
2)In the case you told me the material seems to move to quality stock. But for me when GR is done material should not go to quality stock. It should go to unrestricted stock. I will do result recording later.
Please provide a solution fo this.
regards,
Ram

Similar Messages

  • MM06E005-Screen should be active for particular plant

    Hi,
    Using  MM06E005 i created a new field on the subscreen under  CUSTOMER DATA tab at the item level. How can i change the description of the  CUSTOMER DATA tab to Vendor Acceptance .How can i make this enhancement active for only one plant?All other plants should contain standard things only. Please guide me.
    Regards
    K Srinivas

    Hi Srinivas,
    I am facing the same scenario.
    PLease send the solution.
    Thanks in advance,
    Bala.

  • QM: QM active for another plant

    Dear all
    i have made QM configuration for plant 1000.Now i have some materials on plant 2000 and wants to active QM on that material so what should i do in config for plant 2000.

    Dear,
    IMG settings,
    Go to QM->Basic settings->Maintain settings at plant level.
    Here you need to do plant dependent QM settings.
    Activate the QM view in Material Master,
    Also refer the below link for inputs related to QM.
    http://www.saptechies.com/category/quality-management/
    Regards,
    R.Brahmankar

  • Material Ledger to be activated for a Plant in Live system

    The scenario is as under:
    The Company is already live with about 10 Plants under the Company Code. For one of the Plant we want to activate Actual Costing /Material Ledger. Are there any risks or likely issues?
    Thanks,
    Sanjay

    HI,
    This sort of implementation in the live system happens every where and there is no risks involved.
    There will be some challenges might be.
    1. We need decide, are we going to have raw materials with pricing control S or V.
    2. Are we going to have actual price of last month is going to be new planned price of new month or not?
    3. Is it only for reporting purpose or more than that? like inventory control sort.
    4. User training
    Vijay

  • Message LP327 WM Not active for plant

    Dear All,
    We have just upgraded our SAP system from 4.7 to ECC6.0, While doing a repetitive manufacturing backflush a warning has appeared (LP327 WM Not active for plant), the statement in the warning is correct, the plant is not active for WM, I was wondering if this particular warning could switched off.
    Kind Regards
    Mark Summerbell

    Hi Mark,
    The message is triggering from std SAP program RLLT0R00 and is defaulted to Error message.We cannot change that to warning message in that program.Pls try to search suitable OSS notes for the  same.It looks like Extent WM is active for your plant so the message is issued.
    Pls see below attached details of Extent WM
    Reg
    Benny
    Extent Warehouse Management
    Key that controls the use or the degree of activation of Warehouse Management for a storage location. The key controls whether bin stock is to be managed in the MM-WM component.
    The field can have the following settings:
    blank = normal management of stock in bins. The full range of functions provided by the MM-WM component is available.
    1  = Lean WM for inbound or outbound deliveries. The delivery or pick is executed using transfer orders (from MM-WM). These transfer orders, however, do NOT update bin stock in Warehouse Management.
    2  = For this storage location, you can use normal SD picking in combination with doors and staging areas. In this context, no Warehouse Management functions are activated.
    3 = Lean WM for outbound deliveries. Picking occurs using transfer orders (from LE-WM). However, these transfer orders do NOT update bin stock in Warehouse Management.
    4 = Lean WM for inbound deliveries. Putaway occurs using transfer orders (from LE-WM). These transfer orders do NOT, however, update bin stock in Warehouse Management

  • AFS material-/mrp-status not active for plant.

    Hello Everyone
    I am facing an issue while executing the sales order
    Issue  :AFS material-/mrp-status not active for plant..
    CAN ANY ONE RESOLVE THIS...
    Regards,Rajneesh

    Hi Rajneesh,
    Tht prb might be the material master.
    Goto Material master, select AFS MRP View and activate/ press the AFS MRP status button and save.
    Reward with points if it is helpful
    Kishore

  • Batch to be activated  for a material

    We need to activate Batch Management for a material which was already created and some transactions also done with that.
    We have done the following :
    1) All required settings done in SPRO
    2) All documents for that material have been deleted. There are no Open documents (PR, PO, Sales).
    3) There is no stock for that material.
    4) Now when we try to activate Batch Management tick in Material Master it gives error
    Batch management requirement cannot be changed; choose "Display errors"
    when we click on display errors :
    The batch management requirement cannot
    be changed for the following reasons:
    "Stock already exists at Plant level"
    But there is no stock, no documents. We do not want to do any archiving activity. so whether this material can be activated for batch management.
    Please clarify : If any transaction has happened for a material, but there is no stock or open documents, whether batch can be activated.

