Regarding billing plans

Hi friends... please ssuggest me the configuration steps of periodic billing and mile stone billing... please send me if possible the configuation steps to my mail id  [email protected]

Hi Durga Prasad,
Periodic Billing
Periodic billing means billing a total amount for each individual billing date in the plan. For example, if you are creating a rental contract, the system can propose a schedule of monthly rental payments, according to the length and conditions of the contract.
Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing dates in the billing plan. For example, you can use a billing plan for billing a make-to-order item that is assigned to a project in the SAP Project System. When you enter the project-related make-to-order item in the sales order (or assembly order), the system proposes a billing plan based on milestones defined for networks in the project. As each milestone is successfully reached, the customer is billed either a percentage of the entire project cost or simply a pre-defined amount.
1) Periodic Billing
Periodic billing can be used, for example, in rental contracts. The billing dates in a periodic billing plan can be determined from the following sources:
=> Control data in the billing plan
=> Header data in the rental contract
=> Manually entered dates
The following dates are important for billing date determination:
=> Start and end dates
=> Period (monthly, quarterly, annually)
=> Horizon
Start and end dates
Start and end dates define the duration of the billing plan and, whenever possible, are copied from the start and end dates of the corresponding rental contract. Depending on the configuration of your system, these dates may be indirectly determined by the system. For example, the contract start date may be determined automatically as soon as the installation date is entered.
Period (monthly, quarterly, annually)
The periodicity of the billing dates determines the frequency with which the billing dates are created in the billing plan and, in addition, whether a billing date is processed for billing on the first or last day of the month.
Horizon
In case no end date is entered, or the end date lies so far in the future that not all billing dates can established, then a rule for determining the horizon can be entered. The horizon for periodic billing determines the last date of the billing plan.
The horizon is always determined by a rule that uses the current date as a baseline. If the current date is updated during processing, the system automatically extends the horizon and the schedule of billing dates into the future.
2) Milestone Billing
Milestone billing is typically used for billing projects, such as plant engineering and construction projects. Such projects often include a series of milestones that mark the completion of different stages of the work. In the SAP R/3 System, milestones are defined in a network along with planned and actual dates for the completion of work. The milestones are also assigned to the billing dates in the billing plan. Each milestone-related billing date is blocked for processing until the Project System confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the basis of the requested delivery quantity and not on the total of the confirmed quantities.
For each billing date in a milestone billing plan, you can specify whether the billing date is:
=> fixed
=> always updated with the actual date of the milestone
=> updated with the actual date of the milestone, if the date is earlier than the planned billing date for the date
=> updated with the actual date of the milestone, if the date is earlier than the planned billing date for the date
As of Release 3.0C it is also possible to assign milestones to the dates of the billing plan during milestone billing if no network plan has been opened.
In order to do this you must assign the milestone manually in billing plan maintenance. For you to be able to make this assignment, the Fixed date field of the proposed date category of the billing plan type must not be blank. The additional fixed value (as of Release 3.0C) of Fixed date ‘ ‘ means that you cannot assign it to a milestone. Milestone assignment is possible for all other values. You make these settings in the Implementation Guide.
For configuration please find the below path:
IMG --> Sales and Distribution --> Billing --> Billing Plans
Please Reward If Really Helpful,
Thanks and Regards,
Sateesh.Kandula

Similar Messages

  • Regarding billing plan

    Hi,
    Can anybody can help me in providing document on billing plan i.e
    1.milestone billing
    2.periodic billing
    3.resource related billing ASAP.
    Thanks
    Arun

