Reducing the Freight cost on material value for undelivered material

Hi Experts,
Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
We do not want to load the freight cost for the undelivered material in the value of the material.
Can any one please suggest a solution for the same.
Thanks in advance.
AJ.

Hi
A PO Will be raised for full quantity of material say 100 nos.
The material supplier vendor needs to be paid for full quantity of material.
A freight vendor is maintained at the time of GR for material against the freight condition maintained in the Po.
The freight vendor facilitates the delivery of the material from the vendor to the purchaser for which he is given an under tolerance limit of 0.5%. Any delivery below this tolerance limit, freight amount to the effect of 1.5 times the per unit rate of material x short fall below 0.5% tolerance will be deducted from the freight amount.
A dummy grir will have to be prepared for the short delivered quantity for processing the invoice for the full quantity of the purchase order, as the vendor is going to raise the invoice for full purchase order quantity. The client does not want to load the freight cost of the undelivered quantity on the material value as it will wrongly show the MAP of the material. This shortshipped material will be issued to remove it from the system and the stock will remain for the delivered quantity only. The vendor is subject to gr based invoice verification.
Please suggest a solution.
Thanks in advance.
AJ
The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded.

Similar Messages

  • Reducing freight cost for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    answered

  • How to allocate the freight cost when providing free shipping

    We do not charge our customers freight cost.  We would like to allocate our freight cost to the product cost of each item sold.  Can we allocate our freight cost in the delivery note, then copy the delivery note to the customer invoice and remove the freight?  Will this process allocate the freight cost to each item cost on the delivery note, and at the same time not charge the customer for freight?  If this process will not work, is there another way to allocate the freight cost to each item on an customer invoice, without charging the customer for freight?
    Regards,
    Wayne

    Hi,
    It is not possible to post the freight charge to item cost while booking delivery.
    Freight value will be posted to the Revenue account defined in the Freight set up.
    Material need to be re-valuated by selecting the Freight revenue account, so that freight value will be debited to stock and credited to Freight Revenue account.
    After doing this you can book delivery and Invoice.
    Regards
    Ravindran Srinivasan

  • Designing the consolidated and line item report for specific material

    Hi
    i have a R/3-report and it run only for 7-materials.That means we need to only those 7-materials in the selection screen of report.
    Then we will get each material corresponding line item details(material no, profit center, variable cost, quanity, price, financial loss(this is calculated based on quantity) , Utility Consumption(calculated based on price, variablecost)  ) in one report.
    Another report will give same for consolidated values of financial loss, utiliy consumption.
    <b>so how can i design the consolidated and lineitem details report for each material.</b> pls let me know
    kumar

    0VENDOR_ATTR - Vendor Master Data Attributes
    0FI_AP_51 - Check Register Line Items
    0FI_AP_4 - Accounts Payable Line Items
    It should be noted, however, that this won't get you everything that you need, so you may have to create enhance one or more of these DataSources and create User Exit ABAP code to get the required data. Also, the 0FI_AP_51 DataSource isn't available if your source system isn't ECC6 EHP3 or higher. If your source system is less than that, you're going to have to create a generic DataSource for the data from the PAYR table.

  • How the freight cost are transferred from condition type of shipment cost document to service entry sheet and collected in service PO item

    Dear Experts:
    could you please share with me the knowledge for below topic:
    How the freight cost are transferred from condition type of shipment cost document to service entry sheet and collected in service PO item, because these three objects use three different pricing procedures, and different condition type.
    how did the condition type of service entry sheet know to copy the value of whcih condition type in the pricing procedure of shipment cost document?
    Is this SAP standard function OR there need an enhancement to do that?
    I didn’t find related condition value copy setting in background, could you please share related setting with me? Thank you very much for your kind help!
    Best regards,
    Andy

    Hi, Gopi,
    Glad to see your feedback, but i still have question on your feedback:
    which condition type in the pricing procedure of service entry sheet should know to capture the net value of shipment cost doc? becasue there are so many condition types,
    And i have checked the corresponding condition type (PRSX) of service entry sheet pricing procedure in my SAP system, this is a self-defined condition type, but NO any calculation routine maintained for the condition type (PRSX), how did the condition type (PRSX) know to copy the total cost of shipment cost document?
    Below is the example and another question:
    what the relationship between the pricing procedures at service PO item level and service line item level?
    1. The freight cost in shipment cost document—including used condition type and pricing procedure
    The pricing procedure of shipment cost document
    2. The freight cost in service entry sheet—including used condition type and pricing procedure
    The pricing procedure of service entry sheet--the pricing procedure at service line item level
    3. The freight cost in service PO item—including used condition type and pricing procedure:

  • Reduce the Standard Cost by Percentage

    Hi All,
    We want to reduce standard cost by certain percentage rate ( for eg 5 %) when we run standard cost CK11N. Please suggest how to achieve this.
    For eg : - Standard cost is Rs 100/- for a material but while running CK11N we want it be reduced somehow by 5 % so that standard cost becomes Rs 95/-.
    Regards,
    Aakash

