Reactivating integration models

Hello All,
I deactivated a big sales order integration model in my production system. While trying to reactivate the RIMODAC2 program is taking huge time(30 mins) to complete for 5 part-plant combination. I have around 100K part-plant combinations.
Is there a short cut to reactivate? If there is some alternate program to somehow reactivate the models.Any help will be greatly appreciated.
Anyone ever had such a situation? Any ideas.
Thanks and regards
Sanjeev

Hi Sanjeev,
There is no short cut but I can explain you a way.
First please confirm that only one transaction data integration model was inadvertantly deactivated.
Second - the steps I mention below should be carried out with "care" and after notifying business users suitably as you have to do this when there is mimimal activity in the system.
Broad steps:
1. Stop the CIF Queue by going into /SAPAPO/OM17
2. Activate the sales order integration model
3. There should be queues created inbound to your SCM/APO system (check in SMQ2)
4. Wait till all queues are created for the Sales Order Integration Model and make sure you see the CIF_GEN_EVENT queue (last queue which after going to SCM system returns to R/3 ERP system and marks the Integration Model as active)
5. Delete all the CIF queues for the Sales Order Integration Model except the CIF_GEN_EVENT queue.
6. Start the CIF Queue - the CIF-GEN_EVENT queue should process
7. Confirm that the Integration Model is activated in R/3
8. Run Delta Report (/SAPAPO/CCR) and resolve any differences
Disclaimer: This is not a SAP documented solution.
Hope this helps and works out for you.
Thanks,
Somnath

Similar Messages

  • System copy:integration models altered

    Hi SCM experts,
    We have APO 4.1 connected to ECC system.Recently the QAS data is refreshed with PRD data and after that all CIF integration model variants in QAS are pointing to PRD system. There are more than 100 integration model variants and changing the logical system mnaualy to QAS client is taking long time.
    Is there any standrad report or t.code by means of which we can do a mass maintenance of these integration model variants ?

    Hi deeparai,
    You can change the name of logical system in ECC table CIF_IMOD. However, the integration models will not become active unless you generate them again (CFM1/2/3).
    Hope this helps in reducing manual work.
    regards,
    biplab

  • CIF - Integration model name and APO application

    Hi Experts,
    In the CFM1 Transaction, there are 3 mandatory inputs are Model name, Logical system and APO application.
    Logical systems are customized in CFC1 transaction. I couldn't trace the model name and application creation.
    What is the transaction to customize/Create the new Model name and APO application.
    Hope this is very simple question to you and expect your soon.
    Thanks,
    Saravanan V

    Hi Somnath,
    Thanks for ur reply.
    First I saved the selection as variant. But it was not updated in the IM table.
    Then I tried to generate the model and now I can see the details when I use the F4 help.
    So, to create a integration model need to generate the variant once.
    Thanks for the confirmation.
    Thanks,
    Saravanan V

  • Transfer of material from R/3 to APO, Problem in Integration model

    Hi
    I have created Integration model for Transferring material from R/3 to APO.
    While  activating the model, it is giving error  with status as i..e. SYSFAIL
    On clicking the status, I am getting the following message
    "Logical system R3CON does not assigned to Business System Group"
    ?Where to locate the BSG in  R/3 and assign before transferring  matl to APO
    i require the steps&help  to solve the problem.
    Thanks in advance to all members for the help.
    Srikanth

    Dear Srikant ,
    Pls check you have followed the below steps in the same sequence for R3 and APO
    <u>CIF Settings in R/3</u>
    Check ALE settings or activate ALE settings          
    •Define the logical system               <b>BD54</b>
    •Assign logical system to a client               <b>SCC4</b>
    Set the RFC destination               <b>SM59</b>
    <i>Assign target system and queue type          <b>CFC1</b></i>
    Maintain the SAP APO release               <b>NDV2</b>
    Activate BTEs for SAP APO integration          <b>BF11</b>
    User parameters for CIF               <b>CFC2</b>
    <u>CIF Settings in APO</u>
    Check ALE settings or activate ALE settings          
    • Define the logical system               <b>BD54</b>
    • Assign logical system to a client          <b>SCC4</b>
    Set the RFC destination                <b>SM59</b>
    Set up business system group     
    –Create BSG                <b>/SAPAPO/C1</b>
    –Assign logical systems to BSG          <b>/SAPAPO/C2</b>
    Maintain distribution definitions               <b>/SAPAPO/CP1</b>
    User parameters for CIF               <b>/SAPAPO/C4</b>
    You have got stuck up somewhere in R3 setting , which I have marked in italic font i.e.<i>Assign target system and queue type          CFC1</i>
    I hope this will solve your problem .
    Thanks ,
    Digambar