    Hi
    Billing Plan for Milestone Billing
    Milestone billing means distributing the total amount to be billed over multiple billing
    dates in the billing plan.
    As each milestone is successfully reached, the customer is billed either a percentage of
    the entire project cost or simply a pre-defined amount.
    During sales order processing, the system determines from the item category whether a
    billing plan is required and, if so, which type of plan
    The type of billing plan that is determined at this point is set up in Customizing and
    cannot be changed in the sales document.
    Billing plans for periodic billing and milestone billing plans for project-related milestone
    billing have different overview screens so that you can enter data relevant to your
    processing.
    For example, for milestone billing, you must be able to enter data to identify the
    individual milestones.
    IMG configuration requires :-
    1.  Maintain billing plan types for milestone billing in OVBO.
    2.  Define date description in SM30 - V_TVTB.
    3.  Maintain Date Category for Billing Plan Type IN OVBJ.
    4.  Allocate date category in SM30 - V_TFPLA_TY.
    5.  Maintain date proposal for Billing Plan Type in OVBM.
    6.  Assign Billing Plan Type to Sales Documents Type in OVBP.
    7.  Assign Billing Plan Type to Item Categories in OVBR.
    8.  Define rules for determining the date in OVBS.
    Milestone billing is typically used for billing projects, such as plant engineering and
    construction projects. Such projects often include a series of milestones that mark the
    completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones
    are also assigned to the billing dates in the billing plan.
    Each milestone-related billing date is blocked for processing until the Project System
    confirms that the milestone is completed.
    Delivery-relevant order items for which a milestone billing plan applies are billed on the
    basis of the requested delivery quantity and not on the total of the confirmed quantities.
    The connection between the project and the sales document item is made in the individual
    schedule lines of the item. Each schedule item can be assigned to a network in a project.
    To display the project-related data for a schedule line, proceed as follows:
    In one of the overview screens of the sales document, select
    1.  Item -> Schedule lines.
    2.  Mark the schedule line and select Procurement details.
    The following figure shows an example of milestone billing where only the Contract have
    been billed :
    Order  Item  Turbine    100,000
    Billing Plan
    Billing date Description    %  Value  Billing Block   Milestone   Billing Status
    01-10-94     Contract      10  10,000      -             x           x 
    01-03-95     Assembly      30  30,000      x             x          
    01-04-95     Maintenance   30  30,000      x             x
    01-05-95     Acceptance    30  30,000      x             x
    01-06-95     Final invoice ..    ..        x
    Network/Activities
    Milestone    Estimate      Actual
    Assembly     01-03-95      01-03-95
    Maintenance  01-04-95     
    Acceptance   01-05-95
    For each billing date in a milestone billing plan, you can specify whether the billing
    date is:
    1.  fixed
    2.  always updated with the actual date of the milestone
    3.  updated with the actual date of the milestone, if the date is earlier than the
        planned billing date for the date
    Periodic Billing
    Some customers may require invoices to be processed periodically, so that all deliveries due for billing by a certain time are put into one collective invoice.
    Prerequisites
    To fulfill this requirement, a billing schedule must be defined for the customer:
    A factory calendar which contains special rules instead of working days must be created. These special rules refer to the days on which billing should be carried out. If, for example, an invoice is to be issued every last working day of the month, then this day must be entered as "valid from" day and "valid to" day. This day must be the only day defined as a working day in the calendar for each month.
    The ID-number of the factory calendar must be specified on the billing screen of the payer's customer master record in the Billing schedule field.
    Activities
    When a sales document is created, the system copies the invoice date from the factory calendar and enters it into the relevant document as follows:
    On the next billing date determined by the factory calendar, the system selects all sales orders and deliveries and puts them in a billing due list. They can now be billed.
    As a result of the ID-number of the factory calendar defined in the customer master record, all sales orders or deliveries for that customer over a particular period have the same billing date, and they can be combined in one collective invoice.
    The following figure shows how the system proceeds if a billing schedule has been defined for a customer.
    <a href="http://help.sap.com/saphelp_dimp50/helpdata/EN/59/54fc37004d0a1ee10000009b38f8cf/content.htm">Resource-Related Billing</a>
    http://help.sap.com/saphelp_46c/helpdata/en/dd/560fdd545a11d1a7020000e829fd11/content.htm

  • Debit Billing Plan Line - Contract

    Hi,
    Regarding Billing Plans:
    How do we create Debit Billing Plan Line in Contract ?
    Where do we do the assignemnt of Header Billing Plan and Item Billing Plan ?
    Creation of Billing Plan with reference to another - How ?
    Regards
    Edited by: SAP2020 on Mar 30, 2010 3:42 PM

    Hi,
    You could change the blling document type for the billing plan line in contract.
    The header billing plan will be copied to item if you don't do any change.
    If you want to have different billing plan on item level, please check the indicator "Header billing plan" off on item billing plan tab.
    The indicator could only be set before first billing.
    Thanks and best regards,
    Smile

  • How Billing Plan works

    Hi,
    I have a requirement from client to use a normal SO (not contract, and without Project System elements) with monthly billing that is automatically posted (or triggered as batch) and billing dates manually entered.
    Billing Plan might be useful for this requirement so I have the following questions regarding Billing Plan:
    1) Can Milestone Billing plan be applied to an SO without Project System elements?
    2) Can billing amounts in Periodic Billing be changed?
    2) How does Billing Plan work? In terms of end-user behavior?  Where are the billing dates entered? Can billing dates be entered by the user? Is posting of billing docs automated or at least triggered by a batch job?
    3) Can the same materials (with same item category) in different line items have the same billing plan type but different billing dates (which are manually entered)?
    Thank you so much!

