Dear Expert,
We have Created Subcontracting PO ( SFG -100 EA)and Provided raw material ( paint) to Vendor,we have maintain BOM quantity for Paint as 10 kg /EA,thus we have provided Paint of 1000 Kg to vendor ,we have received SFG of 100 Qty against PO but after Stock take it is Observed that Out off 1000 kg Only 900 is Consumed and 100 Kg still remain at Vendor
Please advice How to do Qty Reconciliation for Subcontracting Challans ? and how to bring back 100 Kg material to our own stock in System
Please Advice
Regards,

Hi Shyam,
Seems this is more related to MM module and should be posted under MM forum.
1.     I assume, you have inwarded 100EA against PO by 101 movement.
2.     The moment you do GR, raw material (entire 1000kg paint in your case) must get automatically consumed at vendoru2019s end by 543 movement and ideally there should not be any material lying at vendoru2019s end.
3.     Check the material document of GR. It should contain 2 movements, 101 and  543.
4.     Check for how many quantities 543 movement is done. THEN only conclusion can be drawn.
5.     May possible that somebody has changed BOM relation in PO before GR.
Regards
Anand Rao

Similar Messages

  • Reconcilation of subcontracting challan

    All SAP Gurus,
    We are having following error while reconcilation of subcontracting challan.
    Material XXXXXXXX is not assigned fully, short by 1.000 NO
    Message no.: 8I574
    Why this error may be coming?
    Regards,

    my query is -
    challan raised for how many qty (MENGE).
    and
    how many qty is in Gr qty field(MENGA) of J1IFQ screen.
    are they equal ?
    Second query
    is there two line items in challan for reconcilliation?
    regards,
    sujit

  • Cancel reconciled subcontracting challan

    Dear Experts,
    our user reconciled a subcontracting challan .after he found  goods receipt was wrong, we want cancel it now?when i am changing in my system,its not allowing me.
    please clarify me,is it SAP standard?
    Regards,
    Varun

    HI,
    what status you have of your challen  ?
    Regards
    kailas Ugale

  • Subcontracting challan reconciliation error

    hiii
    when i m using j1ifq for reconcile the subcontracting challan qty. than system showing a error....
    "Challan 0000000001  Material SFG200KPLP009 is assigned more quantity by 20,000 NOS"
    how it will be reconcile?

    Challan 0000000001 Material SFG200KPLP009 is assigned more quantity by 20,000 NOS"
    how it will be reconcile?
    While doing J1IFQ, you are assigning a material document number with this challan number 000000001,
    This error comes because, I hope that the material document number which you are assigning, is a GRN number (101 and 543 movement). While doing challan reconciliation through J1ifq. System will check only the 543 movement line items quantity.
    That is you have done a GRN for 100 pc, assume the 101 will happen for 100 pc and 543 is also made for 100 pc.
    But the challan balance quantity is  98 pc.
    here the 543 movements quantity is more than the challan quantity, and you will get the error message as
    Challan 0000000001 material XXXX is assigned more quantity by 2  No's.
    Solution: You have to add some more challan numbers, until it meets that 543 quantity.
    Hope you got some clue.
    Thanks and Regards,
    S.Vijay

  • Subcontracting Challan Error *showing error "The document doesn't exist"*

    Dear Gurus,
    When i run T-code j1ifq for quantity reconcilation for subcontracting challan .then i enter Mat. Doc(GRN document)  and fiscle year 2009 and run F8 it's
    showing error "The document doesn't exist" but it exist in system.How to resolve this problem pl provide needful method to solve this issue.
    Thanks
    Abhinav

    hi,
    have you typed the challan no or selected from the F4 list? please check that and the year of the challan document. then you should not have this error.

  • Subcontract Challan Reconcilation

    Hi all,
    We are using the standard functionality of Subcontracting.Here is the prob. description with e.g.
    As per our challan report(J1IFR) the balance quantity of a material at vendor end is 100Kg.
    But when we run MBLB the quantity is 10kg only.
    Pls let me know how to reconcile the pending challan? As we want to match the stock of MBLB with pending challan quantity.
    The data is huge i.e of two years and for appx. 1500 material.
    Regards
    Purnesh

    Hi,
    Reconcile the material document for the scrap material with the challan. Then try to reconcile the challan.
    Regards,
    Prashant

  • How to check Reconciled Subcontract Challan

    Dear Gurus,
                       What is the method through which i can check that material doc(GRN) for subcontract challan has been reconciled.
    Thanks
    Abhinav Royal

    Pl. use J1IFR

  • Subcontracting challan reconcilation & re credit

    Hi,
    Please suggest me about Subcontracting challan reconcilation & re credit in case material is recieved after 180 days. how challan is handled & regarding credit what needs to be done.
    We can reverse challan & reconcile using j1ifq but what steps to be followed in case of paying excise amount.