  • Not able to include PM order type PM03 in integration model

    Hi Experts,
    I am creating PM order in R/3 with order type PM03. But while creating the integration model for maintaince order, PM03 is not populating. and others I am getting like PM01, PM02 etc...
    Please advise if I need to do some setting for the same.
    Thanks
    Hitesh

    Hi,
    Request you to cross check whether the PM03 order type has the below two check box active  in IMG. 9 Tcode = OIOA
    Open Item Management and Release Immediately.
    PM03 order type with the above settings are getting reflected for me in my integration model.

  • Creating integration model

    I have created an integration model using CFM1 & activated in CFM2.
    now  dont know how to proceed.
    is there any document or link to transfer data from R/3 to APO system.
    i m new to this field & trying by own.
    Thanks in advance.

    Best way of creating CIF integration Model
    Hai,
    Please go through the above thread which can help you for understanding more about the integration models creation.
    You have mentioned that you have done CFM1 and CFM2. Can you please inform for which object you have done and what you would like to see in APO?
    Giving more details would enable helping you better.
    Regards,
    Murali.J

  • Deleting an Integration Model.

    hi Guys
                   if any kind of changes happens in master data in ECC then we transfer that data in SCM,then what happens with that planning data with which we work earlier.
    And Deleting an integration model does not mean that the previously selected data in APO is also deleted.what happens of that data.
    thank u
    karan
    Edited by: karan.sap on Feb 27, 2010 6:36 PM

    Hi Karan,
    1) if any kind of changes happens in master data in ECC then we transfer that data in SCM,then what happens with that planning data with which we work earlier.
    As and when you activate an integration model, a new integration model gets
    generated and the earlier one will get deactivated.  (provided the model name,
    model selection criteria are same).  That means the newly changed master data
    will get activated to SCM system in which the old change is obsolete.
    2) And Deleting an integration model does not mean that the previously selected data in APO is also deleted.what happens of that data
    Whenever a new model gets generated, the old model will be there in the system
    only and that inactive models needs to be deleted at frequent intervals orelse
    it will add inconsistency to the system.  This will be done using CFM7 transaction
    by selecting inactive models indicator.  Whether the old model is deleted or not, but
    system always will read and plan as per the newly activated model.
    Regards
    R. Senthil Mareeswaran.

  • Manual Reservations Integration Model

    Hello All,
    In our project, during Go-live we dint had manual reservation Integration Model Activated due to some business reason. 
    whenver a process order is created in R/3, Reservations for Components appear in R/3 and APO.
    Now when the components are good Issued in R/3 during Finished Product Process Order, these dependent reservations are not deleted in APO though the stock is reduced. Upon analysis we found that by activating the Manual Reservation Integration Model , these reservation will be deleted and hence both the R/3 and APO System will be in sync.
    Now the Problem is when we are trying to do this manual reservation Integration Model activation through Batch Job , activation is taking a very long time. Upon further analysis we found that for the material-Plant combinations, program tries to search records in table RESB and approximately it takes around 5 minutes for each material -plant combinations. In our integration model we have around 2400 Material-Plant Combinations. CFC3 settings for Reservations are select block size of 1000 and filter block size of 512. R/3 version is 4.7.
    Table entries in RESB are close to 3.5 Million with 141 Extends.
    So just wanted to check with you guys if anybody has experienced this problem before and what resolutions were put in place to addres this ? Are there any SAP Notes available ? I searched but could not found any.
    also what would be the best way to go forward? Some of the options i could think are
    1) Run the I.M for selected material-Plant Combinations
    2) Run the I.M for generic selection Criteria ( i.e AS IS) during Weekend.
    Pls share your opinions.
    Regards,
    Pawan.

