Regarding Work Center Capacities

Dear Exprts,
How many Capacity Categories Can we maintain in Work center.
Regards,
MANOJ

Dear Manoj,
How many Capacity Categories Can we maintain in Work center.
One can maintain any no of Capacity Categories in the work center, provided that you have actually defined/maintained
that no of Capacity categories in customizing.
So while creating work center you can have capacity categories like machine, person, processing unit, lab etc. as per requirements.
Revert back in case of query,
Thanks,
Sudhakar

Similar Messages

  • Regarding work center hierarchy

    Hi all,
    I have 2 work centers liked to a superior work center in a hirarchy.
    Is it possible to do capacity planning at the superior work center level.
    The scenario is like this - I will get planned order at a superior work center level. I will  convert the planned order into 2 production orders with child work centers in respective order.
    Now I want that, when I see the capacity overview for the superior work center, it should be full. That means I want to link the capacities of the child work centers to the parent work center. 
    Please let me know if it is possible ?
    Regards,
    Yogesh

    Hi,
    Work center hierarchies are used in capacity planning to cumulate available capacity and capacity requirements. You can cumulate available capacities from subordinate work centers to a superior work center level in order to determine the total available capacity for the superior work center.
    In your situation, I think you need to create two planned orders with the two work centers and after this you will be able to see the capacity requirements cumulated at the superior WC.
    Regards
    Datta

  • Regarding  work center master creation In PP

    Hi Iam Kiran working on routings and work centers creation.I want to know how the  formulaes are derived for caluculating capacities,shedulling,Costing.where can I find study material regarding formulae derivation.For the above mentioned.Please respond if your having any material with respect to this content.

    Hi Kiran,
    Please use the following transaction to create/check the parameters & formulas,
    OP17 - Create formula parameter
    OP19  - Maintain standard value key. (The parameters created are entered in this standard value key & this std value key is used in the work center (CR03) basic data tab page)
    OP21 - Create Formulas
    These formulas are assigned in the capacity, scheduling & costing tab page in the workcenter.
    This workcenter is assigned to an operation in the routing (CA03).
    Regards,
    Senthilkumar

  • Work Center: Capacities vs Scheduling tab

    Hi everyone,
    I am confused on the link between Capacities tab and Scheduling tab when setting up the Work Center. When I run MRP and set it to Lead time scheduling and capacity planning, which figures (for setup, processing, teardown, etc time) are used for the calculation of start/finish basic date and start/finish production date? Is it the figures (setup, processing, teardown, etc time)from Capacities tab OR Scheduling tab in the Work Center? What is the link between Capacities and Scheduling?
    Also, in Scheduling tab, there is also capacity category which you have to input. Is this also linked back to all the capacity category stated in the Capacities tab? If we have more than 1 capacity category which do we choose to set in Scheduling tab?
    I would be very grateful for any input.
    Thank you very much.
    Cheers,
    Sue

    Hi,
    The link between the scheduling and capacity
    in Capacity tab we will give the capacities of particular machine ex work center is machine so we are declaring the capacity of the machine. saying I have capacity of eating 10 chocolates that is you're capacity.
    if machine is working defiantly labor will be there so we are defining the labor capacity also but for calculating the dates we are using the machine capacity only which we are defining in the scheduling tab
    in the scheduling tab we are declaring that for any MRP or Production consider the capacity of the Machine for calculating the dates like start date and finished dates.
    In the routing we are declaring for manufacturing of X quantity of materials we require machine time, labor time setup time etc
    EX:
    Machine Capacity in WC= 2 hour
    Labor Capacity in WC= 2 Hr
    so in the Scheduling Tab we will give machine to calculate the dates.
    In routing for Manufacturing of 1 ea we require
    Machine time = 1 hour
    Labor time = 30 mins
    Set up = 20 mins
    so if you have given demand for manufacturing of 10 EA run MRP
    then it will give 5 days to manufacture 10 EA because work center capacity is only 2 hour..
    simple logic for manufacturing of 1 EA it takes 1 hour of machine time so for manufacturing of 10 EA it takes 10 hours but my capacity is only 2 hours per day so 10/2=5 days.
    hope this may clear you're dout
    Regards,
    Ravi

  • Regarding Work center

    Hi gurus,
    Presently I am working for a Engineering and Construction Project, I am new to Project systems. In this project client have one Fabrication unit and 20 Projects across the India. In project site also they are doing some production activities. How to create a work center in this aspect( There is no planned activities as of my knowledge)
    Thanks & Regards,
    Sudha

    hai,
    you are saying workcenter needed for Fabrication unit,
    As per my experiance in Fabrication unit it mainly consist of all types of welding(manuval, MIG, TIG etc) , and also bending and ctting of rods with (power saw, band saw etc).
    find out one suitable Activity unit for welding with time, Power consumption etc

  • Regarding work center configuration.