    Hi Aakash,
    Why do you want to reduce the standard cost estimate like that, what is your actual requirement? I hope it is not possible as you say. I don't see any requirement from client like this.
    If any experts have some idea on this, please share your knowledge, even I am eager to know as Aakash.
    Looks awkward, why don't you reduce your BOM and routing (but it leads to high production variances) by 5% to get your results?
    Regards...
    Jose

  • How can Oracle ERP system reduce the total cost of ownership

    i have read a report that describe the advantages of using Oracle ERP system in different organizations ; it is mentioned that
    "+Oracle’s ERP solution suite helps customers achieve 30-80% lower total cost of ownership, benefit from a predictable cost model, and reduce risk+".
    So does this means that Oracle ERP system reduce the total cost of ownership because it provides cheaper price comparing to other ERP providers, or it is meant that using Oracle ERP system will reduce the total cost of ownership for other assets in the organization by 30-70% ?
    Thanks

    My thoughts:
    1) Oracle ERP (or any ERP) typically replaces numerous applications. Each of those applications needed separate licensing fees, separate support mechanism, and separate employees in your organization to support them. By consolidating into one, it is easier to support it.
    2) Normally, Oracle ERP is cheaper than SAP but it certainly not the cheapest ERP in the market. There are some smaller ERPs which are cheaper but may not offer the breadth that Oracle offers. In fact, Oracle offers a small business ERP that is quite cheaper than EBS.
    Sandeep Gandhi

  • IDoc segment to capture the freight cost (XML/EDI invoice)

    Folks,
    How to capture the freight cost on an EDI incoming invoice. Any idea which IDoc segment can be useful in this regard.
    Any thoughts/suggestions/comments would be deelply appreciated.

    Hope you have not read the Invoice Idoc type whcih is used for EDI invoice.
    The Invoice idoc type does not support the functionality of Planned delivery costs ( Freight )
    Please go through the link
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/44/f50abcea3b11d194dc0000e83dd751/content.htm

  • Lock characteristic value for configurable material in Sales Order

    Is there a setting in SAP which can prevent user changing characteristic value for configurable material in Sales Order after production order created for this Sales Order? Currently, it can only works when first delivery create for this Sales Order.
    Thanks a lot.

    Hi,,
    in the characteristic goto additional data tab,
    you have a field called not ready for input.
    you select this when the value in this characteristic come by calculation based on the previous selection.
    that field will be greyed out.
    OR
    u can even select the no display check box,
    by selecting this u cant see the characteristic in the list,, it will give u a popup before leaving the screen.
    for this the char has to be a required field.
    OR
    if any of this is not working then may be u can try out with authorization management.
    thanks

  • How To Find Opening Stock And Value For a Material

    Hi Experts,
    How To Find Opening Stock And Value For a Material  in Given Dates
    Moderator Message: Search.
    Edited by: kishan P on Sep 15, 2010 4:05 PM

    Thanks For Answering.....
    But I Need Any Function Module To Get Opening Stock And Value For Given Material With in Dates.

  • Firefox is having a problem with Linkedin. I get the error, error in parsing value for "backgroun" and for "filter"

    When trying to send messages in linkedin, firefox takes me back to the log in screen without sending the message. On the error console it shows the error; error in parsing value for "background" and error in parsing value for "filter". What is causing this?

    Pages does not support the Apple font used for color emoji, so that behavior is normal.
    With what app are you reading the yahoo mail?  There is really no guarantee than any other email service will show the special Apple font involved.
    You should have no problem putting emoji directly into Mail or Text edit via drag drop from the Character Viewer as shown below.
    You should also be able to upload graphics here easily by clicking on the camera icon.  My email is tom at bluesky dot org.

  • What is the rear camera's MP value for Encore 2 write 10 inches?

    The rear camera's MP value for Encore 2 Write 10 inches is given as 5 megapixels in the Toshiba's site while its given as 8 megapixels in the Microsoft Store
    So what is the actual value?
    Toshiba link:
    http://www.toshiba.com/us/tablets/encore2-write/10/WT10PE-A264
    Microsoft Store link:
    http://www.microsoftstore.com/store/msusa/en_US/pdp/Toshiba-Encore-2-Write-Signature-Edition-Tablet/...
    Solved!
    Go to Solution.

    Encore 2 Write WT10PE-A264
    Okay, I see it now.
    Encore 2 Write WT10PE-A264M
    Maybe that M version is different?
    Let's ask Peter from Toshiba if he can help.
    -Jerry

  • Urgent:Material Type for Packaging Material in WM and MM

    Hi
    There is a place in SPRO where i can define the material type for packaging.
    Logistics - General -> Handling Unit Management -> Basics -> Define Packaging Material Types
    How can i create a material using this material type? What is the use of material type here?
    Whenever i create material in MM01/MM41, i get the standard material type list.
    Thanks & REgards
    Kapil

