Quantity Proration in case of Price change for a Disconnected Installation

Hi Experts,
As we know if any installation is disconnected then interpolation or Extrapolation of MR will result to Zero consumption , Logically it is correct because after disconnection you can not have consumption .
Because of this if Price change happen in-between a billing period and same installation is disconnected then whole quantity is getting charge either on new price or in old price but normal Quantity proration is not happening .
Example : Bill from 15.04.2014 to 15.05.2014 (30 days)
Quantity =   2000
Price change on 01.05.2014
Normal Bills
Consumption Amount = 1000 * Old Price + 1000 * New Price
But in case of Disconnected installation
Consumption Amount= 2000* Old Price + 0 * New Price
But I wants Quantity Proration to take place in-case of Disconnected installation as well
(One solution I have is Z Variant for QUANTI14 )
Please Help if you know any user exit for MR interpolation or something like that.

The best and easiest solution for this is.
Inside FM "ISU_MRRESULT_DEMARCATE" we have one more FM "ISU_DB_V_EDISCOBJ_SELECT_LNR_H" where system checks whether this contract is disconnected or not if disconnected then it will update variable "y_disconnected" as "X" so at the end of "ISU_DB_V_EDISCOBJ_SELECT_LNR_H" FM SAP provided one enhancement space their based on your requirement you can Change "y_disconnected" value as initial so system will do proration as it is non-disconnected installation.

Similar Messages

  • CO88-Error :Perform the planned price change for material

    Hi Experts,
    While running CO88 i get this error. "Perform the planned price change for material ". My material is manage at S and it doesn't have any marked cost. The status is FR and no other status on cost etimate for the article are active. what i shoul do? why if i run the PP order with KO88 i don't have any error?
    Please help i'm facing the closing period.

    Hi,
    If dynamic price change is active in your system the first posting in the new period of this material tries to
    - release a future cost estimate of that period OR
    - change the price to the future price in accounting view
       (if the future price date is reached)
    Unfortunately this dynamic price change does not work in order settlement. Therefore you are asked to perform the price change first by t-code CKME (or CK24).
    If you are using price determination control 3, any price change or release should always be the first transaction in a new period to avoid any inconsistencies.
    The dynamic price release will only release the price with transactions which involve material movement and this is not the case by posting invoices and order settlements.
    if you are in period 12/2009 then a settlement in 12/2009 does not require the release cost estimate of 01/2010.
    But if you are already in 01/2010 therefore settlement in 12/2009 is a posting into the previous period. This will change also data of the current period. Therefore the cost estimate has to be released first.
    Another option, if you don't want to receive this message, would be to change this message from Error to Warning (check note 434752).
    Please follow the following steps:
    T-CD:OMRM
    Message M8 394
    =>you set the message type to '-' for error message M8394, that means no message is to be issued.
    regards
    Waman

  • Mass price change for inforecord

    Hi All,
    Can I do a mass price change for inforecords? We are in ECC 6.0....
    I have checked transaction MEMASSIN but there is no field for price in this txn.
    Regards,
    V S

    Yes it is Possible. But, not thru any Mass Transactions.
    You need to Perform a BDC for ME12. Go to ME12 and Select Conditions Tab and Select the Gross Price Condition and Click on remove Line and Create New Gross Condition with New Price and Per Unit.
    Hope it will Solve ur Query.

  • Price change for materiale mr21

    Hi all..
    I have the following situation.
    I want to chage the price of a material let's say today..
    Today I have in stock 10000 pcs for 10 USD so the value is 100000.
    If I change the value per material to 15 USD the total value of stock is 150000.
    In this case sap is reaevaluating the stock with the new standard price...
    For me it shouold work like this.:
    stock value is 100000 for 10 usd.
    1 pcs of material in for 15 usd....
    so the value of stock would be 100015.
    Is there a flag somewhere for this... ??
    Thanks.