    Hi,
    Have you checked the stock at zero level for all the plants?
    Also, activate the batch managemetn at material level and create.
    Check open PO exist for any other plant? In MMBE---enter material, got to Environment data on MEnu bar and select Open PO's.
    Then go to MM02 and activate Batchy Management.
    Hope this helps.
    Regards,
    Smitha

  • Material ledger activation in existing plant

    Hey all
    We have a plant in our Production client which was recently created. The materials in this plant have No released cost but we have PO's and movements in this plant.
    Now we are planning to activate Material ledger for this plant. Can anyone advise me on the things that i need to take over of before activating material ledger. Like Closing PO's, MM period, the time of cost run after ML activation and all the Cutover activities that I need to take care of.

    Hi,
    You should activate ML at the beginning of the period. All open orders should be closed.
    Please review note 596558. It contains all recommendations for activating Material Ledger.
    Best regards,
    Antje

  • Material Ledger activation (COML) - multiple plants in single company code.

    Hi -
    Material Ledger activation (COML)- multiple plants in single company code.
    In large mfg plant - process industry (proposed to dived into number of production plants), Matrial 'a'  is produced in plant 'a'.Material 'a' is input to procude matl 'B' in plant 'B"..so on and so forth.
    We are activating Material Ledger (COML) for actual costing purpose. Question -During multi level price determination, will the variance of lower level materials ( produced in lowerlevel /other plants in our case) be rolled up to higher level materials (in a different plant). please let me know if it really works, if yes what are the guidelines (if any) .
    Please advise ASAP.
    Thanks
    Chris
    Edited by: Chris Farr on Oct 23, 2008 11:12 AM

    Hi Chris,
    from a business point of view there is a  difference that you might take into consideration: The valauation level will always be on material and plant combination. That means, the division into several virtual plants will usually lead to different actual prices for the same material in each plant. That might happen for example when you carry over stocks from last month into the current month in one plant, while the other plant has only receipts from the current month.
    That might me desired, but often it is not. If the mutiple plants are in reality only one location it might be hard to explain why the prices differ between plants.
    best regards,  Udo

  • MIRO for Multiple plant..!!!

    Hi all ,
    While posting the Vendor invoice ( MIRO) based on Vendor , the following  error message showing
    Multiple Plant Exists in the same invoice
    Message No : 8I820
    The following function has been activated..
    Sap standard implementation CL_CAT_DET_MM of badi  INVOICE_UPDATE
    Method -> CHANGE_BEFORE_UPDATE
    J_1I_MM_SER_CAT_DETERMINE
    J_1BSA_COMPONENT_ACTIVE
    Message no - 8I 820
    How we can correct this problem.
    Thanks in advance

    Hi Shiva,
    It seems both the Plants having different Excise registration which u have added in single PO
    If yes you need to post seperate invoice for this plant
    Vishal ...

  • Multiple physical inventory document active for same material-storage locat

    hi experts,
    I am using transaction code MI31 for creating physical inventory document for all materials at a particular warehouse(storage location). User is selecting direct generation of of PI documents in the transaction. If by mistake he presses execute button more than once system is creating as many copies of physical inventory documents. As per ERP system logic it sound very wrong to have multiple physical inventory document active for same material-storage location ( no batches or special stocks exist ).
    Is there a message number or some standard setting to prevent such occurrence.
    regards
    Avinash

    Hi,
    Syetem won't create again physical inventory document, if allready PI is active for the same part number,  plant, storage location & batch/valuation type.
    Check your PI documnets
    Regrads
    KRK

  • Assign Multiple Sales Org for One Plant in STO process

    Hi Experts,
    Aware that I can assign multiple sales org to 1 plant (relationship: many to many).
    I am trying to create STOs to supplying plant and assigning them to different sales organization but encountered problem.
    Example:
    Supplying Plant 1000 - Sales Org 1000A (food) and 1000B (apparel)
    Receiving Plant 1100
    Plant 1100 wants to issue 2 STOs to Plant 1000 - 1 for each Sales Org (for instance STO1 to food division, and STO2 for apparel division).
    However, when I tried creating STO in the system, noticed that in the shipping tab (item details) the sales org, DC has been assigned to 1 particular assignment and data is locked.
    Tried to get into SPRO to configure and define the shipping data for plants but noticed that it's 1 to 1 relationship (SPRO - IMG - MM - PO - Set up Stock Transport Order - Define Shipping Data).
    How can this be done?