    Hi,
    In T.code: OMS2, you can get standard material type list.VERP is the standard material type for packing material.You can copy VERP and rename to ur material type( as it is ur business requriement or else u can use same VERP)
    What is the use of material type here?
    With the help of ur Material Type , u can craete material like The material type,will be used while defining the material
    master.At that time,in Tcode:MM01,first screen we need to
    mention,(material type)it show the nature of material
    ex:-engineering product,finished products,semifinished
    product,etc.,
    It also play vital role on material numbering,material type in comination with plant & valuation class, play vital role in inventory & accoputning.
    To Create Material,use t. Code: MM01,
    Step-1
    Enter Material Code: ( example-Polythene Bag, If External Number Range or leave it blnak)
    Enter Industry Sector: ...................
    Enter Material Type: ..........................(VERP- Packing)
    Step-2
    Select
    Views you required( like eample:basic data-1, like basic data-2,purachsing, purchase order text,General plant data, accounting-1, accounting-2 etc)
    Step-3
    Enter Plant,
    Enter Storage location
    {{{Enter Sales organization & Distribution channel(if sales view selected)}}}
    Step-4
    You will have views like (example-1, basic data, enter Base unit of measure, material group and other details as required field,example-2,Accounting data, enter valuation class, price control; S or V & price)
    Step-5
    Save.
    Note: Before creation material you must know which Industry Sector, Material Type ur going to use and material numbering is internal or external.
    For more, check the following link for creation of material
    http://www.synactive.com/docu_e/doc_multi_mm01.html
    Regards,
    Biju K

  • FREIGHT COST TO BE ADDED TO MATERIAL VALUE FOR PRICE CONTROL"S"

    hi,
    How to add the frieght cost to  material cost for the materials with "S" price control While doing MIGO ?
    Edited by: ARITRA MUKHERJEE on Mar 3, 2010 5:07 PM

    Hi
    By stating Price control Indicator  S ,it means that you are valuating your inventory at a standard or Fixed price (As maintainred in the Material master ).Hence your Inventory will be valuated at the standard price no matter what additional expenses you incur
    Regards
    Sandeep

  • Costing run with values for material from info record.

    Hi All
    there is requirement with my client, that when i run my costing run the values of the components in BOM should be from the latest purchase order.
    For this i am maintined valuation criteria as price from info record and sub strategy as gross price from PO.
    When i am create a PO the info record is created automatically in background. So when i run costing run the value is picked correctly.
    Now when i create a PO with same material from diff vendor the info record is generated, but on costing run it picks the value from the info record of earlier vendor. For this i go and check the conditions tab in info record, ensure its balnk and save it. Again generate new PO and then run a costing run. This time the system reads the latest info record.
    My problem is that i want to ensure that during the costing run, system should read the latest info record w/o manual intervention. System behaviour is not consistent when there is multiple vendor and same material info records. Sometimes it pick up the value and sometimes it refers the old info record.
    Can any one help me out in resolving this issue. Its critical.
    Regards
    Rakesh

    Hi!
    Generally first info records will be created with vendor, then PO will be created, based on info records price, price will be updated in PO.
    If you have more than one vendor for same material, you have to create info records for each vendor. then you need to maintain source list, where you can fix the vendor. If there is no fix vendor, then you can do schedule agreement with vendors, where you have to give proportionate percentages again each vendor.
    Now for costing run :
    1. if you have only one info record, the price will take from that info record.
    2. if you have more than one info record, you need to mantain source list, where you can tick the fixed vendor, then system will take price from that vendor info record.
    3. if there is no fixed vendor and you have maintained scehduel agreement with weightage to vendor, then higher percentage vendor info record price will be picked up.
    4. if you have more info reocrds, not maintianed source list or schedule agreement, price will be picked up from first info record ( based on info record creation date).
    5. if you have a schedule agreement, but you have given equal weightage for example 50% and 50%, then also system will pick up from first info record.
    i think it is clear now.
    regs,
    ramesh b

Maybe you are looking for

  • PI 7.1 Error

    Hi Experts,               I am going to work in PI 7.1 now, previously it was PI 7.0, recently it had been upgraded. Here I would like to say that I am successfully able to log on to "Enterprise Service Builder". But while I am trying to log on to "S

  • I cant receive calls!!!

    I can not receive calls on my wife's cell phone. ATT should have support open 24hrs in general but especially this weekend. Any suggestions?

  • Orchestration Instance - message data being inserted multiple times to database

    Hello, I have a Transactional Scope orchestration which has an expression shape which writes unique messages to a custom database using helper - ADO.Net. We are noticing that when the BizTalk server (BTS 2009) is under stress few messages are getting

  • Column Not Allowed Here? Why?

    CREATE TABLE course_location(      venue_id number(6),      street_address varchar2(30),      postal_code varchar2(8),      county varchar2(16),      PRIMARY KEY (venue_id) INSERT INTO course_location (venue_id, street_address, postal_code, county) V

  • Directory Serice Connection status in Red color

    Hi all, We use LDAP transaction to setup AD connector, RFC defined, LDAP connector defined and in green status, system user defiend. While back to Dirctory service Connetion "LDAP", choose server and connector we defined earlier, the status still sho