    Hi Andrew,
    a standard price material always have a uniform price, therefore a price change will revalue the complete stock.
    If you changed the price control to V the behaviour would be as you desire. Only you should not use MR21. When you enter a goods receipt at a price of 15 the new stock value would reflect thr former quantities at the old price plus the new quantity valued at 15.
    best regards,
    Udo

  • Unable to prevent Price change for Outline Agreement

    Dear Experts,
    Once Outline Agreement is generated in SAP, I do not want to allow users to change the price.
    I have tried with " Field Selection at Document level" using ME32-Change outline agreement field selection.
    I select "Quantity and Price" and select check box Display for  "Price and Price Unit",Price Date", "Condition Group".
    This will not allow price change at item details level (field grayed out) but user can still select Item condition (for Example PB00) and change the price there.
    Is there any solution for this ?
    Ideally I want to do this for a particular Document type of Outline Agreement only.
    Thanks and Best Regards,
    Raju

    Hi Ramki,
    Thnka s for you reply.
    This is not the desired solution. I can not ask Client to change to create different uses for create and change .
    In the buinsess process , mostly create an change users are same for outline agreements.
    I do not wna to restrict by User Authorization either as this is also not a 100% solution.
    Still  looking at configuration level only to restrict changes in Pricing for outline agreements.
    Regards,
    Mitesh Desai

  • Price Change for Revenue Recognition

    Dear experts,
    I am using Revenue Recognition of type B with Revenue Recognition before invoicing.
    I have an issue/question about the way price changes are treated in the functionality.
    The below example is used to describe the issue for your understanding:
    1.Pricing master data: $100/EA
    2.Price of item in sales order: $100/EA
    3.Qty in sales order: 10 EA
    4.Delivery & Goods issue: 10 EA
    5.Revenue Recognised (VF44) for: $1000
    Accounting Entry:
    DR Unbilled Accounts Receivable $1000
    CR Revenue $1000
    6.Change in pricing master data: $120/EA
    7.Partial Invoice for: 2 EA @ $120/EA
    Accounting Entry:
    DR Customer $240
    CR Unbilled Accounts Receivable $240
    8.Partial Invoice for balance qty: 8 EA @ $120/EA
    Accounting Entry:
    DR Customer $960
    CR Unbilled Accounts Receivable $760
    CR Deferred revenue $200
    9.Subsequent Revenue Recognition (VF44)
    Accounting Entry:
    DR Deferred revenue $200
    CR Revenue $200
    As you can see in the example above, the amount of the price difference is not credited to sales in step 7. From what I have seen so far the additional amount due to price difference gets credited to sales only after the total invoice value for the item exceeds the revenue recognized.
    Is there any option to set the system so that the price difference is taken into account for revenue recognition during each invoicing (even
    when the invoicing is partial) ?
    Thanks in advance for your help.

    The price difference will not go to Sales in Step 7.  The reason being Revenue Recognition works on the item rather than the amount.  Since you have run F-44, the system finds the same in Unbilled Receivables and posts to that account.
    For updating the price changes, you have to run VF46 to cancel the original RR entries.  In this case, it will just clear of the RR lines if realization has not happened and post a reversal if realization has happened.  This txn will also create a new RR line for VF44 which you can process.
    Refer Note 820417 Implementation guide for RR.  Download the attachments and look into Part2 doc page 13.  This explains how to deal with price changes in sales document.
    Hope this helps.
    Ravi.

  • Price change for a material

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Thanks.
    Dhruv

    Hi Experts,
    Need ur help urgently,
    i have made a PO taking a material with std. price say 1 rs. but before doing GRN i changed the price to 4 rs. Now, when iam
    doing GRN , system post the document taking the old price (1rs.) of the material.
    I want that system should calculate the cost with the new price defined for the material ( 4rs.)
    In Accounting 1 tab of the material display MM03 :
    price control for valuation data for prevoius period is S
    and, price control for valuation data for prevoius year is also S
    Need ur assistance as I am new to MM
    Hi,
    Dhruv,
    Whenever you create purchase order price is suggested from info records (if valid conditions are maintained) , if not from your last purchase order. If info record doesnt exists you have enter the prive manually in the item overview of purchase order. The price mechanism whether Moving average or standard is used basically for valuation purposes only. They are never suggested in purchase order.
    If you have updated your material master record with standard price and has changed it. Then it should be valuated at new standard price during good receipt
    It is always with standard price valuation that good receipt is always valuated at standard price and not purchase order price.
    Kindly check your material master record details.
    Also which transaction you have used for changing the standard price in material master record.Use MM02 Tcode and change the standard price as you like.
    I hope this is useful
    Regards,
    Tushar Patankar