    Hi,
    Please refer the following links
    http://www.sap-img.com/sd006.htm
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/SDBIL/SDBIL2.pdf
    Rewars if it helps
    Regards
    Goutham

  • Regarding Periodic Billing Plan in Rental Contract

    Hi all,
    Scenario.:
    My client having a scenario, rental  contract for the period of one year and billed periodically every month.Rent is fixed based on no of hours.(e.g. 200 Rs per hour)
    But the total rent to billed for the month is changed every month because no of machine working hours are changing every month.How do i capture this scenario?By using periodic billing plan we can bill same amount of rent every month during contract validity period.Here we can't change no of hours every month.
    Please give some idea.
    Regards,
    Kartheek.

    Dear Kookie,
    Initially i created rental contract with the service unit as no of hours and in the quantity field i have entered the total number of hours for the month.By this way i can able to only bill for the same quantity every month.But this is not working incase of machine hours changes every month.So am not able map this.
    Please suggest the way to confirm the actual machine no of hours and billing the same periodically.
    Thanks & Regards,
    Kartheek.

  • Regarding prepayment method 'X' and 'L'present in budget billing plan

    Hi Experts,
    The prepayment column in budget billing plan is 'X' and 'L' for a particular business partner.
    I checked the same column for other business partner also but it was blank.
    Can you please tell me why this field was not blank and what does 'X' and 'L' mean ?
    Thanks a lot.
    Ajit Krishna

    hi Ajit,
    The indicator shows if Budget Billing Plan Item Is Advance Payment.
    X :Normal advance payment
    L :Last due date of advance payment
    F:Last due date. Not yet transferred
    You can check in BBP header if advance payment is activated.
    Thanks,
    Nachiket

  • Sales Order Status with Billing Plan

    Dear SAP SD Gurus,
    I have an order with 2 billing plans and both of them have been invoiced.
    The status of my order still considered "being processed" eventhough both invoiced have been created and posted to FI.
    I'm using item category "TAO".
    Any clue will be greatly appreciated.
    Thanks,
    Soo

    Dear All,
    I have fixed the problem. The schedule line for TAO should be non-delivery relevant.
    I have changed to not-relevant for delivery and it is working now.
    Thanks a lot for all the clues.
    Regards,
    Soo

  • Billing plan (Downpayment) for saved and open sales orders at header level?

    Hi gurus,
    I have configured billing plan in my SD environment at Item Level.
    I want to change it to header level.
    Questions:
    1- When I make the changes to update the system to have billing plan at header level for future sales orders, is that possible for me to change all my saved orders and open orders with the new settings so that I can also have those saved and open orders with a billing plan at item level?
    2- If that scenario is not possible, could we for example copy the data of a previously saved or open sales order into a new sales order with the new customizing (Billing plan at Header level?)
    Thanks for your input
    Kind regards
    Chris

    Hi
    I am afraid you cannot do that converstion for the existing orders. BP at header level are enabled at teh document type level, while BP at item level is done at item category. So both are independent. Mostly it is advisabel to use BP at item level only.
    If you are already using item level BP, and want to mvoe to header BP, then only future transactions can be executed with BP at header level. Existing item level BPlans will remain so in the system.

  • Billing plan as per delivery schedule

    Hi,
    Is it possible to have the billing plan dates as per the schedule lines of the items using the billing plan configuration(either via either periodic billing plan or milestone billing)
    for e.g. for  a line item - qty 10(value 1000), delivery schedule is as follows
    10-Mar-2009 - qty to be delivered is 6
    02-Apr-2009 - qty to be delivered is 4
    ( dates and qty would be decided as per the customer needs. No periodic differences between dates).
    My expected billing plan should be as follows
    10-Mar-2009 - value to be billed is 600
    02-Mar-2009- value to be billed is 400
    if yes, please let me know.
    Thanks in Advance for your answers.
    Regards,
    Madhuri

    Hello,
    I believe the Condition Record for Rent would be based per Month. Now you cannot change this record to Daily because in that case system will bill only for 28 days in month of February.
    Instead there is a way out, in the Condition Type maintenance - T-Code V/06, Under Changes which can be made, put a Tick mark in Qty Relation Check Box.
    This will allow you to change the Calculation Type while creation of Sales Document. Thus for the month of January, you can change the Calculation Type to daily & leave it as it is (Monthly) for other months.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Invoice Correction Request with reference to Billing plan