    Hi,
    follow following steps-
    1.TCode-j1if13.-Complete/Reversal/Recredit- Reverse challan.
    All duties will get reversed.
    2.TCode-j1if13.-Complete/Reversal/Recredit- Recredit challan.
    All duties will get recredited.
    3.Create GR for the purchase order and provide the reference of Challan created.
    4.Reconcile and Complete the Challan
    5.Check RG23A part 2 entries for transaction type 57NR and 57RC in table J_1IPart2
    6.Extract RG23A Part 2 register and download the entries in excel through J2I6
    regards

  • Subcontracting challan Reconcilation

    Dear All,
    We have got a PO [subcontracting] of multiple line items . we make 57F4challan and issue the materials thru 541 mvt. we make GR for individual line items.
    when we make the GR for the first line item with reference to challan and reconcile the challan through J1IFQ it orks fine.
    But when we make the GR for the second  line item with reference to the same challan it throws an error message saying that the challan is aldready reconciled and it does not allow me to further refer that challan for GR.
    Plz help.
    Rahul Bhat.

    HI,
    Because when u issue the materials to the subcontractor thro 57F4 u issue them all in a single challan.
    When the GR is done with respect to single item with reference to the same subcontracting challan it considers only 1 item ( as the Gr is done for the same item)
    You cannot give the same reference again for the second item.
    If you do the GR for all the items against the subcontracting challan then it may allow you to reconcile the challan further thus keeping it open till all the items are done.
    PLease check the same.
    Regards,
    Prasanna
    Award if helpful

  • Problem while reconciling subcontracting challan

    hi friends,
    issue:  while reconciling a challan im getting a msg saying that some qty of the material is not assigned fully.
    but actually all the material was received.the only thing is in GR the mateerial was received in 2 batches so 2 line items. but while posting the GR itself i got a msg that po qty is deficit by the quantity i specified in the 2nd line item.but it was just warning . after posting the GR qty updation was for the whole 2 line items qty.
    but what i understand is system takes the the 1st lineitem qty in GR, while reconciling the challan and says that the 2nd lineitem qty is still to be assigned.
    any ideas to solve this pls
    raja

    hi, Raja just try reading this and do accordingly i think there should not be an error .
    Once a subcontractor has processed your materials and returned them to you, you match the items in the challan against those that have been returned.
    You have posted the goods receipt (or any other material document) for the returned goods.
    1.From the SAP Easy Access screen, choose Indirect Taxes -.>Procurement -> Subcontracting -> Subcontracting Challans -> Reconcile Quantity.
    2.Enter the following data:
    a)In the Material Doc. and Mat. Doc. Year fields, enter the number of the goods receipt document and the year in which it was created.
    b)In the table below, enter the challan numbers and the years in which they were created.
    If the material document is a goods receipt document with movement type 101, you can enter the challans that were not captured when the goods receipt was posted. However, if all the relevant challans were entered during goods receipt, they need not be entered here
    3.Choose   Reconcile.
    A new screen appears. At the top is the information about the goods receipt (or other document); at the bottom is the information from the challans that you have entered.
    4.Specify which challans the materials in the goods receipt originated from:
    a)If you have sent a subcontractor a number of different challans, all containing the same material, you can automatically specify that the materials should come from the oldest challans first, by choosing  .
    b)Otherwise, for each challan, enter manually the quantity of materials has been returned, and choose  to refresh the display.
    5.Once you have accounted for all the materials in the goods receipt, save the challan.
    Result
    The system changes the challans' status as follows:
    1.)If you have accounted for all of the materials in a challan, the system sets its status to Fully Reconciled. In this case, you can complete the challan.
    2.)If you have accounted for only some of the materials, it sets the status to Assigned. In this case, you must assign the remaining quantity of materials to another goods receipt later on.
    3.)Scrap generated is assigned to a challan only if the percentage component scrap is specified in the bill of material for the parent material and this bill of material is assigned to the subcontracting purchase order.