  • Price Change for Consignment

    Hi guys,
    I have a situation where by there is a price change during a consignment process.
    *_17/11/2010-Consingment Fill Up_                                                                
    Material A-100 Unit                                        
    Price $15                                                  
    *_20/11/2010-Consignment Fill Up_
    Material A-100 Unit
    Price $20
    How do I configure the system that, when I do a consignment Issue for 150 Unit on the 25/11/2010, I should invoice as:
    Price as on the 17/11/2010 is 100*$15 = $1500
    Price as on the 20/11/2010 for the remaing 50 units is 50*$20 = $1000
    So total to be invoice in the consignment issue is $2500
    Is this possible?
    Edited by: Saravanand Naiker on Nov 16, 2010 10:09 PM

    hi,
    i understood your question:
    as per standard functionality provided by SAP this might not be possible by taking one single material:
    1. if you are using batch management implement LIFO strategy for your requriment.
    2. other wise this goes to development part.
    take pricing date into consideration VBKD-PRSDT & go back and check if any materials exists with previous pricing date if exists.
    system has to inform you to take that materials first.
    3. in simple terms create two materials for the same and process.
    regards,
    balajia

  • MR21 price change for S price material

    Hi all,
    We are facing an unique problem.
    Earlier on 05May, price was updated for a S price material from A to B thru MR21 having posting date 01May. Price change document and its accounting document has got generated successful. On checking the price on 25May, price is A i.e. Old price. I listed the price change documents for the material, I was not able to find the any document after the above said date. So far the movements has happened in old price.
    Further I checked in MBEW, price is A i.e.Old price. In table MBEWH for the april period, price is B.
    New price has got updated nowhere apart from MBEWH and price change document.
    Anyone can advice, how this has happened. What is the reason
    Regards
    Suddy

    you are working with a fiscal year variant, as your fiiscal year does not match with the calendar year.
    In general the month of the posting date is equal with the period, however, using a fiscal year variant the posting date is checked against a customizing table to determine to which period the posting has to be made.
    Those variants are defined in OB29
    and they are assigned to company code in OB37.
    so check OB37 first to find which variant is assigned to your company, then use OB29 to see the definition of the variant.
    Maybe the first day of the new month is defined to fall into the old period.

  • Price change for FG

    Hi Gurus,
    FG has a price of moving average. It was the client's decision. Now from the new financial year they want to maintain standard price for FG. How to proceed & what will be its implications.
    Regards,
    Kumar

    Hi
    You can change it in accounting view of material master th MM02 .when you change the price control for V to S there would be no financial entries passed .You can collectively change it to multiple materials through MM17
    Regards
    Sandeep

  • Price Change For Slow Moving & Non Moving Items

    Dear all;
    What will be the transaction for the slowmoving and non moving items .is there  a separate transaction for the same ? and what will be the report  to see the price chane history for certain material?
    Thanking You;
    Regards;
    Joydeep Mukherjee

    Dear Friend,
    MC50: Based on you date range selected, The logic here is "No
    Consumption" below certain Stock Level.
    MC46: Based on the date range selected, if there was no movements
    (Consumption), the system would classify them as Slow Movers
    and Goto MM04, Enter the material no and plant check the changes made to that material master. Ofcourse, it'll give all the changes made to that material master
    Check Trn CKMPCSEARCH. It records all the price change docs (Type PR), Ref. Transactn PRCHG
    Regards
    Anjan

  • Where we define price changes for PO

    Hi All
    The Purchase Order was 20.08 ERU however the vendor intimates the price to be 20.06 ERU
    The issue was that Manager getting Email to approve price changes of less than 5%, in this situation the price discrepancy was less than 5% which did not need approval.
    Could you guide me how to resolve this issue?
    Thanks and Regards,
    Kumar

    Hi,
    u mean to say that you r using relaese strategy for the same.
    if this is so then u hav to chek in configuration in OMGS for the relaese indicator wat is the changeablility indicator and wat is the % change in value for which it shud redetermine release startegy.
    Hope it helps
    reward if useful
    Rohit