    Dear SDN frnds,
    I'm having one query in Invoice Correction Request (ZBOC) creation,
    While creating with reference to billing document of billing plan type (ZCI), the net value in Invoice Correction Request is '0' and the net value is not modifiable during any correction done in quantity (L2N) debit, the net value still remains '0' and it is greyed.
    It should get modified!!!
    My configuration in copy control from Billing document (ZCI) to Sales document (ZBOC)
    Header level :
    DataT: 052 - Billing doc. header                           Copy requirements: 021 - Billing header
                                                                             Copy item no. activated
    DataT: 103 - Billing business header data
    DataT: 003 - Billing header partner
    Item level :
    DataT: 153 - Item from billing document                Copy requirements: 303 - Billing header
                                                                             Copy item no. activated
    DataT: 104 - Billing business item data                 Pricing type - E
                                                                             2nd Pricing type - F
    DataT: 004 - Billing item partner                           X - Update document flow
    Billing plan - 402 - Billing plan
    Kindly resolve my issue............
    Best Regards,
    Giridharan (Mumbai)

    Dear Sagar,
    I have selected 'E' in Pricing type in Item category, I didn't make any changes here (Credit memo item in order, Copy control Bill to sales order) and 'M' in 2nd pricing type in Item category, (Debit memo item in order,  Copy control Bill to sales order). Still it didn't worked out.
    Kindly reply me your views and suggestions.
    Thanks for your support.
    Best Regards,
    M. Giridharan
    Edited by: Giridharan Manokaran on May 18, 2009 11:36 AM

  • Excise Invoice- Based on Billing Plan

    Dear All,
    Here in my client's place, we have a requirement like,
    For a project-XYZ we create one sales order with materials A,B & C.
    For this sales order we maintain billing plan 50% = X1 Rupees ,
                                                                    25% = X2 Rupees ,
                                                              and 25% = X3 Rupees.
    When project is finished 50% we create billing with X1 amount with reference of sales order and then we create excise invoice based on this billing document (NO delivery) and send it with material.
    And for second billing for X2 amount SAP is not allowing to create excise invoice and throws message like modvat utilization has been done already.
    Kindly suggest how to proceed and how to create excise invoice for remaining two amounts.
    Thanks & Regards

    Hi ,
    Thanks for your responce...
    Is there any transaction code for removing the billing block automatically in the sales order and how can i indentify the date category as per billing plan..
    Thank you very much..
    Thanks in advance.
    Regards,
    KV

  • Header Billing Plan - credit memo and debit memo

    Folks,
    I have the following scenario here.
    I have a billing plan order (BP) - with header billing plan.
    I have three lines in the billing plan
    1) $5000 ...FAZ (Billing Request)
    2) $10000...L2 (Debit Memo)
    3) $3000...G2 (Credit Memo).
    Once i go to VF04,
    I have all three billing due. However, only billing type FAZ has the header conditions (PR00, AZWR, TAXES) populated and net value $5000. (Populated against AZWR)
    Both L2 and G2 have no header conditions populated and the net value is 0.
    The copy control is set up the same for all and all have same document pricing procedure (A).
    Is it something basic I'm missing or is there anything else I have to do?
    Or pls let me know the process for debit memo / credit memo with a billing plan.
    Pls respond ASAP as we have the Proof of Concept scheduled sooner.
    Helpful answers will be rewarded promptly!
    Thank You,

    Hello,
      I think that basys of this process is not correct: the purpose of billing plan is to define different invoicing schedules, typically for businesses working with projects, and on top of that, billing plan is the only standard way to manage advance payment and automatically determine the settlement of the advance payments on final invoices.
    For this, in my opinion it's not correct entering in the billing plan items with Credit Memo or Debit Memo request. You should have only andvance payment items and invoice items (document category = M).
    In a common invoicing process, you can have the following steps:
    - Down payment request (FAZ);
    - Invoice (F1) reduced by the downpayment amount (if that is the case);
    Then you can create a Credit Memo request, against the Invoice, if for some-reason you have to revert back something to the customer; or you can create a Debit Memo request if you have recharge the customer with reference to a document already invoiced. I think that invoice type G2 and D2 should not be "planned" steps in an invoicing process. On top of that, it's not advisable creating Credit Memo requests with reference to an invoice containing downpayment clearing item, as it would lead to incorrect postings into accounting.
    Hope to be useful.
    Best regards,
    Andrea

