QM in Repetitive

Hi,
I want to record in process results in repetitive manufacturing scenario. There is no inspection lot creation during daily activity. So how can I record in process results?
Best Regards,
Ibne Khalil

Hi,
Create Inprocess Inspection lot for your production version using T code MFPR for recording the results.
Regards,
Ravi Kumar C.

Similar Messages

  • Birthday calendar bizarre repetitions and other issues

    I have the STRANGEST things happening with birthdays on both my iPhone (5, 32GB, white, iOS 6) and iPad (32GB, iOS 6, white).
    I'm posting it here in the iPhone forum, assuming more people may be able to help.
    First of all, I sync a Google Apps calendar with my iPhone and iPad via CalDAV. I also sync my Google Contacts with my address book (including birthdays), which syncs via my MacBook on OS 10.6.8 using the sync icon in the system tray. (I hesitate to call it MobileMe, even though that's what the System Preferences calls it, because it really has nothing to do with MobileMe -- it does not sync via MobileMe [I do not have an account], it just syncs my Address Book with Google with my phone or iPad when hooked up. It is through a WIRED connection that it does the final sync to the device.)
    So, my birthdays from my address/contact books and my Google contacts DO sync and they DO show up on both my iOS devices in the fancy Birthday calendar with the cute cake symbol, as well as in my Google calendar.
    NOW HERE'S THE CRAZY PARTS.
    Sometime recently, my birthdays were getting repeated. But oddly, enough they are a different amount on the two iOS devices. I have 18 copies of all birthdays (on the same day) in my iPhone calendar and 68 (YES, SIXTY-EIGHT COPIES) in my iPad of every birthday.
    My Google calendar shows NO SUCH ERRONEOUS copies.
    The crazier thing is that the copies of the birthdays are NOT on the birthday calendar. In fact, IT'S AS IF THEY JUMP AROUND ON DIFFERENT CALENDARS. They show up all one color, but some random color. They will appear or disappear only SOMETIMES if I turn "off" some calendars or others (for example, once they would go away if I hid a "Personal" calendar, another if I hid a calendar I subscribe to via Google but sync via CalDAV from Weather Underground, and another calendar that is a Google calendar but also my "default calendar" in the iOS settings). And this is all within minutes.
    When I go into an instance of the repeated calendar event, it will actually say it belongs to my default calendar, regardless of what was hiding or showing it before.
    When I try to "edit" the birthday just to see what happens, it crashes the app.
    WHAT. THE. ______???
    Here's what already I've tried:
    Searching the internet for someone with a similar problem. NADA.
    Turning off the option to sync my Google birthday calendar via the Google sync page (I think it's actually unnecessary anyway, since iOS pulls from the contact book, anyway). That did nothing.
    Hiding all calendars and then selecting them to show one at a time to figure out which calendar was causing the problem, but as I mentioned above, it is not consistent.
    Re-syncing my devices with iTunes.
    Searching for and merging duplicate contacts in Google contacts.
    Turning off the iOS birthday calendar.
    Killing and re-starting the calendar app.
    Re-starting my iOS devices.
    Re-syncing my contact book with my devices.
    Someone. Please. Tell me you're having this problem and that you have the solution? I'm going crazy over here! I can't remember anything that may have triggered this to happen.