  • Mass price change for articles using VKP5

    Hi All,
    I have came across a requirement where I need to create price calculation for articles in mass using VKP5 transaction. What are the ways I can achieve this? e.g. BDC, LSMW , BAPI etc.
    Thanks
    Ashutosh

    Hi Jay,
    Thanks a lot for your valuable reply, let me give you an overview of the requirement, we have around 16K articles for which we need to create price calculation using VKP5 which usually created the pricing document. is this BAPI can be used for the same functionality? do you have an idea how to implement this BAPI if it serves the required purpose.
    Thanks for your inputs
    Ashutosh

  • Price change for material with Goods Receipt with out Order reference?

    hi all,
    Our client company have some finished products produced from raw materials. But we are not using Production planning module. So in MM we are receiving these products with Goods receipt with out order reference(521).
    The issue is, the price for this product will change monthly. This new price will affect the existing stock as moving average price calculation.
    ex:
                                     Quantity             Price             Value
    Stock balanace        100To                 2.00/To         200 
    Newly produced      100To                 2.20/To         220   
    after the GRN for newly produced is done. The price also need to change as below.
    Total                         200To                 2.10/To         420
    This is easy if we receive goods with PO price, as moving average price will updae in the master record.
    But here no reference. So only quantity updated with existing price. 
    So how to achieve the change of price ? Please help.
    Thanks,
    Aravind

    Hi Bijay,
    Thanks for the reply. I will use the posting method suggested by you.
    but how you are arriving  newly produced material quantity & price!
    The reply for your comment is,
    Every month My client company revise the price of the produced material based on various factors including the
    raw material purchase cost.
    The price will be fixed for the whole month.
    While posting the GRN, the accounts updated are,
    Dr  Material account
    Cr Production Cost
    Please let me know what you have asked is answered or not.
    So that i can brief more. This is my initial project. So your feedback is very helpful to me.
    Thanks,
    Aravind

  • MR21 price changes for split valuation materials

    HI
    I have changed the material price for the material whcih are maintained with split valuation ie. in MR21 i could able to change the price for valuation types only.. i'm not able to change the main material price , its asking to enter the val type?? how to change the the price ? 
    Ex . Mat code : MAT 123, having val types as IN and OV, which has price control of S, here i have changed the price for the val types IN & OV, but i'm not able to change the  price for the main material MAT123, which has price control V?? how to change it

    hi Samuel,
    We have a similar case, need your help;
    Case: Split valuation is activated but parent has price control "V" and child i.e. diff valuation types have "S". We want to make std prices of all valuation types "0". It is done but the parent still shows value in MAP.
    a. How do we make MAP of parent as "0" (price control "V")
    b. Will it impact and how e.g. MB5L
    c. Is it ok if we ignore the valuation of parent
    d. All valuation types under parent are made "0"
    Thx
    Bhushan

Maybe you are looking for

  • Move directories based on names stored in a CSV

    Hi there,  I'm currently attempting to import a CSV file that contains a list of directory names. This list needs to then be checked against the current contents of a second directory (H:\) and all child directories of (H:\) that are listed in the CS

  • Error Accessing an Oracle Function

    Hi There, I am trying to access an oracle function and getting an error. CREATE OR REPLACE FUNCTION simple RETURN VARCHAR2 IS BEGIN RETURN 'Simple Function'; END simple; <cfstoredproc procedure="simple" datasource="MySource" returnCode ="no"> <CFPROC

  • TCURR date HElp needed

    I have the following statement in an end routine transformation: READ TABLE GT_CURR WITH KEY  GDATU = <RESULT_FIELDS>-BILL_DATE                                   FCURR = 'MXN'                                  TCURR = 'USD' INTO GWA_CURR BINARY SEARCH

  • HELP - Library Left pane scroll issues ( when in grid view )

    I've run into a issue that is really starting to piss me off and hinder my workflow! When in Library mode grid view, I can't scroll left folder/publish service with my mouse scroll wheel. UNLESS I'm hovering over the scroll bar.  If I'm hovering over

  • Barcode and mailing label report

    Hi everybody, I am wondering if oracle report support barcode 128. If it does, how ? Another question is how to control the number of copies mailing label printed. For example, I have a report generated a page of mailing labels, but I want some of th