    Hello Kenneth,
    As i understand from your message that if a final Issue Indicator is unchecked, then those reservations should be present in APO. However i got confused with your below statement
    Therefore it is neccessary that reservations with final issue indicator set are available in APO.
    I think you might be trying to tell  reservations with final issue indicator unchecked ( and not SET) are available in APO.
    Regarding Transaction Code MBVR, I have few queries
    1) Does this T-CODE MBVR sets the deletion Indicator in Table RESB or does it delete the Reservation permanently from Table.
    2) I am not able to locate Completed Items field, which will enable me to delete Reservations. Can you pls let me know the field name.
    Pls note that whenever i am trying to delete reservations thorugh t-code MBVR, it gives a message " No Document exists for the Speficied data".
    thanks for your assistance,
    Pawan.

  • Requirement Reduction integration model

    Hi,
    Can someone explain in layman terms with an example what happens when "requirment reduction" object is CIF'd alongwith Planned independent Requirements (to APO). Why should/would someone create an integration model for requirement reduction when integration models exist for PIRs and Sales Orders consumption settings are taking care of netting (as applicable/set). we have funtionalities for consumption and reduction of sales orders from PIR's e.g in APO and ECC.
    Thanks
    Lok

    Hello,
    I would like to see a clear explanation to that as well.
    From what I understand reading about this topic it is to have additional control over this by applying own logic in CIF.
    Quoting the SAP documents:
    <<If you set this indicator, you can create integration models specifically for
    the Requirements Reduction filter object type (type T_FCC).
    The filtering takes place on the basis of active integration models for
    requirements reduction. In this case, you can control in greater detail for
    which material-plant combinations a requirements reduction should be transferred
    to SAP APO.>>
    For normal cases this is not needed. Perhaps it is needed if you want certain shipments to other plants to reduce forecast. E.g. mixed MRP.
    Regards,
    Tor

  • Purchase Order Integration Model Activation Error "Source Invalid"

    Hi Experts,
    When I try to activate Purchase Order CIF integration model for a specific plant, I am getting an error
    "SOURCE_INVALID" r                                    XC           014
    When I checked failed LUW, found one product which is Subcontracted.
    These a Subcon PO exist at this plant and Vendor is Subcon Vendor.
    Before IM activation, I have CIFed Subcon vendor and T-lane between Vendor to plant exists in APO.
    Any idea how can I resolve this issue?
    Thanks,
    Vipul

    Hi Vipul,
    I hope you have created subcontracting purchasing info record and connected with the productuon version.
    Secondly whether it is valid.
    A purchasing info record of the category subcontracting which documents the subcontractor as the source of supply of the end product.
    Regards
    Datta

  • TVARV - Integration model.

    hi
    we currently use TVARV entries for specifying the materials in the integration models ( to CIF to APO).  when we use a TVARV entry, we have a limitation of using only 500 entries at a times. so the number of materials in Integration Model  is restricted.
    is there any way not to specify the materials in the integration model but during runtime.
    regards
    Joe

    Joe
    Here is one way to solve the problem . Create a custom field in MARA . It will be a boolean field with values " " and some other non blank value say "Y" . For the materials that you like to transfer to APO , set the value of this custom field to "Y" .
    You can enhance your integration model selection criteria and add fields to the IM selection. Add the custom field to the selection . Refer note 360723 . It explains how to add  fields to IM selection
    Save a variant of the integration model with value for custom field = "Y" .  Now all you have to do on a daily basis is to go and set the custom field to Y for materials that you want to CIF to APO . This will make sure the materials get picked by the IM automatically.
    Thanks
    Saradha

  • Staring integration model after activation throws an error

    Hello Experts,
    I am trying to import Sales Orders from SAP ERP to APO. The integration model is done and the master data like Products and Location are transfeered to APO.
    But when I try to transfer the Sales Orders I get an error saying:
    Outbound Queue Blocked.
    Function/Q/SAPAPO/CIF_ECM_INBOUND
    Text:        Processing of change number 500000000007 cancelled
    Then the dialog box gives the options to goto the: qRFC Monitor, Ignore or Cancel.
    The qRFC monitor records theame error.
    Kindly let me know how I can solve this and transfer theSales Orders to APO.
    Thanks,
    Dilip