  • MIGO with reference to Subcontracting challan

    Dear Friends,
    I have a couple of questions which u may be able to solve:-
    1. In a MIGO for a subcontracting PO, i can select the option Refer subcontracting challan in the excise invoice tab. I wanted to know the purpose of this functionality. If i refer the subcontracting challan in the MIGO does it mean I dont have to reconcile the challan after MIGO.
    2. When I refer the subcontracting challan in the GR and enter the challan no and year the system throws an  error which says - Challan material is different from material document. i have checked the material document for the transfer posting made. But the material is the same in all the cases and flows from the PO itself. please help me out with this error.
    Regards
    Gurvinder

    for point 2 do this
    In spro --> taxon goods movemnt > indiac> business transaction --> subcontrcating --> maintain movement type grp
    here miantain
    0001 101 O
    0001 122
    0001 541
    0001 544 O
    0002 542
    0002 543 O
    Edited by: Kedar Kulkarni on Jan 27, 2010 7:53 PM
    Edited by: Kedar Kulkarni on Jan 27, 2010 8:21 PM
    Edited by: Kedar Kulkarni on Jan 27, 2010 8:26 PM

  • Cancellation subcontracting challan

    Dear all,
          One subcontracting challan has been created. Now my client wants to cancel it. i used the transaction J1IF13 to cancel the challan. The error which I am getting is " document already completed".  I have made all the checks like material document, purchase order, etc. The challan number also exists.
    Regards

    Hi Mahesh,
    If it is showing the status as completed means u have reconciled the challan and then completed.  If u want to reverse this, u have to reverse the challan in J1IF13 and go to j1if11 and cancel it
    hope it works
    otherwise let us know

  • Reversing process or Subcontract Challan

    Hi,
      I want to know how to cancel the subcontrcat challn also in status of challna therte are reverse , cancel  and delete  what is exact diffrenece in all this i want to cancel my challan and also material docuemnt  what is use of reverse process   also in status  there is also posted  what is men by if status is posted  as if we close it status is comleted .
    regards,
      zafar

    Hi,
    The process is like
    SUB-CONTRACTING CONDITION RECORDS - FV11 for service tax and cess
    SUB-CONTRACTING CONDITION RECORDS - ME21N
    RELEASE STRATERGY FOR PURCHASE ORDER - ME28
    TRANSFER POSTING OF CHILD PARTS TO SUB-CONTRACTOR - MB1B 541 Mvt Type
    SUBCONTRACTING CHALLAN - J1ILN
    GOODS RECIEPT - MIGO
    RECONCILING SUBCONTRACTING CHALLAN - J1IFQ
    INVOICE VERIFICATION - MIRO
    For reversal Status C is for Completed. Go to J1IF11 and give Challan No and inside Try to Delete items.
    Also try to Reverse the Subcontracting Challan in J1IF13.
    Please go through below link is a little Explanatory in your case,
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm

  • Re -Reconcillation of subcontracting challan against "102" mov type mat doc

    Dear All,
    While we are doing the reconcilliation of the Material document (mov type-"102" ) against the subcontracting challan (ALREADY fully reconcilled against 101 material document, but not compeleted), then system is NOT allowing us to do the reconcillation, requirement is to reduce the qty assignment  in already reconcilled challan, as we have reversed the material document
    1.) When we have assigned the 102 movement type to movement type group to 0001( Issue movement type group)
    then system is giving an error message : 8I567-Challan not valid, Material doc. is valid for another scenario during J1IFQ.
    2.) and when we are assigning the 102 movement type to movement type group 0002( Receipt movement type group) , then system gives error message : 8I574 -Material XXX is not assigned fully, short by YYY KG
    Please suggest the right way of doing it.
    Thanks & Regards
    Nitin Chhabra

    Hi
    If a challan is reconciled it should not be opened again. That is illegal. You need to do subsequent adjustment if you want to alter your consumption in subcontract. If you do 102 and reverse your consumed material,You need to include 544 movement type in your movement type grouping then You need to create a new 45a challan.
    Regards
    Antony

  • Subcontracting Challan !!

    Hi,
    In subcontracting subsequent adjustment ( overuse/underuse)
    How do we supply more material to the vendor and how we take back  excess material from the vendor. How do we deal with such a situation  if subcontracting challan is to be made.Are we supposed to make a seperate  challan for excess material and do we reconcile such a challan.
    Any idea friends...
    Thank You

    Hi,
    For Case 1:
    Seperate physical mvt of 20 kg means seperate challn for sure, now to correct the consumption u have two opstions either correct the Component qty in MIGO (GR itself) or do a subsequent adjsutment
    challans will get reconcilled through J1IFQ if you have made 541/542/543/544 relevent to SC
    case2) we supplied 100 kg for 100 items. at GR we find tht 20 kg less consumed. how to take back this extra 20kg and how to reconcile the challan and qty.
    same as stated above
    Rgds
    Dheeraj