    I figured it out! (Or at least, it's been fixed for a day on both my iPad and iPhone.)
    By the way, I discovered more oddities, but I'm not going to even bother with describing them.)
    I am assuming everyone here has been syncing their birthday calendar off of Google/Gmail (whether CalDAV or Exchange, it doesn't matter).
    The key to this is to know three things:
    A) Tgara was on to something: syncing the Google birthday calendar in your Google sync settings -- even though it does not show up in your calendar list on the iphone/ipad -- is the culprit.
    B) BUT, simply un-syncing will not make them go away unless you completely un-sync all your Google calendars. Once the repetitions get into your phone/iPad via they are kind of "stuck" there, and you've got to go back to the beginning to un-stick them for good.
    C) Thus, it may require some trial and error because I had to repeat this a couple times. I may no have the right order of operations, but this is my best recreation/guess.
    How I fixed it (I had to repeat a couple times for some reason):
    1) I'm debating whether you have to do this step (I think I did it on my iPhone, but not my iPad, and yet both worked), but it doesn't take long, so you could just to be safe: on your iOS device, Settings > Mail, Contacts, Calendars -- delete your Google calendar account.
    2) On your iOS device, go to the proper Google sync page to choose what calendars are available for syncing.
    For Exchange, go to: https://m.google.com/sync/settings/iconfig/device
    For CalDAV and Gmail/normal sync, go to: https://www.google.com/calendar/b/0/iphoneselect
    For Google Apps CalDAV (although it worked for me on the normal page above), go to: https://www.google.com/calendar/hosted/yourhosteddomain.com/iphoneselect
    If you're not sure which method you use, do both of them.
    3) Sign in and choose the device in question (if prompted) and then uncheck ALL the calendars. Save/apply.
    4) Go to calendar app. You should have an On my iPhone or On my iPad calendar and the iOS birthday calendar. Ensure that no repetitions are seen when you check mark each calendar idividually and also collectively to be visible. If there are, repeat the steps above.
    5) Once the repetitions are gone, go to your iOS settings and add the calendar account back in if you removed it in step one.
    6) Go back to the calendar app. Again, you will have two calendars -- one default Google calendar and one ios birthday calendar. Turn on each one at a time and also together to make sure the repetitions are gone. If they are not, repeat the above again.
    7) Once they are gone, go back to the Google sync page(s) and add all the calendars you want back, BUT DO NOT SELECT YOUR BIRTHDAY CALENDAR. Save/apply.
    8) Go to the calendar app. Open up the calendar list. Wait for it to refresh. Now you should be able to turn on all your calendars you wish to see, wait for it to propagate, and confirm there are no copies. If there are copies, repeat all the steps!
    YOU DO NOT need to erase your contacts. Not sure about iGust's work-around, but that's unnecessary. And christina44, I actually think this is a different problem. All my copies were on the correct date.

  • Can we use batch management in repetitive manufacturing?

    Can we use batch management in repetitive manufacturing?
    If not, can we use classification or something else?
    or what else options we have.
    Thnx!

    why not?
    http://help.sap.com/saphelp_47x200/helpdata/en/25/283c594f7811d18a150000e816ae6e/frameset.htm

  • Report for Material consumption quantity  & its cost in Repetitive MFG.

    Hello,
    Is there any Standard Report available in SAP to check the Quantity of raw / intermediate material consumed & their cost in Repetitive manufacturing Backflush transaction MFBF?
    Thanks

    Here I'm interesed in the MFBF Qty & against which the consumption of Raw Materials & their cost.
    The reports which you asked me to check are all structures & not much of use for individual analysis.
    My requirement: When we access the material document(MB51) of the individual MFBF we get all the Raw material Consumption Qty & from there we can go to FI Doc (A/c Document).In A/c documet  we get the cost of all Raw materials consumed alongwith the Qty.
    Is there any report or I need to develope a new report?

  • With iCal can I hide repetitive events in month view only?

    I was wondering if it was possible to hide repetitive events in month view but have them show in week and day views. For instance, I have my class schedule on iCal but I don't want to see it when I look at the month view, I just want to see events that are not repetitive, such as exam/test events. If anyone can help, that would be awesome. Thanks.

    jk_baller23,
    You could create a separate calendar for repetitive events, and uncheck them when using the day/week view.
    ;~)

  • How to Create a simple report with headers and repetitive details

    Hi All,
    I have been trying to do a report through PLD with a query that accept a parameter and has been saved into a Query category of the Query Manager. The Problem that i have encountered is that though i wish to have some of my fields into the Report's Page Header Area, i may not able to move it from Repetitive Area1 Area.
    I tried creating a field of database and tried linking it with Table but only the First Record details of my table gets displayed in that field irrespective of the parameters i provide.
    Thanks in Advance,
    Siju Dasan

    Hi Suda,
    The 'T0.' and 'T1.' can be avoided as you say...
    The resultset would contain same values for fields of Table1 and the different values of fields of Table2, which means the fields of table1 can be grouped and moved to the header and so it needn't be redundant in the report.
    just like resultset,
    T0.Field1  T0.Field2  T1.Field1  T1.Field2
    1              Henry       Item01     345
    1              Henry       Item02     112
    1              Henry       Item03     745
    As in this resultset above, you can see that fields of T0 that is Table1 can be grouped so that only Fields of T1 that is Table2 need be displayed in repetitive area.
    Thanks,
    Siju Dasan

  • Month view ok, but Day view has endless repetition of events...

    When I am in Month view in iCal, my events look normal, but when I am in Day view, it seems like there is an endless repetition of all of my recurring events every day.  Has anyone experienced this?  I am running iCal 3.0.8 on Mac OS 10.5.8.  Also the problem appears on my iPhone.
    Thanks.

    I carefully checked and made sure each recurring event did not go on forever.  In the Month view it reflects the end dates, but the Day view does not, and ALL the events seem to be stacked endlessly Every day in the Day view.