    Hi PP Gurus,
    We need to take an account to Rated Line Speed (Bottles per minute)  (i.e. It should be the current capacity of the bottling line operating at the full rated speed, irrespective of the bottling format).
    We're using Discrete Manufacturing scenario and work center (CR01). How could it be taken into account.
    Is there any alternte way to put an additional fiueld in work center create (CR01)/work center change (CR02) transaction code?
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Jan 30, 2009 9:46 AM

    hi,
    What I mentioned is ,  create a reference operation set of one operation with that particular work center  and maintain operation times as the speed of that line  ( 100 bottles for minute should be entered as base qty as 100 and time as 1 min).   Call this reference operation set in any routings that uses this line.
    If you do this,  you don't need additional field in work center and so don't get confused  with it.
    cheers
    Rav

  • Why ist Pool Capacity from PP work center automatically involved

    Hi, All
    i use PP work center to create a PM Order.
    this PP work center has machine-, labor- and pool capacity. and I add "SAP008" into field "other fomula" for labor capacity in Tab capacities.
    now after I create a PM Order, when I check CM50, I can see for this PP Work center also  Pool Capacity involved.
    Question:
    1. where comes this Pool capacity, even though I didnot set  any formula in field "other formula" for pool capacity in Tab capacities?
    2. for creating PM Order, do I also need add "SAP008" into field "other fomula" for machine capacity in Tab capacities?
    thanks&regards

    Hi Shrithar,
    Do you means the time Profile in CM50.
    when I check this time Profile, I see differant time interval, -Database read period
                                                                                    -Evalution period
                                                                                    -plannung period
                                                                                    -Dispatching of backlog
    is it also influencing work center capacities?
    thanks&regards

  • Reg: Combined work center / Capacity requirement planning .

    Hi,
    i need few informations  regarding work center.
    1. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
       can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
    2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.
    Arond 30  Now  i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..?
    We are planning to carry out Proper scheduling and capacity planning for this resource.
    3. And May i know how to carry out Proper scheduling and capacity planning of resource.. So if capacity is not available ,i should be not able to go-head even with the releasing of order. How to carry out this. Is any customization required.
    4. Can we create combined resource  Ex: Crane  and laddle.
    I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?
    Please let me know.......THANK U IN ADVANCE.
    Edited by: dan01234 on Dec 30, 2010 6:21 AM

    Dear
    Frist of all , I would appreacite if you can create seperate theard as you have multiple question .Refer : http://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement
    However , please find the answers :
    1.. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
    can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
    Yes you can with Usage Type 009.But there may be diffienece in Standard Value Key and Formula Key  which will be used  for calcuating activity  and also Capacity Reuiqemenet .
    .2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..? We are planning to carry out Proper scheduling and capacity planning for this resource.
    A resource is plance where certain operation will happend sequentially as per Master Recipe or Routing .If you have Plate where you carry our certain engineering optiaon rather utlising thoem at requorce to excute the opration , then you can very well create them as resource or work centre .This Resource /Work centre will be having optaion , material , scheuling , CRP etc .Do u think that u will doing the same for Plate ??
    If you are interested to carry out CRP/Scheduling the refer this theard : Capacity Leveling of Work Center
    4. Can we create combined resource Ex: Crane and laddle.I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?  :
    Yes you can  if both of them are intregal part of the resource /work centre as per as Setup , Machine , labour hrs is concern based on selection of Standard value Key and Formula Key .Wor centre or Reosurce cost captured through Actvity type ( KP26  with fixed or variable rate aginst costing elenemts) and Formula Key as assinged in the reosurce or work centre -Costing tab .
    Check and revert
    Regards
    JH

  • PP-Diffrence between "Capacities" tab & "Scheduling" tab in work center

    Dear Friends,
       While creating work center in t.code CR01, i am entering the following formulae in "Capacities" tab:
    1. Setup formula
    2. Processing Formula
    3. Teardown formula.
    I am entering the same details(formulae) in the "Scheduling" tab also.
    What is the difference of maintaining the formulas is two diffrerens tabs?
    If i do not maintain the formula in "Scheduling" tab, How it will effect?
    please explain me.
    Regards
    Senthil

    Hi,
      Thank you.
    Let me consider some example.
    Assume in routing i have maintained standard time as 10 min for each quantity.
    My total production order quantity is 100.  (Order number 300000)
    So the formula in "Capacities" tab will calculate the total capacity  required to complete the production order as 1000 min. Is it so?
    1000 min means, 16.6 hours.
    let us assume that, the particular work center has been blocked for another 83 (three and half days) hours by other production orders. So i can not start the work immeadiately. After three and half days only i can start the production order 300000.
    So if i maintain the formula in "Scheduling" tab only, the system can propose the information that Planned start date as 07.09.2007 & Planned End date as 07.09.2007. (Based on the forward scheduling / backward scheduling). Is it so?
    Regards
    Senthil

  • Please help me regarding VAR customer create new message in work center

    Hi, guru
    I have encountered with a problem regarding, for example, when VAR customer 'X' create new message in work center and specify message processor to partner no '1'  (partner no 1 has employee role with username 'A' in BP) but when username 'A' log on and open work center via SAPGUI to find a new message created to him, username 'A' did't got a new message from VAR customer 'X' whom choose specify message processor to him and work center show My Messages (0)
    why, do I set something config wrong ?
    Any recommend would be appreciated
    thank you very much