    You can set different sales areas (~sales organisation) for one plant in SAP - based on issuing SLoc provided STO between storage locations is activated.
    SPRO > Materials Management > Purchasing > Purchase Order > Set up Stock Transport Order > Set Up Stock Transfer Between Storage Locations > Define Shipping Data for Stock Transfers Between Storage Locations
    Edited by: Csaba Szommer on Jul 2, 2011 6:14 PM

  • Core Interface for new plants

    Hi All:
    We created new plants and have all the other transaction data.  But when I created the IM for these plants and activated the model, I do not see these plants data in APO.  I tried it a few times.  I checked if the connectivity between APO and R3 was an issue.  It is not.  What are the things I can look for?  Transaction /SAPAPO/C3 gave me one message 'Incorrect import parameter for method /SAPAPO/CL_CURTO_DB=>SAVE_DATA.

    Sorry... I send the message before I completed the message.....
    Hi All:
    Looks like the new locations has been CIFed already.  Then I created an IM for some specific materials and some of these plants.  I could activate the model, I do see these material plant combo in the active IM (CFM2). But they are not in APO (RRP3 or MAT1). 
    I checked the following transactions in R3 (SLG1 and CFG1) and (/sapapo/C3).  I dont see any log for these.
    I checked the queues both in R3 and APO and they are not blocked.  But there are many other logs in APO that are greyed (not red, not green) which tells me that they have not been processed yet.  My suspicion is if are processed at all. 
    I checked the connection (changed a factor in an existing material plant and they flow).
    Can anyone help pl?

  • ECM change no mandatory only for specified Plants in CA01 and CA02

    Dear All,
    I am in the process of activating the engineering change management for BOM and Routing.
    I did the necessary setting to work ECM.
    Now my problem is we have different plants and the ECM has to be activated only for 2 plants.
    To make change number mandatory in CA01 and CA02 for these 2 plants. i followed the below steps.
    IN T CODE OP5A- PP TASK LIST INITIAL SCREEN - CHANGE NUMBER - CHOOSE RADIO BUTTON INPUT - SELECT INFLUENCING -SELECT PLANT -CHANGE NUMBER - ENTER PLANT - CHOOSE RADIO BUTTON REQUIRED
    Same like that I did for both plants. Even after this setting it is not allowing without change number.
    Can any one help me to solve this issue.?
    Thanks in advance
    Ganesh

    Thanks for your reply.
    After giving authorizations also  problem pertains the same.
    Can any one tell steps followed in field selection parameters is right or wrong?
    Regards,
    Ganesh

  • MIGO / MB01 - Barcode scenario for archiving just for certain plants

    Dear Experts,
    I'm trying to activate the barcode scenario for archiving delivery notes when posting a goods receipt. We are working with several plants but the barcode scenario should be activated just for certain plants .
    Does anyone have an idea how I can use barcode scenario for certain plants?
    Thanks in advance!
    Petra Hönnemann

    Hi Petra,
    not sure, if your question already had been answered. But if not, I think what you need is to create documenttypes for each plant. Also create different Contenet Reps and link them to the corresponding documenttype. In TA OAC5 you can activate the barcode scenario for each plant.
    Regards,
    Lu

Maybe you are looking for

  • Can we use custom RFC in creating models in Visual composer??

    Dear Experts, Can we use custom RFC in creating models in Visual composer?? If yes, kindly provide some documents or links which would guide me how to achieve it. Warm Regards Upendra Agrawal

  • Ipod nano formatted to mac / pc?

    i formatted a nano ipod to a mac and uploaded music to it as a gift. the recipient unfortunately has a PC; to plug into the PC, he needs to restore the ipod to factory setting (thereby losing all the music).  if he reconfigures it for a PC, can i sti

  • Query - text name chnage

    Hi I have a query wherein tables mast and stpo tables are used to extract data in the output. In teh query output we are pulling in Material number for which I have used the function to get the material number along with its text . SO in the output I

  • Photoshop Elements 11 - Photo Editor not working

    The editor on Photoshop Elements 11 has stopped working.  I have tried to uninstall Photoshop Elements 9 and failed, this may have caused this problem.  Is there a way to run a repair of the applicaiton?  If not, will I lose what I have in my catalog

  • Display 3 decimal in ALV for data element KBETR

    Hi experts, I've got an ALV report that reports, besides other things, the values stored in KONP-KBETR. The values from KONP-KBETR are passed across to an internal table field which is defined as type KONP-KBETR. The problem is that KONP-KBETR is dis