  • Regular Expression Question, Repetition Operators

    These are my success entries for a field;
    123456,
    123456,123456,
    123456,123456,123456,
    123456,123456,123456,123456,
    "," seperated 6 digits can be repeated unlimited times.
    I found on documentation this; "Repetition Operators; {m,}     Match at least m times" and for my need i tried this regular expression; "^[[[:digit:]]{6},]{1,}$", but didnt worked :(
    Any comments?
    Thank you very much :)
    Tonguc

    repeating exactly 6
    {6}
    repeating at least 1
    +
    repeating at least 6
    {6,}
    ok, your problem is [ instead of (                                                                                                                                                                                                                                                    

  • Error  while giving the production line in repetitive mfg

    Hello friends,
       When i am maintaining the production version in material master for repetitive mfg, and in production line when i am giving the workcenter which is in operation of rate routing, system giving me the error message that "REP01(which is my workcenter) is not maintained in plan (planning type = plant = smp1)".Message no. is CFVO90.
          Though i have got the solution of this message, but i am not able to understand the solution.
          Actually while creating the production version in material master, for task list data i was only maintaining the task list type, Group Number and Group counter for  Rate Based only as Rate Routing.And when i would give the workcenter which is in operation of rate routing then  system would give me the error.
           Later on when i maintained the Task list type, Group Number and Group counter for Detailed scheduling, Rate Routing, and Rough cut scheduling and than maintained the workcenter in production line,system didn't give the error.
          My question is as we are doing the repetitive mfg, and as we have maintained the rate routing, so why it so that in Detailed scheduling and rough cut scheduling also we have to maintain the Task list type, Group Number and Group counter.
         Plz guide.

    Hello pravin,
    Thanks for the reply.
      Actually if i give the details of Task list type, Group, Group counter for Rate based scheduling only in production version and if i maintain the workcenter which i have given in the operation of Rate Rounting in production line then system is throwing the error mentioned above.
        Unless and until i mention the details of Rate Routing for all i.e. Detailed scheduling, Rough cut scheduling and Rate based scheduling, system is not allowing me to save the production version.
           As per your answer, even i am confused that as i have ticked the repetitive mfg in mrp 4 view and as i have given REM profile, so system should not give me the error when i only maintain the rate routing data in Rate based scheduling in production version.
          Is there any other way to solve this error.If not than whats the logic behind it.
               I hope u have understood my query.

  • When I connect my iPad to my iMac I get a repetitive flashing error message "iTunes could not connect to this iPhone. This device is no longer connected."

    When I connect my iPad to my iMac I get a repetitive flashing error message "iTunes could not connect to this iPhone. This device is no longer connected." iPhoto eventually launches but iTunes will not launch iTunes.  iPad will not charge.  Restarted iMac and rebooted iPad and no difference.

    Hi GJ374,
    Thanks for using Apple Support Communities.  This article has steps you can take for issues with your iPad not being correctly recognized in iTunes:
    iOS: Device not recognized in iTunes for Windows
    http://support.apple.com/kb/TS1538
    Cheers,
    - Ari

  • My iPod Touch attempts to reboot, but shuts-off, creating a repetitive process...?

    About a week ago, I was browsing on safari on my 4th generation ipod touch and all of a sudden, the screen froze for a couple of seconds and soon the screen went complete black (you can tell the ipod was still on) and then the apple sign comes up as if my ipod is rebooting itself, but it takes much longer than usual, and then there's a quick flash of whitelight from the screen and immediately shuts off, creating a very repetitive process. About two days later without charging my ipod, so the battery can completely die therefore everything is shut down and soon after, I plug it in to my computer, in hopes that this will increase my chances of my hard earned 64gb ipod touch returns back to normal. In which, did not resolve anything. Itunes won't recognize my ipod, in which will not allow me to restore my ipod back and ever since then, I've had my ipod touch charging from my iphone charger for the past two days, and the process of my ipod rebooting and shuting off is very annoying and frustrating. I'm sadly confident that it's broken, unless I can be informed of some heplful techniques fixing it or informed of some places that can fix mechanical failures like this. Thank You.

    First, try a system reset.  It cures many ills and it's quick, easy and harmless...
    Hold down the on/off switch and the Home button simultaneously until the screen blacks out or you see the Apple logo.  Ignore the "Slide to power off" text if it appears.  You will not lose any apps, data, music, movies, settings, etc.
    If the Reset doesn't work, try a Restore.  Note that it's nowhere near as quick as a Reset.  Connect via cable to the computer that you use for sync.  From iTunes, select the iPad/iPod and then select the Summary tab.  Follow directions for Restore and be sure to say "yes" to the backup.  You will be warned that all data (apps, music, movies, etc.) will be erased but, as the Restore finishes, you will be asked if you wish the contents of the backup to be copied to the iPad/iPod.  Again, say "yes."
    Finally, if the Restore doesn't work, let the battery drain completely.  Then recharge for at least an hour and Restore again.