    Dear Tibor,
    Thank you for you reply. I will check the authorizations.
    After this error I canceled it and went ahead. Then it gave me another error saying Product <> not found.
    After getting beyond this error too it gave me about 260 successful messages in the logs. But when I execute the BAPI BAPI_SLSRVAPS_GETLIST2 OR go to the table /SAPAPO/ORDKEY in APO I cant find any Orders.
    Can you kindly guide me as to where I am going wrong?
    Best Regards,
    Dilip

  • Activtion of PPM Integration Model does not send any data to APO

    Hi all,
    When I activate my PPM Integration Model, the activation finishs without any error, but no data is being tranfered to APO.
    I do not get any error message to start looking for the problem.
    Thanks and regards,
    LHM

    Hi Luiz,
                  "no data is being transfered to APO" Which data are you looking for?? I am assuming youa re expecting a PPM to be created in APO.
    If so,
    1. Do you see any PPm in /sapapo/scc03?
    2. Check if the pre reqs. for creating PPM as in [Integration of Production Process Models|http://help.sap.com/saphelp_scm50/helpdata/en/8e/d4ef37e9a4ba6ee10000009b38f842/frameset.htm] are satisfied.
    3. make sure to check the inbound APO queue or outbound R/3 queue depending on what you are using.
    4. Also not the time of activation and check CFG1 in R/3 to see if you can get any clues.

  • BOM and PDS in integration model

    Hi, All!!
    Could you help me colleagues?
    I try to create integration model in ECC (transacion CFM1), but at choice PDS or BOM the system gives out the message: "Integration model contains object types not valid for this APO release"
    How to transfer in APO this data?

    Thanks, I have understood

  • Is it possible to get integration model in CIF exit??

    Hi experts,
    I am new to CIF interface and i have a question about the interface enhancement () on ERP side.
    The scenario is, we want to send purchase order from SAP ERP to SAP APO through CIF. There are 2 integration models and they are active at the same time. After entering the enhancement code (CIFPUR01), is it possible to know which integration model is used for current purchase order? In other word, in the exit CIFPUR01, is it possible to trace reversely which IM is used? Because we want to validate some fields per different different integration model.
    Thanks so much.

    Chirs
    I do not know why you have two different IM's for PO's . Standard SAP recommendation is to have one integration model for each object type.
    Coming back to your question please check the BadI CIF_INT_MODEL. It has a  method MODIFY_OBJECT_LIST and one of the parameters of this method is "IS_CIF_IMODK" which identifies the IM name . Check whether this will serve your purpose
    Thanks
    Aparna

Maybe you are looking for

  • Printing Single Quotation mark in PDF report

    Hi, we are working in Oracle Applications 11i, using Oracle database 9i and Oracle reports builder 9i. In Oracle Purchasing we have item descriptions entered in a PO as A'SSY_CONNECTOR . I can see it correct from the front end. When querying the tabl

  • CallManager Trace Analysis Application

    If it’s helpful to anyone I created an application to analyze a “Text based trace log” within CallManager. You can see a few screenshots and download the application for free at http://www.aaronsoftware.com/products/win/TraceTextParser/default.asp I

  • Automatic payments refused (dont understand why)

    Dear all, I have a problem in paying for my skype fee. I have entered a valid credit card (master card) and it has always worked.Since it was refused, I entered the same credit card number again and nothing seems to change. I am lost, do not understa

  • Process Chain Problem - RSPCPROCESSLOG

    Hi, we have just upgraded from BW3.5 to BI7(patch 11) and we are currently experiencing a sporadic problem when executing process chains.  In some loading chains, even though the previous infopackage has finished successfully, the next package does n

  • IPod Volume

    My iPod (3rd gen) plays with inconsistent volumes through my Alpine car stereo.  I'm not talking song to song, I'm talking total volume.  I attach the iPod using an Apple ipod connection into the back of the Alpine, and all functions can be controlle