  • CRM 2007 Pricing based on settlement period of billing plan

    Hi,
    I need the ability to have disocunts on a service contract based on the settlement period of the billing plan.
    A contract list price is 12 GBP per month.
    If the customer want to bill monthly no doscount will be applied.
    If the customer wants to bill quarterly a discount of 1 GBP will be applied.
    If the customer wants to bill annually a discount of 2 GBP will be applied.
    If the cusomter wants to pay upfront a discount of 5 GBP will be applied.
    For this purpose I enhanced the field catalog for pricing with this new field.
    A condition table using this field was created.
    Badi CRM_COND_COM_BADI was used to pass the field from the billing plan to pricing. I used FM CRM_BILLPLAN_READ_OB  in if_ex_crm_cond_com_badi~item_communication_structure.
    When the contract is created the Badi is called and the period specific price is found.
    When I change billing plan the badi is only called for the BRI (Billing Request Item) but not for the contract item for which the price is mantained.
    Does someone has an idea how to establish this???
    Thanks in advance.
    Points guaranteed.
    Regards
    Dirk

    Hi Stas Shapiro,
    Your question is related to u201CCustomer servicesu201D module in SAP, you can post such issues in a forum called u201CEnterprise Asset Management (EAM)u201D in sap.sdn forum,
    Whether you have Service contract or in Warranty you need to have special condition types like ZZDC, PPAG etc. for pricing procedures PABR01/02 (Header or item pricing procedures.)
    Similarly a different pricing type for Warranty need to be configured.
    I suggest you to go through the following sap.help.link to get complete solution to your thread
    http://help.sap.com/saphelp_46c/helpdata/en/e6/4a903f9e0311d189b70000e829fbbd/frameset.htm
    For time related billing you need to use service orders with resource related billing, even for this you need to explore the  above link.
    all the best.
    Regards
    DSR
    Edited by: D.Srinivasa Rao on Nov 1, 2011 12:05 PM

  • How to link sales order and billing plan?

    Hi,
    Based on a sales order how can I know the billing plan? I tried to search for some posts, but could not find one with one exact answer regarding this.
    Thanks,
    Best regards

    Hi,
    In "OVBP" T.code,you can find the billing plan assigned to a sales order.
    The path is:
    SPRO>Sales and Distribution>Billing>Billing Plan>Assign the billing plan type to the sales order.
    In two ways we can assign this billing plan to order.
    One is the above mentioned one.
    Another one is to assign the billing plan type to the item category using the T.Code "OVBR".
    Regards,
    Krishna.

  • How to create Billing Plan in sales order using Function module /BAPI

    hi,
    How to create Billing Plan in sales order using Function module /BAPI
    i hv check few FM such
    BILLING_SCHEDULE_READ
    BILLING_SCHEDULE_GET_NUMBER
    BILLING_SCHEDULE_SAVE
    But unable to create billing plan for a sales order.....any other method to create???

    Hi,
    Use this link.
    Create sales order with billing plan via LSMW and BAPI BUS2032
    BAPI or Function to update Billing Plan in Sales Order Items
    Hope this will help you.
    Regards,
    Vijay

Maybe you are looking for

  • How do I create a save button to hide a dropdown and pass on the dropdown data to a label?

    Hi InDesign Scripting Experts! I'm desparetly looking for some help to get this issue resolved. Essentially I've a lot of PDF forms that've been designed by using InDesign CS4 and then converted to an interactive PDF via Adobe Lifecycle. The final 2

  • BLOB image in XML Publisher

    Currently we are using 6i reports to generate XML output, which in turn is passed to XML publisher to generate documents. I am trying to access a blob image from DB in 6i reports. How Can I pass this image to XML publisher. Basically my doubt is: How

  • Waiting because of e

    Hello all,   I have a problem with a bpm execution. When the Receiver Determination call a simple BPM, this process stop and in transaction SWEQBROWSER show a object ZXI_PROXY .... with status  Waiting because of e.   Thanks all

  • Discoverer 3.1 to 10g rel 2 EUL upgrade incorrect results

    hi. my client has discoverer 3.1 installed a decade ago (shewww)... i just upgraded the eul to 10g rel 2 version of discoverer ... i didnt encounter any error at all during the upgrade. but the results are not correct in new upgrade. i tried to digg

  • How do i gift music from my iphone?

    How can i gift itunes music using my iphone?