  • Cost  of finished product repetitive manufacturing

    Hi,
    My clients produces 5 different finshed products always. I want to map the scenario in Repetitive manufacturing.
    Is it possible in REM to get the actual cost of production of 5 products separately?? fir example can i get cost of finished product 1 as Rs200, in the month of Jan2009 for 10 quantity, cost of finished product 2 in the month of Jan2009 for 5 quantity etc etc .
    Regards.

    Thanks to all for their valuable inputs.
    Dear Mangalraj: Its really a challenge for me to decide whether to go for REM or not. The reason why I am not going for discrete is :
    1. Client doesnt know how much of ( for example) fertilizers it issues for finished 1 or finished 2 . client says he  knows that in a month how much he has used  for example 100 kg of fertilizers in total, not on basis of finished goods. So, i think i will have problem during BOM creation and goods issue in particular.
    2. Since finished products are rose plants, jasmine plants etc, client says i dont how much to do Goods reciept. few plants may still be not ready to be able to do goods reciept.Client says its very difficult for me to count flower plants everyday and then say out of 1000, 10 are ready to be done Goods reciept and 15 are dead so these should be scrapped etc.
    These are the resons why i thought it to map to REM. But client also wants to know price of each plant , means whats the price of rose plant(per plant), price of jasmine plant( per plant).
    Request you all to throw some light on this..
    Regards.

  • Production Order in Repetitive Manufacturing

    Hi All,
    We are using REM scenarios. But we need to use the Production order for some material in the same plant where we are already using REM.
    Is it possible to use both Discrete and REM for the same material but at different periods? Using Discrete for some period and switching over to REM. Is there is anyway to use the above mentioned scenario.
    Kindly suggest.
    Regards,
    Sureshbabu G.

    Hi,
             As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
    To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
    Regards
    Chandra

  • What are the different steps for  costing related to repetitive manufacturi

    Hi PP guys
    can any one explain the different steps for costing in repetitive scenario as compared to discrete scenario what is the major difference
    thanks
    shaik

    Dear Michel,
    !.In REM scenario Product cost collector is required for all the products for which production booking is
    to be done.
    2.For each production version created a product cost collector will be created in KKF6N.
    3.Without a product cost collector production confirmation can not be done in MFBF.
    4.Product cost collector is the cost object in REM scenario.
    5.Once after creating material master,BOM,work center,rate routing,aproduction version the next steps
    is creating product cost collector.
    6.While creating the PCC,the system creates a preliminary cost estimate nothing bu the sum up of the
    BOM and dare routing cost.
    7.Either a prelimnary cost or a standard cost estimate can be used for doing the production
    confirmation in MFBF as per the REM profile assigned.
    8.Standard cost estimate can be done in CK40N and this costs gets updated in the material master.
    9.For every production confirmation made in MFBF the costs gets accumulated in the respective PCC.
    10.the variances can be settled periodically as per the business requirement.
    Regards
    Mangalraj.S

  • Repetitive milestone copying in the sales order from Projects

    Hi friends,
    A particular WBS element with, say 5 milestones with the invoice percentages adding up to 100%, can be assigned to multiple line items in a sales order. Hence the milestones can be copied to each line item. I want to stop this repetitive copying of same milestones. Since each milestone has a particular number attached to it, I want to stop this multiple copying with the help of this milestone number. Is there any user exit for this? Please let me know.
    bye
    Pratap.V

    Hi Pratap,
    I couldn't find the exact user exit for your query but the below link shows some of the user exits related to milestone billing methods, may it help you .
    http://help.sap.com/saphelp_45B/helpdata/en/22/f62c7dd435d1118b3f0060b03ca329/content.htm
    Thanks,
    Dhruv

  • How can I fix repetitive 'fontd' crashes after recovery from time machine backup?

    After recovery from time machine backup (Disk Utility told me to reformat my internal hard drive) i got annoying repetitive prompts from crashing 'fontd'. How can I fix it? Anyone suffering from the same disease?

    Back up all data.
    Launch the Font Book application and validate all fonts. You must select the fonts in order to validate them. See the built-in help and this support article for instructions. If Font Book finds any issues, resolve them, then boot in safe mode to rebuild the font caches. Boot again as usual and test.
    Note: If FileVault is enabled under OS X 10.7 or later, or if a firmware password is set, or if the boot volume is a software RAID, you can’t boot in safe mode. In that case, ask for instructions.

Maybe you are looking for