    Hi
    1) can you check in CRM_DNO_MONITOR and oepn the ticket , whethere the processor name appearing in the ticket?
    2) Does your customer assign the processor manually or any automatic support team assgnemt, if so please verify your automatic support tean assignment against the blog
    [/people/dolores.correa/blog/2007/10/06/service-desk-support-team-determination|/people/dolores.correa/blog/2007/10/06/service-desk-support-team-determination]
    3)Might be an authoraisation issue of the Processor. assign SAP_ALL access and check again
    [Service desk roles|http://help.sap.com/saphelp_sm32/helpdata/en/0a/f12c41ab78f66fe10000000a1550b0/content.htm]
    Thanks,
    Jansi

  • Regarding Size of the iview in the work center

    Hi
    I created a work center in EP 6.0 having 5 iviews as views in the work center. When i click the view name in the left side of the work center, it is showing the view in the content Area in the right side.
    But the area is limited. It is showing tray size scrollable iview.
    Even I changed the properties of iview.
    Fixed Height
    Type of Page
    Max height
    Min Height
    It is showing "Not equal to " Icon with a message"
    Property Object is defined locally but not inherited in the source object". Moreover the properties is not reflecting in the work center
    Can anyone help me in this thing?

    Hi Sreekar,
    Have you put the iViews onto pages first and then added the pages to the workset?  That the way that I go about it.
    Try this... Change the Height Type to Automatic.
    Also, what kind of iViews are on the page?  Are they for ESS or MSS or just custom written?  Do they interact with a Team Viewer?  The Isolation Method of the iViews has to be the same if they are all on the same page.  Isolation Method is important if you are interacting with a Team Viewer.  They must all be set to URL.  The default when creating an iView from a custom par file is Embedded.
    The Not Equals To icon in the iView properties just means that it is not the original setting and has been changed by some user.
    So, short of the long, place your iView on a page and the page into the workset.
    Does this help or maybe you can tell me what you mean by Work Center.
    Cheers!!
    Kevin

  • Table with all versions of capacities (work center)

    Hi,
    I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
    I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
    Thanks
    Dede

    Dede,
    You will have to use a combination of tables, perhaps a SQVI to join tables
    CRHD - Work Center Header (link work center to capacity ID)
    KAZY - Capacity version
    KAPA - shifts and intervals
    In KAPA the times are displayed in seconds
    Hope that helps,
    ~Sunil

  • Dyanmic work center selection in production order based on material

    Hi ALL,
    We’ve a business requirement to support the following functionality.
    There are four similar type of milling machines say MILL1 MILL2, MILL3, MILL4, we create a single work center called MILLMC by specifying total capacity of four milling machines in the capacity header screen of work center with 4 individual capacities. And we mention work center MILLMC in the operation of routings for respective materials.
    However, during production order creation, there needs to be provision for detailed planning of work centers as per the following requirements
    In production order, some operations can be performed on any one of the machines MILL1 MILL2, MILL3, MILL4, so provision needs to be there to enter exact machine on which it is performed in the production order operation after the details are copied from respective routing during production order creation.
    In production order, some operations can be performed on only MILL3, so system should select only MILL3 in the respective operation of the production order
    In production order, some operations can be performed on either MILL1 or MILL2 or MILL4 and not on MILL3, so system should not select MILL3 in the respective operation of the production order.
    Please provide your valuable feedback to support the above requirements.
    Regards,
    Satya.

    Hi Satyanarayan,
      Please do refer to the below document. I think the same concept can be used for work centers as it is used for resources in PI industry.
    Resource Classification in Master Recipe for Planning
    Regards
    Kalyan

  • How to find the reporting for work center machine wise

    hi gurus
    My question is . In one work center machine capacity category 2 machines are used. Client is asking the report machine wise. i.e as 2 machines are available .What is the capacity utilisation for each machine.Provide me the information for this. Thanks in advance
    kalyan

    Hi Kalyan
    you have to make some settings in production order & work center first.
    In work center capacity header ,you have to make indiovidual capacities as 2.
    In the same capacity header screen by going through the menu Goto--->individual capacitities  define these different individual machines.
    In the production order operation detail screen goto " capacity reqmt assignment " assign the quantities for different work centers.
    Adfter this in the confirmation CO11N you have to fill the split field accordingly& confirm different wortk centers seoperatley.
    Then you can the report in the CO14 for diferent work centers.
    you try this.
    Regards
    YMREDDY

  • Work center-Machine wise report

    Hi Guys,
    I have a work center for ex CNC in which i have taken 3 machines,in capacities i define the individual capacity for each machine & iam also able to split the capacity amoung the machines,Now if i want to take a report to give to the work center supervisor -list of the operations that i have loaded in the work center,<b>is there any standard report available where i can even get the detail of the load in the machines of particular work center?</b> otherwise pls give me some workaround

    Hi vijay,
    what u need is, day or weekly wise  prodution load for each machine .. am i correct?
    u need a report containing details about  what are all materials to be produced and its all operations for  each machine.
    In that case  u have to develop some customized Zreport.
    regards
    pradeep